Loading...
HomeMy WebLinkAbout20201736 Ver 2_14.04042 - Elm City WWTP Plan Sheets_20220303z 0 0:23 AM WYNN W 2 C200 SHEETS.DWG PLOT DATE 11/ DRAWINGS z 0 in W N N (.9 0 H tY 2 W z 0 J / J AL AL AL MARSH AL EXISTING 1 AL / J /— /- ,� �_� / r.• AL AL 'T \\ / AL 'Li I A I //r. .f S N N I AL .L\ AL 126�\ / AL \•\ �� \ /•:\ A, • r 25 / / I /'_� l / — -128• ) ►/ 4"x2" -111 / / // /` / ` /K REDUCER / /,L 129' / / /11 3--7, / 10 / / / �// / / 1�\ i / RkDUCER • / I / / /2„ /• / - ▪ _ ,13 - 7— / • -135 136., I .137.\ H 01 5 ZONE 2 AL - 123 -724 +- -129" I I -130 T PROPO 'ED FILL AT 1.5:1 SLOPE WITE-(RIPRAP PROTECTION AL AL PROP@SED 4-36" RCP SEE DETAILS THIS SHEET AL AL AL ALL .JIL AL AL aL. .JL '1 AL AL AL AL jk ,'<1' 1ryh PROPOSED 16' WO-.)( ' N // GRAVEL DRIVE' 1 / \� AL J / / - , �/ \ — ' / /) \ /— 132 I // x _ \ \ 2, / Th \� \ ,L \ .1 I I RE I I ( 1-1/= "x3" DUCE 1 / \ - • • // I ,72y / EXISTING SOIL DRIVE / , \� / 4'I 13 ) I * \ I /f �fi / �/I ,1 1 /�k 4 1 // 4r -- s 1 4 --I- I 4t / /// < \��' — ~.�S�A \ 4` 8" ( SHARPE, JOHN LLOYD JR. PIN: 3736-72-2734.000 DB 1158, PG 308 \ l I PROPOSED j 12" PVC IRRIGATION MAI / I AL AL AL AL / AL l/ -TK 1.5" 22.5' #""- PLAN — / — \ — - - _— — 11- BEND v� 4-v i1 ,2y� // J/ 1.5 x2' r / / I / REDUCER X1.5" -730 TEE c2" REDUCER/ I TE 6" 22.5' BEND ,� 4>k1.5" 6"x2" 3"„� TEE TEES 1,;- 3»x2„ 1.5" 45' TEE BEND _ � 14" / 12"�112" TEE I / 1 2'` GATE YALVEI 14 I 11 ' /1 I \ / ry I W , ,L. I `I ^� I _2-1--N r I I T (r 8" 8„ u �_ 8» 8 -� 3" 1.5" v 1.5" 4 / ` / 3 x1.5" EDUCER BEND `L ^� //~ // 1 _-� l --/ // `— 1-1/2" 4" '�4o N �� FN / / 135 �� ' 2">�1 5" R DUCER 3 \ \ 8 —FlA-----N---� / 2 CLASS A RIPRAP ARMOR IN WETLAND AREA SELECT SOIL AS REQUIRED 2' UNDERCUT OF EXISTING SOIL 8" CABC 16' 4" FT GRAVEL ROAD CROSS-SECTION NOT TO SCALE CLASS A RIPRAP ARMOR IN WETLAND AREA 16' 8" CABC 1 4" 4" T 8" SELECT SOIL 32 LF 36" RCP 7" EMBEDMENT 2' UNDERCUT OF EXISTING SOIL GRAVEL ROAD CROSS-SECTION AT CULVERT NOT TO SCALE 5 Regional Circle Suite A mcgi Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcgillassociates.com / / 4"x1 '17'2 _L112" Rd- 3"x1.5" REDUCER EXISTING IRRIGATION MAIN SHALL BE PLUGGED AND ABANDONED IN PLACE, TYPICAL FINAL DESIGN FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION / 1.7 L FIELONBOUNDARY ZONE 2 I REDUCER • REDUCER :..00! BEND II I / E /-"7 / r NOTES: 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. 2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES. 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. N 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL. 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, & RE -INSTALL EXISTING UTILITY CABLES. - -121- �� / 1titi— ryry — / / I I \ N 1 \ \ / \ ryti / / I ice, 1 tftNU '1, _ 6'x1.5 TEE �^ i �► 1 \ _ --1-- 1 N / 6?s [\ \ \ I \\ \ \ I I `18\ \ \ \�\ ----BENSI� N. \ \ \`I\ \ �i 1 = - - -I 1 N 121�„ ,J�\ \��_ ,. �__ BEND 3" 2" 2"x1.5" REDUCER 2"x1.5" REDUCER TEE 2,01 ZONE 1 ) ------- 443,7--hn- 67 — F mt — - 7 - -8F ti -- 1-1/2" EXISTING SPRAYFIELD LINE TO / REDUCE 6"x4" TEE 46" REDUCER 6" aLic1.5" REDVCER 1-1/2" "PROPO-SEK CONTRO N 1-1/2" \ 4" 2.5"x2 REDUCER x2" REDUCER/ 1) 22.1 5'''I?ND I r if 244.11 BEND / 1-1/2" 1,1 aro r?/- 7- / IZ1 24--: 7-FM --._Th-- "- - - —Om 111 III 4"x3" REDUCER II 11 II II 10"x4" CROSS - co 1 EMAIN IN SERVICE, TYPICAL NO. DATE BY DESCRIPTION It 4"x2" REDUCER 4" 90' BEND E o cp ZONE 2 1.5"x3" TEE r_37x1.5" TEE 3" BEND ' 4"x2 TEE BEND 4"x2" TEE 4" 45' BEND BEND -- OS SAI PROPOSED REPLAC/7-)- EXISTING Er ZONE 3 CONTROL VALVE \ NOTE: \ SEE SHEET C-100A FOR \ EROSION CONTROL MEASURES /7/ / ZONE 3 PROPOSED IRRIGATION PROPOSED CHEMICAL STORAGE BUILDING PROPOSED CHLORINE CONTACT BASIN PROPOSED 3” ZONE 3 CONTROL VALVE EXISTING SECONDARY LAGOON ZONE 3 / TOWN OF ELM CITY PIN: 3736-84-0309.000 DB: 1267, PG: 879 PROPOSED FULL CIRCLE.-- SPRAYHEAD, TYPICAL WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY WILSON COUNTY, NORTH CAROLINA 100 50 100 1 0 0 0 0 7 EXISTING DITCH LINE, TYPICAL PROPOSED / HALF CIRCLE SPRAYHEAD, TYPICAL 200 GRAPHIC SCALE DIVISION VALUE = 100 FEET PROPOSED TEMPORARY SILT FENCE OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT ZONE 2 MAYER, JOHN E. PIN: 3736-94-4252.000 DB 2264, PG 541 WALTON, CAROL L. WALTON, GEORGE E. PIN: 3736-93-4425.000 DB 2100, PG 14 • FM LEGEND PROPOSED FULL CIRCLE HEAD PROPOSED PARTIAL CIRCLE HEAD PROPOSED IRRIGATION MAIN EXISTING IRRIGATION MAIN EXISTING IRRIGATION MAIN ABANDONED IN PLACE EXISTING FIELD BOUNDARY PARCEL LINE EXISTING FIELDS 1-3 IRRIGATION SYSTEM IMPROVEMENTS PROJECT MANAGER D. HONEYCUTT REVIEWER DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # SHEET C-201 14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY 301A } z 0 PM WYNN W 2 C300 SHEETS.DWG PLOT DATE 11/ DRAWINGS z 0 w 0 N INEHURST\DRAWINGS\2014 It I\ PROPOSED TEMPORARY GRAVEL CONSTRUCTION III ENTRANCE II II II I II HOMESTEAD -ROAD IF Alb / 1/ AL AL .ALIO / / .' AL / AL I FINAL DESIGN FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION AL/ .I S AL or .d ' 1 1 AIL / " 45° BEND »x2» /--� DUCER -�\ .5" 22.57 BEND I\ 1.5"x2" REDUCE 1.5" 45° BEND 1.5"x2" REDUCER EXISTING MONITOR WELL #4 DO NOT DISTURB / V V / / ELL / 1.5" 22.5° BEND 1.5"x2" REDUCER 1.5" 22.5° BEND 1.5"x2" REDUCER / / 11.5" 45° BEND 1.5"x2" I REDUCER 1.5" 8" 45° BEND 11.5" 22.5' BEND 1.5"x2" IREDUCER I / f 14 1.5" 8"x2" TEE 2" 8"x2" TEE 1.5" 22.5° BENDI\ 1.5"x2" �--a • REDUCER EXISTING WELLS DO NOT DISTURB 8"x12" REDUCER 1.5.. 2" FM 6"x1.5" TEE 7 If 8"x1.5" TEE 8"x2" TEE 1.5" 45° BEINID. 1.5"x2" REDUCER 8"x2" TEE I. n " 8" r- 8"x1.5" TEE / \ 1.5" 2" 1.5" 2" 8" / 1.3" / \ l \ \ 3"x2" TEE I N \ I I - \ 1.5" / N AL � ,r AL 1.5" 11.25' BEND 1.5"x2" a REDUCER 3"x2" TEE 4"x6" REDUCER 6"x1.5" TEE 6"x2" TEE 6"x8" REDUCER 3" 8"x1.5" TEE 4"x1.5" TEE 1.5 a AL AL A / / 100 FT / / WETLAND SETBACK / / / 3" 22.5° BEND 3"x4" REDUCER 4"x2" TEE 6"x1.5" TEE/' 6"x2" TEE PROPOSED SPRAY HEAD DISTRIBUTION AREA, TYP. SEE SHEET C-301 PROPOSED TEMPORARY SILT FENCE, TYPICAL TOWN OF ELM CITY PIN: 3736-45-5400.000 DB: 2607, PG: 154 PROPOSED HALF CIRCLE SPRAY HEAD, TYPICAL 1.5" 1 2" 1.5" 90° BEND 1.5"x3" REDUCER 3" 1 5" TEE 3"x1.5" TEE` AL AL / N / / / 3"x1.5" TEE 1.5" 22.5° BEND 1.5"x2" REDUCER PLAN AL AL NOTES: 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. 2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES. 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL. 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, Sc RE -INSTALL EXISTING UTILITY CABLES. AL AL AL EXISTING TREES AND/OR SHRUBS TO BE CLEARED ONLY AS REQUIRED FOR IRRIGATION SYSTEM INSTALLATION N\ 1.5"x3" REDUCER 3"x1.5" TEE k° BEND\ J AL V / / \\\ I I A N ��/ I •�N / / / / s,. 4"x2" TEE )e5 11.25° BEND 1.5"x2" ' N REDUCER 6" 45° BEND 1.5" 0-- FM 6"x1.5" TEE 6"x2" TEE 2" " PROPOSED FULL CIRCLE SPRAY HEAD, TYPICAL 1.5" rFm 8"x1.5" TEE PROPOSED SPRAYFIELD LIMITS, TYPICAL 8"x1.5"TEE 2" 1.5" FM 1, I a RE U'CER M ATCH LI N E SHEET C- 304 /"x1.5" TEE 1.5" 4 �°x1.5 ` TEE /8 "x1.5" TEE EXISTING MONITOR WELL #3 g" g0° BEND • NOT DI . 4" 45° BEND 1.5" Rd d 1.5" 4'x6" DUCER 4"x1'5" TEE 6"x1.5" TEE 1.5" 1.5" 2 6"x1.5" TEE0 W IJ 6" 22.5 6"x1.5" TEE BEND / 6"x12" 8" " • AL AL A EXISTING WETLANDS EXISTING DENSE SHRUBS 3"x1.5" ITEE i 1.5- pm / �3"x1.5" TEE / / S:l► 4"x2" TEE 4"x2" TEE • I 4"x6" REDUCER 6"x8" REDUCER / / 8"x2" TEE ,, AL AL NOTE: SEE SHEET C-100A FOR ER2SION CONTEOL MEASUf ES 1.5" 90° BEND 3"x4" REDUCER 4"x2" ity TEE 1.5" 22.5° BEND 1.5"x2" / REDUCER 1 ooFT WETLAND SETBAC / AL AL PROPOSED 12" 90° BEND 12" ZONE 7 C NTROL VALVE AL 1.5"x3" REDUCER 3 \2" TEE 1 WETLAN00FTD `?/ SETBACK 3" 45° BIND \ 1.5" 22.5' BEND 1.5"x2" \ REDUCER J / / / / EXISTING LIMITS OF DENSE BRUSH AL AL AL AL AL PROPOSED GRAVEL DRIVE 8" 11.25° BEND EXISTING SOIL DRIVE I III, o. AL \ ALL / / AL AL AL \\ \ \\\\ �\ 1 I `1\ \\ \ I II \ \ \\ \ I�q 11 II I/ / \\ 1 1 I I I I I I II I I 11 I \ \ \ \ \ I 1 AL I I \\\\\ I I \ Yt\Ih I / / 1 11 11III 1\ EXIS I1NG TREEI IN l I \ II I I \\\\\\� I l \ \ \ \ \ \ \ \� �/ / I l I \ 1 / / \\I 7V 7/ / I 1 I \ I►\ �- / /i // �,I� / /AL \ \\ AL (/ \ \ \\ 100 WETLAND SETBACK \ FM 12"x8" TEE 12"x12" TEE 8''�•12'� REDUCER 1.5 • EXISTING MONITOR WELL #5 ,119 T DO NOT DISTURB SETBACK 1.5" (3"x1.5" TEE I REDUCER If 1.5" PROPOSED 12" ZONE 4 CONTROL VALVE 6" 901 BEND FM - '`QT / 3”x1.5” TEE 4-e• • • RED C 1. 6"x2" TEE 2" 6”x6” TEE Fld 1.5" 12%6' TEE 0 FM LEGEND PROPOSED FULL CIRCLE HEAD PROPOSED PARTIAL CIRCLE HEAD PROPOSED IRRIGATION MAIN EXISTING IRRIGATION MAIN EXISTING IRRIGATION MAIN ABANDONED IN PLACE PROPOSED FIELD BOUNDARY PARCEL LINE to • .5' AL AL CD o LLI LPL LLI AL idb AL flI AL UCER REDUCER 4''x1.5” TEE ni 1...:L., 12" 45° BEND 0° BEND FM • 1.57 _3"x1.5" 2 REDUCER / DUC It TEE - • 2" TEE )3'' • • PIA 71 RED 3 22.5° BEND REDU REDUCER 4" 1.5" TEE • BEND 1 VIA 6 REDUC 1.5" rid \1.5” 11.25° BEND .5”x2” REDUCER ex2” TEE NI‹ TEE FM ft FM PROPOSED 12" ZONE 6 2 CONTROL VALVE FM RE REbuCE 6”x2” TEE 5 Regional Circle Suite A mcgill Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcgillassociates.com NO. DATE BY DESCRIPTION WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY WILSON COUNTY, NORTH CAROLINA 60 0 30 60 120 GRAPHIC SCALE DIVISION VALUE = 60 FEET OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT NEW SPRAY FIELDS 1 PROJECT MANAGER D. HONEYCUTT REVIEWER DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # SHEET C-302 7-0030 TOWN OF ELM CI 042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W- z 0 AM WYNN W INEHURST\DRAWINGS\2014 _" D AL E �N 1.5- I"x2" TE\E \ v N FM // -/ TEE j/1 1.5"// \\ 1.5" / / I / "� TEE / � I // I / � / 1.5" 90° BEND . 