HomeMy WebLinkAbout20201736 Ver 2_14.04042 - Elm City WWTP Plan Sheets_20220303z
0
0:23 AM WYNN W
2 C200 SHEETS.DWG PLOT DATE 11/
DRAWINGS
z
0
in
W
N
N
(.9
0
H
tY
2
W
z
0
J
/
J
AL
AL
AL
MARSH
AL
EXISTING
1
AL
/
J
/— /- ,�
�_� /
r.•
AL
AL
'T \\
/ AL 'Li I A
I //r. .f
S N N
I
AL
.L\
AL
126�\ /
AL
\•\
�� \ /•:\
A, • r 25
/
/
I /'_�
l / — -128• ) ►/ 4"x2" -111
/ / // /` / ` /K REDUCER
/ /,L 129' / / /11
3--7,
/ 10
/ / /
�// /
/ 1�\
i
/ RkDUCER
•
/ I
/
/ /2„
/• /
- ▪ _ ,13
-
7—
/
• -135
136., I
.137.\
H
01 5
ZONE 2
AL
- 123
-724
+- -129"
I I
-130
T
PROPO 'ED
FILL AT 1.5:1 SLOPE
WITE-(RIPRAP PROTECTION
AL
AL
PROP@SED
4-36" RCP
SEE DETAILS THIS SHEET
AL
AL
AL
ALL .JIL
AL AL
aL. .JL
'1
AL AL AL AL jk
,'<1' 1ryh PROPOSED 16' WO-.)(
' N // GRAVEL DRIVE' 1 / \�
AL J
/ / - , �/ \ —
' / /) \
/—
132 I //
x _ \
\ 2,
/ Th \�
\ ,L \ .1
I I RE
I I
( 1-1/=
"x3"
DUCE
1
/ \ - • • //
I ,72y / EXISTING SOIL DRIVE
/ , \�
/ 4'I 13 )
I * \
I /f �fi / �/I ,1 1
/�k 4 1 // 4r -- s 1
4 --I-
I
4t / ///
< \��'
—
~.�S�A \
4`
8"
(
SHARPE, JOHN LLOYD JR.
PIN: 3736-72-2734.000
DB 1158, PG 308
\
l I
PROPOSED j 12" PVC IRRIGATION MAI /
I
AL
AL
AL
AL
/
AL
l/
-TK 1.5" 22.5' #""-
PLAN
— / — \ — - - _— —
11- BEND v� 4-v i1
,2y� // J/ 1.5 x2'
r / / I / REDUCER
X1.5" -730
TEE
c2"
REDUCER/ I TE
6" 22.5'
BEND
,� 4>k1.5" 6"x2"
3"„� TEE TEES
1,;-
3»x2„ 1.5" 45'
TEE BEND _ � 14" /
12"�112" TEE I
/ 1 2'` GATE YALVEI 14
I
11 '
/1
I \
/
ry
I W , ,L. I `I ^�
I
_2-1--N r I I T (r
8"
8„ u �_ 8» 8 -� 3" 1.5" v 1.5" 4
/ ` / 3 x1.5" EDUCER BEND `L
^� //~ // 1 _-� l --/ // `— 1-1/2" 4" '�4o
N ��
FN
/ / 135 �� ' 2">�1 5" R DUCER 3 \
\
8
—FlA-----N---�
/
2
CLASS A RIPRAP ARMOR
IN WETLAND AREA
SELECT SOIL AS REQUIRED
2' UNDERCUT OF EXISTING SOIL
8" CABC
16'
4" FT
GRAVEL ROAD CROSS-SECTION
NOT TO SCALE
CLASS A RIPRAP ARMOR
IN WETLAND AREA
16'
8" CABC
1 4"
4" T
8" SELECT SOIL 32 LF 36" RCP
7" EMBEDMENT
2' UNDERCUT OF EXISTING SOIL
GRAVEL ROAD CROSS-SECTION AT CULVERT
NOT TO SCALE
5 Regional Circle
Suite A
mcgi Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcgillassociates.com
/
/
4"x1
'17'2 _L112"
Rd-
3"x1.5" REDUCER
EXISTING IRRIGATION MAIN
SHALL BE PLUGGED AND
ABANDONED IN PLACE, TYPICAL
FINAL DESIGN
FOR REVIEW PURPOSES ONLY
NOT RELEASED FOR CONSTRUCTION
/
1.7
L
FIELONBOUNDARY
ZONE 2
I REDUCER
•
REDUCER
:..00! BEND
II I / E /-"7 / r
NOTES:
1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES.
3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES.
N
4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL.
5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING
UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL
PROPOSED UTILITY LINE, & RE -INSTALL EXISTING UTILITY CABLES.
- -121-
��
/
1titi—
ryry
—
/ / I I \ N
1 \ \
/ \ ryti
/ / I ice,
1 tftNU '1, _
6'x1.5
TEE �^ i �► 1 \ _ --1-- 1
N / 6?s [\ \ \ I \\ \ \ I I
`18\ \ \ \�\ ----BENSI�
N. \ \ \`I\ \ �i 1 = - - -I
1 N 121�„ ,J�\ \��_ ,. �__
BEND
3"
2"
2"x1.5" REDUCER
2"x1.5" REDUCER
TEE 2,01
ZONE 1 ) ------- 443,7--hn-
67 — F mt — - 7 - -8F ti --
1-1/2"
EXISTING SPRAYFIELD LINE TO
/
REDUCE
6"x4"
TEE
46"
REDUCER
6"
aLic1.5" REDVCER
1-1/2"
"PROPO-SEK
CONTRO
N
1-1/2" \
4"
2.5"x2 REDUCER
x2" REDUCER/
1) 22.1 5'''I?ND
I r
if
244.11
BEND /
1-1/2"
1,1
aro
r?/- 7- / IZ1 24--: 7-FM --._Th-- "- - - —Om 111
III
4"x3" REDUCER
II
11
II
II 10"x4" CROSS
-
co 1
EMAIN IN SERVICE, TYPICAL
NO.
DATE
BY
DESCRIPTION
It
4"x2" REDUCER
4" 90'
BEND E
o
cp
ZONE 2
1.5"x3" TEE
r_37x1.5" TEE
3"
BEND '
4"x2
TEE
BEND
4"x2" TEE
4" 45'
BEND
BEND
--
OS
SAI
PROPOSED REPLAC/7-)-
EXISTING Er ZONE 3
CONTROL VALVE
\ NOTE:
\ SEE SHEET C-100A FOR
\ EROSION CONTROL MEASURES
/7/ /
ZONE 3
PROPOSED IRRIGATION
PROPOSED CHEMICAL
STORAGE BUILDING
PROPOSED CHLORINE
CONTACT BASIN
PROPOSED
3” ZONE 3 CONTROL VALVE
EXISTING SECONDARY LAGOON
ZONE 3
/
TOWN OF ELM CITY
PIN: 3736-84-0309.000
DB: 1267, PG: 879
PROPOSED FULL CIRCLE.--
SPRAYHEAD, TYPICAL
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
TOWN OF ELM CITY
WILSON COUNTY, NORTH CAROLINA
100
50
100
1
0
0
0
0
7
EXISTING DITCH LINE, TYPICAL
PROPOSED
/ HALF CIRCLE
SPRAYHEAD,
TYPICAL
200
GRAPHIC SCALE DIVISION VALUE = 100 FEET
PROPOSED
TEMPORARY
SILT FENCE
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
ZONE 2
MAYER, JOHN E.
PIN: 3736-94-4252.000
DB 2264, PG 541
WALTON, CAROL L.
WALTON, GEORGE E.
