Loading...
HomeMy WebLinkAbout20220371 Ver 1_ePCN Application_20220308Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 6, 2021 Ver 4.2 Initial Review Has this project met the requirements for acceptance in to the review process?* OO Yes O No Is this project a public transportation project?* OYes 0No Change only if needed. BIMS # Assigned* Version#* 20220371 1 Is a payment required for this project?* O No payment required O Fee received ;' Fee needed - send electronic notification Reviewing Office* Winston-Salem Regional Office - (336) 776- 9800 Information for Initial Review What amout is owed?* 0 $240.00 @ $570.00 Select Project Reviewer* Sue Homewood:eads\slhomewood 1a. Name of project: Robert Davis Stream Restoration la. Who is the Primary Contact?* Derek Goddard 1b. Primary Contact Email:* lc. Primary Contact Phone:* derek@brec.biz (828)964-9349 Date Submitted 3/8/2022 Nearest Body of Water Little Pine Creek Basin New Water Classification C; Tr Site Coordinates Latitude: 36.511458 A. Processing Information Longitude: -80.977626 County (or Counties) where the project is located: Alleghany Is this a NCDMS Project 0 Yes ® No Is this project a public transportation project?* 0Yes ONo la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) O Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* 0 Yes O No lb. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) CI Regional General Permit (RGP) 0 Standard (IP) lc. Has the NWP or GP number been verified by the Corps? OO Yes No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): td. Type(s) of approval sought from the DWR: RI 401 Water Quality Certification - Regular CI Non-404 Jurisdictional General Permit C Individual 401 Water Quality Certification 27 - Restoration le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* 0 Yes O No O 401 Water Quality Certification - Express D Riparian Buffer Authorization lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? O Yes ® No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? O Yes 0 No 1h. Is the project located in any of NC's twenty coastal counties? O Yes ® No 1j. Is the project located in a designated trout watershed? OYes 0No B. Applicant Information OYes 0No 0 Yes 0 No 1d. Who is applying for the permit? O Owner '0 Applicant (other than owner) le. Is there an Agent/Consultant for this project?* OYes 0No 2. Owner Information 2a. Name(s) on recorded deed: Robert & Brenda Davis 2b. Deed book and page no.: 393/503 2c. Contact Person: 2d. Address Street Address 3899 Ridgeglen Road Address Line 2 City Sparta Postal / Zip Code 28675 2e. Telephone Number: (336)657-1821 State I Province / Region NC Country USA 2f. Fax Number: 2g. Email Address:* derek@brec.biz 3. Applicant Information (if different from owner) 3a. Name: Derek Goddard 3b. Business Name: BREC PA 3c. Address Street Address 1520 Meadowview Drive Address Line 2 City Wilkesboro Postal / Zip Code 28697 3d. Telephone Number: (336)844-4088 3f. Email Address:* derek@brec.biz 4. Agent/Consultant (if applicable) 4a. Name: Derek Goddard 4b. Business Name: BREC PA 4c. Address Street Address 1520 Meadowview Drive Address Line 2 City Wilkesboro Postal / Zip Code 28697 4d. Telephone Number: (828)964-9349 4f. Email Address: * derek@brec.biz C. Project Information and Prior Project History State / Province / Region NC Country USA 3e. Fax Number. State / Province / Region NC Country USA 4e. Fax Number: 1. Project Information lb. Subdivision name: (if appropriate) lc. Nearest municipality / town: Glade Creek 2. Project Identification 2a. Property Identification Number: 4011912668 2c. Project Address Street Address Wagoner Ridge Road Address Line 2 City Sparta Postal / Zip Code 28675 3. Surface Waters 2b. Property size: 37.34 State / Province / Region NC Country USA 3a. Name of the nearest body of water to proposed project: * Little Pine Creek 3b. Water Resources Classification of nearest receiving water: * C; Tr 3c. What river basin(s) is your project located in?* New 3d. Please provide the 12-digit HUC in which the project is located. 050500010405 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * This site is a rural cattle farm with sparse residential homes 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* O Yes O No O Unknown 4f. List the total estimated acreage of all existing wetlands on the property: .04 4g. List the total estimated linear feet of all existing streams on the property: 641 4h. Explain the purpose of the proposed project:* To improve water quality and wildlife habitat of the watershed. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The project seeks to impact 541 Little Pine Creek as part of a USDA -NRCS Stream Restoration Project. The project will use excavators and other similar equipment to install instream structures, bankfull benches, install a stream ford, reslope banks, and establish riparian buffers, cattle will be excluded from the riparian area. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* •r Yes Comments: No 0 Unknown 5b. If the Corps made a jurisdictional determination, what type of determination was made? * Preliminary ; Approved O Not Verified C Unknown O N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans Derek Goddard BREC 6a. Is this a phased project?* O Yes O No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): O Wetlands O Streams -tributaries Ei Open Waters O Pond Construction 3. Stream Impacts O Buffers 3a. Reason for impact (?) 3b.lmpact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type* (?) 3f. Type of Jurisdiction* 3g. S. width* 3h. Impact length* S1 Pump Around Temporary Dewatering Little Pine Creek Perennial Both 10 Average (feet) 10 (linear feet) S2 Restoration Permanent Bank Stabilization Little Pine Creek Perennial Both 10 Average (feet) 501 (linear feet) S3 Pump Around Temporary Dewatering Little Pine Creek Perennial Both 10 Average (feet) 10 (linear feet) S4 Ford Crossing Permanent Other Little Pine Creek Perennial Both 10 Average (feet) 20 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 521 3i. Total stream and ditch impacts: 541 3j. Comments: E. Impact Justification and Mitigation 3i. Total temporary stream impacts: 20 �^1 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Bank stabilization and restoration are only practical alternative. A pump around will be utilized. Work will be stabilized prior to rainfall events. Measures and BMPs for sensitive watersheds will be adhered to. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Project will stabilize the site prior to large rainfall events and work from the bank whenever practical and possible. Late model equipment free from leaks will be utilized. Fueling of equipment will occur 100' from the streams. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes •: No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? 0 Yes No If no, explain why: 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * 0 Yes ® No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? OYes 0No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* (i Yes O No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * U Yes ® No Comments: * Not required for USDA Projects 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes • No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes • No 3b. If you answered "no," provide a short narrative description. The project will improve water quality 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes • No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes O No 5b. Have you checked with the USFWS conceming Endangered Species Act impacts?* Yes O No 5d. Is another Federal agency involved?* 0 Yes 5e. Is this a DOT project located within Division's 1-8? 0 Yes 0 No O No Unknown 5f. Will you cut any trees in order to conduct the work in waters of the U.S 0 Yes • No 5g. Does this project involve bridge maintenance or removal? 0Yes ®No 5h. Does this project involve the construction/installation of a wind turbine(s)?* 0Yes ®No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? 0 Yes • No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? usfws.gov 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes • No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* usfws.gov 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes • No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* ncshpo.gov 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes • No 8c. What source(s) did you use to make the floodplain determination?* fema.gov Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or dreg and drop files here to attach document DAVIS_PCN_DOCUMENTS.pdf 4.46MB File must be PDF or KMZ Comments Signature ,71 By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction' subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Derek Goddard Signature Date 3/8/2022 DAVIS STREAM RESTORATION VICINITY MAP (NTS) STREAM IMPACT TABLE (NATIONWIDE 27) IMPACT NUMBER TYPE OF IMPACT TEMPORARY/ PERMANENT LENGTH (LF) #1 PUMP AROUND TEMPORARY 10 #2 STREAM RESTORATION PERMANENT 501 #3 PUMP AROUND TEMPORARY 10 #4 STREAM CROSSING PERMANENT 20 TOTAL 541 JUSTIN C. CHURCH, PE TSP 11-7806 CITY/TOWN: ENNICE, NC LITTLE PINE CREEK h �1) p �` ' DAVIS STREAM , C C r IWate4111 <�--- ,��, UGN -s4lo„,„: - 7109 �' ,____{,,,..