5"x3" EDUCER IN\ \ I /3"x1/5" TEE \ / / / \ 3"x2" 1 TEE N O 1/4 AL tilt 11° 8N0_ x2\ UCER \ II \ \// 3 1 �\ I � / / / / / / 7 1.5" 2 EE "%6" TEE 12" 45° BEN 3END FM -1.5" 45° BEND 1.5"x2" REDUCER ,`. Lr 4"x1.5" T 4"x6" �7' / / REDUCER /7 4"43-° BEND 4" x1.5" 7 TE //� - - 1.57 - 3"x1.5" I REDUCER 3" UCER -rU 2" EE 2 2" 8"x2" TEE TEE • 2" 1.5 REDU g TEE RTUCER 12"x8" TEE 12"x6" TEE\ Rd \1.5" 11.25° BEND .5"x2" REDUCER TEE FIA 1.5 REDUCER Fki 1.5" 22.5' BEND 1.5"x2" REDUCER 44. 8" 45' BEND REDUCER \ 1.5" ) ff AL AL 4"x6" REDUCER 22.5' BEND 3"x4" REDUCER 1.5" TEE FM REDUCER 2" 1.5"x2" REDUCER 6"x8" REDUCER ft PROPOSED 12" ZONE 6 2 CONTROL VALVE RECyCER nsi FM REDUCER 3" 5 Regional Circle Suite A mcgill Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcgillassociates.com FM Ei"x2" TEE 8"45" TEE-\ 2" FM 6" / 1.5"x3" REDUCER 3"x4" REDUCER 4"x2" TEE / \ 7 77 SILT FEINCE, TYPICAL N AL 1.5" nA REDUCER -4N1-.5c TEE 1.5"x2" REDUCER \,<11- 1.5" 3"x4" REDUCER 2 REbuCER 6"x2" TEE FM FM FM 22.5° BEND 1.5"x2" REDUCER 8"x4" TEE 1.5" TE 0 / 1.5" 6"x2" TEE REDUCER 3" TEE 1-0 REDUCER 1.51\ TEE 3"x1 8"x12" N REDUCER NN REDUCER 3"x4" REDUCER 1/4 AL AL AL AL P)ROPOSED HALF- CIRCLE SPRAY HEAD, TYPICAt 1.5"x N N N PROPOSED SPRAY HEAD DISTRIBUTION AREA, TYP. SEE SHEET C-301 AL AL /1 / PLAN TOWN OF ELI\I CITY PIN: 3736-55\-9745.000 45' BEND REDUCER REDUCER REDUCER 12"x12" TEE 12" FM CONTROL VALVE 12"x2" TEE 12"x1.5" TEE FM FM ft It PROPOSED FULL CIRCLE SPKkAY HEAD,, 1.5" AL FINAL DESIGN FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION Jd REDUCEt 1.5" 8"x2" TEE TEE 1.5" 361.5" TEE 1.5"x2" REDUCER 4"x6" REDUCER 6"x2" TEE 6"x8" REDUCER 6" 1.5 7 7 7 / NO. DATE BY DESCRIPTION AL Its 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. 2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES. 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL. 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, & RE -INSTALL EXISTING UTILITY CABLES. N EXISTING TREE LINE 14\ 3" 2 EXISTING LIMITS OF DENSE BRUSH 2" 90° BEND 1.5"x3" REDUCER 2" REDUCER 1.5" AL old REDUCER 8"x2" TEE 2" 22.5° BEND REDUCER 11.25' BEND 2"x3" REDUCER 125- 2" 2 FM 8"x2" TEE 6"x2" TEE 4"x2" TEE 1.5" II 1 / ( . i 7 II I / I / I / // 2" FM 8"x6" TEE 6" FM AL REDUCER ft REDUCER 4" 4"x6" REDUCER REDUCER \ REDUCER ff 3"x4" REDUCER / EXISTING MONITOR WELL #1 DO NOT DISTURB 45° BElilD REDUCER cr.' z7 AL AL AL AL AL AL AL AL AL AL AL WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY WILSON COUNTY, NORTH CAROLINA 3"x4" REDUCER 3"x2" TEE REDUCER AIL AL AL AL AL AL AL AL 60 0 AL AL SEE SHEET C-100A FOR N: 765493.16 E: 2336785.24 4"x2" TEE 3" AL AL AL ,o, AIL AL ft x1.5" TEE REDUCER AL AL EXISTING SPRAYFIELD AREA DELINEATION IN ORIGJNAL 30 60 120 GRAPHIC SCALE DIVISION VALUE = 60 FEET OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT 1/4 1/4 AL N N \ p AL AL AL • t/ LL • NEW SPRAY FIELDS 2 PROJECT MANAGER D. HONEYCUTT REVIEWER DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # SHEET C-303 14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY Z 0 /2020 3:02 PM WYNN W 2 C300 SHEETS.DWG PLOT DATE 11/ DRAWINGS Z 0 w 0 N INEHURST\DRAWINGS\2014 1.5" 22.5° BEND 1.5"x2" REDUCER EXISTING WELLS DO NOT DISTURB YRS1 137 Base Setup IPS GPS STAT1C N: 764029.73 E: 2333708.34 EL:143.57 8"x2" TEE 8"x12" REDUCER 12"x2" TEE ` PROPOSED FULL CIRCLE SPRAY HEAD, TYPICAL N N 8 x1.5 TEE 4"x1.5" TEE 1.5" 4" 45° BEND 1.5" 12"x2" TEE PROPOSED SPRAY HEAD DISTRIBUTION AREA, TYP. SEE SHEET C-301 12" 45° BEND N N PROPOSED HALF CIRCLE SPRAY HEAD, TYPICAL 4'x6" DUCER EXISTING PARCEL 1.5\ 45° BEND 1.5"x " REDUCER PROPOSED TEMPORARY SILT FENCE, TYPICAL EXISTING TREE LINE- N N EXISTING MONITOR WELL #2 DO NOT DISTURB EXISTING WETLANDS 3"x4" REDUCER 4"x1.5" TEE 1.5" 12"x1.5" TEE 4"x1.5\ TEE \t). 45° BEND 6"x1.5" TEE 1.5" 2 1.5" 22.5° BD� 1.5"x2" REDUCER 12"x1.5'NTEE \ � N 1.5" 22.5° BEND 1.5"x2" REDUCER AIL 3"x2" TEE 8"x1.5" ' TEE 8"x1.5" TEE /8%1.5" TEE -EXISIING MONITOR WELL #3 8 90° BEND • NOT DIST 1.5" 6"x1.5" TEE ,40 11.25° BEND 1.5"x2" REDUCER -�. 6" 22.5BEND 6"x1.5" TEE / 12"x1.5" TEE 12"x2" TEE 12"x4" TEE 4"x2" TEE 4"x1.5" TEE 3"x4" REDU 1.5"x3" REDUCER 1.5" 90° BEND EXISTING LIMITS OF DENSE BRUSH FINAL DESIGN FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION 5 Regional Circle Suite A mcgill Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcgillassociates.com AIL AIL 1.5"x2" REDUCER AIL EXISTING WETLAND, TYPICAL-/4 6"x12" REDUCER 12"x1.15" TEE 8"x2" TEE Al...) ILL 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. 2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES. 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL. 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, & RE -INSTALL EXISTING UTILITY CABLES. NOTE: SEE SHEET C-100A FOR EROSION CONTROL MEAS RES PROPOSED 12" 90° BEND 12" ZONE 7 C NTROL VALVE FM 12"x8" TEE 12"x12" TEE \ REDUCER b 1.5" 45° BEND 1.5"x2" 'REDUCER \ - 1.5" 90° BEND 12"x2" TEE 3"x6" REDUCER 12"x2" TEE 1.5" 11.25° BEND 1.5"x2" REDUCER 4"x1.5" TEE 1.5" FM FM 1.5" 22.5° BEND 1.5"x2" REDUCER 45° BEND AIL AIL AIL AIL AIL AIL EXISTING PARCEL, TYPICAL PROPOSED GRAVEL DRIVE 8"x1.5" TEE 8"x1.5" TEE 1.5" 45. BEND 1.5"x2" REDUCER 12"x1.5" TEE 12" 45 BEND 1.5" 1.5" �r 4"x6" REDUCER 8"x1.5" TEE \ vu 12"x1.5" E 6"x15" TEE 7 3"x1.5 TEE 1.5" 1.5"�� 2"x1.5" TEE NO. DATE BY DESCRIPTION AIL 2" 45° BEND 2"x3" REDUCER AIL AIL AIL AIL AIL AIL AIL / 7 -FM 6" 22.5° BEAD PROPOSED 12" ZONE 4 CONTROL VALVE 6" 901 BEND 3"x1.5" TEE 3"x2" TEE 11.25° BEND 1.5"x2" REDUCER 6"x4" TEE 2" -FM FM 11.25° BEND 1.5"x2" REDUCER 3"x4" 6" _ _ REDUCER -FM _ FM FM 1.5" 2" / \ 3"x2" TEE J / -- / - // /(7/ \ . AJIL II 3"x1.5" TEE AIL AIL AIL AIL AIL AIL 3"x1.5" REDUCER 90° BEND . 1.5" 11.25° BEND I 1.5"x2" REDUCER WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY WILSON COUNTY, NORTH CAROLINA 1.5" 90° BE I - 3"x1.5" ' EE 12"x6" TEE 12" 45° BEND 3" 90° BEND FM- 1.5" 45° BEND 1.5"x2" REDUCER „?e 6"x8" REDUCER 4" UCER 4" 2" TEE 1.5" /° Rd A 3" tee TEE 1.5" I 1.5" 60 0 3" x4" REDUCER 3"x1.5" TEE 1.5" 12"x6" TEE\ 1.5" 3"x1.5" TEE • 2" 41."" TEE FM 1.5 1.5" 22.5° BEND 1.5"x2" REDUCER 8" FM 1.5" 22.5° BEND 1.5"x2" REDUCER �► 8" 45° BEND 8"x6" TEE (�'x2" TEE 2" 6"x8" REDUCER \ ♦-FM PROPOSED 12" ZONE 6 2 CONTROL VALVE 8"x 12" REDUCER FM FM 8" 45° BEND 8"x2" TEE 4"x1.5" TEE 1.5'N 6"A%45" TEE \ REDUCER ,7 71 30 60 120 GRAPHIC SCALE DIVISION VALUE = 60 FEET OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT 3" 1.5" vu -� ) 4"x6" I\ 1.5" REDUCER j ,140- 1.5" rid 2 1.5" 11.25° BEND 1.5"x2" REDUCER - 3"x2" TEE 1.5" - 3"x1.5"/EE 4/ 1.5"x3" REDUCER 1.5" 45' B AIL I 135 /8'x4' /1.5" 1.5" VII 3"x1.5" TEE -FM FM �8"x2" TEE "x-\.5" TEE 3"x4" REDUCER 2 - 4"x6 REDUCER 6"x2" TEE 8 FM FM -22.5° BEND 1.5"x2" REDUCER FM 1.5" ' TEE A 8" 4 4END- 3"x1.5" TEE 1.5"x3" REDUCE -1.5" 90° BEND AIL J I EXISTING MONITOR WELL #6 NEW SPRAY FIELDS 3 AIL AIL e 1.5" FM I I U "x2" TE 'x8" DUCER 1.5 FMTE 4"x2" TEE n� 2" 22.5° BEND 1.5"x2" REDUCER 8" 45° DO NOT DISTURB PROJECT MANAGER D. HONEYCUTT REVIEWER DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # E-SRP-W-17-0030 / / / / 8"x1.5" TEE D- SHEET 0-304 AIL 14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 C100 EC PLAN.DWG PLOT DATE 11/6/2020 11:10 AM WYNN WILSON I / r � Alic '/1 I 1 / / / l LsiY DGE 0 \\ \ \ \ \ \ \ \ \ \ AL • • /y ITC onitoring Well No.1 4 /!' J / / / / I — - / / 1 � I / / 1 / I Ir 4, Monitoring Well No. 2 ‘4) NN J AL • • • AL AL • ♦• \ •J AL ▪ PROPOSED LIMITS L AL / • / / / AL AL AL / / I / r ) // / I // / r c. / / 0, I I / / �/ : ,a / • • ♦ ♦ ,♦ ♦ f ♦ ♦ '<', I I r • ♦ I 7,--- �N ♦♦ //~� // / TOWN OF ELM CITY PIN: 3736-45-5400.000 DB: 2607, PG: 154 \ \ \ \\ \ PROPOSED LIMITS OF \ DISTURBANCE, TYPICAL Nom 7 / --..., / / / / /// / \,., WETLAND LIMITS, TYPICAL .Y. J FINAL DESIGN FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION Alk . • I / t N I I «I / / AL AL AL WHEAT H 'GH / I z / I AL AL AL AL PROPOSED HALF —CIRCLE SPRAY HEAD, TYPICAL I I \\I I\ \ \\1II I \ 1 \\ AL l PLAN PROPOSED FULL CIRCLE SPRAY HEAD, — TYPICAL / 1 I / �/ \ \� ,� / / - N I 7, ' / F '—'Ir) : \ v v FOR CONSTRUCTION 1,2 • FM i/ AL cro EXISTING WETLANDS, TYPICAL AL LeoN Monitoring Well No. 5 112:122, N / ci AL BIMINI AL • • • AL TOWN OF ELM CITY PIN: 3736-55-9745.000 AL AL PROPOSED TEMPORARY —SILT FENCE, TYP. PROPOSED SILT FENCE / ,OUTLET, TYP. MIME NNW 7r I Vr'—\ I T / \ Z \ \ • • • AL AL AEL \A. AEL TOWN OF EL CITY rl • • 128 sat sit / AL AL • AL PROPOSED EROSION CONTROL MATTING, TYP. PROPOSED IRRIGATION PIPING, TYPICAL AEL N • • 71 NOTE: DISTURBED AREA INCLUDES MAXIMUM 10 FT WIDE ALONG EACH IRRIGATION MAIN AND AT SILT FENCE LOCATIONS. Man 111: Alt Alt sat Alt ALL sat • • • • 4110 rvN Au Au 0 AL AL Alt Alt Alt Alt Alt PROPOSED LIMITS OF DISTURBANCE, TYP. EROSION CONTROL LEGEND MAT LINING LIMITS OF DISTURBANCE TEMPORARY SILT FENCE TOP OF SLOPE TOE OF SLOPE 5 Regional Circle Suite A mcgill Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcgillassociates.com • NO. DATE BY DESCRIPTION WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY WILSON COUNTY, NORTH CAROLINA 100 50 100 200 GRAPHIC SCALE DIVISION VALUE = 100 FEET OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT EROSION CONTROL PLAN 1 PROJECT MANAGER D. HONEYCUTT REVIEWER DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # SHEET C-100A 14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 C200 SHEETS.DWG PLOT DATE 11/4/2020 4:11 PM WYNN WILSON O 1 1I - - I l —� / PROPOSED I' ---- -____ '---- - \—N�TEs: TTn/��� �y �1 VC �ON33A 1 1 I , I~ / PLAN -- 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. X/�'3 x� ___ - 2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES. " BEGIN 16" PV. IRRI1I�A 110 MNI� / I I I 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. MI 1� ��� - -- ---- AT EDG ),QIlMG `-'�T_,.