PIN: 3736-93-4425.000
DB 2100, PG 14
•
FM
LEGEND
PROPOSED FULL CIRCLE HEAD
PROPOSED PARTIAL CIRCLE HEAD
PROPOSED IRRIGATION MAIN
EXISTING IRRIGATION MAIN
EXISTING IRRIGATION MAIN ABANDONED IN
PLACE
EXISTING FIELD BOUNDARY
PARCEL LINE
EXISTING FIELDS 1-3 IRRIGATION SYSTEM
IMPROVEMENTS
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
SHEET
C-201
14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY
301A
}
z
0
PM WYNN W
2 C300 SHEETS.DWG PLOT DATE 11/
DRAWINGS
z
0
w
0
N
INEHURST\DRAWINGS\2014
It
I\
PROPOSED
TEMPORARY
GRAVEL
CONSTRUCTION
III
ENTRANCE II
II
II
I
II
HOMESTEAD -ROAD
IF
Alb
/
1/
AL
AL
.ALIO
/
/
.'
AL
/ AL
I
FINAL DESIGN
FOR REVIEW PURPOSES ONLY
NOT RELEASED FOR CONSTRUCTION
AL/
.I
S
AL
or
.d
' 1
1
AIL
/
" 45° BEND
»x2» /--�
DUCER
-�\
.5" 22.57 BEND I\
1.5"x2"
REDUCE
1.5" 45° BEND
1.5"x2"
REDUCER
EXISTING MONITOR WELL #4 DO NOT DISTURB
/
V
V /
/
ELL
/
1.5" 22.5° BEND
1.5"x2"
REDUCER
1.5" 22.5° BEND
1.5"x2"
REDUCER
/
/
11.5" 45° BEND
1.5"x2"
I REDUCER
1.5"
8" 45° BEND
11.5" 22.5' BEND
1.5"x2"
IREDUCER
I
/
f 14
1.5"
8"x2" TEE
2"
8"x2" TEE
1.5" 22.5° BENDI\
1.5"x2" �--a •
REDUCER
EXISTING WELLS DO NOT
DISTURB
8"x12"
REDUCER
1.5..
2"
FM
6"x1.5" TEE
7
If
8"x1.5" TEE
8"x2" TEE
1.5" 45° BEINID.
1.5"x2"
REDUCER
8"x2" TEE
I.
n
"
8" r- 8"x1.5" TEE /
\
1.5"
2"
1.5"
2"
8"
/ 1.3"
/ \
l \
\ 3"x2" TEE
I N
\
I
I - \ 1.5"
/
N
AL � ,r AL
1.5" 11.25' BEND
1.5"x2"
a REDUCER
3"x2" TEE
4"x6"
REDUCER
6"x1.5" TEE
6"x2" TEE
6"x8"
REDUCER
3"
8"x1.5" TEE
4"x1.5" TEE
1.5
a
AL AL
A
/
/
100 FT
/
/
WETLAND
SETBACK
/
/
/ 3" 22.5° BEND
3"x4"
REDUCER
4"x2" TEE
6"x1.5" TEE/'
6"x2" TEE
PROPOSED SPRAY HEAD
DISTRIBUTION AREA, TYP.
SEE SHEET C-301
PROPOSED TEMPORARY
SILT FENCE, TYPICAL
TOWN OF ELM CITY
PIN: 3736-45-5400.000
DB: 2607, PG: 154
PROPOSED HALF CIRCLE
SPRAY HEAD, TYPICAL
1.5"
1
2"
1.5" 90° BEND
1.5"x3" REDUCER
3" 1 5" TEE
3"x1.5" TEE`
AL
AL
/
N
/
/
/
3"x1.5" TEE
1.5" 22.5° BEND
1.5"x2"
REDUCER
PLAN
AL AL
NOTES:
1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES.
3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES.
4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL.
5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING
UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL
PROPOSED UTILITY LINE, Sc RE -INSTALL EXISTING UTILITY CABLES.
AL
AL AL
EXISTING TREES AND/OR SHRUBS TO
BE CLEARED ONLY AS REQUIRED FOR
IRRIGATION SYSTEM INSTALLATION
N\
1.5"x3"
REDUCER
3"x1.5" TEE
k° BEND\
J
AL
V
/
/
\\\ I I A
N
��/ I •�N
/
/
/
/
s,.
4"x2" TEE
)e5 11.25° BEND
1.5"x2" ' N
REDUCER
6" 45° BEND
1.5"
0-- FM
6"x1.5" TEE
6"x2" TEE
2"
"
PROPOSED FULL CIRCLE
SPRAY HEAD, TYPICAL
1.5"
rFm
8"x1.5" TEE
PROPOSED SPRAYFIELD
LIMITS, TYPICAL
8"x1.5"TEE
2"
1.5"
FM
1, I
a
RE U'CER M ATCH LI N E SHEET C- 304 /"x1.5" TEE
1.5" 4
�°x1.5 ` TEE /8 "x1.5" TEE
EXISTING MONITOR WELL #3 g" g0° BEND
• NOT DI .
4" 45° BEND
1.5"
Rd d
1.5"
4'x6"
DUCER
4"x1'5" TEE
6"x1.5" TEE 1.5"
1.5" 2 6"x1.5" TEE0
W IJ
6" 22.5
6"x1.5" TEE
BEND
/ 6"x12"
8"
"
•
AL AL
A
EXISTING WETLANDS
EXISTING DENSE SHRUBS
3"x1.5" ITEE
i
1.5-
pm
/ �3"x1.5" TEE
/ / S:l►
4"x2" TEE
4"x2" TEE
•
I
4"x6"
REDUCER
6"x8"
REDUCER
/
/ 8"x2" TEE
,,
AL AL
NOTE:
SEE SHEET C-100A FOR
ER2SION CONTEOL MEASUf ES
1.5" 90° BEND
3"x4"
REDUCER
4"x2"
ity
TEE
1.5" 22.5° BEND
1.5"x2" /
REDUCER
1 ooFT
WETLAND
SETBAC
/
AL
AL
PROPOSED
12" 90° BEND
12" ZONE 7 C NTROL VALVE
AL
1.5"x3"
REDUCER
3 \2" TEE 1
WETLAN00FTD
`?/ SETBACK
3" 45° BIND
\ 1.5" 22.5' BEND
1.5"x2"
\ REDUCER
J
/
/
/
/
EXISTING LIMITS
OF DENSE BRUSH
AL
AL AL
AL
AL
PROPOSED GRAVEL DRIVE
8" 11.25° BEND
EXISTING SOIL DRIVE
I
III,
o.
AL
\
ALL
/
/
AL AL
AL
\\
\ \\\\ �\ 1 I
`1\ \\ \ I II
\ \ \\ \ I�q 11 II I/ /
\\ 1 1 I I I
I I I II
I I 11
I \ \ \ \ \ I 1
AL
I I \\\\\
I I \ Yt\Ih
I / / 1
11 11III 1\
EXIS I1NG TREEI IN l I \
II I I \\\\\\�
I l \ \ \ \
\ \ \ \�
�/ / I l I \ 1
/ / \\I
7V 7/ / I 1 I \
I►\
�- / /i
// �,I� / /AL \ \\ AL
(/ \ \
\\
100
WETLAND
SETBACK \
FM
12"x8" TEE
12"x12" TEE
8''�•12'�
REDUCER
1.5
•
EXISTING MONITOR WELL #5
,119 T DO NOT DISTURB
SETBACK
1.5"
(3"x1.5" TEE
I
REDUCER
If
1.5"
PROPOSED
12" ZONE 4
CONTROL VALVE
6" 901 BEND
FM
-
'`QT / 3”x1.5” TEE
4-e•
•
•
RED C
1.
