HomeMy WebLinkAboutNC0046728_Compliance Evaluation Inspection_20220304ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
S. DANIEL SMITH
Director
Allison Kraft, Public Utilities Director
Town of Mooresville
Post Office Box 878
Mooresville, North Carolina 28115
Dear Ms. Kraft:
NORTH CAROLINA
Environmental Quality
March 4, 2022
Subject: Compliance Evaluation Inspection
Town of Mooresville/Rocky River WWTP
NPDES Permit No. NC0046728
Iredell County
Enclosed is a copy of the Compliance Evaluation Inspection (CEI) Report for the inspection conducted at the subject
facility on March 1, 2022, by Mr. Wes Bell of this Office. Please advise the facility's Operator -in -Responsible Charge
(ORC) of our findings by forwarding a copy of the enclosed report.
Should you have any questions concerning this report, please do not hesitate to contact Mr. Bell at (704) 235-2192,
or via email at wes.bell@ncdenr.gov.
Enclosure: Inspection Report
NORTH
Dep®rlmont of Environmental Onolit
Sincerely,
DocuSigned by:
Le14.1444i, H Nue4
F161FB69A2D84A3...
fo r
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
North Carolina Department of Environmental Quality 1 Division of Water Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115
704.663.1699
United States Environmental Protection Agency
E PA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code
1 IN I 2 I5
21IIIIII
NPDES yr/mo/day Inspection
I 3 I NC0046728 111 121 22/03/01 117
Type
18 i i
IIIIIIIIIII
Inspector Fac Type
19 I S I 201
IIIIIIIIIIIIIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
67I2.0 I 70I4 I 71IN I 72 I N I 731 I 74 751
I I 1
I I I I I I 180
l
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Rocky River WWTP
369 Johnson Dairy Rd
Mooresville NC 28115
Entry Time/Date
09:10AM 22/03/01
Permit Effective Date
19/11/01
Exit Time/Date
11:56AM 22/03/01
Permit Expiration Date
24/03/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
James Levis/ORC/704-662-8341/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Allison Kraft,2523 Charlotte Hwy Mooresville NC 28115//704-799-4066/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran Sludge Handling DispoFacility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s)
Wes Bell
of Inspector(s) Agency/Office/Phone and Fax Numbers Date
-Docusiyned by: DWR/MRO WQ/704-663-1699 Ext.2192/
3/4/2022
ioer Belt
'-A61696D9OCC3437...
Signature of Maau61AReviewer Agency/Office/Phone and Fax Numbers Date
Andrew Pitn rA4-014144, H P *'f3WR/MRO WQ/704-663-1699 Ext.2180/ 3.4.22
F161FB69A2D84A3...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
31
NPDES yr/mo/day
N C0046728 111 121 22/03/01
117
Inspection Type
18 [j
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On -site Representatives:
The following Town of Mooresville staff were in attendance during the inspection: Mr. Jamie Levis, Mr.
Jerry Lyman and Mr. Jeff Campbell.
Page# 2
Permit: NC0046728
Inspection Date: 03/01/2022
Owner - Facility: Rocky River WWTP
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ ❑
application?
Is the facility as described in the permit? • ❑ El El
# Are there any special conditions for the permit? • ❑ ❑ ❑
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑
Comment: The last compliance evaluation inspection at this facility was performed by DWR staff
on 11/20/19.
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
•
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: The records reviewed during the inspection were organized and well maintained.
Discharge monitoring reports (eDMRs) were reviewed for the period January 2021
through December 2021. All monitoring frequencies were correct. A weekly average
effluent BOD violation was reported in April 2021. The Division has previously
addressed this limit violation through the issuance of a Notice of Violation (NOV).
Page# 3
Permit: NC0046728
Inspection Date: 03/01/2022
Owner - Facility: Rocky River WWTP
Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Laboratory
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: Influent and effluent analyses (including field) are performed under the Town's Rocky
River WWTP Laboratory Certification #173. Pace Analytical Services has also been
contracted to provide analytical support.
The facility staff must ensure to compare (and document) the LDO meter to the
theoretical dissolved oxygen level prior to each effluent analysis day in accordance
with the NC Wastewater/Groundwater Laboratory Certification approved procedure for
the analysis/calibration of DO. The LDO meter reading should be within +/- 0.5 mg/L of
the theorectical DO value.
Influent Sampling
# Is composite sampling flow proportional?
Is sample collected above side streams?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is sampling performed according to the permit?
Comment: The subject permit requires influent BOD and TSS composite samples.
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? • ❑ ❑ ❑
Is sample collected below all treatment units? • ❑ ❑ ❑
Is proper volume collected? ■ ❑ ❑ ❑
Is the tubing clean? • ❑ ❑ ❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 • ❑ ❑ ❑
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type • El El El
representative)?
Page# 4
Permit: NC0046728
Inspection Date: 03/01/2022
Owner - Facility: Rocky River WWTP
Inspection Type: Compliance Evaluation
Effluent Sampling Yes No NA NE
Comment: The subject permit requires composite and grab effluent samples.
Upstream / Downstream Samplinq Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, MODE
and sampling location)?
Comment: The facility staff perform the upstream hardness sampling.
The Division has conditionally waived the instream monitoring for dissolved oxygen and
temperature due to the Town's participation in the Yadkin -Pee Dee River Basin
Association.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable MODE
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: The wastewater treatment facility appeared to be properly operated and well
maintained. Facility staff incorporate a comprehensive process control program with all
measurements being properly documented and maintained on -site. In-depth
operation and maintenance records are also maintained on -site.