„_ I 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL. so OF • -- r'14-----►r�--___It, ___ I 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING I ocie �a,e = = I o a° "d'�--I\ -"'J_____ w�---_� I �r UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL x - �3 ,o,r�� < -, -./ 1 Os-, w— 1 PROPOSED UTILITY LINE, & RE -INSTALL EXISTING UTILITY CABLES. //eROP —. STA. 10+ 2 I ��� 'tNA ° ° ^° _ __ I / 16"\22 1 Bi- D 1i I 9+ 3 dROPO' 1 ►I I a. � / I - ---- _ r / / �‘ I -'�----f�- __ 1 / I — _ '�---VIA / ,� �1 NOTE: SEE SHEET C-100A FOR 0 �A-1-01-00 \" 0 � ---___�_ ��o / r �� o o I ICI-"�---- --- I E OSION CONTROL MEASURES •38825.4\9\ 64513 68 \ r X I + / p i10 ZON +2 CONTROL VALVE + I= i �j / c i I o PROPOSED 12" PVC IRRIGATION MAIN o I I ___ ---- m _--__ I - EXI`IN� — --- I SOIL DRIVE/ ��l JJ, ;; � ---la-- - - - - - - - 1 1 = \ 1 �� 1 z / �, - \ d� <<g PROPOSED I I i _ _L_ 8 ZONE 3 CONTR VALVE I I -�- -_ _- _ r wd �-- ---wd� !—'�----- ----- Lo o 0 +I 0 I I I `- 1 f— AWE o1210 + 00 - PROPOSED I o o STA. 21 +81 I + 0 o 12" F + + o 22.25 BEND �,- 1�a . I ' I _____ 5zL PROPOSED 10+50I • I r . / I I I - . — I I I —Fy_ --- " �— ——Mld___ - - - ----_ - - _ - — — — _ _ —i_ _= _ _ _ — --- - - - - - -�-F-- _ - ------_--=r-==-= I�Trij --— I 1__ �� _ -_ �- --±_ Fy-===- . ----- rt - - - - ----- - _-FM--4- N / <Y I ----r----- PROPOSED -/ru-----YU-_ — - -_ _i -�------►�___-___ STA. 22++�1STA. ---+ - -_2 12" 2225° - -------f�_____16 - _ BEND i X16 TEE I I _ - ---=ter=- _------- f 16" 45', TIE TO BEND / EXISTI G i I I I I PROPOSED I j I -I 1 STA. 14+ 11 2 I I I ff I» I I --►�_--! I I 12�fX12 TEE I I I I I I 12 ATE VALVE I / 1 I I I I 2 I I 1 I I 1 I I 77I I \ I I 1 I - _ _ _ i I ;------- J I I M I I I \ PROPOSED 16' WIDE - ------ _ _ - - ---- 1- _ PROPOSED 1--- -, �i��►\ J I \ / I 1 \ STA. 22+64 I 1 \� \ 12" 11.5 BEND • ; \�\ oo \ I \\�\ �_--���-���_-.�������. ����I� ����♦��Y 1ti� �ti ---------- �--�, ti� ,�° /' _ / / / I / / wl� - R ASED 1 , STA. 11 + /` ` /� C,/ 16"X14" TEE / \ 14" GATE VALVE » 2" 1 P1REDUCER ��� "r �� I 1 /` i I -� 1\ ' T 1 J. I y I I ` �EXISmNG IRRIGATION PIPE TO REMAIN IN SERVICE, TYPICAL I I I \I I I I II I I I 139 (4. I I tip" AVEL DRIVE I I \��\ I I \ I I I \� \ I IL -, \ l, I I---------------, \k \ I 1 i ' \� O ' I \ O I 1 I j �I- \\ ' -;� 1 — — I � \ o I T I l \ �/ 0 \ /�' �' ' ---y/--- -� I ` I`j j I` / I - I I 12 I I `` I I \ / _V 1 \T'42.- / ` �. III// `° 1 I 1 1 ,2a I I , �'�� - ,� I I PROPOSED I/ I I / 1 I 1 I •/ I I Y I / I I I 1 I I I I I I 1 I I 1 `�\loos I I I I I 1 I '38 PROP D I I STA. 1 64 I �► /f w \ 0 / \ \ -N + '"� .CO \ \ 00 \ \ \ II N I - _ I�-/� VJ ---- -__ / J _ ) LIMITS OF DISTURBANCE, �� I I -� 12 x44 EE I 1 127 TYPICAL �6► i `s i --`:A I ��►'I� I \ —� _—� 127 I I I I I �i I 12"ZONE 1 CONTROL VALVE {\ I/ I — —f'''--- W ___� z �. ... - J I "� I 1 �126 1 I I 1 ��` N \ �,' '� ,L -- -� / // �wj� i N / ♦ z.�N�T ---- 1----------- / / / / / / PROPOSED 1 STA. 10�61-----126-----�' c - _ a 6-'-22 1 2' BEND 16"45 BEND Y -125 ♦ � /' ��♦ _ -�. q I I 1 PROPOSES I / ---- 1` \� I ���, \ ` I �� I�� ' /I�� �3o STA. 2+86 I 1 PROF;OSED PVC IRRIGATION MAIN 11 \ 1 \ - r� I L /� ' ,� _ _ - / _ _ -„ ° I I %� / I1 \\ \\I \ v, \ \ \ // ,�' I /'/ / % 12 45 BEAD-- I I / \ 1, \ \1 1 / / _ _/ I 1 _ �, - _ _ __ Y'' EXISTING IRRIGATION PIPS I \ \ i \ M i 1 1 / I / //\ii. r 9 _ I -_ I k �I \ 1 I 1 I /�•�1 tiI ;ti /I I ABANDONED IN PLACE, \ I \ I I I�� / I / I / I i�-I / _ '� \ \ I �� I— —-___I," / —_ / I � M I --- -4. -\ \ \ \ I \ \ \i I I I \ _- / / / / �I �1 • \ N I \ \� \ \I 1 �/ / - U` PROPQSEDTYPICAL STA. 1 i I P` 24+29 — e 1 1 / -�'? 1 PROPOSED U`�>II 1 STA. 25+05 _ i / 12"11.5 BEND / / i/ �/ / Fir2 ■ --/-- \ \ I I 1 I _ _�� �� / I / / I I/-428� 1 I 12" / oo/ I\ �� I _ � 1 \I i 1 / I 1 / / / �, / �■—r—� I ; / 1 ,1 6^\ I / \ \ •\ �� • \ 1 / I / / I ? \ \ I / _ ___ I1 \ \ I / / 1 / / / 1' // I I -- 1 / 4. \ I / / / / / 1 / 1 \ \ ` '� 1/4 160 I/ I 160 t PROFILE SCALE: HORIZ. 1= 50' VERT. 1= 5' 155 155 150 150 145 145 140 EXISTING IRRIGATION LINE 140 BEGIN 16" PVC EXISTING GROUND EXISTING IRRIGATION LINE IRRIGATION PROPOSED MAIN AT IRRIGATION - 3 COVER MIN. 135 PUMP STATION 135 A 130 I 130 12" CLEARANCE, TYPICAL — PROPOSED 12"X4" TEE Mill Api-ii, 125 PROPOSED 125 2-12" 22.5° BENDS PROPOSED PROPOSED 12"X12" TEE 16"X14" -TEE PROPOSED PROPOSED 120 PROPOSED 16" 45' BEND 16"X12" REDUCER PROPOSED 12" SDR21 PVC IRRIGATION MAIN 12" 11.25° BEND 12" 45° BEND 120 PROPOSED PROPOSED 2-12" 11.25° BENDS I 16" 22.5' BEND 115 PROPOSED FINAL DESIGN 115 16" 22.5° BEND FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 ,,,,,`N'�AR''�,,,, ;zo��oFEss�oti9'�=; _ eQ < , - % SEAL a - QSQ 034999 0 = v L°oF,y ��;� J ;� '','O °°°c!NE° --k ,\N �/ HONE \`\ '/''���/1IIII%1��``\ WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 50 25 50 '°° FM-1 PLAN AND PROFILE STA. 10+00 TO STA. 26+00 SHEET C -2 02 5 Regional Circle IN Suite A EFORFy GRAPHIC SCALE DIVISION VALUE = 50 FEET N9 811 o Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcg OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT TOk WILSON COUNTY, NORTH CAROLINA PROJECT MANAGER D. HONEYCUTT REVIEWER . DATE JANUARY 2020 PROJECT# 14.04042 FUNDING# E-SRP-W-17-0030 /AGING PP mcgillassociates.com NO. DATE BY DESCRIPTION L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 C200 SHEETS.DWG PLOT DATE 12/9/2020 1:42 PM WYNN WILSON 130 /III\ 'III / 1'11k 'III i1 'III 711TV • / f I / I NOTES: O - PLAN 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. NOTE: 2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES. 129 SEE SHEET C-100A FOR O •'9Zl 3'I Q 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. j28 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL. EROSION CONTROL EASURES _ ` co X (1, ff,� °"oj., 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING I / / UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, & RE -INSTALL EXISTING UTILITY CABLES. /I I' •• Zr, I W N � ,J PROPOSED Z. N'��.z STA. 27+43 _ - 12" 22.5' BEND �-0 ' �N, 5 PROPOSED o, �, I �,� \ STA. 26+12 _ - \ 12"45 BEND ^" �� /I I' /I I' fi i� /I i� /I i� fi i I I �� I I I I i / I i J ® / .' I / / i / ( I / % ,, WETLAND LIMITS TYPICAL /1 /� i I i ► II i -��`� f / ,I / / I ) I/ /I / / I I I I I I 1////,/ / / / / �� !. I / � , PROPOSED TEMPORARY / • / _ \ ?S - �/ \ SILT FENCE / / / 7 / i f / / N - / ' /' i / / / / / ,/ ,� \ I •J3 � Fm _ �� ter NV N� ,'' r / --- — I __, ` - NN/A: ` / 7 �1 I ''�'V I I I I I/ i/ / • , STA. 3430 PROPOSED LIMITS , ; �/ _ _ ' ! _41 \�-,2� ^� \ `� OF CONSTRUCTION ' ��', ��' , �;��' -'_ �' /'/all 11.25\ BEND ... -- ' �7 - / / ,2 \��o, �'/� 12 , _— J,-�'� — — �, -- i 1. ... _ ,, �g �� \ 12s— _ _ • . , /��� / // , / EXISTING WETLAND / / /Ili /I /I /I - /10\ / / S 7 PROPOSEI, 4 36" RCP ' I I ,,h I ' '�' ' ' I / 1 - - - — M � FM o 0 i + \�' _ ` // , o ��--- J \ i INV. IN: 121.42 --' 7/ . o �� o+ o \/ INV. OUT 121.06 ♦ \\ , \ ��.•. /�� o PROPOSED - 'J + I/ o+o �\ 1 -- STA. 33+75 ' / N III o+ co SEE DETAILS ON SHEET C-201 r`;���.`����4` / / —_ — .._ \ N__ 12" 11.25' BEN ---- _--i=_—_�� r� / /, ( , /'\ \\ \�\ _� ' EXISTING SOIL DRIVE / 69'SZ l /\3�3 43SOdObd / `I , - ►n / I / N. — —/ — -�— — — Q / _ - I,. I,. ,,I,.� Dili o — , - _ _ - — = i� cn , , _ \ M �' - J --z Ili cv ,/ y _--- a _ __ V PROPOSED 1.5:1 SLOPE 7 - _ 3NJy73f11 - %/ / \ / 11d��ma / ,� il II 2' ( Dili `, -7 / ,- —— VI / / / - �2� — _ — — — / — _�_ _ _ -- - I - ,— r —��— / \ N \ U Q 7 ,1� �Q\� �.,1� PR OSED 36"RCP �- ".�� INV. IN: 122.84 �� �� OUT 122.48 _ �,,2a� - ° _ _ . _ - �— �� ��� ,�° _ /' '/' /' � /I /' 7' / oo _ 3° / ' / -' PROPOSED 16' WI GRAVEL DRIVE /� I I i I /�\� I___ \ �' \,...- .-'INV. / i PROPOSED c / ��� '- I \\ �� J� _ / � PROPOD 12" PVC / // STA. 42+77 / // x ///7/,-' /' '� I f>, / / » »I' �,/ / / I' '' / / IRRIGATION MAIN 12 x12 TEE // '�✓ / / / STREAM LINE . / / / 1 /\�\ / I / / II // / / / //f\EX. ///// / '/ / /� // �\ / / / �. / I I /� ��/ I II \ �I MONITOR WELL #1 / �, 1% TOP CASING: 14"0.51' a I TOP CONCRETE: 13 7.71 f»,_41�1d I� —- / / / 12" \� -V / ZONE 5 \ // / /' / // CONTROL VALVE �\ \ / 1 \ / / I 1 / // // / \N ` / \\ / `` '' \ / \ \N /4? —� /% — �' PROPOSED .\ / ,/7 / / c \ I� / I gig - 1%.4%. I/ \ k/ STA. f31+61 - 2-12 45 BENDS 1 . 7 / �� ` \, \ \\ \ °.... „u. / \ \� \ 1 ffl �/ — ,,, — I./ / / / S9 0d -179Z :Ea 155 155 PROFILE 150 150 SCALE: HORIZ. 1= 50' VERT. 1= 5' 145 145 140 14A- 135 �_ a Jz 1 5 PROPOSEDf yAT PROPOSED 12"X12" PROPOSED 12" IRRIGATION TEE LINE 130 PROPOSED FILL PROPOSED 130 FINISH GRADE FOR ROAD BASE Ni() + �t-N co w EXISTING GROUND 3' COVER / MIN. ',' 4, z� I 4 IRRIGATION LINE 12" CLEARANCE 125 — w _ .� 125 ���� , � PROPOSED 2-12" 45' BENDS PROPOSED 2-12" 11.25' BENDS PROPOSED 12ff SDR21 PVC IRRIGATION MAIN 120 120 PROPOSED PROPOSED 12" 45' 115 BEND PROPOSED 12" 22.5' 36" 1' CLASS IV RCP WITH MINIMUM COVER, 115 INV. IN 122.84 BEND PROPOSED 4-36" CLASS INV. IV RCP OUT: 122.48 110 WITH SEE DETAILS INV. IN INV. OUT: 1' 121.42 MINIMUM COVER, 121.06 110 NOT FOR RELEASED REVIEW FINAL PURPOSES FOR DESIGN CONSTRUCTION ONLY 27+00 28+00 29+00 30+00 31 +00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41 +00 42+00 ,,,,`"N'CARo,,, ;_0escEssioti°0'ti = - °� = o SEAL 034999 0� ` CA = v �'%G/0����N��y�,J�\ °°°°ee EFOR81Fy WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 50 25 50 °° FM-1 PLAN AND PROFILE STA. 26+00 TO STA. 43+00 SHEET C m 203 mcg 5 Regional Circle Suite A 4 Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 GRAPHIC SCALE DIVISION VALUE = 50 FEET � Goy 1 o _,I,, C OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT TO N OF EL CITY W I LS O N COUNTY, NORTH CARO L I NA PROJECT MANAGER D. HONEYCUTT REVIEWER . DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # E-SRP-W-17-0030 GGING P mcgillassociates.com NO. DATE BY DESCRIPTION w z 0 /2020 3:22 PM MATTHEW 14.04042 C200 SHEETS.DWG PLOT DATE 11/ DRAWINGS I N E H U RST\DRAWINGS\2014\ 14.04042\D ES I G N • /- — / / Fr L 2 / - i I— —135— — / / r //X/ —4;3' _ / 47 fe 77 t / / Ill 51 1�I Rd—z 111 Rd + / ----136---� 7 _# /— / J /— , /, 1 , / / . / i f / pi L16- If L O ' Rd a Iii Ili a ++FFM- 7Tir- 7 - lir 74- 1 r--* I I_ ' lz r \ / 1' `,nI —T— +ti---�--FM--1-- I r 140 135 43+00 44+00 1 r 12r FM -..FM PROPOSED / STA. 47+78 12"X12" TEE 12" ZONE 6 — \ CONTROL VALVE 1 45+00 5 Regional Circle Suite A mcgill Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcgillassociates.com PROPOSED i RA FM \\ PROPOSED Ili / / I / / / • Rd PROPOSED HALF CIRCLE SPRAY HEAD 12" o l ot PROPOSED ' STA. 49+01 12" 11.25° BEND Rd Ili 121 FM h PROPOSED \ 0 STA. 51+62 / / 0 \ FU FU---i'd 4 . / FM 1 PLAN PROPOSED FULL CIRCLE SPRAY HEAD I GATION MAIN rr 1. .0._1 2 PROPOSED STA. 49+51 12" 11.25° BEND 0) 12" 11.25° BEND //---1-40m 2' IL. __ 14)/ I r - PI a‘/V -"-----v, , _ _ 112 I 0.