6"x2" TEE
2"
6”x6” TEE
Fld
1.5"
12%6' TEE
0
FM
LEGEND
PROPOSED FULL CIRCLE HEAD
PROPOSED PARTIAL CIRCLE HEAD
PROPOSED IRRIGATION MAIN
EXISTING IRRIGATION MAIN
EXISTING IRRIGATION MAIN ABANDONED IN
PLACE
PROPOSED FIELD BOUNDARY
PARCEL LINE
to
•
.5'
AL
AL
CD
o
LLI
LPL
LLI
AL
idb
AL
flI
AL
UCER
REDUCER
4''x1.5” TEE ni
1...:L.,
12" 45° BEND
0° BEND
FM
•
1.57
_3"x1.5" 2
REDUCER /
DUC
It
TEE
-
•
2"
TEE
)3''
•
•
PIA
71
RED
3 22.5° BEND
REDU
REDUCER
4" 1.5" TEE
•
BEND 1
VIA
6
REDUC
1.5"
rid
\1.5” 11.25° BEND
.5”x2” REDUCER
ex2” TEE
NI‹ TEE
FM
ft
FM
PROPOSED
12" ZONE 6 2
CONTROL VALVE
FM
RE
REbuCE
6”x2” TEE
5 Regional Circle
Suite A
mcgill Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcgillassociates.com
NO.
DATE
BY
DESCRIPTION
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
TOWN OF ELM CITY
WILSON COUNTY, NORTH CAROLINA
60 0
30 60
120
GRAPHIC SCALE DIVISION VALUE = 60 FEET
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
NEW SPRAY FIELDS 1
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
SHEET
C-302
7-0030 TOWN OF ELM CI
042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-
z
0
AM WYNN W
INEHURST\DRAWINGS\2014
_"
D
AL
E
�N 1.5-
I"x2" TE\E
\ v
N
FM
//
-/
TEE j/1 1.5"// \\ 1.5"
/ / I /
"� TEE / �
I //
I / �
/
1.5" 90° BEND
. 5"x3"
EDUCER
IN\
\
I
/3"x1/5" TEE \
/ /
/
\ 3"x2" 1 TEE
N
O
1/4
AL
tilt
11° 8N0_
x2\
UCER \
II
\ \//
3
1 �\
I �
/
/
/
/
/
/
7
1.5"
2
EE
"%6" TEE
12" 45° BEN
3END
FM
-1.5" 45° BEND
1.5"x2"
REDUCER ,`. Lr
4"x1.5" T
4"x6" �7' / /
REDUCER /7
4"43-° BEND
4" x1.5" 7 TE
//� - -
1.57
- 3"x1.5" I
REDUCER
3"
UCER
-rU
2"
EE
2 2"
8"x2" TEE
TEE
•
2"
1.5
REDU
g TEE
RTUCER
12"x8" TEE
12"x6" TEE\
Rd
\1.5" 11.25° BEND
.5"x2" REDUCER
TEE
FIA
1.5
REDUCER
Fki
1.5" 22.5' BEND
1.5"x2"
REDUCER 44.
8" 45' BEND
REDUCER \
1.5"
)
ff
AL AL
4"x6"
REDUCER
22.5' BEND
3"x4"
REDUCER
1.5" TEE
FM
REDUCER
2"
1.5"x2"
REDUCER
6"x8"
REDUCER
ft
PROPOSED
12" ZONE 6 2
CONTROL VALVE
RECyCER
nsi FM
REDUCER
3"
5 Regional Circle
Suite A
mcgill Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcgillassociates.com
FM
Ei"x2" TEE
8"45" TEE-\
2"
FM
6"
/
1.5"x3"
REDUCER
3"x4"
REDUCER
4"x2" TEE
/ \ 7
77
SILT FEINCE, TYPICAL
N
AL
1.5"
nA
REDUCER
-4N1-.5c TEE
1.5"x2"
REDUCER \,<11-
1.5"
3"x4"
REDUCER 2
REbuCER
6"x2" TEE
FM
FM
FM
22.5° BEND
1.5"x2"
REDUCER
8"x4" TEE
1.5"
TE
0
/ 1.5"
6"x2" TEE
REDUCER
3"
TEE
1-0
REDUCER
1.51\
TEE
3"x1
8"x12"
N REDUCER
NN
REDUCER
3"x4"
REDUCER
1/4
AL
AL AL
AL
P)ROPOSED HALF- CIRCLE
SPRAY HEAD, TYPICAt
1.5"x
N N
N
PROPOSED SPRAY HEAD
DISTRIBUTION AREA, TYP.
SEE SHEET C-301
AL
AL
/1 /
PLAN
TOWN OF ELI\I CITY
PIN: 3736-55\-9745.000
45' BEND
REDUCER
REDUCER
REDUCER
12"x12" TEE
12"
FM
CONTROL VALVE
12"x2" TEE
12"x1.5" TEE
FM FM
ft
It
PROPOSED FULL CIRCLE
SPKkAY HEAD,,
1.5"
AL
FINAL DESIGN
FOR REVIEW PURPOSES ONLY
NOT RELEASED FOR CONSTRUCTION
Jd
REDUCEt
1.5"
8"x2" TEE
TEE
1.5"
361.5" TEE
1.5"x2"
REDUCER
4"x6"
REDUCER
6"x2" TEE
6"x8"
REDUCER
6"
1.5
7 7 7
/
NO.
DATE
BY
DESCRIPTION
AL
Its
1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES.
3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES.
4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL.
5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING
UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL
PROPOSED UTILITY LINE, & RE -INSTALL EXISTING UTILITY CABLES.
N
EXISTING TREE LINE
14\
3" 2
EXISTING LIMITS OF DENSE BRUSH
2"
90° BEND
1.5"x3"
REDUCER
2"
REDUCER
1.5"
AL
old
REDUCER
8"x2" TEE
2"
22.5° BEND
REDUCER
11.25' BEND
2"x3" REDUCER
125-
2" 2
FM
8"x2" TEE
6"x2" TEE
4"x2" TEE
1.5"
II 1 / ( . i 7
II I
/
I /
I /
//
2"
FM
8"x6" TEE
6"
FM
AL
REDUCER
ft
REDUCER
4"
4"x6"
REDUCER
REDUCER
\ REDUCER
ff
3"x4"
REDUCER /
EXISTING MONITOR WELL #1
DO NOT DISTURB
45° BElilD
REDUCER cr.' z7
AL AL
AL
AL
AL AL
AL AL AL AL
AL
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
TOWN OF ELM CITY
WILSON COUNTY, NORTH CAROLINA
3"x4"
REDUCER
3"x2" TEE
REDUCER
AIL AL
AL
AL AL
AL
AL
AL
60 0
AL
AL
SEE SHEET C-100A FOR
N: 765493.16
E: 2336785.24
4"x2" TEE
3"
AL AL
AL
,o,
AIL
AL
ft
x1.5" TEE
REDUCER
AL
AL
EXISTING SPRAYFIELD AREA
DELINEATION IN ORIGJNAL
30 60 120
GRAPHIC SCALE
DIVISION VALUE = 60 FEET
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
1/4
1/4
AL
N
N \ p
AL AL
AL
•
t/
LL
•
NEW SPRAY FIELDS 2
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
SHEET
C-303
14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY
Z
0
/2020 3:02 PM WYNN W
2 C300 SHEETS.DWG PLOT DATE 11/
DRAWINGS
Z
0
w
0
N
INEHURST\DRAWINGS\2014
1.5" 22.5° BEND
1.5"x2"
REDUCER
EXISTING WELLS DO NOT
DISTURB
YRS1
137
Base Setup
IPS GPS STAT1C
N: 764029.73
E: 2333708.34
EL:143.57
8"x2" TEE
8"x12"
REDUCER
12"x2" TEE
` PROPOSED FULL CIRCLE
SPRAY HEAD, TYPICAL
N
N
8 x1.5 TEE
4"x1.5" TEE
1.5"
4" 45° BEND
1.5"
12"x2" TEE
PROPOSED SPRAY HEAD
DISTRIBUTION AREA, TYP.
