HomeMy WebLinkAboutWQ0003271_Monitoring - 12-2021_20220114Monitoring Report Submittal
Permit Number #*
Name of Facility:*
Month: * December
Report Information
WQ0003271
Hestron Park
Type *
NDMR, NDAR-1, NDAR-2, NDMLR
Confirmation Email Address:*
Name of Submitter: *
Signature:
Date of submittal:
Initial Review
Year:* 2021
Upload Document*
Hestron_DMR_ Dec.pdf 123.01 KB
PDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
stacy.goff@carolinawaterservicenc.com
Stacy Goff
Reviewer: Gerald, Wanda
1 /14/2022
This will be filled in automatically
Is the project number correct?* WQ0003271
Is the monitoring report accepted?* Yes No
Regional Office* Wilmington
Accepted Date:
3/8/2022
(Basins Only)
Freeboard
Loading
Daily
Infiltrated
Time
Applied
Volume
(Basins Only)
Freeboard
Loading
Daily
Infiltrated
Time
Applied
Volume
(Basins Only)
Freeboard
Loading
Daily
Infiltrated
Time
Applied
Volume
(Basins Only)
Freeboard
Loading
Daily
Infiltrated
Time
Applied
Volume
(if applicable)
5-Day Upset
(if applicable)
Storage
Precipitation
Temperature
Weather Code
Day
Solids
Suspended
Total
Solids
Dissolved
Total
Phosphorus
Total
pH
Nitrogen
Total
Nitrate
Nitrogen
Total Kjeldahl
Ammonia
Coliform
Fecal
Chlorine
Residual
Total
Chloride
BOD5
Flow
Site
ORC Time On
Time
ORC Arrival
Day