-4 IT'/ I 747 — — AI k / Y /#_ %' 0 / / I / 2 / I 1,,,/ I / PROPOSED // EXISTING GROUND 12" CLEARANCE. TYPICALPROPOSED 12" 11.25° BEND FINAL DESIGN FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION 46+00 Opcz SEALk 034999'�G/�'.NGINEB yG4. E�H ON ,. 47+00 48+00 I 2 :111 2 / 2 STA. 50+09 /12" 11.25' BEND PROPOSED 12"X12" TEE PROPOSED 6" IRRIGATION LINE 49+00 50+00 000 PROPOSED STA. 50+91 12" 11.25' BEND PROPOSED STA. 50+31 12"x12" TEE 12" ZONE 4 CONTROL VALVE 1 / PROFILE SCALE: HORIZ. 1= 50' VERT. 1= 5' 3MIN. COVER PROPOSED 12" 11.25' BEND PROPOSED PROPOSED STA. 52+20 12" 11.25° BEND NOTES: FM FM FM— ' 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. 2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES. .--3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. '4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL. . 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING I UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL PROPOSED UTILITY LINE, & RE —INSTALL EXISTING UTILITY CABLES. — FM__FMFM al FM FM FM!/\A, Tv --k -- . Nk ,, �2....... - _ ,N, I ,,-Iiii., L\ \Ax N li O N .,_ \., - II Rd EXISTING SOIL DRIVE PROPOSED 16' WIDE GRAVEL DRIVE 12" SDR21 PVC IRRIGATION MAIN 51+00 52+00 53+00 NO. DATE BY DESCRIPTION RRd I I I \ I I \--,-/_ —\ ___/ PROPOSED END STA. 56+09.25 N 12" 90° BEND 12" ZONE 7 CONTROL VALVE 1 41_ 1\ 1 I I / I �I\ I 1 11 127 I PROPOSED IRRIGATION ZONE I 2 i I O O N FM FM 54+00 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY WILSON COUNTY, NORTH CAROLINA I PROPOSED 12" 90' BEND 55+00 50 0 i PROPOSED END STA. 56+09.25 56+00 25 50 100 GRAPHIC SCALE DIVISION VALUE = 50 FEET OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT IU—' V — --__ EX. MONITOR WELL #3 111-1 TOP CONCRETE: 143.87 TOP CASING: 146.64 DO NOT DISTURB \ FM N \ LIMITS OF DISTURBANCE 57-00 FM-1 PLAN AND PROFILE STA. 43+00 TO STA. 56+09.25 FM i PROJECT MANAGER D. HONEYCUTT REVIEWER DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # i SHEET C-204 L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:18 AM WYNN WILSON EC NORTH CAROLINA LAND QUALITY SECTION EROSION CONTROL NOTES NATIVE PLANT SEEDING MIX FOR STREAM OR RIVERBANK STABILIZATION 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE (MIN. 14 GAUGE 6"X6" WIRE) 6' MAX EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE I 1 I 44 UPDATED JULY, 2019 SEEDING FOR STREAM OR RIVERBANK STABILIZATION SHALL BE A MIXTURE OF NATIVE GRASSES, PLANTS AND TREES. NATIVE PLANT MIX SHALL INCLUDE THE FOLLOWING: GRASSES — BIG BLUESTEM (ANDROPOGON GERARDII), INDIAN GRASS (SORGHASTRUM NUTANS), LITTLE BLUESTEM (SCHIZACHYRIUM SCOPARIUM), SWITCHGRASS (PANICUM VIRGATUM). 15 LBS/ACRE EACH AUGUST THRU MAY — GREENRYE (SECALE CEREALE) 25 LBS/ACRE EACH MAY 1 THRU AUGUST — MILLET (PENNISETUM GLAUCUM) 25 LBS/ACRE GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH EACH REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ), DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), LAND QUALITY SECTION. THE FOLLOWING TREES — SILKY DOGWOOD (CORNUS AMOMUM), SILKY WILLOW (SALIX SERICEA), HAZEL ALDER (ALNUS CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. SERRULATA) AND ELDERBERRY (SAMBUUS CANADENSIS) 1. PRIOR TO BEGINNING WORK ON THE PROJECT THE CONTRACTOR SHALL OBTAIN FROM THE OWNER A NATIVE PLANT MIX VARIATIONS SHALL BE APPROVED BY ENGINEER COPY OF THE "EROSION AND SEDIMENT CONTROL APPROVAL" FROM THE NORTH CAROLINA DEPARTMENT NOTE: NO FERTILIZER SHALL BE USED WITHIN 10' OF TOP OF STREAM OR RIVER BANK. OF ENVIRONMENTAL QUALITY (NCDEQ). DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), DIVISION OF LAND QUALITY, OR THE LOCAL AUTHORIZED PROGRAM. THE APPROVAL NOTICE MUST BE 12. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. AVAILABLE ON —SITE DURING ALL GRADING AND CONSTRUCTION ACTIVITIES. 13. REQUEST FINAL APPROVAL BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, 2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY THE NORTH CAROLINA DEPARTMENT OF DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION. ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION. 14. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. NOTE: ALL UTILITY INSTALLATION WITHIN 25' OF A RIVER OR STREAM BANK SHALL BE INSTALLED PER STREAM PROTECTION DURING EXCAVATION DETAIL. SEEDING AND MULCHING SHALL BE COMPLETED DAILY TEMPORARY SEEDING SPECIFICATION 5' STEEL POST41 Ito (MIN. 1.25 LB/LF) PLASTIC OR /WIRE TIES wIRE----,.. r 2 FENCE '' . I I EXISTING 1 GRADE \ A� ��/�\\//\//\�/\\j ., o= \\\\\ //\\/\` Q W 3c,w 0o~ SECTION VIEW STING GROUNDI POST N WIRE FENCE / �// // // \ \/ //`O�!%=�``'' 'STEEL / "'`'''''°°"''''°'°' 0000000.•00.0 ooio,�'�'�'�'��'� i,`ppi���ioioioi�pi,��i,��i,��ip ;,:•;,,•;,,•i,,•,,•�,•;,,,,,,,•�,•�; ,,,,,,,,`�•,,,�:� oo.�0000.•oo. %����`''`°�`` FILTER FABRIC ''A ' ''' BACKFILL THOROUGHLYT / /\\ / / /\/ \`m // / TRENCH / (DisTU RBED AREA) EXISTING GROUND IN AREAS NOTED AS STREAM PROTECTION AREAS. SILT FENCE IN THESE AREAS SHALL NOT BE SEEDING MIXTURE: INSTALLED CLOSER THAN 5' FROM CREEK BANK UNLESS FIELD CONDITIONS PREVENT SUFFICIENT SPECIES RATE (lb/acre) CLEARANCE. ALL SILT FENCES SHALL BE INSPECTED AND CLEANED AS NEEDED AFTER EACH RAIN. RYE (grain) 120 SEEDING DATES: 3. NO WORK SHALL BE PERFORMED IN STREAM FROM OCTOBER 15 TO APRIL 15 (TO ACCOMMODATE COE AUG 15 TO DEC 30 AND DWQ RECOMMENDATIONS CONCERNING WORK IN TROUT WATERS.) SOIL AMENDMENTS: 4. CONTRACTOR IS TO PLACE PERMANENT STAKES MARKING CLEARLY THE 25' BUFFER FOR STREAMSFOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY WHERE SHOWN ON THE PLANS AND THE MARKERS ARE TO BE VISIBLE AT ALL TIMES DURING 2000 lb/ac GROUND AGRICULTURAL LIMESTONE AND/\///\//A/\ CONSTRUCTION. 750 lb/ac 10-10-10 FERTILIZER. 5. OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON —SITE INSPECTION BY A REPRESENTATIVE OF THE MULCH: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND APPLY 4000Ib/ac STRAW. ANCHOR STRAW BY TACKING w/ ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. RESOURCES, LAND QUALITY SECTION. A DISK w/ BLADES SER NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. 6. CONSTRUCTION SHALL BE LIMITED TO 2000' OF CONTIGUOUS ROAD CORRIDOR UNTIL ALL CUTS, FILLS, AND DITCHES ARE STABILIZED FOR THAT 2000' SECTION. UPON STABILIZATION OF THAT SECTION MAINTENANCE: RE —FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE, RE —SEED, ANOTHER 2000' SECTION CAN BE CONSTRUCTED AND STABILIZED. RE —FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION 7. ALL STREAM CROSSINGS AND PERENNIAL STREAMS WILL BE ALIGNED WITH THE NATURAL STREAM OR OTHER DAMAGE. PATTERNS ABOVE AND BELOW THE PROPOSED ROAD. ARCH CULVERTS WILL BE USED AND FOOTERS CUT/FILL SLOPES SEEDING SPECIFICATIONS - STEEPER THAN 3:1 \ NOTES: \\ 1. IMMEDIATELY FILTER BARRIERS SHALL BE INSPECTED AFTER EACH RAINFALL AND 2. DAILY REPAIR FABRIC DURING PROLONGED RAINFALL. SHALL BE MADE AS NECESSARY. SHALL BE REPLACED PROMPTLY SLOPE SLOPE <2% 2 TO 5% 5 TO 10%2 20% 20% LENGTH(FT) 100 75 50 125 MAXIMUM AREA(SQFT) 10,000 7,500 5,000 1,500 IF 3. 4.DESIGNECTIONNI FOUND SEDIMENT AFTER DEPOSITS HEIGHT TO BE IN DISREPAIR. DEPOSITS SHALL BE REMOVED EACH STORM EVENT AND WHEN REACH APPROXIMATELY 1/3 OF BARRIER. D MANUAL:6.62.TY SILT FENCE PLAN WILL BE CONSTRUCTED IN UNDISTURBED BANKS AWAY FROM THE STREAM FLOW. SEEDING MIXTURE: SPECIES RATE (lb/acre) 8. PROCEED WITH GRADING, CLEARING AND GRUBBING. NOTE: NO OFF SITE DISPOSAL OF MATERIAL IS TALL FESCUE 100 ALLOWED UNLESS THE DISPOSAL SITE HAS AN APPROVED EROSION CONTROL PLAN. SWITCHGRASS AND PARTRIDGE PEA MIX 30 KOBE LESPEDEZA 10 9. SEED AND PLACE EROSION CONTROL MATTING ON ALL CUT AND FILL SLOPES THAT ARE NOT ROCK NURSE PLANTS: IMMEDIATELY UPON COMPLETION OF SLOPE STABILIZATION. BETWEEN MAY 1 AND AUG 15, ADD 10Ib/ac GERMAN MILLET OR 15 lb/ac SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG 15, 10. ALL TEMPORARY STREAM AND CREEK CROSSINGS FOR EQUIPMENT DURING CONSTRUCTION SHALL BE ADD 40 lb/ac RYE (GRAIN). IT MAY BE BENEFICIAL TO PLANT THE MADE USING TEMPORARY BRIDGES. NO STREAM BANK OR STREAM BED DISTURBANCE SHALL BE GRASSES IN LATE SUMMER AND OVERSEED THE LESPENDEZAS ALLOWED FOR EQUIPMENT CROSSINGS. IN MARCH. 11. SEED AND MULCH DENUDED AREA WITHIN TIME FRAME SPECIFIED (SEE TABLE). SEED AND SOIL SEEDING DATES: AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE. BEST POSSIBLE STRAW MULCH SHALL BE TACKED WITH TACKING AGENT APPLIED BY HYDROSEEDER. AUG 25 — SEPT 15 AUG 20 — OCT 25 FEB 15 — MAR 20 FEB 1 — APRIL 15 LIME 4,000 LBS SOIL AMENDMENTS: FERTILIZER (10-10-10) 1,000 LBS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR KY-31 FESCUE (POA PRATENSIS) 100 LBS (MOWED AND MAINTAINED AREAS ONLY) APPLY 4000 lb/ac GROUND AGRICULTURAL LIMESTONE AND OR 750 lb/ac 10-10-10 FERTILIZER. CREEPING RED FESCUE 100 LBS (NATURAL AREAS AND STREAMBANKS) STRAW MULCH 60-80 BALES MULCH: FOR SUMMER SEEDING ADD TO THE ABOVE: APPLY 4000 lb/ac GRAIN STRAW OR EQUIVALENT COVER OF GERMAN MILLET (SETARIA ITALICA) 40 LBS ANOTHER SUITABLE MULCHING MATERIAL, ANCHOR MULCH BY SMALL —STEMMED SUDAN GRASS (SORGHUM BICOLOR) 50 LBS TACKING w/ ASPHALT, ROVING OR NETTING, NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. FOR WINTER SEEDING ADD TO THE ABOVE: RYE GRAIN (SECALE CEREALE 120 LBS MAINTENANCE: ) MOW NO MORE THAN ONCE A YEAR, RE —FERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. IF HYDROSEEDING, WOOD CELLULOSE MAY BE USED IN ADDITION TO STRAW MULCH AT THE RATE OF RE —SEED, RE —FERTILIZE, RE —MULCH DAMAGED AREAS IMMEDIATELY. 