SEE SHEET C-301
12" 45° BEND
N
N
PROPOSED HALF CIRCLE
SPRAY HEAD, TYPICAL
4'x6"
DUCER
EXISTING
PARCEL
1.5\ 45° BEND
1.5"x "
REDUCER
PROPOSED TEMPORARY
SILT FENCE, TYPICAL
EXISTING TREE LINE-
N
N
EXISTING MONITOR WELL #2
DO NOT DISTURB
EXISTING WETLANDS
3"x4"
REDUCER
4"x1.5" TEE
1.5"
12"x1.5" TEE
4"x1.5\ TEE
\t).
45° BEND
6"x1.5" TEE
1.5" 2
1.5" 22.5° BD�
1.5"x2"
REDUCER
12"x1.5'NTEE
\ � N
1.5" 22.5° BEND
1.5"x2"
REDUCER
AIL
3"x2" TEE
8"x1.5" ' TEE
8"x1.5" TEE
/8%1.5" TEE
-EXISIING MONITOR WELL #3 8 90° BEND
• NOT DIST
1.5"
6"x1.5" TEE
,40
11.25° BEND
1.5"x2"
REDUCER
-�.
6" 22.5BEND
6"x1.5" TEE
/
12"x1.5" TEE
12"x2" TEE
12"x4" TEE
4"x2" TEE
4"x1.5" TEE
3"x4"
REDU
1.5"x3"
REDUCER
1.5" 90° BEND
EXISTING LIMITS OF DENSE BRUSH
FINAL DESIGN
FOR REVIEW PURPOSES ONLY
NOT RELEASED FOR CONSTRUCTION
5 Regional Circle
Suite A
mcgill Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcgillassociates.com
AIL
AIL
1.5"x2"
REDUCER
AIL
EXISTING WETLAND, TYPICAL-/4
6"x12"
REDUCER
12"x1.15" TEE
8"x2" TEE
Al...) ILL
1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES.
3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES.
4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL.
5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING
UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL
PROPOSED UTILITY LINE, & RE -INSTALL EXISTING UTILITY CABLES.
NOTE:
SEE SHEET C-100A FOR
EROSION CONTROL MEAS RES
PROPOSED
12" 90° BEND
12" ZONE 7 C NTROL VALVE
FM
12"x8" TEE
12"x12" TEE
\ REDUCER b
1.5" 45° BEND
1.5"x2"
'REDUCER
\ -
1.5" 90° BEND
12"x2" TEE
3"x6"
REDUCER
12"x2" TEE
1.5" 11.25° BEND
1.5"x2"
REDUCER
4"x1.5" TEE
1.5"
FM FM
1.5" 22.5° BEND
1.5"x2"
REDUCER
45° BEND
AIL AIL
AIL AIL AIL
AIL
EXISTING PARCEL, TYPICAL
PROPOSED GRAVEL DRIVE
8"x1.5" TEE
8"x1.5" TEE
1.5" 45. BEND
1.5"x2"
REDUCER
12"x1.5" TEE
12" 45 BEND
1.5"
1.5" �r
4"x6"
REDUCER
8"x1.5" TEE
\
vu
12"x1.5" E
6"x15" TEE
7
3"x1.5 TEE
1.5"
1.5"��
2"x1.5" TEE
NO.
DATE
BY
DESCRIPTION
AIL
2" 45° BEND
2"x3"
REDUCER
AIL AIL
AIL AIL AIL
AIL AIL
/
7
-FM
6" 22.5° BEAD
PROPOSED
12" ZONE 4
CONTROL VALVE
6" 901 BEND
3"x1.5" TEE
3"x2" TEE
11.25° BEND
1.5"x2"
REDUCER
6"x4" TEE
2"
-FM FM
11.25° BEND
1.5"x2"
REDUCER
3"x4"
6" _ _ REDUCER
-FM _ FM FM
1.5" 2"
/ \
3"x2" TEE
J
/ --
/ -
//
/(7/ \ .
AJIL
II
3"x1.5" TEE
AIL AIL
AIL AIL
AIL AIL
3"x1.5"
REDUCER
90° BEND
.
1.5" 11.25° BEND I
1.5"x2"
REDUCER
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
TOWN OF ELM CITY
WILSON COUNTY, NORTH CAROLINA
1.5" 90° BE I -
3"x1.5" ' EE
12"x6" TEE
12" 45° BEND
3" 90° BEND
FM-
1.5" 45° BEND
1.5"x2"
REDUCER „?e
6"x8"
REDUCER
4"
UCER
4" 2" TEE
1.5" /°
Rd A
3" tee TEE
1.5" I 1.5"
60 0
3" x4"
REDUCER
3"x1.5" TEE
1.5"
12"x6" TEE\
1.5"
3"x1.5" TEE
•
2"
41."" TEE
FM
1.5
1.5" 22.5° BEND
1.5"x2"
REDUCER
8"
FM
1.5" 22.5° BEND
1.5"x2"
REDUCER �►
8" 45° BEND
8"x6" TEE (�'x2" TEE
2"
6"x8"
REDUCER \ ♦-FM
PROPOSED
12" ZONE 6 2
CONTROL VALVE
8"x 12"
REDUCER
FM FM
8" 45° BEND
8"x2" TEE
4"x1.5" TEE
1.5'N
6"A%45" TEE \ REDUCER
,7
71
30 60 120
GRAPHIC SCALE DIVISION VALUE = 60 FEET
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
3"
1.5"
vu -� )
4"x6" I\ 1.5"
REDUCER j
,140-
1.5"
rid
2
1.5" 11.25° BEND
1.5"x2"
REDUCER
- 3"x2" TEE
1.5"
- 3"x1.5"/EE
4/
1.5"x3"
REDUCER
1.5" 45' B
AIL
I
135
/8'x4'
/1.5"
1.5"
VII
3"x1.5" TEE
-FM FM
�8"x2" TEE
"x-\.5" TEE
3"x4"
REDUCER 2
- 4"x6
REDUCER
6"x2" TEE
8
FM FM
-22.5° BEND
1.5"x2"
REDUCER
FM
1.5"
' TEE A
8" 4 4END-
3"x1.5" TEE
1.5"x3"
REDUCE
-1.5" 90° BEND
AIL
J
I
EXISTING MONITOR WELL #6
NEW SPRAY FIELDS 3
AIL
AIL
e
1.5"
FM
I I
U
"x2" TE
'x8"
DUCER
1.5
FMTE
4"x2" TEE
n�
2" 22.5° BEND
1.5"x2"
REDUCER
8" 45°
DO NOT DISTURB
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
E-SRP-W-17-0030
/
/
/
/
8"x1.5" TEE
D-
SHEET
0-304
AIL
14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY
L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 C100 EC PLAN.DWG PLOT DATE 11/6/2020 11:10 AM WYNN WILSON
I
/
r �
Alic
'/1
I 1
/ /
/
l
LsiY
DGE 0
\\
\ \
\ \
\
\ \
\ \
AL
•
•
/y
ITC
onitoring Well No.1 4 /!'
J /
/ / /
I
— - / / 1
�
I / / 1
/ I
Ir
4,
Monitoring Well No. 2
‘4)
NN
J
AL
•
•
•
AL AL
•
♦•
\ •J
AL
▪ PROPOSED LIMITS L
AL
/
•
/
/ /
AL
AL AL
/ / I
/
r ) // / I
// / r
c.
/ /
0, I I / /
�/ : ,a /
•
•
♦
♦ ,♦
♦
f ♦ ♦ '<',
I I r •
♦
I 7,--- �N ♦♦ //~�
//
/
TOWN OF ELM CITY
PIN: 3736-45-5400.000
DB: 2607, PG: 154
\
\ \
\\ \
PROPOSED LIMITS OF \
DISTURBANCE, TYPICAL
Nom
7
/ --...,
/ /
/
/ /// / \,.,
WETLAND LIMITS, TYPICAL
.Y.