„ USGS MAP (NTS) 1:24,000 (CUMBERLAND KNOB QUAD) ENGINEER: BREC, PA 1520 MEADOWVIEW DRIVE WILKESBORO, NC 28697 LICENSE # C-3448 TOPOGRAPHIC SURVEY: BLUE RIDGE GEOMATICS, PA 1520 MEADOWVIEW DRIVE WILKESBORO, NC 28697 LICENSE: C-3576 PROPERTY ADDRESS: WAGONER RIDGE ROAD ENNICE, NC PARCEL ID: 4011-91-2668 USDA- NRCS NUMBER EQUP 2018 744532201 SK oratirlimpsikwas Aussirc OsAivAtoteol imet410" Nor NORTH CAROLINA COUNTY MAP (ALLEGHANY COUNTY) SHEET INDEX C000 C100 C101 C102 C103 C104 C105 C106 C107 C900 C901 C902 C903 C904 COVER SHEET OVERALL PLAN PLAN & PROFILE PLAN & PROFILE PLAN & PROFILE TABLES & SECTIONS WATERS OF THE US IMPACT PLAN USGS MAP DETAILS DETAILS DETAILS DETAILS DETAILS SITE COORDINATES: LATITUDE = 36.511529° N LONGITUDE =-80.977520° W ENGINEERING 'PLANNING 'ENVIRONMENTAL 1620 MEADOWVIEW DRIVE WILKESBORO,. 28607 336 844 4088 OMhbrea biz 031c82 22 •.OQ�CC,�pT�.. ?NCBELS#C3448; %1C1 aa; 1- w w 1- w J d 0 0 `w w C) w w DO CIJ U) J d w 0 1- 0 0 0 L 0 SHEET SIZE PROJECT NUMBER LU52D15 DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE NTS (H) (V) SHEET C000 © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. LEGEND — — PROPERTY LINE —100 — — — EXISTING CONTOURS 100 I PROPOSED CONTOURS — X EXISTING FENCE - EXISTING THALWEG NOTES 1. ALL STREAMS WILL BE EXCLUDED FROM LIVESTOCK WITH FENCING. 2. BUFFER WIDTHS ARE MIN. 10' UP TO 25'. IIL \ I \ C103 STRUCTURE LEGEND SINGLE DROP J-HOOK SEE DET. 1-2/C901 Er:=3 SINGLE DROP CROSS VANE SEE DET. 1-2/C900 ~l "''--J/1 r N _ i N / \261 i/ ,i/ \I i / \ / i �� �. / / / / V. /� :1 i /� 1��0 ( 1 ( / // \ \ / C LITTLE PINE CREEk / / i ( _ 1 ire i ' 1ff 1 V i iy ) 1( ` --1 \f J�) ( r N ^ / / / 1 ( S ( I l J r--- 1 1 --, -) J ,-.rk / (1 \\ fr //-\J L\f( ) �i ( f (.-\.—. 40 20 0 r 40 J / J c 80 ENGINEERING 'PLANNING 'ER/ROWE., 1620 MEADowvIEW DRIVE WILKESBORO,. 28607 336 844 4088 OM Arco biz 03/08/2022 ;NCBELSNC34414 ��'••'"HCARS . 0 0 SHEET SIZE PROJECT NUMBER LU5zD15 REARM BY J EDWARDS APPROVED BY J CHURCH SCALE 1"=40' (H) (O SHEET C100 © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. 0+00 2630 LITTLE PINE CREEK PROFILE STATION 1+00 2+00 2620- BP:0+00 2610 m 1 2600 2590 2580 ELEV. = 2606.40 PC: 0+00. ELEV. = 2606.00 2570 0+00 �\ 1' _ ,(t (--- // `/// \ ..�, P78.22 2604.82 2+59 2630 -2620 2610 / / / //7 /// / /r .._ .,. — // x 1 \,-- / \ \ I b / / ^ \ \ N / — L 1+00 2+00 r / /) J`\f / / L � / 2600 2590 2580 2570 2+59 • / / / 10 0. 20 40 ENGINEERING 'PLANNING I EWIRONIEIEN,J 1620 MEADowvIEW DRIVE WILKESBORO,. 28697 336 844 4088 Mtp6breabiz 03/08/2022 0 SHEET SIZE 11"X14" PROJECT NUMBER J9LUb2019 DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE 1"= 20' 1"=20' (H) M SHEET C101 © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. 2+59 2630 2620 2610 m 1 2600 2590 2580 2570 3+00 LITTLE PINE CREEK PROFILE STATION 4+00 5+00 PT: 4+3 ELEV . = 2602.40 5+18 2630 2+59 3+00 (y S /_7 l\_ J/ \ / / /- \..- Il / \ ( > ? 1\/ J~ , /� \ I //--'_' \ STREAM CROSSING ✓ / I NRCS STD. 578- \ c�O f �`L / r / � / ` / A / "r r——� r /— /// / / \ -o —1 //x /// / / /// / /// i / / / ///% / 7 4 00 2608, \ \ 20 10 2620 2610 2600 2590 2580 2570 5+00 5+18 40 ENGINEERING 'PLANNING I EWIRONIEIEN,J 1620 MEADOWXEW DRIVE WILKESBORO,. 28697 336 844 4088 Mtp6brea biz 03/08/2022 0 0 SHEET SIZE 11"X11" PROJECT NUMBER a39LUb2019 DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE 1"= 20' 1"=20' (O SHEET C102 © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. LITTLE PINE CREEK PROFILE STATION 0 2 EP: 5+70.75 ELEV. = 2601.10 _ - - PC: 5+20.54 PT: 5+68.39 ELEV. = 2601.50 ELEV. = 2601.10 - - I— I I I 263 630 262 261 m 1 260 259 258 620 610 600 590 580 257 570 J r..:- :11 Fi 114 / / / 1 j // // / /// �/ / / / / / / / 7 I / / J C-- 2600 / +00 ARE., ERN a I i )_, II )II �11 11 (�1 () 20 10 — 0 20 40 ENGINEERING 'PLANNING I EWIRONIEIEN,J 1620 MEADowvIEW DRIVE WILKESBORO,. 28697 336 844 4088 Mtp6brea biz H- w CO H- w CL 0 CO LLJ w C_) w w H- z J a w Q 0 CO - 0 z 0 03/08/2022 ;NCBELSNC34414 4:. `P, 0 0 SHEET SIZE PROJECT NUMBER W9Llib2019 DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE 1"= 20' 1"=20' (H) (O SHEET C103 © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. -0+20 10 TYP. RIFFLE SECTION TYP. POOL SECTION m 1 0-- -10 STATION STATION 0+00 0+20 -0+20 0+00 10 10 22' 1.75' 1 8' f m 1 0-- 0 10 -10 27.5' 0+20 10 -0+20 0+00 0+20 -0+20 0+00 0+20 10 STATION STRUCTURE ELEVATION 0+00 HEAD OF POOL 2606.40 0+40.03 HEAD OF RIFFLE 2606.00 0+87.78 HEAD OF POOL 2605.22 1+78.22 HEAD OF POOL 2604.82 2+19.35 HEAD OF RIFFLE 2604.42 2+49.35 HEAD OF POOL 2603.92 2+98.73 HEAD OF RIFFLE 2603.52 3+43.08 HEAD OF POOL 2602.80 4+31.32 HEAD OF POOL 2602.40 4+90.54 HEAD OF RIFFLE 2602.00 5+20.54 HEAD OF POOL 2601.50 5+68.39 HEAD OF RIFFLE 2601.10 5+70.75 END 2601.10 1 20 MEADOWXEW DRIVE WILKESBORO,.28697 336 844 4088 Oto Arco To H- w CO H- w J d 0 0 CO `0 w C_) w w m z 0_ w Q 0 CO z 0 03/08/2022 ;NCBELBNC3444 0 ` Q,c 0 Qo w ct CO CO CO w 0 Ct 0 !n SHEET SIZE 11"X14" PROJECT NUMBER W9LUb2015 DRAM BY J EDWARDS APPROVED BY J CHURCH SCALE 1"= 10' 1"=5' SHEET 10 5 0 10 20 © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. C104 STREAM TABLE WETLAND - 1 POINT TABLE WETLAND - 2 POINT TABLE NAME EXISTING LENGTH (FT) NUMBER LATITUE LONGITUDE NUMBER LATITUE LONGITUDE LITTLE PINE CREEK 641.00 #1 36.511892 -80.977839 #1 36.511922 -80.977088 WETLAND TABLE #2 36.511927 -80.977709 #2 36.511996 -80.977072 NAME AREA #3 36.511825 -80.977637 #3 36.512111 -80.976988 WETLAND - 1 1767 SF (0.04 ACRES) #4 36.511779 -80.977771 #4 36.512155 -80.976860 �l P�GNN ROp,� • #5 36.512003 -80.976837 WETLAND - 1 #3 WETLAND;-2 #2 n. #1 2612 f• _ I / / #3 `,,_1 �I /i ,26�0// 1� r � / \ — -- .. — / ! #4 / / 2610 r `dam ; / a -r !