1,000 LBS PER ACRE. DITCH/OPEN AREA PERMANENT SEEDING SPECIFICATION EC SYMBOL 1 UPDATED MARCH, 2017 NOT TO SCALE POST STANDARD HARDWARE CLOTH — EXTEND 12" BELOW GRADE RIP RAP FACED WITH WASHED STONE — 6" #57 THK. MIN. GROUND /\/ = . � \ mi - / /\\ \�i�\�i\\�i\\�i s" � —OPTIONAL EXCAVATE s" 12" SEDIMENT TRENCH 5' x 10' x 2' DEEP TRAP x UPSLOPE ALONG LINE EXTENHARDWARE CLOTH EXTEND TRENCH. BACKFILL TRENCH COMPACT SECTION OF POSTS. SOIL. INTO AND ADDITIONAL HORIZONTAL BRACE AT OPENING s'—o" MAX. 4' O.C. I IL - ALL SEEDING SHALL BE MAINTAINED, WATERED ETC.., UNTIL A PERMANENT VEGETATIVE GROUND COVER SEEDING MIXTURE: IS ESTABLISHED OVER ALL DISTURBED AREAS. FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE: SPECIES RATE (Ib/ac)CD/II PURGE LIVE SEED SWITCHGRASS 4 LBS TALL FESCUE 250 (6 Ib/1000 sq ft) B R O WN TO P MILLET OR PEARL MILLET (PENNISETUM GLAUCUM) 8 LBS GRAIN SORGHUM (SORGHUM BICOLOR (L.) MOENCH SSP. BICOLOR) 2 LBS NURSE PLANTS:►i�������������������������• ALL SLOPES 2:1 OR STEEPER SHALL BE COVERED BY EROSION CONTROL MATTING. BETWEEN MAY 1 AND AU 15, ADD 10 lb/ac GERMAN MILLET OR 15 lb/ac SUDANGRASS, PRIOR TO MAY 1 OR AFTER AUG 15, NATIVE SEEDING: ADD 40 lb/ac RYE (GRAIN). I; I►�������������������������� u '������������� �.", ... A.�,�������4� STANDARD HARDWARE CLOTH — EXTEND 12" BELOW GRADE u ,,,,, ����������,�,�,�_�.� �i����•���',�i�i�i�• u ELEVATION SILT ATTACH HARDWARE CLOTH TO POST SECURELY WITH TIES u THE CORRECT SEEDBED pH IS 5.5 TO 6.5. SOIL AMENDMENTS: APPLY LIME AND FERTILIZE ACCORDING TO SOIL TEST, OR APPLY APPLY ZERO NITROGEN AT PLANTING. 4000 lb/ac GROUND AGRICULTURAL LIMESTONE AND 750 lb/ac 10-10-10 FERTILIZER. INCORPORATE SOIL AMENDMENTS INTO TOPSOIL/ROOT ZONE BEFORE SEEDING. MULCH: USE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF DITCHES. FIRM SEEDBED BEFORE SEEDING (TRAVEL WITH DOZER CLEATS). THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH AND IN OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THE HEIGHT, SEEDING DEPTH FOR ALL NATIVE SSP. EXCEPT E.GAMAGRASS (TRIPSACUM DACTYLOIDES) NEED TO BE DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4000 lb/ac 1 /4" — 1 /2". GREATER DEPTHS CAUSE HIGH SEED MORTALITY. GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH SPECIALIZED SEEDING IMPLEMENTS ARE REQUIRED. SEED MIXES AND RATES TO MATCH SEEDER USED. A DOWN SLOPE WHERE THEY CAN CLOG DRAINAGE DEVICES. NO —TILL, DROP SEEDER OR BROADCASTER WITH PRECISION METERING TO CONTROL SMALL SEED FLOW MAINTENANCE: AND PICKER WHEEL AGITATORS TO HANDLE FLUFFY SEED ARE BEST SUITED FOR NATIVE SEED. INSPECT AND REPAIR MULCH FREQUENTLY. RE —FERTILIZE IN LATE WINTER ACCORDING TO SOIL TESTS OR APPLY 150 lb/ac 10-10-10 FERTILIZER (3 Ib/1000 sq ft). MOW REGULARLY TO A HEIGHT OF 2" TO 4". NOTES: 1. FILTER BARRIERS SHALL BE IMMEDIATELY AFTER EACH RAINFALL DAILY DURING PROLONGED RAINFALL. REPAIR SHALL BE MADE AS INSPECTED 3. SEDIMENT DEPOSITS SHALL BE REMOVED AND AFTER EACH STORM EVENT AND WHEN DEPOSITS REACH APPROXIMATELY 1/3 NECESSARY. HEIGHT OF BARRIER. 2. FABRIC SHALL BE REPLACED IF FOUND TO BE IN DISREPAIR. PROMPTLY 4. SILT FENCE OUTLETS SHALL BE LOCATED AT LOW POINTS IN CONTINUOUS RUNS OF SILT FENCE. FINAL DESIGN FOR REVIEW PURPOSES ONLY RELEASED FOR CONSTRUCTION EC SILT FENCE - OUTLET NO UPDATED MARCH, 2017 NOT TO SCALE ,,,,,`N'�AR''�,,,, . �� °°°°°°°°°°°o,''-; oa�oFEss�oti°°ti = zaQ� 9<�� : a SEAL a _ QS° 034999 0 = v %°oF,y �;� J '', �O ,c!NE°yG�,`` HONE �`� ����������`�� WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 AS NOTED EROSION CONTROL DETAILS SHEET C .5 0 1 mcg 1011A 5 Regional Circle Suite A Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 ,�EFORFy � N9 ' °� ���' o � OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT TO N OF EL CITY WILSON COUNTY, NORTH CAROLINA PROJECT MANAGER D. HONEYCUTT REVIEWER . DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # E-SRP-W-17-0030 ��GING PP mcgillassociates.com NO. DATE BY DESCRIPTION L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:18 AM WYNN WILSON GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Site Area Description Stabilize within this many calendar days after ceasing land disturbance Timeframe variations (a) Perimeter dikes, swales, ditches, and perimeter slopes SAME DAY None (b) High Quality Water (HQW) Zones SAME DAY None (c) Slopes steeper than 3:1 SAME DAY If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed (d) Slopes 3:1 to 4:1 SAME DAY -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes flatter than 4:1 SAME DAY -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil I reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5 Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. 0 0 0 co to 0 �A PLAN ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER SILT FENCE BELOW GRADE WASHOUT STRUCTURE WASHOUT „k.."Es II aa,AP�E o=TVP �LOCATION DETERMINED HFIELD ICININI,112 INCHES OF FREEBOARD CONCRETE WASHOUT STRUCTURE NEEDS NOTING DEVICE ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self -inspections are required during below. When adverse weather or personnel to be in jeopardy, the inspection which it is safe to perform the inspection. greater than 1.0 inch occurs outside performed upon the commencement were delayed shall be noted in the Inspect Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event >1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDOs) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part Ill, Section C, Item (2)(a) of this permit of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be documented in the manner 1. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC Plan. Initial and date each E&SC Measure on a copy of the approved E&SC Plan or complete, date and sign an inspection report that lists each E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC Plan. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC Measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC Measures. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if passible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(1)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 FINAL DESIGN FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION 10' EXISTING ROAD 6" HUMP TO DIVERT RUNOFF FROM EXISTING ROAD 6" HUMP TO DIVERT RUNOFF FROM EXISTING ROAD 2"-3" COARSE AGGREGATE (RAILROAD BALLAST) 4' FILTER FABRIC FILTER FABRIC NOTES: 36' MIN. 1. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM AN EXISTING ROAD. 2. STONE TO BE 2 - 3 INCH WASHED STONE RAILROAD BALLAST. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET, WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. 6. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.06. TEMPORARY CONSTRUCTION ENTRANCE UPDATED MARCH, 2017 NOT TO SCALE 6" MIN. MATERIALS STORAGE FUEL STORAGE NOTES: EARTHEN BERM STABILIZED CONSTRUCTION ENTRANCE DUMPSTER SELECT FILL/ STONE TEMPORARY SPOILS STORAGE SILT FENCE PRIMARY SILT FENCE AROUND STOCKPILES (TYP.) 1. SITE TO BE ESTABLISHED TO PREVENT TRANSPORT OF SEDIMENTS/ CONTAMINANTS FROM SITE. 2. FUEL STORAGE AREA TO COMPLY WITH SPCC REQUIREMENTS FOR PETROLEUM/ OILS/ LUBRICANTS (POL) STORAGE. 3. CONTRACTOR SHALL MONITOR BMP'S ON A WEEKLY BASIS AND FOLLOWING SIGNIFICANT STORM EVENTS; MAKING REPAIRS AND/ OR PROVIDING ADDITIONAL BMP'S AS WARRANTED. LAYDOWN / STORAGE YARD UPDATED MARCH, 2017 NOT TO SCALE r mcgi Regional Circle I I Suite A Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcgillassociates.com 0%1 1111111//,/ SSS‘'‹N•C•ARo//0/ 0,c)C ESSioti•°4 =o� -1%7 _ oQ <o SEAL o E a o 034999 0 . • ��LiO'o,Nc t.1 HON ''"llllllltttt�` NO. DATE BY DESCRIPTION WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY WILSON COUNTY, NORTH CAROLINA AS NOTED OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT EROSION CONTROL DETAILS 2 PROJECT MANAGER D. HONEYCUTT REVIEWER DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # E-SRP-W-1 7-0030 SHEET 0-502 14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:18 AM WYNN WILSON UNDISTURBED EARTH CONCRETE THRUST BLOCK BEND CONCRETE THRUST BLOCK \ \ \\ \ \ TYPICAL THRUST BLOCKS FOR BENDS TRENCH WIDTH THREADED ROD (GALVANIZED OR BITUMINOUS COATED) BLOCK CONCRETE THRUST \//\t/ \ \\\\/{\\//\\ \ y/\//\\ \/i \\\\\\\\\��, \ THREADED ROD (GALVANIZED /\/\/, . • ° - •" \//// OR BITUMINOUS COATED) II• • 0 E UNDISTURBED EARTH U , zo wN P 47,• • °M • r • • II ° i UNDISTURBED EARTH //1 PIPE �AMETERS E ////k\\\//>/,/. TYPICAL THRUST BLOCK FOR REDUCERS THREADED ROD (GALVANIZED OR BITUMINOUS COATED) TRENCH WIDTH CONCRETE THRUST BLOCK \ iN 3= !Es 3J THREADED ROD (GALVANIZED OR BITUMINOUS COATED) PLUG /\/ \/\//\ UNDISTURBED EARTH /\/\/\\ //\//A \\i / TYPICAL THRUST BLOCK FOR PLUGS UNDISTURBED EARTH CONCRETE THRUST BLOCK 3/4" TAP W/ CORPORATION STOP FOR AIR PRESSURE RELIEF CONCRETE THRUST BLOCK A /\ A TEE '— UNDISTURBED EARTH TYPICAL THRUST BLOCKS FOR TEES NOTES: 1. FITTING JOINTS SHALL NOT BE POURED IN CONCRETE OR HAVE CONCRETE SPILLED ON THE BOLTS OR NUTS. THE FITTING SHALL BE WRAPPED IN A LAYER OF POLYETHYLENE PLASTIC PRIOR TO POURING THE THRUST BLOCK. 2. ROD AND EYE BOLT DIAMETER SHALL BE A MINIMUM OF 3/4" AND SHALL MATCH THE SIZE OF THE BOLT PROVIDED WITH THE FITTING. 