J
FINAL DESIGN
FOR REVIEW PURPOSES ONLY
NOT RELEASED FOR CONSTRUCTION
Alk
.
•
I
/ t
N
I I
«I
/
/
AL
AL
AL
WHEAT H 'GH
/
I
z / I
AL
AL
AL
AL
PROPOSED HALF
—CIRCLE SPRAY HEAD,
TYPICAL
I I \\I I\ \ \\1II
I \ 1 \\
AL
l
PLAN
PROPOSED FULL
CIRCLE SPRAY HEAD,
— TYPICAL
/ 1 I
/ �/ \ \� ,� / /
-
N I
7, ' / F '—'Ir) : \
v v FOR CONSTRUCTION
1,2
•
FM
i/
AL
cro
EXISTING WETLANDS, TYPICAL
AL
LeoN
Monitoring Well No. 5
112:122, N
/
ci
AL
BIMINI
AL
•
•
•
AL
TOWN OF ELM CITY
PIN: 3736-55-9745.000
AL
AL
PROPOSED TEMPORARY
—SILT FENCE, TYP.
PROPOSED SILT FENCE /
,OUTLET, TYP.
MIME
NNW
7r
I Vr'—\
I T / \ Z \ \
•
•
•
AL
AL AEL
\A.
AEL
TOWN OF EL CITY
rl
•
•
128
sat
sit
/
AL
AL
•
AL
PROPOSED EROSION
CONTROL MATTING, TYP.
PROPOSED IRRIGATION
PIPING, TYPICAL
AEL
N
•
•
71
NOTE: DISTURBED AREA INCLUDES MAXIMUM 10 FT WIDE
ALONG EACH IRRIGATION MAIN AND AT SILT FENCE LOCATIONS.
Man
111:
Alt Alt
sat
Alt
ALL
sat
•
•
•
•
4110
rvN
Au Au 0
AL AL
Alt Alt Alt
Alt Alt
PROPOSED LIMITS OF
DISTURBANCE, TYP.
EROSION
CONTROL LEGEND
MAT LINING
LIMITS OF DISTURBANCE
TEMPORARY SILT FENCE
TOP OF SLOPE
TOE OF SLOPE
5 Regional Circle
Suite A
mcgill Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcgillassociates.com
•
NO.
DATE
BY
DESCRIPTION
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
TOWN OF ELM CITY
WILSON COUNTY, NORTH CAROLINA
100
50 100 200
GRAPHIC SCALE
DIVISION VALUE = 100 FEET
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
EROSION CONTROL PLAN 1
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
SHEET
C-100A
14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY
L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 C200 SHEETS.DWG PLOT DATE 11/4/2020 4:11 PM WYNN WILSON
O
1 1I
- - I l
—� /
PROPOSED
I'
---- -____ '----
-
\—N�TEs:
TTn/��� �y
�1 VC �ON33A
1 1
I
,
I~ /
PLAN
-- 1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
X/�'3
x�
___ - 2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES.
"
BEGIN 16" PV. IRRI1I�A 110 MNI� / I I I
3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES.
MI
1� ��� - -- ----
AT EDG ),QIlMG `-'�T_,.„_ I 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL.
so
OF • --
r'14-----►r�--___It, ___ I 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING
I
ocie
�a,e
=
=
I o a° "d'�--I\ -"'J_____ w�---_� I �r UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL
x - �3
,o,r�� < -, -./ 1
Os-, w— 1 PROPOSED UTILITY LINE, & RE -INSTALL EXISTING UTILITY CABLES.
//eROP —.
STA. 10+ 2
I ���
'tNA
°
°
^° _ __
I / 16"\22 1 Bi- D
1i
I 9+ 3
dROPO'
1
►I
I
a. � / I
- ---- _ r / / �‘ I
-'�----f�- __ 1 / I
— _
'�---VIA /
,�
�1
NOTE:
SEE SHEET C-100A FOR
0
�A-1-01-00
\"
0 � ---___�_
��o / r �� o o I ICI-"�---- --- I
E OSION CONTROL MEASURES
•38825.4\9\
64513 68 \
r
X
I + / p i10 ZON +2 CONTROL VALVE +
I= i �j / c i
I
o PROPOSED 12" PVC IRRIGATION MAIN
o
I
I
___
---- m _--__ I
- EXI`IN� — --- I
SOIL DRIVE/
��l JJ, ;; �
---la--
- - - - - - -
1 1 =
\
1 �� 1 z
/ �, -
\
d� <<g
PROPOSED I I
i
_ _L_ 8 ZONE 3 CONTR VALVE I I
-�- -_ _- _ r
wd �-- ---wd�
!—'�----- -----
Lo o 0
+I
0 I
I
I `-
1 f— AWE
o1210
+
00
-
PROPOSED I
o o STA. 21 +81 I
+ 0 o 12"
F + + o 22.25 BEND �,-
1�a
.
I
'
I
_____ 5zL
PROPOSED
10+50I
•
I r .
/ I
I
I
- .
—
I
I
I
—Fy_ --- " �— ——Mld___
- - - ----_ - - _ -
— — — _ _ —i_ _= _ _ _ —
--- - - - - - -�-F-- _ -
------_--=r-==-=
I�Trij
--—
I 1__
��
_ -_
�-
--±_ Fy-===-
. ----- rt -
-
- - -----
- _-FM--4-
N
/ <Y I
----r----- PROPOSED
-/ru-----YU-_ — -
-_ _i -�------►�___-___ STA. 22++�1STA.
---+ - -_2 12" 2225°
- -------f�_____16
- _
BEND
i
X16
TEE
I I
_ -
---=ter=- _-------
f
16" 45',
TIE TO
BEND /
EXISTI G
i
I
I
I
I PROPOSED
I j I -I 1
STA. 14+ 11
2 I I I ff I» I I
--►�_--! I I 12�fX12 TEE I I
I I
I I 12 ATE VALVE I
/ 1 I I I I
2 I I
1
I
I
1
I
I
77I
I \
I
I
1 I
- _ _ _
i I ;-------
J I
I M I
I
I \ PROPOSED 16' WIDE
- ------
_ _ -
-
---- 1- _ PROPOSED
1--- -, �i��►\ J
I \ /
I 1 \ STA. 22+64
I 1 \� \ 12" 11.5 BEND •
; \�\ oo \
I \\�\
�_--���-���_-.�������.
����I� ����♦��Y
1ti�
�ti
----------
�--�,
ti�
,�°
/'
_ /
/
/
I /
/
wl�
-
R ASED
1
, STA. 11 + /` ` /� C,/
16"X14" TEE / \
14" GATE VALVE
» 2"
1 P1REDUCER ��� "r
��
I 1
/` i I -�
1\ '
T
1 J. I
y
I I ` �EXISmNG IRRIGATION PIPE TO
REMAIN IN SERVICE, TYPICAL I
I I \I
I I I
II
I I
I
139
(4.