/ / / J I I / / j / CLASS C; Tr I I I — x -��--v.- I tio`1 / / 1 1 lam. ,� 2608 / (V / / / • / / / / 7 / ( > \ i.-'ti r c� ter' / / / /✓ L — — (� t'\ ��/ (--. r \ 1 / r NMI 70 35 0 70 140 ENGINEERING 'PLANNING I EWIRONIEIEN,J 1620 MEADowvIEW DRIVE WILKESBORO,. 28697 336 844 4088 Mip6breabiz 03/08/2022 CBELSNC3448; tioqq.. `$r w co w w J d 0 0 co `w w 0 w w m z d w 0 co 0 z 0 0 0 SHEET SIZE 11"X1M PROJECT NUMBER a39LUb2019 DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE 1°=70' (O SHEET C105 © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. STREAM IMPACT TABLE (NATIONWIDE 27) IMPACT NUMBER TYPE OF IMPACT TEMPORARY/ PERMANENT LENGTH (LF) #1 PUMP AROUND TEMPORARY 10 #2 STREAM RESTORATION PERMANENT 501 #3 PUMP AROUND TEMPORARY 10 #4 STREAM CROSSING PERMANENT 20 TOTAL 541 x IMPACT #3 PUMP AROUND 1 �t=_I—1 r x J N_ / / - 2608 - 7- / i\J / --J / o / / N I/ / / / ----- 2610\ \ IMPACT #1 PUMP AROUND / / / 40,-* / 2610, l --' / \ LITTLE PINE CREEk / _// l /i ,I l 0 0 \ '\ IMPACT #2 �� STREAM RESTORATION , r f 1 / (/ - ) I ( `, - / j / - IMPACT#2 -� y/ % / STREAM RESTORATION ) \ ^ / l 1 1_/-- IMPACT#4 S STREAM CROSSING �� l 1} I l(� l- �i <� t ) L\ f( (�.-. 40 20 0 40 (J cJ 80 ENGINEERING 'PLANNING 'ENVIRONMENTAL 1620 MEADowvIEW DRIVE WILKESBORO,. 28697 336 844 4088 MipArco biz H- w co w H- w 0 0 co w C_) w w 00 H- z CO Cl_ w Q 0 CO - 0 z 0 03/08/2022 ;NCBELSNC3448; '••4H 4CARS . 0 SHEET SIZE PROJECT NUMBER DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE 1"=40' (H) (O SHEET C106 © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. ENGINEERING 'PLANNING I EWIRONIEIEN,J 1620 MEADOWXEW DRIVE WILKESBORO,. 28697 336 844 4088 Mip6brea biz ;NCBELSNC3448; \'••'�HCARS 0 Z Q O LLJ Ct Q ct CO CO > CO < u"I 0 CL' H- w CO H- w J d 0 C.) CO 0 `w w C_) w w CO w Q CO CO - 0 z 0 0 CO CO CC 0 z H- CO C.) CC z w J CO C.) J d d H— w w CO z J d w CO w H LL w_ J w CO 0 z H- z w w C9 0 w C9 0 w 0 z Q z 0 SHEET SIZE 11"X11" PROJECT NUMBER a39LUb2019 DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE 1"=40' (H) (V) SHEET C107 © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. CO CO w LL 0 d LL 0 CO - w CO w 0 H- 1 C900 FILTER FABRIC BACKFILL WITH SELECT MATERIAL FILTER FABRIC BURIED IN BANK FOOTER LOG LOG CROSS VANE - SINGLE DROP IFLOW I FLOW I :ANKFULIL BANKFULL BANKFUL AI LOG DIA CROSS LOG BURIED IN BANK °-30° HEADER LOG BANKFULL PLAN VIEW BANKFULL ELEVATION HEADER LOG HEADER LOG 1/2 BANKFULL IALVATION •/ •i/ SECTION A -A STREAMBED 1 FILTER FABRIC BURIED IN BANK HEADER CROSS LOG BANKFU NOTCH SHALL BE CUT 2" WIDER THAN THE DIAMETER OF THE LOG TO FIT IN NOTCH SIDE VIEdffliNTCH 15-30° PLAN VIEW OF NOTCH e' irt/ r, SECTION B-B STREAMBED GENERAL NOTES: 1. CROSS LOGS SHOULD BE A MINIMUM OF 24" IN DIAMETER. VANE ARM LENGTH SHOULD BE A MINIMUM OF 18" IN DIAMETER. ALL LOGS SHOULD BE RELATIVELY STRAIGHT AND OF A HARDWOOD SPECIES. 2. CROSS LOGS SHOULD BE BURIED INTO THE BANK ATA MINIMUM OF 10'. 3. VANE ARM LOGS SHOULD BE BURIED INTO THE BANK AT A MINIMUM OF 5'. 4. NAIL FILTER FABRIC ON TOP OF FOOTER LOG USING 3" 10d GALVANIZED COMMON NAIL ON 2' SPACING ALONG THE LOG. 5. SET ELEVATION OF THE TOP OF LOG'S CROSS PIECE TO THE INVERT ELEVATION OF THE STREAMBED. 6. NOTCH IS FORMED BY MAKING CUTS WITH A CHAINSAW 1-2" APART AND THEN KNOCKING OUT SECTIONS WITH A CHISEL AND HAMMER. 7. ANGLE OF NOTCH SHOULD MATCH ANGLE BETWEEN LOG ARMS OF CROSSVANE AND STREAMBANK. 8. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE VANE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. 2 C900 FILTER FABRIC 20-30 DEG BACKFILL WITH SELECT MATERIAL +OF PROPOSED BANKFULL WIDTH SINGLE STEP ROCK CROSS VANE OF PROPOSED BANKFULL WIDTH BANKFULL SEE NOTE 7 +OF PROPOSED BANKFULL WIDT 3OF PROPOSED BANKFULL WIDTH I I I BANKFULL ELEVATION STREAMBED ELEV. TOP OF CENTER+STONES SET AT ELEVATION SHOWN ON LONGITUDINAL PROFILE FILTER FABRIC i/ CROSS-SECTION SLOPE OF VANE FROM CENTERLINE TOP BANKFULL SHALL BE 2-5 FLOW HEADER "i w STONE // �/• POC ., FOOTER • i ; •%�; STONE FILTER FABRIC SECTION A -A NO GAPS BETWEEN BOULDE FOOTER BOULDERS WILL BE PLACED INTO THE EXISTING SUBSTRATE A MINIMUM OF THE ROCK DIAMETER MAX OF 0.5' STREAMBED ELEV. •STEP ROCK GENERAL NOTES: 1. ALL STONES ARE TO BE STRUCTURE STONE. 2. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH STRUCTURE STONE CLASS A AND SELECT MATERIAL OR CHINKING STONE APPROVED BY DESIGN ENGINEER, AND LINING WITH FILTER FABRIC. 3. DIMENSIONS AND SLOPES MAYBE ADJUSTED TO FIT BY THE DESIGN ENGINEER. 4. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TIGHTLY. 5. FOOTER BOULDERS AND VANE BOULDERS SHALL BE NATIVE STONE OR SHOT ROCK, CUBICAL OR RECTANGULAR IN NATURE. 6. SLOPE OF VANE FROM CENTERLINE TO THE TOP OF THE VANE ARM SHALL BE 2-5%. 7. ELEVATION CHANGE SHALL BE SPLIT EVENLY OVER TWO DROPS. 8. THERE SHALL BE NO DROP GREATER THAN 6 INCHES. 9. THE ELEVATION OF EACH GRADE CONTROL STRUCTURE SHOULD BE EQUAL TO OR GREATER THAN THE ELEVATION OF THE TOP OF THE FOOTER ROCKS DIRECTLY UPSTREAM. 10.FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. STREAMBANK 'i FOOTER BOULDERS WILL BE PLACED INTO THE EXISTING SUBTRATE A MINIMUM OF THE BOULDER DIAMETER BANKFULL ELEVATION STREAMBED ELEVATION SECTION B-B ENGINEERING 'PLANNING EWIRONIEN,L 1620 MEADowvIEW DRIVE WILKESBORO,. 28697 336 844 4088 OM Arco To 03/08/2022 0 it Z Q W Ct Q I— ct COCO > CO W 0 SHEET SIZE 11"X14" PROJECT NUMBER LUb2019 DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE NTS (H) (V) SHEET © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. C900 2 C901 BANKFULL FEATHER OUT BANK 20-30 DEG BACKFILL WITH SELECT MATERIAL FOOTER LOG ROOT WAD ANCHOR BOULDER TIED INTO STREAM BANK BANKFULL BACKFILL WITH SELECT MATERIAL FILTER FABRIC HEADER LOG FOOTER LOG 1 C901 WATER FLOW .agNK U GAP 3 x D84 PLAN VIEW BANFULL WIDTH SECTION A -A BANKFULL FEATHER -OUT BANK BACKFILL WITH SELECT MATERIAL FILTER FABRIC ROCK SILL ROCK SILL HEADER BOULDER ROCK SILL STREAM BED ELEVATION 20 ROCK J-HOOK VANE - SINGLE DROP PLAN VIEW NO.57 STONE '/ FILTER FABRIC BANKFULL WIDTH J-HOOK STONES BANKFULL ELEVATION BANKFULL ELEVATION HEADER STONE Sz BANKFULL ELEVATIO / /'IJ FOOTER STONE SECTION A -A' //% STREAMBED ELEVATION FOOTER STONE CROSS SECTION GENERAL NOTES: 1. ALL STONES ARE TO BE STRUCTURE STONE. 2. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER, PLUGGING WITH STRUCTURE STONE CLASS A AND SELECT MATERIAL AND LINING WITH FILTER FABRIC. 3. DIMENSIONS AND SLOPES MAYBE ADJUSTED TO FIT BY THE ENGINEER. 4. A DOUBLE FOOTER BOULDER SHALL BE UTILIZED IN SAND BED MATERIAL. 5. VANE ARM SHALL TIE INTO HALFWAY BETWEEN THE CHANNEL INVERT AND BANKFULL ELEVATIONS. THE VANE ARMS SHALL RISE AT 2-5% FROM THE CHANNEL INVERT AT AN ANGLE OF 15-30 DEG. FROM THE ADJACENT TANGENT LINE. THE VANE ARM SHALL CONTINUE UP TO THE BANKFULL ELEVATION BUT THE ARM'S SLOPE MAY BE INCREASED TO GREATER THAN 5% AT THE DIRECTION OF THE DESIGNER. ADDITIONALLY, THE VANE ARM'S ANGLE OF DEPARTURE MAY BE ADJUSTED TO 90 DEG TO THE FLOW DIRECTION AT THE DIRECTION OF THE DESIGNER. 6. THE CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS. 7. BOULDERS SHALL BE NATIVE STONE OR SHOT ROCK, CUBICAL OR RECTANGULAR IN NATURE. 8. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE VANE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. 9. DIRECT FLOW AWAY FROM STRUCTURE USING BED MATERIAL SO THAT NEW SOILS HAS MINIMUM CONTACT WITH LIVE WATER. STREAMBANKK HEADER STONE 2-52-5-OPE ///// FOOTER BALDER 3E�Pc,Z!�/ INTO THE EXISTING SUBTRATE / /�% A MINIMUM OF THE BOULDER DIAMETER SECTION B-B' LOG J-HOOK ROOTWAD COMBO - SINGLE DROP GROUND SURFACE FOOTER LOGS WILL BE PLACED INTO THE EXISTING SUBTRATE AND SHALL BE A MINIMUM OF THE 18" DIAMETER BANKFULL ELEVATION 1/2 BANKFULL ELEVATION STREAMBED ELEVATION SECTION B-B FOOTER BOULDER STREAMBED GENERAL NOTES: 1. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE 1/4 DIAMETER FROM THE TOP OF THE LOG. THE NAILS SHALL BE ON 12 INCH CENTERS. FILTER FABRIC SHALL BE BURIED IN THE BOTTOM OF THE CHANNEL AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. 2. A TRENCH SHALL BE DUG IN SUCH A MANNER THAT THE FOOTER LOGS A MINIMUM OF 2/3 OF THE HEADER BOULDER IS BURIED BENEATH THE BED SURFACE ELEVATION. 3. A HYDRAULIC EXCAVATOR WITH A BUCKET THAT CONTAINS A HYDRAULIC THUMB SHALL BE USED TO PLACE BOULDERS AND LOGS WITH THE SUPERVISION OF THE ENGINEER. 4. SEE SPECIAL PROVISIONS FOR HEADER AND FOOTER DIMENSIONS. 5. FOOTER LOG SHALL BE PLACED FIRST WITH HEADER LOG PLACED ON TOP PRIOR TO BACKFILLING THE TRENCH. 6. 1/3 OF THE WAY ACROSS THE CHANNEL FROM THE OUTSIDE BANK THE HEADER ROCK SHALL BE PLACED AT 0.2 FT ABOVE THE CHANNEL. 7. THERE SHALL BE GAPS BETWEEN THE HEADER ROCKS OF AT LEAST 3 TIMES THE D84 OF THE CHANNEL BED.. 8. HEADER LOGS SHALL SLOPE FROM THE BED ELEVATION, AT THE HEAD OF THE VANE, TO 1/2 BANKFULL ELEVATION AT A SLOPE OF 2%-5%. HEADER AND FOOTER LOGS SHALL BE TIED SECURELY INTO THE BANK IN SUCH A WAY THAT IT ELIMINATES THE POSSIBILITY OF STREAMFLOW DIVERTING AROUND THEM. 9. ANY SOIL DISTURBED DURING THE PLACEMENT OF J-HOOK VANES, SHALL BE SEEDED USING TEMPORARY AND PERMANENT SEEDING METHODS. 10. ROOTWAD, FOOTER, AND HEADER LOGS SHALL BE CABLED TOGETHER AT THE HORIZONTAL LOCATION OF BANKFULL 11. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE VANE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. ENGINEERING 'PLANNING EWIRONIEN,L 1620 MEADOWVIEW DRIVE WILKESBORO,. 28697 336 844 4088 OM Arco To 03/08/2022 0 Q LLJ Q ct COCO > CO < L1J 0 SHEET SIZE 11"X14" PROJECT NUMBER W9LUb2019 DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE NTS (V) SHEET © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. C901 1 C902 PLANTING NOTES: LIVESTAKE/BAREROOT PLANTING PLANTING BAG DURING PLANTING, SEEDLINGS SHALL BE KEPT IN A MOIST CANVAS BAG OR SIMILAR CONTAINER TO PREVENT THE ROOT SYSTEMS FROM DRYING. KBC PLANTING BAR PLANTING BAR SHALL HAVE A BLADE WITH A TRIANGULAR CROSS SECTION, AND SHALL BE 121N. LONG, 41N. WIDE AND 1IN. THICK AT CENTER. ROOT PRUNING ALL SEEDLINGS SHALL BE ROOT PRUNED, IF NECESSARY, SO THAT NO ROOTS EXTEND MORE THAN 10 INCHES (10IN.) BELOW THE ROOT COLLAR. SQUARE CUT �\ BUDS (FACING UPWARD) LIVE CUTTING (1/2" TO 1" DIAMETER) ANGLE CUT 30"-45" LIVE STAKE 2 C902 700 GRAM COIR FIBER MATTING FROM TOE OF CHANNEL TO 5 FT. BEYOND BANKFULL WAl STAKING MAY BE REQUIRED THROUGH MATTING, ROCK OR COMPACTED SOILS A STARTER HOLE MAY BE REQUIRED. LIVE STAKES DIBBLE PLANTING METHOD USING THE KBC PLANTING BAR (FOR FLOODPLAIN BUFFER PLANTING AND UPLAND BUFFER PLANTNG) 1. INSERT PLANTING BAR AS SHOWN AND PULL HANDLE TOWARDIPLANTER. EXISTING/PROPOSED GROUND EXISTING/PROPOSED STREAMBED GENERAL NOTES: 1. LIVE STAKES SHALL BE EVENLY SPACED 1 PER SQ.YD. 2. LIVE STAKES SHALL BE DRIVEN UNTIL APPROXIMATELY OF LIVE STAKE IS WITHIN GROUND. 3. IF STARTER HOLE IS NEEDED, MINIMIZE AIR POCKET. 4. UTILIZE ALL ON SITE TRANSPLANT MATERIALS MADE AVAILABLE BY THE OWNER. ONCE SOURCE OF TRANSPLANT MATERIAL HAS BEEN HARVESTED, THEN UTILIZE LIVE STAKING. BANK STABILIZATION WITH LIVE STAKES PROPOSED BANKFULL PROPOSED CHANNEL TOE PROPOSED CHANNEL TOE PROPOSED BANKFULL 2. REMOVE PLANTING BAR AND PLACE SEEDLING AT CORRECT DEPTH. 4. PULL HANDLE OF 5. PUSH HANDLE BAR TOWARD FORWARD FIRMING PLANTER, FIRMING SOIL AT TOP. SOIL AT BOTTOM. 3. INSERT PLANTING BAR 21N. TOWARD PLANTER FROM SEEDLING. mil 6. LEAVE COMPACTION HOLE OPEN. WATER THOROUGHLY. GENERAL NOTES: 1. TREE REFORESTATION SHALL BE PLANTED 6' TO 10' ON CENTER, RANDOM SPACING, AVERAGING 8' ON CENTER, APPROXIMATELY 436-681 PLANTS PER ACRE. 2. OTHER PLANTING METHOD CAN BE USED WITH THE PERMISSION OF THE PLANTING SUPERVISOR. Stream Crossing Cross -Section Grading (Berm or Diversion ditch) Looking Downstream At each end of crossing to prevent surface runoff from entering the crossing Bottom width: ft. Left ramp: ft. long, slope (% or H:V) Fence Post Fencing Break Away Anchor post Right ramp: ft. long, slope (% or H:V) must meet Wire Fence Construction Specification Min. dia. 5" Crossing surface width (parallel to flow): ft. - Line post Min. dia. 3 1/2" Surface Material & Thickness: - Existing stream channel / See Toe ax. (Srl) Bottom width should —/ match stream bottom width Slope 2 Trench Detai Fabric Filter Cloth Must meet MRCS Material Spec. 592 . I Staples ��O.C. 5 foot See0.Cetail Overexcavate to install min. 8" thick gravel layer over fabric filter cloth. Gravel should be crusher run (road bond) or railroad ballast stone or a combination of both. Stream 3:1 Cut slope Crossing Plan View -- Stream bottom Top of bank 3:1 Cut slope Stabilize all cut slopes immediately after construction Berm or Diverstion Ditch See Toe Trench Detail 3erm or Diverstion Ditch Left ramp HSee Fabric JLapping Detail Bottom of crossing Right ramp See Fabric H Trenching Detail 3:1 Cut slope / tl 3:1 Cut slope Caution 578 - Stream Crossing (Ford Type) Producer or Farm Name Sheet of USDA-NRCS North Carolina Before beginning excavation check for underground and overhead utilities Call811 Meld Office J TYPICAL MATTING LOCATION DETAIL 111E1111 700 GRAM COIR FIBER MATTING FROM TOE OF CHANNEL TO 2 FT. BEYOND BANKFULL NOTES: 1. USE WOOD STAKES 2"x2"x18" (NOT METAL) FOR MATTING INSTALLED IN PUMP AROUND OR IN THE WET. 2. USE OF METAL STAPLES IS ACCEPTABLE WHEN CONSTRUCTING IN THE DRY AND VEGETATION IS ESTABLISHED PRIOR TO DIVERTING WATER. 3. 700 GRAM COIR FIBER MATTING SHALL BE PLACED ALONG THE OUTSIDE OF ALL BENDS AND ALONG BOTH SIDES OF THE CHANNEL IN TANGENT AREAS. 4. STRAW AND SEED SHALL BE PLACED UNDER THE 700 GRAM COIR FIBER MATTING TO AID SEED GERMINATION. 