3. CONTRACTOR SHALL REPLACE FITTING BOLTS WITH THREADED ROD FOR 1/2 OF THE BOLTS SUPPLIED WITH EACH FITTING. RODS SHALL BE EQUALLY SPACED. TYPE SIZE 11-1 /4° BEND 22-1 /2° BEND 45° BEND 90° BEND TEE PLUG 2-6 12 12 12 16 16 14 8 12 12 16 22 22 18 10 12 14 20 28 28 22 12 12 18 24 32 32 28 14 14 20 28 38 38 32 16 16 22 32 42 42 36 18 18 26 36 48 48 40 20 20 28 40 52 52 44 24 24 34 46 64 64 54 30 30 42 58 78 78 66 36 36 50 70 94 94 80 42 40 58 80 108 108 92 48 46 66 90 124 124 104 THRUST BLOCK DIMENSION "A" S THRUST BLOCKING - ALL 28 UPDATED MARCH, 2017 NOT TO SCALE BACKFILL MATERIAL COMPACTED IN 6" LIFTS BACKFILL MATERIAL COMPACTED IN 3" LIFTS No.12 COATED COPPER TRACING ,\ WIRE \/\\/ APPROVED WARNING TAPE 24" ABOVE PIPE \\/\\�\\‘ V\\%\\` \-\/\/. \ / * / / / / UNDISTURBED EARTH BACKFILL MATERIAL COMPACTED IN 6" LIFTS SPRING LINE OF PIPE No.12 COATED COPPER TRACING WIRE CLASS I EMBEDMENT NOTES: STANDARD EXCAVATION UNDISTURBED EARTH BACKFILL MATERIAL COMPACTED IN 6" LIFTS BACKFILL MATERIAL COMPACTED IN 3" LIFTS No.12 COATED COPPER TRACINGWIRE APPROVED WARNING TAPE 24" ABOVE PIPE UNDISTURBED EARTH OVERCUT EXCAVATION DUCTILE IRON GRAVITY SEWER BACKFILL MATERIAL COMPACTED IN 6" LIFTS SPRING LINE OF PIPE No.12 COATED COPPER TRACING WIRE CLASS I EMBEDMENT APPROVED WARNING TAPE 24" ABOVE PIPE > UNDISTURBED EARTH STANDARD EXCAVATION PVC GRAVITY SEWER APPROVED WARNING TAPE 24" ABOVE PIPE \\ \12�' MAX/, \\ STANDARD EXCAVATION IN WET CONDITIONS BACKFILL MATERIAL COMPACTED IN 6" LIFTS SPRING LINE OF PIPE No.12 COATED COPPER TRACING WIRE CLASS I EMBEDMENT FOUNDATION STONE FOR UNDERCUT EXCAVATION ONLY AS DIRECTED BY ENGINEER UNDISTURBED EARTH APPROVED WARNING TAPE 24" ABOVE PIPE MAX' UNDERCUT EXCAVATION IN UNSTABLE SOILS TYPES PIPE IN WET OR UNSTABLE CONDITIONS ALL PIPE TYPES (AS DIRECTED BY ENGINEER) 1. CONSTRUCTION OF TRENCHES SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY AND HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE REGULATIONS AND FOLLOW THEM ACCORDINGLY. 2. FOR UNIT PRICE CONTRACTS ONLY, PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL QUANTITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH SHOWN ON THIS DETAIL. 3. FOR UNIT PRICE CONTRACTS ONLY, PAYMENT FOR FOUNDATION STONE UNDERCUT SHALL BE FOR THE LENGTH OF THE TRENCH REQUIRING UNDERCUT X 6" DEPTH INCREMENTS TO THE DEPTH REQUIRED. 4. CLASS I EMBEDMENT SHALL BE NCDOT STANDARD # 67 STONE OR APPROVED EQUAL. FOUNDATION STONE SHALL BE NCDOT STANDARD # 57, # 67 STONE, RAILROAD BALLAST OR APPROVED EQUAL. GRAVITY SEWER TRENCHING DETAILS UPDATED MARCH, 2017 NOT TO SCALE BACKFILL MATERIAL COMPACTED IN 6" LIFTS /\ BACKFILL MATERIAL / COMPACTED IN 3" LIFTS APPROVED WARNING TAPE 24" ABOVE PIPE BACKFILL MATERIAL COMPACTED IN 6" LIFTS BACKFILL MATERIAL COMPACTED IN 3" LIFTS No.12 COATED COPPER TRACING WIRE UNDISTURBED J UNDISTURBED EARTH STANDARD EXCAVATION NOTES: NOTE: BELL HOLES NOT SHOWN EARTH OVERCUT EXCAVATION 1. CONSTRUCTION OF TRENCHES SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY AND HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE REGULATIONS AND FOLLOW THEM ACCORDINGLY. 2. PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL QUANTITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH SHOWN ON THIS DETAIL. S SEWER FORCE MAIN TRENCHING 24 UPDATED FEBRUARY, 2018 NOT TO SCALE FINAL DESIGN FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION J mcgill 5 Regional Circle Suite A Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcgillassociates.com NO. DATE BY DESCRIPTION WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY WILSON COUNTY, NORTH CAROLINA AS NOTED OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT SANITARY SEWER DETAILS PROJECT MANAGER D. HONEYCUTT REVIEWER DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # E-SRP-W-17-0030 SHEET 0-503 14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:18 AM WYNN WILSON FINISHED GRADE i e a / COMPACTED BACKFILL— CONCRETE BRICK SUPPORT a d \ ' ♦ ♦ and ? d ♦ ♦ < ♦ ad WORD "SEWER" CAST IN TOP 24"x24"x4" CONCRETE PAD ADJUSTABLE CAST IRON VALVE BOX (SCREW TYPE) 7 CONCRETE BRICK SUPPORT PLUG VALVE COMPACTED BACKFILL CONCRETE SUPPORT PAD 6" LARGER THAN VALVE (REQUIRED ON VALVES 10" AND LARGER ONLY) PLUG VALVE UPDATED MARCH, 2017 NOT TO SCALE 9" 27 1 /2" 36" MIN. BURY DEPTH 1" PVC CONCRETE BLOCK 1" VALVE WI HANDWHEEL OPERATOR 18" YARD HYDRANT WOODFORD IOWA MODEL Y1 OR APPROVED EQUAL i" STANDARD NOZZLE WITH OPTIONAL 1" NOZZLE 24" 6x6 10/10 WWF—\_ \-3'-6"x2'-6"x4" CONCRETE SPLASH BLOCK STD. VALVE BOX AND LID 11" GALVANIZED STEEL CASING PIPE 1" VALVE BODY WITH 1" NPT INLET #67 STONE YARD HYDRANT UPDATED MARCH, 2017 NOT TO SCALE CORNER POST CAP BARBED WIRE (3 STRANDS) V V V V V V V 1/ V V V V'"V V V V V V V V'"V V V V V 2r CORNER POST TENSION BAR WIRE TIES 15" O.C. (TYP) No.9 GAUGE WIRE 2" MESH (TYP.) TENSION WIRE —)42500 PSI �j CONCRETE (TYP) 2" CLEARANCE (TYP) 10'-0" MAX. (TYP.) f V V V V V VVVVV V V V V VVVV V V V V VV 2" LINE POST i:!rrri►:!:!:!i►:!Ati►:!:!:!:! _AtAti►.44. \,\\\\\\\\\ \\ \//\\/�\/�\\��\\ice\��\/�\\\��\ j\ \/3'-0" �\\ MN. %\ (TYP.) \ %� 9" MIN. (TYP.) 1-3" MIN. (TYP.) BARBED WIRE (3 STRANDS) FABRIC TO MATCH THAT USED IN LINE OF FENCE • e\/ GALV. 8"S D. PIPE we \//�/��//, /\ \/4\/ MIN. CHAIN LINK FENCE and DOUBLE GATE UPDATED MARCH, 2017 NOT TO SCALE WELD ALL JOINTS PADLOCK HOLE 6'-0" `. ��.YV/i�/��/i�/YV/i�/\\/ 2500 PSI J7t.4/17\,_9;.\\\,\ d it CONCRETE ((TYP.) SEMI —SELF DRAINING CENTER STOP MIN. (TYP.) —3" MIN. (TYP.) EXISTING BASE COURSE DRY/ cUNDISTURBED EARTH 8" MIN. CABC COMPACTED TO 100% SD._ PROCTOR' 4" LIFTS TO MATCH EXISTING GRAVEL SURFACE EXISTING BASE COURSE 6" LIFTS OF SUITABLE SOIL OR CABC AT OPTIMUM MOISTURE COMPACTED 95% STANDARD PROCTOR GRAVEL DRIVE REPAIR UPDATED MARCH, 2017 NOT TO SCALE FINAL DESIGN FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION mcgill 5 Regional Circle Suite A Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcgillassociates.com , 0FE /04;o/j,Pct % SEAL O ad 034999 0 '�Gi�',�G I N E� yG`� 0aoddISs ��, 4. H ONE ,. NO. DATE BY DESCRIPTION WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY WILSON COUNTY, NORTH CAROLINA AS NOTED OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT SITE DETAILS PROJECT MANAGER D. HONEYCUTT REVIEWER DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # E-SRP-W-17-0030 SHEET 0-504 14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:19 AM WYNN WILSON GENERAL PERMIT REQUIREMENT NOTES NOTES: STATEMENT OF PERMIT AND CONTRACTOR RESPONSIBILITIES 1. PROJECT SITE CONTAINS JURISDICTIONAL WATERS OF THE U.S (WOTUS). 2. PROJECT INVOLVES IMPACTS TO WOTUS IN SEVERAL LOCATIONS. 3. PROPOSED IMPACTS TO WOTUS ARE REGULATED BY THE CLEAN WATER ACT SECTIONS 404 AND 401. 4. PERMITS HAVE BEEN OBTAINED BY SCOTLAND COUNTY ECONOMIC DEVELOPMENT, LAURINBURG, NC TO AUTHORIZE THE PROPOSED IMPACTS TO WOTUS AND ARE SUBJECT TO THE TERMS AND CONDITIONS OF THE PERMITS. 5. CWA 404/401 PERMIT REQUIREMENTS, TERMS, AND CONDITIONS ARE SUMMARIZED ON THIS SHEET ALONG WITH VARIOUS ASSOCIATED DETAILS AND SPECIFICATIONS. 6. A COPY OF THE PERMITS HAVE BEEN PROVIDED TO THE CONTRACTOR AT THE PRE -CONSTRUCTION MEETING. THE CONTRACTOR IS RESPONSIBLE FOR READING THE PERMITS, PLANS AND SPECIFICATIONS, AND UNDERSTANDING HIS/HER RESPONSIBILITIES UNDER THE PERMITS, WHICH INCLUDE BUT ARE NOT LIMITED TO: AVOIDANCE OF IMPACTS TO WETLANDS OUTSIDE PERMITTED AREA, WORKING IN THE DRY, STOCK PILING AND REUSE OF WETLAND SOILS IN THE PERMITTED CROSSING AREA, RESEEDING WITH NATIVE SPECIES FOR PERMANENT COVER. A) COMPLIANCE WITH ALL PERMIT CONDITIONS RELATING TO CONTRACTED CONSTRUCTION ACTIVITIES BOTH ON -SITE AND OFF -SITE, IF OFF -SITE AREAS ARE USED FOR PROJECT RELATED PURPOSES (EG: ACCESS, LAYDOWN, STAGING, BORROW, WASTE, ETC.) B) COMMUNICATION OF PERMIT COMPLIANCE RESPONSIBILITIES TO SUBCONTRACTORS WORKING ON THE PROJECT. C) COORDINATION WITH PROJECT ENGINEER REGARDING PERMIT COMPLIANCE RELATED ISSUES AND QUESTIONS. D) IMMEDIATE REPORTING TO PROJECT ENGINEER OR OWNER OF ANY VIOLATION OR SUSPECTED VIOLATION OF PERMIT CONDITIONS. E) A COPY OF ALL PERMITS AND CONDITIONS SHOULD BE MADE AVAILABLE AT THE PROJECT SITE DURING CONSTRUCTION AND MAINTENANCE ACTIVITIES. PERMITTED WETLAND SEEDING REQUIREMENTS ALL SEEDING SHALL BE MAINTAINED, WATERED ETC.., UNTIL A PERMANENT VEGETATIVE GROUND COVER IS ESTABLISHED OVER ALL DISTURBED AREAS. FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE: PURE LIVE SEED SWITCHGRASS BROWNTOP MILLET GRAIN SORGHUM 4 LBS 8 LBS 2 LBS ALL SLOPES 2:1 OR STEEPER SHALL BE COVERED BY EROSION CONTROL MATTING. NATIVE SEEDING: THE CORRECT SEEDBED pH IS 5.5 TO 6.5. APPLY ZERO NITROGEN AT PLANTING. INCORPORATE SOIL AMENDMENTS INTO TOPSOIL/ROOT ZONE BEFORE SEEDING. FIRM SEEDBED BEFORE SEEDING (TRAVEL WITH DOZER CLEATS). SEEDING DEPTH FOR ALL NATIVE SSP. (EXCEPT E.GAMAGRASS) NEED TO BE 1/4" - 1/2". GREATER DEPTHS CAUSE HIGH SEED MORTALITY. SPECIALIZED SEEDING IMPLEMENTS ARE REQUIRED. SEED MIXES AND RATES TO MATCH SEEDER USED. A NO -TILL, DROP SEEDER OR BROADCASTER WITH PRECISION METERING TO CONTROL SMALL SEED FLOW AND PICKER WHEEL AGITATORS TO HANDLE FLUFFY SEED ARE BEST SUITED FOR NATIVE SEED. NATIVE PLANT SEEDING MIX FOR WETLAND. STREAM OR RIVERBANK STABILIZATION SEEDING FOR WETLAND, STREAM OR RIVERBANK STABILIZATION SHALL BE A MIXTURE OF NATIVE GRASSES, PLANTS AND TREES. NATIVE PLANT MIX SHALL INCLUDE THE FOLLOWING: GRASSES - BIG BLUESTEM, INDIAN GRASS, LITTLE BLUESTEM, SWITCHGRASS AUGUST THRU MAY - GREENRYE MAY 1 THRU AUGUST - MILLET 5 LBS/ACRE EACH 25 LBS/ACRE EACH 25 LBS/ACRE EACH WETLAND GRASSES - HOP SEDGE (CAREX LUPUUNA), BLUNT BROOM SEDGE (CAREX SCOPARIA), FOX SEDGE (CAREX VULPINOIDEA), DEERTONGUE (PANICUM CLANDESTINUM), EASTERN BUR REED (SPARGANIUM AMERICANUM), SOFT RUSH (JUNCUS EFFUSUS). TREES - SILKY DOGWOOD (CORNUS AMONUM), SILKY WILLOW (SALIX SERICEA), HAZEL ALDER (ALMUS SERRULATA) AND ELDERBERRY (SAMBUEUS CANADENSIS) NATIVE PLANT MIX VARIATIONS SHALL BE APPROVED BY ENGINEER. NOTE: NO FERTILIZER SHALL BE USED WITHIN 10' OF TOP OF STREAM OR RIVER BANK. COIR MATTING BASE FLOW WATER ELEVATION -III III III III II' ELEVATION BANK OR BENCH • TRENCH TOP OF MATTING TO A DEPTH OF AT LEAST 12", STAKE OR STAPLE IN PLACE, & BACKFILL TO DESIGN GRADE • MINIMUM 24" ECO-STAKES® INSTALLED ALONG TOE OF MATTING (INTERCEPT BETWEEN WATER SURFACE AND BANK) • 0.75" X 0.75" OPENINGS 460 G/M WEIGHT 12" ECO-STAKE® (TYP.) 24" ECO-STAKE® (TYP.) r 24" ECO-STAKE® (TYP.) COIR MATTING DETAIL NOT TO SCALE •♦4.,.