I
I
tip"
AVEL DRIVE I I \��\
I I \
I I I \� \
I IL -, \ l,
I I---------------, \k \
I 1 i ' \� O
' I \ O
I 1 I
j �I- \\ ' -;� 1 — — I � \ o
I T I l \ �/ 0
\
/�'
�'
'
---y/--- -� I ` I`j j I`
/ I - I I
12 I I `` I I
\ / _V 1
\T'42.-
/ ` �. III// `° 1 I 1 1
,2a I I , �'�� - ,�
I I PROPOSED I/
I
I
/ 1
I 1 I •/ I I Y
I / I I I 1
I I I I I I
1 I I 1 `�\loos I
I I I I 1
I '38 PROP D I
I STA. 1 64 I �► /f w
\ 0
/ \ \ -N +
'"� .CO
\ \
00 \ \ \ II N
I - _ I�-/�
VJ
----
-__
/ J
_
) LIMITS OF DISTURBANCE, �� I I -� 12 x44 EE I
1 127 TYPICAL �6► i `s i --`:A I ��►'I� I \
—� _—� 127 I I I I I �i I 12"ZONE 1 CONTROL VALVE {\ I/ I
— —f'''--- W
___� z
�. ... - J
I
"� I
1 �126 1 I I 1
��`
N
\ �,'
'� ,L
-- -�
/ //
�wj�
i N
/ ♦
z.�N�T
---- 1-----------
/ /
/
/ / /
PROPOSED
1 STA. 10�61-----126-----�'
c - _ a 6-'-22 1 2' BEND
16"45 BEND
Y -125
♦ �
/' ��♦ _
-�.
q
I
I 1 PROPOSES
I / ---- 1` \� I ���, \ ` I �� I�� ' /I�� �3o STA. 2+86
I 1 PROF;OSED PVC IRRIGATION MAIN 11 \ 1 \ - r� I L /� ' ,� _ _ - / _ _ -„ °
I I %� / I1 \\ \\I \ v, \ \ \ // ,�' I /'/ / % 12 45 BEAD--
I I / \ 1, \ \1 1 / / _ _/ I
1 _ �, - _ _ __
Y'' EXISTING IRRIGATION PIPS I \ \ i \ M i 1 1 / I / //\ii. r 9 _ I -_ I
k �I \ 1 I 1 I /�•�1
tiI ;ti /I I ABANDONED IN PLACE, \ I \ I I I�� / I / I / I i�-I
/ _
'� \ \ I �� I— —-___I,"
/ —_
/ I � M I --- -4. -\ \ \ \ I \ \ \i I I I \ _- / / / / �I
�1 • \
N I \ \� \ \I
1 �/ /
- U`
PROPQSEDTYPICAL
STA.
1
i
I P`
24+29 —
e
1
1 / -�'?
1 PROPOSED
U`�>II
1 STA. 25+05 _
i
/ 12"11.5 BEND
/
/
i/
�/
/
Fir2
■ --/-- \ \ I
I 1 I _ _�� ��
/ I / / I I/-428� 1 I 12"
/
oo/
I\ �� I
_
� 1 \I i 1 / I 1
/ / /
�,
/
�■—r—� I
; / 1 ,1 6^\ I / \ \ •\ �� • \ 1
/ I / / I ? \ \
I / _ ___
I1
\ \ I / / 1 / / / 1' // I I -- 1 /
4. \ I / / / / / 1 / 1 \ \ ` '� 1/4
160
I/
I
160
t
PROFILE
SCALE: HORIZ. 1= 50'
VERT. 1= 5'
155
155
150
150
145
145
140
EXISTING IRRIGATION LINE
140
BEGIN 16"
PVC
EXISTING GROUND
EXISTING
IRRIGATION LINE
IRRIGATION
PROPOSED
MAIN AT
IRRIGATION
-
3
COVER
MIN.
135
PUMP STATION
135
A
130
I 130
12" CLEARANCE, TYPICAL
—
PROPOSED
12"X4"
TEE
Mill
Api-ii,
125
PROPOSED
125
2-12" 22.5°
BENDS
PROPOSED
PROPOSED
12"X12"
TEE
16"X14" -TEE
PROPOSED
PROPOSED
120
PROPOSED
16" 45' BEND
16"X12"
REDUCER
PROPOSED
12" SDR21
PVC IRRIGATION
MAIN
12" 11.25° BEND
12" 45°
BEND
120
PROPOSED
PROPOSED
2-12" 11.25° BENDS
I
16" 22.5'
BEND
115
PROPOSED
FINAL
DESIGN
115
16" 22.5°
BEND
FOR
REVIEW
PURPOSES
ONLY
NOT RELEASED FOR CONSTRUCTION
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00
,,,,,`N'�AR''�,,,,
;zo��oFEss�oti9'�=;
_ eQ < ,
- % SEAL a -
QSQ 034999 0
= v
L°oF,y ��;� J ;�
'','O °°°c!NE° --k ,\N
�/ HONE \`\
'/''���/1IIII%1��``\
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
50
25 50
'°°
FM-1 PLAN AND PROFILE
STA. 10+00 TO STA. 26+00
SHEET
C -2 02
5 Regional Circle
IN Suite A
EFORFy
GRAPHIC SCALE
DIVISION VALUE
= 50 FEET
N9
811
o
Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcg
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
TOk
WILSON COUNTY, NORTH CAROLINA
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
.
DATE
JANUARY 2020
PROJECT#
14.04042
FUNDING#
E-SRP-W-17-0030
/AGING PP
mcgillassociates.com
NO.
DATE
BY
DESCRIPTION
L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 C200 SHEETS.DWG PLOT DATE 12/9/2020 1:42 PM WYNN WILSON
130
/III\ 'III / 1'11k 'III i1
'III 711TV • / f I / I
NOTES:
O
-
PLAN
1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. NOTE:
2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES.
129
SEE SHEET C-100A FOR
O •'9Zl 3'I
Q
3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES.
j28 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL. EROSION CONTROL EASURES
_
`
co X
(1, ff,�
°"oj.,
5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING I
/ / UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL
PROPOSED UTILITY LINE, & RE -INSTALL EXISTING UTILITY CABLES.
/I I'
•• Zr, I
W N � ,J PROPOSED
Z. N'��.z
STA. 27+43
_ - 12" 22.5' BEND
�-0 ' �N, 5
PROPOSED o, �,
I �,� \
STA. 26+12 _ - \
12"45 BEND ^" ��
/I I' /I I' fi i� /I i� /I i� fi i
I I �� I I I I
i / I i J ®
/ .' I / / i
/ ( I / % ,,
WETLAND LIMITS TYPICAL /1 /� i I i ► II i -��`�
f / ,I / / I ) I/ /I / /
I I I I I I 1////,/ / / / / ��
!. I /
� , PROPOSED TEMPORARY / • / _
\ ?S - �/
\ SILT FENCE / / / 7
/ i f
/ / N - / ' /' i / / / / / ,/ ,�
\
I
•J3
�
Fm _
�� ter
NV
N� ,''
r /
--- —
I __,
` -
NN/A:
` /
7 �1
I ''�'V
I I I I I/ i/ /
•
,
STA. 3430 PROPOSED LIMITS , ; �/ _ _
'
!
_41
\�-,2� ^� \ `� OF CONSTRUCTION ' ��', ��' , �;��' -'_ �' /'/all
11.25\ BEND ... -- ' �7 - /
/ ,2 \��o, �'/� 12 ,
_—
J,-�'� — —
�, -- i
1.
...
_
,,
�g �� \ 12s— _ _ • . , /��� / // , / EXISTING WETLAND
/ / /Ili /I /I /I - /10\ / / S
7 PROPOSEI, 4 36" RCP ' I I ,,h I ' '�' ' ' I / 1
- - - — M � FM
o
0 i +
\�'
_ `
// , o
��--- J \
i
INV. IN: 121.42
--' 7/ . o ��
o+
o
\/
INV. OUT 121.06 ♦ \\ , \
��.•.