The facility's SCADA system was operational and in service.
Pump Station - Influent Yes No NA NE
Is the pump wet well free of bypass lines or structures? • ❑ ❑ ❑
Is the wet well free of excessive grease? • ❑ ❑ ❑
Are all pumps present? • ❑ ❑ ❑
Are all pumps operable? • ❑ ❑ ❑
Are float controls operable? • ❑ ❑ ❑
Is SCADA telemetry available and operational? • ❑ ❑ ❑
Is audible and visual alarm available and operational? ❑ ❑ • ❑
Comment: The influent pump stations for the traditional plant (screw pumps) and package plants
(submersible pumps) were operational and in service. One of the submersible pumps
was in the process of being repaired.
Equalization Basins
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Yes No NA NE
Page# 5
Permit: NC0046728
Inspection Date: 03/01/2022
Owner - Facility: Rocky River WWTP
Inspection Type: Compliance Evaluation
Equalization Basins Yes No NA NE
Are float controls operable? • ❑ ❑ ❑
Are audible and visual alarms operable? ❑ ❑ • ❑
# Is basin size/volume adequate? • ❑ ❑ ❑
Comment. Both equalization tanks (1 MG each) were in service.
Bar Screens
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment: Screenings are disposed at a permitted landfill.
Yes No NA NE
•
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Chemical Feed Yes No NA NE
Is containment adequate? • ❑ ❑ ❑
Is storage adequate? • ❑ ❑ ❑
Are backup pumps available? • ❑ ❑ ❑
Is the site free of excessive leaking? • ❑ ❑ ❑
Comment:
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Surface
Is the basin free of dead spots? • ❑ ❑ ❑
Are surface aerators and mixers operational? • ❑ ❑ ❑
Are the diffusers operational? • ❑ ❑ ❑
Is the foam the proper color for the treatment process? • ❑ ❑ ❑
Does the foam cover less than 25% of the basin's surface? • ❑ ❑ ❑
Is the DO level acceptable? • ❑ ❑ ❑
Is the DO level acceptable?(1.0 to 3.0 mg/I) • ❑ ❑ ❑
Page# 6
Permit: NC0046728
Inspection Date: 03/01/2022
Owner - Facility: Rocky River WWTP
Inspection Type: Compliance Evaluation
Aeration Basins
Yes No NA NE
Comment: The traditional plant is equipped with surface aeration and the package plants are
equipped with diffused aeration. Sodium hydroxide is added to maintain appropriate
alkalinity/pH levels.
Secondary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
Yes No NA NE
Comment: All four (4) final clarifiers (2 — traditional plant and 2 — package plants) were in service.
Pumps-RAS-WAS
Are pumps in place?
Are pumps operational?
Are there adequate spare parts and supplies on site?
Comment:
Filtration (High Rate Tertiary)
Type of operation:
Is the filter media present?
Is the filter surface free of clogging?
Is the filter free of growth?
Is the air scour operational?
Is the scouring acceptable?
Is the clear well free of excessive solids and filter media?
Comment: The final clarifier effluents from the traditional plant and package
prior to the tertiary filters.
All four (4) disc type tertiary filter trains were in service.
❑ ❑
El El
El El
❑ ❑
❑ ❑
El El
El El
❑ ❑
❑ ❑
El El
El El
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
Cross flow
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
plants are combined
Page# 7
Permit: NC0046728
Inspection Date: 03/01/2022
Owner - Facility: Rocky River WWTP
Inspection Type: Compliance Evaluation
Filtration (High Rate Tertiary) Yes No NA NE
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: The flow meter is calibrated quarterly and was last calibrated on 1/19/22 by CTS, Inc.
Disinfection - UV
Are extra UV bulbs available on site?
Are UV bulbs clean?
Is UV intensity adequate?
Is transmittance at or above designed level?
Is there a backup system on site?
Is effluent clear and free of solids?
Comment:
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? • ❑ ❑ ❑
Are the receiving water free of foam other than trace amounts and other debris? • El El El
If effluent (diffuser pipes are required) are they operating properly? El El • El
Comment: The effluent appeared clear with no floatable solids or foam. The receiving stream did
not appear to be negatively impacted.
Aerobic Digester Yes No NA NE
Is the capacity adequate? • ❑ ❑ ❑
Is the mixing adequate? • El El El
Is the site free of excessive foaming in the tank? • El El El
# Is the odor acceptable? • El ❑ ❑
# Is tankage available for properly waste sludge? • ❑ ❑ ❑
Comment: Both aerobic digesters were in service.
Solids Handling Equipment
Is the equipment operational?
•
Yes No NA NE
❑ ❑ ❑
Page# 8
Permit: NC0046728
Inspection Date: 03/01/2022
Owner - Facility: Rocky River WWTP
Inspection Type: Compliance Evaluation
Solids Handling Equipment Yes No NA NE
Is the chemical feed equipment operational?
Is storage adequate?
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
Is the site free of sludge buildup on belts and/or rollers of filter press?
Is the site free of excessive moisture in belt filter press sludge cake?
The facility has an approved sludge management plan?
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: The belt press and dryer system were operational and in service. Dewatered
bio-solids are conveyed to the dryer system to produce a Class A product. Dewatered
bio-solids from the belt press are also disposed into a permitted landfill if the dryer
system is not in service.
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: The facility is equipped with four (4) backup generators. The generators are serviced
on a quarterly basis by a contracted company (Power Generation & Control, Inc.).
Page# 9