���`♦�0-0,�♦�♦��`♦♦�.�♦�A�, 44, P'Oiii♦i�►��������i���� PLAN 12" ECO-STAKE® (TYP.) • MINIMUM 2' CENTERS ALONG BOTTOM • MINIMUM 1' OVERLAP AT JOINING SECTIONS OF COIR MATTING • 12" ECO-STAKES® INSTALLED IN BANK FLUSH WITH COIR MATTING ABOVE BOTTOM ROW OF 24" ECO-STAKES® • ECO-STAKES® SPACED AT MAXIMUM 3' CENTERS (APPROX.) BOTH DIRECTIONS NOTES: NCDEQ GENERAL CONDITIONS 1. CONSTRUCTION CORRIDORS IN WETLANDS AND ACROSS STREAM CHANNELS WILL BE MINIMIZED TO THE MAXIMUM EXTENT PRACTICABLE AND WILL NOT EXCEED 50' WIDE FOR GAS UTILITY LINES AND 40' WIDE FOR ALL OTHER UTILITY LINES. EXCEPTIONS TO THIS CONDITION REQUIRE APPLICATION TO AND WRITTEN APPROVAL FROM DWR. FOR CONSTRUCTION CORRIDORS IN WETLANDS AND ACROSS STREAM CHANNELS, STUMPS WILL BE GRUBBED ONLY AS NEEDED TO INSTALL THE UTILITY AND REMAINING STUMPS SHOULD BE CUT OFF AT GRADE LEVEL. THE GENERAL STRIPPING OF TOPSOIL WITHIN WETLANDS ALONG THE CONSTRUCTION CORRIDOR IS NOT PERMITTED. 2. PERMANENT MAINTAINED ACCESS CORRIDORS IN WETLANDS AND ACROSS STREAM CHANNELS WILL BE RESTRICTED TO THE MINIMUM WIDTH PRACTICABLE AND SHALL NOT EXCEED 30' WIDE FOR GAS UTILITY LINES AND 20' WIDE FOR ALL OTHER UTILITY LINES EXCEPT AT MANHOLE LOCATIONS. 15' X 15' PERPENDICULAR VEHICLE TURN-AROUNDS ARE ALLOWED IN ACCESS CORRIDORS BUT MUST BE SPACED AT LEAST 500' APART. EXCEPTIONS TO THIS CONDITION REQUIRE APPLICATION TO AND WRITTEN APPROVAL FROM DWR. 3. THE CONTRACTOR WILL HAVE A SPECIFIC PLAN FOR RESTORING WETLAND CONTOURS. ANY EXCESS MATERIAL WILL BE REMOVED TO A HIGH GROUND DISPOSAL AREA. THE MIXING OF TOPSOIL AND SUBSOILS WITHIN THE WETLANDS ALONG UTILITY CORRIDORS SHOULD BE MINIMIZED TO THE GREATEST EXTENT PRACTICAL. DURING EXCAVATION, THE SOILS WILL BE PLACED ON FABRIC TO MINIMIZE IMPACTS WHENEVER POSSIBLE. TOPSOIL EXCAVATED FROM UTILITY TRENCHES WILL BE PILED SEPARATELY FROM SUBSOILS AND WILL BE BACKFILLED INTO THE TRENCH ONLY AFTER THE SUBSOILS HAVE BEEN PLACED AND COMPACTED. 4. NO WASTE, SPOIL, SOLIDS, OR FILL OF ANY KIND CAN OCCUR IN WETLANDS OR WATERS BEYOND THE FOOTPRINT OF THE IMPACTS (INCLUDING TEMPORARY IMPACTS) AS AUTHORIZED IN THE WRITTEN APPROVAL FROM DWR; OR BEYOND THE PERMITTED THRESHOLDS WITHOUT WRITTEN AUTHORIZATION. NO REMOVAL OF VEGETATION OR OTHER IMPACTS OF ANY KIND CAN OCCUR TO STATE REGULATED RIPARIAN BUFFERS BEYOND THE FOOTPRINT OF IMPACTS APPROVED IN A BUFFER AUTHORIZATION OR VARIANCE OR AS LISTED AS AN EXEMPT ACTIVITY IN THE APPLICABLE RIPARIAN BUFFER RULES. 5. ALL DEVICES SHALL BE MAINTAINED ON ALL CONSTRUCTION SITES, BORROW SITES, AND WASTE PILE (SPOIL) SITES, INCLUDING CONTRACTOR OWNED OR LEASED BORROW PITS ASSOCIATED WITH THE PROJECT. SUFFICIENT MATERIALS REQUIRED FOR STABILIZATION AND/OR REPAIR OF EROSION CONTROL MEASURES AND STORMWATER ROUTING AND TREATMENT SHALL BE ON -SITE AT ALL TIMES. 6. SEDIMENT AND EROSION CONTROL MEASURES WILL NOT BE PLACED IN WETLANDS OR WATERS EXCEPT WITHIN THE FOOTPRINT OF TEMPORARY OR PERMANENT IMPACTS AUTHORIZED UNDER THE PERMITS. EXCEPTIONS TO THIS CONDITION REQUIRE APPLICATION TO AND WRITTEN APPROVAL FROM DWR. 7. EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE MUST NOT BE USED ALONG STREAMBANKS OR WITHIN WETLANDS. EXCEPTIONS TO THIS CONDITION REQUIRE APPLICATION TO AND WRITTEN APPROVAL FROM DWR. 8. AN NPDES CONSTRUCTION STORMWATER PERMIT (NCG010000) IS REQUIRED FOR CONSTRUCTION PROJECTS THAT DISTURB ONE OR MORE ACRES OF LAND. THE NCG010000 PERMIT ALLOWS STORMWATER TO BE DISCHARGED DURING LAND DISTURBING CONSTRUCTION ACTIVITIES AS STIPULATED IN THE CONDITIONS OF THE PERMIT. IF THE PROJECT IS COVERED BY THE PERMITS, FULL COMPLIANCE WITH PERMIT CONDITIONS INCLUDING THE EROSION AND SEDIMENTATION CONTROL PLAN, INSPECTIONS AND MAINTENANCE, SELF -MONITORING, RECORD KEEPING AND REPORTING REQUIREMENTS IS REQUIRED. 9. ALL WORK IN OR ADJACENT TO STREAMS SHOULD BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA. APPROVED BEST MANAGEMENT PRACTICES FROM THE MOST CURRENT VERSION OF THE NC SEDIMENT AND EROSION CONTROL MANUAL, OR THE NC DOT CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL, SUCH AS SANDBAGS, ROCK BERMS, COFFERDAMS, AND OTHER DIVERSION STRUCTURES SHOULD BE USED TO MINIMIZE EXCAVATION IN FLOWING WATER. EXCEPTIONS TO THIS CONDITION REQUIRE APPLICATION TO AND WRITTEN APPROVAL FROM DWR. 10. CULVERTS WILL BE DESIGNED AND INSTALLED IN SUCH A MANNER THAT THE ORIGINAL STREAM PROFILES ARE NOT ALTERED AND ALLOW FOR AQUATIC LIFE MOVEMENT DURING LOW FLOWS. THE DIMENSION, PATTERN, AND PROFILE OF THE STREAM ABOVE AND BELOW A PIPE OR CULVERT WILL NOT BE MODIFIED BY WIDENING THE STREAM CHANNEL OR BY REDUCING THE DEPTH OF THE STREAM IN CONNECTION WITH THE CONSTRUCTION ACTIVITY. THE WIDTH , HEIGHT, AND GRADIENT OF A PROPOSED CULVERT SHALL BE SUCH AS TO PASS THE AVERAGE HISTORICAL LOW FLOW AND SPRING FLOW WITHOUT ADVERSELY ALTERING FLOW VELOCITY. PLACEMENT OF CULVERTS AND OTHER STRUCTURES IN STREAMS SHOULD BE BELOW THE ELEVATION OF THE STREAMBED BY ONE FOOT FOR ALL CULVERTS WITH A DIAMETER GREATER THAN 48", AND 20% OF THE CULVERT DIAMETER FOR CULVERTS HAVING A DIAMETER LESS THAN OR EQUAL TO 48", TO ALLOW LOW FLOW PASSAGE OF WATER AND AQUATIC LIFE. IF MULTIPLE PIPES OR BARRELS ARE REQUIRED, THEY SHOULD BE DESIGNED TO MIMIC THE EXISTING STREAM CROSS SECTION AS CLOSELY AS POSSIBLE INCLUDING PIPES OR BARRELS AT FLOOD PLANE ELEVATION AND/OR SILLS WHERE APPROPRIATE. WIDENING THE STREAM CHANNEL SHOULD BE AVOIDED. WHEN TOPOGRAPHIC CONSTRAINTS INDICATE CULVERT SLOPES OF GREATER THAN 5%, CULVERT BURIAL IS NOT REQUIRED, PROVIDED THAT ALL ALTERNATIVE OPTIONS FOR FLATTENING THE SLOPE HAVE BEEN INVESTIGATED AND AQUATIC LIFE MOVEMENT/CONNECTIVITY HAS BEEN PROVIDED WHEN POSSIBLE (E.G. ROCK LADDERS, CROSS VEINS, ETC.). NOTIFICATION, INCLUDING SUPPORTING DOCUMENTATION TO INCLUDE A LOCATION MAP OF THE CULVERT, CULVERT PROFILE DRAWINGS, AND SLOPE CALCULATIONS, SHOULD BE PROVIDED TO DWR 60 CALENDAR DAYS PRIOR TO THE INSTALLATION OF THE CULVERT. WHEN BEDROCK IS PRESENT IN CULVERT LOCATIONS, CULVERT BURIAL IS NOT REQUIRED PROVIDED THAT THERE IS SUFFICIENT DOCUMENTATION OF THE PRESENCE OF BEDROCK. NOTIFICATION, INCLUDING SUPPORTING DOCUMENTATION SUCH AS A LOCATION MAP OF THE CULVERT, GEOTECHNICAL REPORTS, PHOTOGRAPHS, ETC. SHALL BE PROVIDED TO DWR A MINIMUM OF 60 CALENDAR DAYS PRIOR TO THE INSTALLATION OF THE CULVERT. IF BEDROCK IS DISCOVERED DURING CONSTRUCTION, THEN DWR SHALL BE NOTIFIED BY PHONE OR EMAIL WITHIN 24 HOURS OF DISCOVERY. IF OTHER SITE SPECIFIC TOPOGRAPHIC CONSTRAINTS PRECLUDE THE ABILITY TO BURY THE CULVERTS AS DESCRIBED ABOVE AND/OR IT CAN BE DEMONSTRATED THAT BURYING THE CULVERT WOULD RESULT IN DESTABILIZATION OF THE CHANNEL, THEN EXCEPTIONS TO THIS CONDITION REQUIRE APPLICATION TO AND WRITTEN APPROVAL FROM DWR. 11. APPLICATION OF FERTILIZER TO ESTABLISH PLANTED/SEEDED VEGETATION WITHIN DISTURBED RIPARIAN AREAS AND/OR WETLANDS WILL BE CONDUCTED AS AGRONOMIC RATES AND MUST COMPLY WITH ALL OTHER FEDERAL, STATE AND LOCAL REGULATIONS. FERTILIZER APPLICATION WILL BE ACCOMPLISHED IN A MANNER THAT MINIMIZES THE RISK OF CONTACT BETWEEN THE FERTILIZER AND SURFACE WATERS. 12. IF CONCRETE IS USED DURING CONSTRUCTION, THEN ALL NECESSARY MEASURES WILL BE TAKEN TO PREVENT DIRECT CONTACT BETWEEN UNCURED OR CURING CONCRETE AND WATERS OF THE US. WATER THAT INADVERTENTLY CONTACTS UNCURED CONCRETE CAN NOT BE DISCHARGED TO WATERS OF THE US. 13. ALL PROPOSED AND APPROVED TEMPORARY FILL AND CULVERTS MUST BE REMOVED AND THE IMPACTED AREA RETURNED TO NATURAL CONDITIONS WITHIN 60 CALENDAR DAYS AFTER THE TEMPORARY IMPACT IS NO LONGER NECESSARY. THE IMPACTED AREAS WILL BE RETURNED TO ORIGINAL GRADE, INCLUDING EACH STREAM'S ORIGINAL CROSS SECTIONAL DIMENSIONS, PLANFORM PATTERN, AND LONGITUDINAL BED PROFILE. ALL TEMPORARY IMPACTS SHOULD BE RESTORED AND STABILIZED WITH NATIVE VEGETATION. 14. ALL PROPOSED AND APPROVED TEMPORARY PIPES/CULVERTS/RIP-RAP PADS ETC. IN STREAMS SHOULD BE INSTALLED AS OUTLINED IN THE MOST RECENT EDITION OF THE NC SEDIMENT AND EROSION CONTROL PLANNING AND DESIGN MANUAL OR THE NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES SO AS NOT TO RESTRICT STREAM FLOW OR CAUSE DIS-EQUILIBRIUM DURING USE OF THIS CERTIFICATION. 15. ANY RIP -RAP REQUIRED FOR PROPER CULVERT PLACEMENT, STREAM STABILIZATION, OR RESTORATION OF TEMPORARILY DISTURBED AREAS WILL BE RESTRICTED TO THE AREA DIRECTLY IMPACTED BY THE APPROVED CONSTRUCTION ACTIVITY. ALL RIP -RAP SHOULD BE PLACED SUCH THAT THE ORIGINAL STREAM ELEVATION AND STREAM BANK CONTOURS ARE RESTORED AND MAINTAINED, SHOULD NOT RESULT IN THE DE -STABILIZATION OF STREAM BED OR BANKS UPSTREAM OR DOWNSTREAM OF THE AREA, AND SHOULD NOT RESTRICT AQUATIC LIFE PASSAGE. 16. ANY RIP -RAP USED FOR STREAM OR SHORELINE STABILIZATION WILL BE OF SIZE AND DENSITY TO PREVENT MOVEMENT BY WAVE, CURRENT, OR STREAM FLOWS, WILL CONSIST OF CLEAN ROCK OR MASONRY MATERIAL. RIP -RAP SHOULD NOT BE INSTALLED IN THE STREAMBED EXCEPT IN SPECIFIC AREAS REQUIRED FOR VELOCITY CONTROL AND TO ENSURE STRUCTURAL INTEGRITY OF BANK STABILIZATION MEASURES. 17. ALL MECHANIZED EQUIPMENT OPERATED NEAR SURFACE WATERS SHOULD BE INSPECTED, FUELED, LUBRICATED, AND MAINTAINED REGULARLY AND MAINTENANCE PERFORMED IN A MANNER TO PREVENT CONTAMINATION OF STREAM WATER FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS, OR OTHER TOXIC MATERIALS. 