/�� o
PROPOSED - 'J + I/ o+o �\ 1 --
STA. 33+75 ' / N
III
o+
co
SEE DETAILS ON SHEET C-201
r`;���.`����4` / /
—_ — .._ \
N__ 12" 11.25' BEN ---- _--i=_—_�� r� / /, ( , /'\ \\ \�\ _�
'
EXISTING SOIL DRIVE /
69'SZ l /\3�3 43SOdObd /
`I , - ►n / I / N. —
—/
— -�— — —
Q
/
_
-
I,. I,. ,,I,.�
Dili o — , - _ _
-
— =
i�
cn
, , _
\
M �' - J
--z
Ili
cv ,/ y _--- a
_ __
V
PROPOSED 1.5:1 SLOPE
7
- _
3NJy73f11 - %/ /
\ / 11d��ma
/ ,�
il II 2' ( Dili `,
-7 / ,- —— VI / /
/ - �2� — _ — — — /
—
_�_ _ _ -- - I
-
,— r —��—
/
\ N
\
U
Q
7 ,1� �Q\�
�.,1�
PR OSED 36"RCP �- ".��
INV. IN: 122.84 �� ��
OUT 122.48
_
�,,2a� - ° _ _ . _ - �—
�� ��� ,�° _ /'
'/' /' � /I
/' 7' / oo _ 3° / ' /
-' PROPOSED 16' WI
GRAVEL DRIVE
/� I
I i
I /�\�
I___
\
�' \,...-
.-'INV.
/ i PROPOSED
c
/
��� '-
I \\ �� J�
_
/
�
PROPOD 12" PVC
/ // STA. 42+77
/ //
x ///7/,-' /'
'�
I f>,
/ / » »I'
�,/
/
/ I' '' / /
IRRIGATION MAIN
12 x12 TEE
//
'�✓ / / /
STREAM LINE . / / / 1
/\�\
/ I
/ / II
// / /
/ //f\EX.
/////
/ '/ / /� //
�\ / / /
�. / I I
/� ��/ I
II
\ �I
MONITOR WELL #1
/
�, 1% TOP CASING: 14"0.51' a
I TOP CONCRETE: 13 7.71
f»,_41�1d I�
—- / / / 12" \�
-V / ZONE 5 \
//
/ /' / // CONTROL VALVE �\ \
/ 1 \
/ / I 1
/
// // /
\N
`
/ \\
/
``
''
\
/ \ \N
/4? —�
/% — �'
PROPOSED .\ /
,/7 / / c \ I� / I
gig - 1%.4%. I/ \
k/
STA. f31+61 -
2-12 45 BENDS 1
. 7
/ �� ` \, \ \\ \
°.... „u. /
\ \� \ 1
ffl
�/
— ,,,
— I./ / / / S9 0d -179Z :Ea
155
155
PROFILE
150
150
SCALE: HORIZ. 1= 50'
VERT. 1= 5'
145
145
140
14A-
135
�_
a
Jz
1 5
PROPOSEDf
yAT
PROPOSED
12"X12"
PROPOSED
12" IRRIGATION
TEE
LINE 130
PROPOSED
FILL
PROPOSED
130 FINISH GRADE
FOR ROAD BASE
Ni()
+
�t-N
co
w
EXISTING
GROUND
3'
COVER
/
MIN.
','
4, z�
I
4 IRRIGATION LINE
12" CLEARANCE
125
—
w
_ .�
125
���� ,
�
PROPOSED
2-12" 45' BENDS
PROPOSED
2-12" 11.25' BENDS
PROPOSED 12ff
SDR21 PVC IRRIGATION
MAIN
120
120
PROPOSED
PROPOSED
12" 45'
115
BEND
PROPOSED
12" 22.5'
36"
1'
CLASS IV RCP WITH
MINIMUM COVER,
115
INV.
IN 122.84
BEND
PROPOSED
4-36"
CLASS
INV.
IV RCP
OUT: 122.48
110
WITH
SEE DETAILS
INV. IN
INV. OUT:
1'
121.42
MINIMUM COVER,
121.06
110
NOT
FOR
RELEASED
REVIEW
FINAL
PURPOSES
FOR
DESIGN
CONSTRUCTION
ONLY
27+00 28+00 29+00 30+00 31 +00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41 +00 42+00
,,,,`"N'CARo,,,
;_0escEssioti°0'ti =
- °� =
o SEAL
034999 0� `
CA
= v
�'%G/0����N��y�,J�\
°°°°ee
EFOR81Fy
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
50
25 50
°°
FM-1 PLAN AND PROFILE
STA. 26+00 TO STA. 43+00
SHEET
C m 203
mcg
5 Regional Circle
Suite A
4
Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
GRAPHIC SCALE
DIVISION VALUE
= 50 FEET
� Goy
1 o
_,I,,
C
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
TO
N OF
EL
CITY
W I LS O N COUNTY, NORTH CARO L I NA
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
.
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
E-SRP-W-17-0030
GGING P
mcgillassociates.com
NO.
DATE
BY
DESCRIPTION
w
z
0
/2020 3:22 PM MATTHEW
14.04042 C200 SHEETS.DWG PLOT DATE 11/
DRAWINGS
I N E H U RST\DRAWINGS\2014\ 14.04042\D ES I G N
•
/- —
/
/ Fr
L
2
/
-
i
I—
—135— —
/
/ r
//X/
—4;3' _ /
47
fe
77 t
/ / Ill
51 1�I
Rd—z
111
Rd
+
/
----136---�
7 _#
/—
/
J
/—
, /, 1 , / /
. / i
f
/ pi
L16-
If
L O
' Rd a Iii Ili a ++FFM-
7Tir- 7 - lir 74-
1 r--*
I I_
' lz
r
\ /
1'
`,nI —T— +ti---�--FM--1--
I r
140
135
43+00
44+00
1 r
12r FM -..FM
PROPOSED
/ STA. 47+78
12"X12" TEE
12" ZONE 6
—
\ CONTROL VALVE
1
45+00
5 Regional Circle
Suite A
mcgill Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcgillassociates.com
PROPOSED
i
RA
FM
\\
PROPOSED
Ili
/
/ I
/
/
/
•
Rd
PROPOSED
HALF CIRCLE
SPRAY HEAD
12"
o l
ot PROPOSED
' STA. 49+01
12" 11.25° BEND
Rd
Ili
121
FM
h PROPOSED
\ 0 STA. 51+62
/ /
0 \
FU
FU---i'd 4 .
/
FM
1
PLAN
PROPOSED FULL
CIRCLE SPRAY HEAD
I
GATION MAIN
rr
1.
.0._1
2 PROPOSED
STA. 49+51
12" 11.25° BEND
0)
12" 11.25° BEND
//---1-40m
2' IL. __ 14)/
I r - PI a‘/V -"-----v, , _ _
112
I 0.-4 IT'/ I
747 — — AI
k / Y
/#_ %' 0
/
/ I
/ 2 /
I 1,,,/
I
/
PROPOSED
//
EXISTING GROUND
12" CLEARANCE. TYPICALPROPOSED
12" 11.25° BEND
FINAL DESIGN
FOR REVIEW PURPOSES ONLY
NOT RELEASED FOR CONSTRUCTION
46+00
Opcz
SEALk 034999'�G/�'.NGINEB yG4. E�H ON ,.
47+00
48+00
I
2
:111
2 /
2 STA. 50+09
/12" 11.25' BEND
PROPOSED
12"X12" TEE
PROPOSED
6" IRRIGATION LINE
49+00 50+00
000
PROPOSED
STA. 50+91
12" 11.25' BEND
PROPOSED
STA. 50+31
12"x12" TEE
12" ZONE 4
CONTROL VALVE
1 /
PROFILE
SCALE: HORIZ. 1= 50'
VERT. 1= 5'
3MIN.
COVER
PROPOSED
12" 11.25' BEND
PROPOSED
PROPOSED
STA. 52+20
12" 11.25° BEND
NOTES:
FM FM FM— '
1. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
2. CONTRACTOR SHALL VERIFY RIM AND TIE IN ELEVATIONS PRIOR TO ORDERING ANY MANHOLES.
.--3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES.