700 GRAM COIR FIBER MATTING BACKFILL 12' LONG 1" x 2' WOOD STAKES w/ 2" GALVANIZED ROOFING NAIL AT THE TOP TO HOLD MATTING SECTION A -A 700 GRAM COIR MATTING CROSS SECTION BANKFULL ROCK CONSTRUCTED RIFFLE - SECTION B-B' OVERLA 5' TYP. MATTING STAKING VIEW 700 GRAM COIR FIBER MATTING 2' LONG 1" x 2" WOOD STAKES w/ 2" GALVANIZED ROOFING NAIL AT THE TOP TO HOLD MATTING ENGINEERING 'PLANNING 'ENVIRONMENTAL 1620 MEADOWVIEW DRIVE WILKESBORO, NS 28607 336 844 4088 OM Arco biz 1- w co w 1- w 0 0 0 co w 0 w w CO CO z 0 w Q 0 CO 1- 0 z 0 03/08/2022 icP�oR9rF ?NCBELSNC3448; 0 Q ct CO CO > CO < L1J 0 fY SHEET SITE 11"X1/• PROJECT NUMBER awuU5201s DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE NTS SHEET © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. C902 RIPARIAN PLANTING PLAN BARE ROOTS WILL BE SELECTED FROM THE NATIVE VEGETATION SPECIES LISTED BELOW. TREES SHOULD BE PLANTED AT A DENSITY SUFFICIENT TO PROVIDE 320 TREES PER ACRE AT MATURITY. TO ACHIEVE THIS DENSITY, APPROXIMATELY 436 (10'x10' SPACING) TO 681 (8'x8' SPACING) TREES PER ACRE SHOULD BE PLANTED INITIALLY. SHRUBS SHOULD BE PLANTED AT A DENSITY SUFFICIENT TO PROVIDE 1200 SHRUBS PER ACRE. NO MORE THAN 20%OF ANY SPECIES SHALL BE USED. PLUGS SHALL BE USED AT THE SLOPE TOES AS NEEDED FOR STABILITY AND HABITAT. WOODY VEGETATION NATIVE TO WESTERN NORTH CAROLINA SHRUBS COMMON NAME *BUTTONBUSH AMERICAN WITCH HAZEL *TAG ALDER *CAROLINA WILLOW *ELDERBERRY RED CHOKEBERRY *SILKY DOGWOOD *SILKY WILLOW WINTERBERRY *NINE BARK TREES */**BLACK WILLOW **BLACKGUM **RED MAPI.E **RIVER BIRCH **SYCAMORE **EASTERN HEMLOCK SCIENTIFIC NAME CEPHALANTHUS OCCIDENTALIS HAMAMELIS VIRGINIANA ALNUS SERRULATA SALIX CAROLINIANA SAMBUCUS CANADENSIS ARONIAARBUTIFOLIA* CORNUS AMOMUIN SALIX SERICEA ILEX VERTICILLATA PHYSOCARPUS SALIX NIGRA NYSSA SYLVATICA ACER RUBRUM BETULA NIGRA PLANTANUS OCCIDENTALIS TSUGA CANADENSIS *SPECIES TO USE FOR LIVESTAKES **TREES TREES & SHRUBS PER PLANS FLOODPLAIN BENCH WATER SURFACE 2 LIVESTAKES & PLUGS PER PLANS — FLOODPLAIN RIPARIAN SEEDING SCHEDULE * FOR USE WITHIN 25' RIPARIAN BUFFER. SEE E&SC SEEDING SCHEDULE FOR NON -BUFFER SEEDING SPECS. SEEDING MIXTURE SPECIES % COMPOSTIION PANICUM VIRGATUM (SWITCHGRASS PANICUM CLANDESTINUM (DEER TONGUE) JUNCUS EFFUSUS (SOFT RUSH) CAREX VULPINOIDEA (FOX SEDGE) SORGHASTRUM NUTANS (INDIAN GRASS) CHASMANTHIUM LATIFOLIUM (RIVER OATS) ELYMUS HYSTRIX (BOTTLEBRUSH GRASS) VERNONIA GIGANTEA (GIANT IRONWEED) RUBECKIA HIRTA (BLACK EYED SUSAN) EUPATORIUM FISTULOSUM (JOE PYE WEED) RHUS TYPHINA (STAGHORN SUMAC) VERBENA HASTATA (BLUE VERVAIN) PENSTEMON DIGITALIS (TALL WHITE BEARD TONGUE) APPLICATION: APPLY AT A RATE OF 15LBS/ACRE. 10 10 10 10 10 10 10 5 5 5 5 5 5 SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 4000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1000 LB/ACRE 5-10-10 FERTILIZER. MAINTENANCE: REFERTILIZE THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. E&SC TEMPORARY SEEDING SCHEDULE MOUNTAINS SEEDING DATES SPECIES RATE (INacre) ABOVE 2500 FEET: FEB. 15- MAY 15 BELOW 2500 FEET: FEB. 1 - MAY 1 RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOREAN) 50 MAY 15-AUG. 15 GERMAN MILLET 40 AUG. 15- DEC. 15 RYE (GRAIN) 120 PIEDMONT SEEDING DATES SPECIES RATE (INacre) JAN. 1- MAY 1 RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE) 50 MAY 1- AUG. 15 GERMAN MILLET 40 AUG. 15 - DEC. 20 RYE (GRAIN) 120 COASTAL PLAIN SEEDING DATES SPECIES RATE (INacre) DEC. 1 - APRIL 15 RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE) 50 APRIL 15-AUG. 15 GERMAN MILLET 40 AUG. 15 - DEC. 30 RYE (GRAIN) 120 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TEST OR APPLY 2000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. INCREASE FERTILIZER RATE TO 1000 LB/ACRE IN THE FALL. MULCH APPLY 4000-5000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OR ANOTHER SUITABLE MULCHING MATERIAL. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IN NOT FULLY ADEQUATE. RESEED, FERTILIZER, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOREAN LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. SOIL PREPARATION: SOIL TEST: SOIL TESTING WILL DETERMINE WHETHER THE SOIL PH AND NUTRIENT (PHOSPHORUS, POTASSIUM, CALCIUM AND MAGNESIUM) LEVELS ARE IN A RANGE THAT FAVOR TURFGRASS GROWTH. THE SOIL TEST REPORT WILL INDICATE NEEDED AMOUNTS OF FERTILIZER AND/OR LIME. CLEAN AND ROUGH GRADE: REMOVE ALL DEBRIS FROM THE LOCATION TO BE PLANTED. THIS INCLUDES ROCKS, BOTTLES, LARGE ROOTS AND OLD TREE TRUNKS. IF EXTENSIVE GRADING IS NEEDED, REMOVE THE TOPSOIL AND STOCKPILE IT FOR REPLACEMENT AFTER THE ROUGH GRADE IS ESTABLISHED. THE SUBSURFACE MAY BECOME COMPACTED DURING ROUGH GRADING, ESPECIALLY IF THE GROUND IS WET. THIS COMPACTED LAYER MUST BE BROKEN UP. A SPRING -TOOTH HARROW WORKS WELL ON LIGHTLY COMPACTED SOILS; A SMALL ROTOTILLER MAY BE NEEDED FOR MORE HEAVILY COMPACTED SITES. DEEP TILLAGE: ROTOTILLING LOOSENS COMPACTED SOIL AND IMPROVES THE SPEED AND DEPTH OF ROOTING. A TRACTOR -MOUNTED OR SELF-PROPELLED TILLER WILL ADEQUATELY TILL THE SOIL. TAKE CARE NOT TO DESTROY THE EXISTING TREES IN THE LAWN. CUTTING TOO MANY TREE ROOTS DURING SOIL TILLAGE CAN SEVERELY DAMAGE OR KILL A TREE. TREES CAN ALSO BE SUFFOCATED BY DEEPLY COVERING THE ROOTS WITH SOIL. IF ADDITIONAL SOIL IS NECESSARY AT A TREE BASE, CONSTRUCT A "TREE WELL." REPLACE THE TOPSOIL: ONCE THE SUBSURFACE IS ESTABLISHED, RETURN THE TOPSOIL AND SPREAD UNIFORMLY OVER THE ENTIRE AREA. ALLOW FOR AT LEAST 6 TO 8 INCHES OF DEPTH AFTER THE SOIL HAS SETTLED. THIS MEANS PLACING ABOUT 8 TO 10 INCHES OF TOPSOIL OVER THE SUBSURFACE. IMPROVE THE SOIL BY ADDING ORGANIC MATTER. THIS IMPROVES WATER RETENTION IN SANDY SOILS AND DRAINAGE IN CLAY SOILS AND REDUCES FERTILIZER LEACHING. ENGINEERING 'PLANNING EWIRONIEN,L 1620 MEADOWVIEW DRIVE WILKESBORO,. 