18. HEAVY EQUIPMENT WORKING IN WETLANDS WILL BE PLACED ON MATS OR OTHER MEASURES TAKEN TO MINIMIZE SOIL DISTURBANCE. 19. THE CONTRACTOR OR OTHER RESPONSIBLE ENTITY WILL REPORT ANY PETROLEUM SPILL OF 25 GALLONS OR MORE; ANY SPILL REGARDLESS OF AMOUNT THAT CAUSES A SHEEN ON SURFACE WATERS; ANY PETROLEUM SPILL REGARDLESS OF SIZE THAT OCCURS WITHIN 100-FEET OF SURFACE WATER; AND ANY PETROLEUM SPILL LASS THAN 25 GALLONS THAT CANNOT BE CLEANED UP WITHIN 24 HOURS. WETLAND NOTES - NCDEQ GENERAL CONDITIONS: 1. FOR ALL UTILITY LINES CONSTRUCTED WITHIN WETLANDS, AN ANTI -SEEP COLLAR SHALL BE PLACED AT THE DOWNSTREAM (UTILITY LINE GRADIENT) WETLAND BOUNDARY AND EVERY 150 FEET UP THE GRADIENT UNTIL THE UTILITY EXITS THE WETLAND. ANTI -SEEP COLLARS MAY BE CONSTRUCTED WITH CLASS B CONCRETE, COMPACTED CLAY, PVC PIPE, OR METAL COLLARS. WETLAND CROSSINGS THAT ARE DIRECTIONALLY DRILLED, AND PERPENDICULAR WETLAND CROSSINGS THAT ARE OPEN CUT AND LESS THAN 150 FEET LONG DO NOT REQUIRE ANTI -SEEP COLLARS. 2.THE MIXING OF TOPSOIL AND SUBSOILS WITHIN THE WETLANDS ALONG UTILITY CORRIDORS SHALL BE MINIMIZED TO THE GREATEST EXTENT PRACTICAL. DURING EXCAVATION, THE SOILS SHALL BE PLACED ON FABRIC TO MINIMIZE IMPACTS WHENEVER POSSIBLE. TOPSOIL EXCAVATED FROM UTILITY TRENCHES WILL BE PILED SEPARATELY FROM SUBSOILS AND WILL BE BACKFILLED INTO THE TRENCH ONLY AFTER THE SUBSOILS HAVE BEEN PLACED AND COMPACTED. WETLAND CONTOURS SHOULD BE RESTORED TO ORIGINAL CONDITIONS. 3.SEDIMENT AND EROSION CONTROL MEASURES SHALL NOT BE PLACED IN WETLANDS OR WATERS EXCEPT WITHIN THE FOOTPRINT OF PERMITTED TEMPORARY OR PERMANENT IMPACTS. 4.EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE SHALL NOT BE USED ALONG STREAMBANKS OR WITHIN WETLANDS. 5.ALL WORK IN OR ADJACENT TO STREAMS SHALL BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA. 6.PERMANENT CULVERTS SHALL BE DESIGNED AND INSTALLED IN SUCH A MANNER THAT THE ORIGINAL STREAM PROFILES ARE NOT ALTERED AND ALLOW FOR AQUATIC LIFE MOVEMENT DURING LOW FLOWS. 7.ALL TEMPORARY FILL AND CULVERTS SHALL BE REMOVED AND THE IMPACTED AREA SHALL BE RETURNED TO NATURAL CONDITIONS WITHIN 60 CALENDAR DAYS AFTER THE TEMPORARY IMPACT IS NO LONGER NECESSARY. THE IMPACTED AREAS SHALL BE RESTORED TO ORIGINAL GRADE, INCLUDING EACH STREAM'S ORIGINAL CROSS -SECTIONAL DIMENSIONS, PLANFORM PATTERN, AND LONGITUDINAL BED PROFILE. ALL TEMPORARILY IMPACTED SITES SHALL BE RESTORED AND STABILIZED WITH NATIVE VEGETATION. 8.ANY RIP -RAP REQUIRED FOR PROPER CULVERT PLACEMENT, STREAM STABILIZATION, OR RESTORATION OF TEMPORARILY DISTURBED AREAS SHALL BE RESTRICTED TO THE AREA DIRECTLY IMPACTED BY THE APPROVED CONSTRUCTION ACTIVITY. THE RIP -RAP SHALL BE OF A SIZE AND DENSITY TO PREVENT MOVEMENT BY WAVE, CURRENT ACTION, OR STREAM FLOWS, AND SHALL CONSIST OF CLEAN ROCK OR MASONRY MATERIAL FREE OF DEBRIS OR TOXIC POLLUTANTS. ALL RIP -RAP SHALL BE PLACED SUCH THAT THE ORIGINAL STREAM ELEVATION AND STREAMBANK CONTOURS ARE RESTORED AND MAINTAINED. 9.ALL MECHANIZED EQUIPMENT OPERATED NEAR SURFACE WATERS SHALL BE INSPECTED AND MAINTAINED REGULARLY TO PREVENT CONTAMINATION OF STREAM WATERS FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS, OR OTHER TOXIC MATERIALS. HEAVY EQUIPMENT WORKING IN WETLANDS SHALL BE PLACED ON MATS OR OTHER MEASURES SHALL BE TAKEN TO MINIMIZE SOIL DISTURBANCE. NOTE: WHERE THERE IS ANY OVERLAP OF REQUIREMENTS BETWEEN PERMITTED STREAM AND WETLAND DETAILS AND NOTES (AS SHOWN ON SHEETS C-506 AND C-507) AND ANY EROSION AND SEDIMENTATION CONTROL DETAIL/NOTE OR ANY OTHER ASPECT OF THE CONTRACT PLANS AND SPECIFICATIONS, CONTRACTOR SHALL CONFIRM WITH ENGINEER PRIOR TO BEGINNING WORK IN WETLAND AREA. FINAL DESIGN FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION PA 5 Regional Circle Suite A mcgill Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcgillassociates.com J • NO. DATE BY DESCRIPTION WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY WILSON COUNTY, NORTH CAROLINA AS NOTED OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT PERMITTED STREAM AND WETLAND CROSSING CONDITIONS PROJECT MANAGER D. HONEYCUTT REVIEWER DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # E-SRP-W-17-0030 SHEET 0-505 14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:19 AM WYNN WILSON GEOTEXTILE FILTER FABRIC 6" #57 STONE GEOTEXTILE FILTER BAG SIZED FOR PUMP DISCHARGE (MIN. 10'X15') GEOTEXTILE FILTER FABRIC 6" #57 STONE NOTES: PLAN SEWN -IN PIPE DISCHARGE SLEEVE 8" MIN. WATER IN TRENCH PUMP DISCHARGE HOSE ATTACHMENT POINT FOR PUMP DISCHARGE ATTACHMENT POINT FOR PUMP DISCHARGE PUMP DISCHARGE HOSE \/\/\//�\/\\/\\/\/\\�\\��\,\ \/�\/�\\//\\//\\///\//\ INSTALL ON LESS THAN5% SLOPE SECTION UNDISTURBED EARTH 1. FILTER BAG SHALL BE CONSTRUCTED OF NON —WOVEN FILTER FABRIC WITH A MIN. 8 OZ/SQUARE YARD WEIGHT 2. FILTER BAG FABRIC SHALL HAVE A FLOW RATE OF 80 GPM/S.F. OR SIZED FOR PUMP DISCHARGE 3. SILT BAG SHALL HAVE SLEEVE SEWN —IN SLEEVE FOR RECEIVING THE PUMP DISCHARGE AND PUMP HOSE SHALL BE SECURELY ATTACHED TO SILT BAG 4. SILT BAG SHALL BE REPLACED WHEN HALF FULL OR PUMP DISCHARGE RATE IS REDUCED ENOUGH TO CAUSE OVERFLOW. CONTRACTOR SHALL PROVIDE ADDITIONAL BAGS AS REQUIRED. 5. BOTH FILTER BAG AND SILT WITHIN SHALL BE DISPOSED OF IN A PROPER MANNER AFTER MATERIAL INSIDE IS DRY, RESULTING IN NO DISCHARGE TO THE STREAM * CONTRACTOR SHALL INSPECT DISCHARGE FROM SILT BAG AND/OR SOCK TO PREVENT SEDIMENT OR TURBIDITY IN RECEIVING WATERS. SUCTION HOSE • Pt /\/%/%/%/%/ BERM SECTION / ISOMETRIC NOTES: PUMP INSERT DISCHARGE HOSE INTO DEWATERING FILTER TUBE/ SOCK ///\/ WRAP ROP\\ FOR SECURE SEAL. PUMP DISCHARGE HOSE DEWATERING FILTER TUBE/ SOCK 1. CONSTRUCT A STABILIZED EARTHEN BERM BETWEEN THE DEWATERING DEVICE AND THE TRENCH TO PROTECT THE TRENCH IN THE EVENT OF A FAILURE. 2. PLACE DEWATERING FILTER TUBE/ SOCK ON THE GROUND OR ON A TRAILER OVER A RELATIVELY LEVEL, STABILIZED AREA. 3. INSERT DISCHARGE PIPE FROM PUMP SUFFICIENTLY FAR INTO DEWATERING FILTER TUBE/ SOCK AND SECURE WITH A ROPE WRAPPED AROUND THE SNOUT OF THE BAG, OR PER MANUFACTURER INSTRUCTIONS. SECURE THE OTHER END OF THE TUBE BY FOLDING THE OPEN END BACK ON ITSELF, AND THEN WRAPPING THAT END WITH A ROPE, OR PER MANUFACTURER INSTRUCTIONS. TYPICAL SILT BAG 4. EMPTY DEWATERING FILTER TUBE/ SOCK WHEN: (1) HALF FULL OF SEDIMENT; (2) WHEN THE SEDIMENT HAS REDUCED THE FLOW RATE OF THE PUMP DISCHARGE TO AN IMPRACTICAL AMOUNT; OR (3) PER MANUFACTURER INSTRUCTIONS. MAINTENANCE AND DISPOSAL: 1. REMOVE AND DISPOSE OF ACCUMULATED SEDIMENT IN A PRE —APPROVED LOCATION AWAY FROM WATERWAYS OR ENVIRONMENTALLY SENSITIVE AREAS. OPEN BOTH ENDS OF THE DEWATERING FILTER TUBE/ SOCK, PICK IT UP IN THE CENTER AND DUMP ACCUMULATED SEDIMENT OUT OF BOTH ENDS, OR PER MANUFACTURER INSTRUCTIONS. 2. ALLOW TO DRY AND STORE FOR RE —USE OR; AS DIRECTED BY ENGINEER OR INSPECTOR. TRENCH DEWATERING DETAIL UPDATED FEBRUARY, 2018 NOT TO SCALE TYPICAL SILT SOCK — CLOSED END No.12 COATED COPPER TRACING WIRE (PVC ONLY) 1'-0" BELOW BOTTOM OF TRENCH 6" APPROVED WARNING TAPE 24" ABOVE PIPE (PVC ONLY) —18" TRENCH WIDTH 6" NOT TO EXCEED 40 FEET BETWEEN COLLARS /v v v \/ \/ 2 /12", /\/,-6-4 <- 2 -7 2/ 2 2/ 2./2./2./2./2./2„ SECTION d a' e ° a° e G• ° PLAN UTILITY LINE (DIAMETER VARIES) CLASS B CONCRETE OR COMPACTED CLAY CLASS B CONCRETE OR COMPACTED CLAY nANTI-SEEP COLLAR UPDATED MARCH, 2017 NOT TO SCALE UPDATED MARCH, 2017 NOT TO SCALE PROPOSED SILT FENCE PROPOSED TEMPORARY PUMP AROUND X PROPOSED DIRECT BURIED SEWER LINE PROPOSED DIRECT BURIED WATER MAIN ENERGY DISSIPATOR x X r- 2 X X TOP OF BANK EXISTING STREAM WORK AREA IMPERVIOUS DIKE\ TO BE INSTALLED \ IN CHANNEL X PUMP DEWATERING DEVICE IMPERVIOUS DIKE PROPOSED SILT FENCE CMS 77/ TEMPORARY BYPASS NOTES 1. Install all erosion control measures as shown on Erosion Control Plan and in this detail. 2. Construct impervious dike (recommend sand bags or other easily removable material) on upstream side of existing channel and install temporary bypass pump to divert water around construction area. All material must be completely removed following construction. 3. Construct impervious dike (recommend sand bags or other easily removable material) on downstream side of existing channel to prevent backing up of stream water into the construction area. 4. Dewater the construction area using another temporary pump and discharge water into a dewatering basin until sediment has settled and water can be discharged back into stream. Dewatering basin must be outside of any restricted buffer areas, use wattles instead of earth berm if reasonable. 5. Begin construction of buired water line and elevated sewer line across existing channel. Contractor shall inspect system daily before beginning any construction. No construction shall continue if system is not fully operational. 6. Any wash material removed from bypass area should be stored outside the flood zone or regulated buffer area until construction is complete. 7. Upon installation and backfill of water main excavation and installation of aerial sewer main, remove bypass system within (2) two calendar days. 8. Stabilize all areas disturbed during construction. Stream bed and banks must be returned to pre —construction conditions. 9. Contractor shall receive prior approval from engineer if choosing to use another method in lieu of bypass channel. PROPOSED EASEMENT TEMPORARY STREAM BYPASS UPDATED APRIL 2018 NOT TO SCALE PA 5 Regional Circle Suite A mcgill Pinehurst, NC 28374 910.295.3159 NC Firm License # C-0459 mcgillassociates.com J NO. DATE BY DESCRIPTION WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY WILSON COUNTY, NORTH CAROLINA AS NOTED OFFICE MANAGER D. CHAPMAN DESIGNER D. HONEYCUTT STREAM AND WETLAND CROSSING DETAILS PROJECT MANAGER D. HONEYCUTT REVIEWER DATE JANUARY 2020 PROJECT # 14.04042 FUNDING # E-SRP-W-17-0030 SHEET 0-506 14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY