HomeMy WebLinkAboutNCC220996_NOI Signed Certification_20220309NCG01 Notice of Intent (NON) Certification Form
Directions:
Print this form, complete, scan and upload to the electronic NOL
Then, mail the original form to the NC DEMLR Stormwater Program (with $100 check if paying by check) at:
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 61h Floor (Office 640K)
1612 Mail Service Center
Raleigh, NC 27699-1612
DO NOT MA iL THIS FORM OR PAYMiE.NT UNTIL APPUCATiON FIRS BEEN ACCEP!TFD AS COMV' .L i' .
THE FORM YOU AIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE (NOS' DIGITAL) [40 CFR 122,221
Per NC General Statute 143-21S.6B (i), any person who knowingly makes any false statement, representation, or
certification in any application, record, report, plan, or other document filed or required to be maintained render this
Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to
exceed ten thousand dollars ($10,000).
Under penalty of law, I certify that (check all boxes to indicate your agreement):
M✓ I am the person responsible for the construction activities of this project, for satisfying the requirements of this
permit, and for any civil or criminal penalties incurred due to violations of this permit.
M The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete
based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information.
R1 I will abide by all conditions of the NCGO10000 General Permit and the approved Erosion and Sediment Control
Plan.
if the approved Erosion and Sediment Control Plan is not compliant with Part li (Stormwater Pollution
Prevention Plan) of the NCGO10000 General Permia, I will nonetheless ensure that all conditions of Part II of the
permit are met on the project at all times_
I hereby request coverage under the NCGO10000 General Per -mit. and understand that coverage under this
permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Name (must match Ala): Lots @ BnAewood-Morrison 22-NIL-06
Specific Lot Numbers (must match Alb): 4, 20, 31-32, 36: and 38
Scott Morrison
Permittee (must match B1):
Legally Responsible Person (must match B2 & 83): Scott Morrison
Title of Legally Responsible Person (must match B3h), Individual
Name & Title of Signed if Authorized Individual
Differs from Legally Responsible Person.
704-634-6606
Phone Number:
03/08/22
of Legally Responsible Person or Authorized Individual
Date
IMPORTANT MOTE: This form mast be signed by a responsible corporate officer that owns or operates the construction activity,
such as a president secretary, treasurer, or vice president or a manager that is authorizer} in accordance with Fart IV, Section 8,
Item (6) of the NCGO10000 permit.