28697 336 844 4088 OM Arco To H- w co w H- w J d 0 0 co w w C_) CO w H— Z J d w 0 CO - 0 Z 0 03/08/2022 . POR4rF ;NCBELSNC3448; ��'••'*HCARS . 0 Z Qo w� Q ct CO CO > CO < u"I 0 SHEET SIZE 11"X14" PROJECT NUMBER a39u352019 DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE NTS SHEET © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. C903 1 C904 STREAMBANK WATER SURFACE ELEVATION SANDBAGS SECTION B-B' FLOW DISSIPATION DEVICE DOWNSTREAM POOL PUMP AROUND 30 MIL POLY RIPRAP FLOW DISSIPATOR 1'ABOVE BASEFLOW (2' MIN.) B' A PUMPED EFFLUENT DEWATERING DEVICE SEE DETAIL PROVIDED SANDBAGS Itteal Ye* STREAM BANK CHANNEL BED/WORK AREA FLOW DIRECTION PUMP PLAN HANNELBED/VVORK AREA ,,,, . el i (*ay cc 1 ccao- cteleili Willi 4.0 cc• i �(.* SECTION A -A' B SANDBAGS UPSTREAM POOL SUMP HOLE OR POOL (12" MIN. DEPTH, 2' MIN, DIAMETER) 30 MIL POLY ENGINEERING 'PLANNING EWIRONIEN,L 1620 MEADowvIEW DRIVE WILKESBORO,. 28697 336 844 4088 OM Arco biz 03/08/2022 0 o ct C/) 0 >N 0 W Ct SHEET SIZE 11"X14" PROJECT NUMBER a39LUb2019 DRAWN BY J EDWARDS APPROVED BY J CHURCH SCALE NTS SHEET © COPYRIGHT 2022 BY BREC, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BREC, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. C904 AGENT AUTHORIZATION FORM Property Legal Description PIN: 1011 of 266, Address: . 1,i !i r id C- 2i4-_—X Property Owner : f 1 ? 4 i' ' 4 ofY. 5 The undersigned, registered property owners of the above noted property, do hereby authorize Derek Goddard , of BREC, PA (Agent) (Name of consulting firm) , of (Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing , issuance and acceptance of this permit or certification and all standard and special conditions attached. In addition I hereby authorize BREC & it's staff and the,4J44,4„v to have full access to my USDA & NC Ag Cost Share Applications, Files & Documents. Property Owner Street Address(if different than property above): (1446f% iRA, - /1i 7 Co "/ 4VG We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. oC) 9 ) Authorized Signature- Print and Sign Date: : / f Soil Map—Alleghany County, North Carolina 501860 501910 501960 502010 502060 502110 502160 36°30'47"N 1 1 36°30'47"N - « $ _ WaE u.� $ r ter._ r TaC . N • • 4 ram' , 4 • } ' 7 • •Ad • lii fl 1[I.l!] OF • i rill • • g000 Gawp may mit Pa wwDod ail t lhilo amOQ° 36°30'33"N 1 1 36°30'33"N 501860 501910 501960 502010 502003 502110 502160 Map Scale:1:2,210 if printed on A portrait(8.5"x 11")sheet. Meters 8 N 0 30 60 120 180 8 A 0 100 200 400 600 Map projection:Web Mercator Feet Comerwordinates:WGS84 Edge tics:UTM Zane 17N WGS84 USDA Natural Resources Web Soil Survey 3/8/2022 Conservation Service National Cooperative Soil Survey Page 1 of 3 Soil Map—Alleghany County, North Carolina MAP LEGEND Area of Interest (AOI) n Area of Interest (AOI) Soils El Soil Map Unit Polygons Soil Map Unit Lines ▪ Soil Map Unit Points Special Point Features Blowout 031 Borrow Pit Clay Spot Closed Depression • Gravel Pit Gravelly Spot ▪ Landfill A. Lava Flow jda Marsh or swamp • Mine or Quarry CO Miscellaneous Water • Perennial Water • Rock Outcrop • Saline Spot Sandy Spot Severely Eroded Spot • Sinkhole Slide or Slip o Sodic Spot Spoil Area Stony Spot el Very Stony Spot Wet Spot ▪ Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background rika Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Allegheny County, North Carolina Survey Area Data: Version 20, Jan 21, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: May 18, 2019—May 21, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usDn Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/8/2022 Page 2 of 3 Soil Map—Alleghany County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Ad Alluvial land, wet (nikwasi) 4.8 40.6% CaF Chandler silt loam, 25 to 45 percent slopes 2.5 21.4% TaC Tate loam, 6 to 10 percent slopes 1.7 14.4% WaC Watauga loam, 6 to 10 percent slopes 0.3 2.6% WaE Watauga loam, 10 to 25 percent slopes 2.5 21.0% Totals for Area of Interest 11.7 100.0% USDA Natural Resources Web Soil Survey 3/8/2022 Conservation Service National Cooperative Soil Survey Page 3 of 3