'4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING EXCAVATED MATERIAL.
. 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO CONSTRUCTION. IF EXISTING
I UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR SHALL STRIP OUT EXISTING CABLES, INSTALL
PROPOSED UTILITY LINE, & RE —INSTALL EXISTING UTILITY CABLES.
— FM__FMFM al FM FM FM!/\A,
Tv
--k -- .
Nk
,,
�2....... - _
,N,
I
,,-Iiii., L\
\Ax
N li
O N .,_ \.,
-
II
Rd
EXISTING SOIL DRIVE
PROPOSED 16' WIDE
GRAVEL DRIVE
12" SDR21 PVC IRRIGATION MAIN
51+00 52+00 53+00
NO.
DATE
BY
DESCRIPTION
RRd
I I I
\ I I \--,-/_ —\
___/
PROPOSED
END STA. 56+09.25 N
12" 90° BEND
12" ZONE 7
CONTROL VALVE 1 41_
1\ 1
I
I / I
�I\ I
1
11 127
I
PROPOSED IRRIGATION ZONE
I 2
i
I
O
O
N
FM FM
54+00
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
TOWN OF ELM CITY
WILSON COUNTY, NORTH CAROLINA
I
PROPOSED
12" 90' BEND
55+00
50 0
i
PROPOSED END
STA. 56+09.25
56+00
25 50 100
GRAPHIC SCALE DIVISION VALUE = 50 FEET
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
IU—'
V — --__
EX. MONITOR WELL #3
111-1
TOP CONCRETE: 143.87
TOP CASING: 146.64
DO NOT DISTURB
\ FM
N
\
LIMITS OF DISTURBANCE
57-00
FM-1 PLAN AND PROFILE
STA. 43+00 TO STA. 56+09.25
FM
i
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
i
SHEET
C-204
L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:18 AM WYNN WILSON
EC NORTH CAROLINA LAND QUALITY SECTION EROSION CONTROL NOTES NATIVE PLANT SEEDING MIX FOR STREAM OR RIVERBANK STABILIZATION
8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE
(MIN. 14 GAUGE 6"X6" WIRE)
6' MAX EXTRA STRENGTH FABRIC WITHOUT
WIRE FENCE
I 1
I
44 UPDATED JULY, 2019 SEEDING FOR STREAM OR RIVERBANK STABILIZATION SHALL BE A MIXTURE OF NATIVE GRASSES, PLANTS
AND TREES. NATIVE PLANT MIX SHALL INCLUDE THE FOLLOWING:
GRASSES — BIG BLUESTEM (ANDROPOGON GERARDII), INDIAN GRASS (SORGHASTRUM NUTANS), LITTLE
BLUESTEM
(SCHIZACHYRIUM SCOPARIUM), SWITCHGRASS (PANICUM VIRGATUM). 15 LBS/ACRE EACH
AUGUST THRU MAY — GREENRYE (SECALE CEREALE) 25 LBS/ACRE EACH
MAY 1 THRU AUGUST — MILLET (PENNISETUM GLAUCUM) 25 LBS/ACRE
GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH EACH
REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ), DIVISION
OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), LAND QUALITY SECTION. THE FOLLOWING TREES — SILKY DOGWOOD (CORNUS AMOMUM), SILKY WILLOW (SALIX SERICEA), HAZEL ALDER (ALNUS
CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. SERRULATA) AND ELDERBERRY (SAMBUUS CANADENSIS)
1. PRIOR TO BEGINNING WORK ON THE PROJECT THE CONTRACTOR SHALL OBTAIN FROM THE OWNER A NATIVE PLANT MIX VARIATIONS SHALL BE APPROVED BY ENGINEER
COPY OF THE "EROSION AND SEDIMENT CONTROL APPROVAL" FROM THE NORTH CAROLINA DEPARTMENT NOTE: NO FERTILIZER SHALL BE USED WITHIN 10' OF TOP OF STREAM OR RIVER BANK.
OF ENVIRONMENTAL QUALITY (NCDEQ). DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR),
DIVISION OF LAND QUALITY, OR THE LOCAL AUTHORIZED PROGRAM. THE APPROVAL NOTICE MUST BE 12. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED.
AVAILABLE ON —SITE DURING ALL GRADING AND CONSTRUCTION ACTIVITIES.
13. REQUEST FINAL APPROVAL BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY,
2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY THE NORTH CAROLINA DEPARTMENT OF DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION.
ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY
SECTION. 14. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS.
NOTE: ALL UTILITY INSTALLATION WITHIN 25' OF A RIVER OR STREAM BANK SHALL BE INSTALLED PER
STREAM PROTECTION DURING EXCAVATION DETAIL. SEEDING AND MULCHING SHALL BE COMPLETED DAILY TEMPORARY SEEDING SPECIFICATION
5' STEEL POST41
Ito
(MIN. 1.25 LB/LF)
PLASTIC OR
/WIRE TIES
wIRE----,.. r
2
FENCE
''
.
I
I
EXISTING
1
GRADE
\ A�
��/�\\//\//\�/\\j
., o=
\\\\\
//\\/\`
Q W
3c,w
0o~
SECTION
VIEW
STING
GROUNDI
POST
N
WIRE
FENCE
/
�// //
//
\
\/
//`O�!%=�``''
'STEEL
/
"'`'''''°°"''''°'°'
0000000.•00.0
ooio,�'�'�'�'��'�
i,`ppi���ioioioi�pi,��i,��i,��ip
;,:•;,,•;,,•i,,•,,•�,•;,,,,,,,•�,•�;
,,,,,,,,`�•,,,�:�
oo.�0000.•oo.
%����`''`°�``
FILTER
FABRIC
''A
' '''
BACKFILL
THOROUGHLYT
/ /\\
/ /
/\/
\`m
//
/
TRENCH
/
(DisTU RBED
AREA)
EXISTING
GROUND
IN AREAS NOTED AS STREAM PROTECTION AREAS. SILT FENCE IN THESE AREAS SHALL NOT BE SEEDING MIXTURE:
INSTALLED CLOSER THAN 5' FROM CREEK BANK UNLESS FIELD CONDITIONS PREVENT SUFFICIENT SPECIES RATE (lb/acre)
CLEARANCE. ALL SILT FENCES SHALL BE INSPECTED AND CLEANED AS NEEDED AFTER EACH RAIN. RYE (grain) 120
SEEDING DATES:
3. NO WORK SHALL BE PERFORMED IN STREAM FROM OCTOBER 15 TO APRIL 15 (TO ACCOMMODATE COE AUG 15 TO DEC 30
AND DWQ RECOMMENDATIONS CONCERNING WORK IN TROUT WATERS.)
SOIL AMENDMENTS:
4. CONTRACTOR IS TO PLACE PERMANENT STAKES MARKING CLEARLY THE 25' BUFFER FOR STREAMSFOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY
WHERE SHOWN ON THE PLANS AND THE MARKERS ARE TO BE VISIBLE AT ALL TIMES DURING 2000 lb/ac GROUND AGRICULTURAL LIMESTONE AND/\///\//A/\
CONSTRUCTION. 750 lb/ac 10-10-10 FERTILIZER.
5. OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON —SITE INSPECTION BY A REPRESENTATIVE OF THE MULCH:
NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND APPLY 4000Ib/ac STRAW. ANCHOR STRAW BY TACKING
w/ ASPHALT, NETTING, OR A MULCH ANCHORING TOOL.
RESOURCES, LAND QUALITY SECTION. A DISK w/ BLADES SER NEARLY STRAIGHT CAN BE USED
AS A MULCH ANCHORING TOOL.
6. CONSTRUCTION SHALL BE LIMITED TO 2000' OF CONTIGUOUS ROAD CORRIDOR UNTIL ALL CUTS, FILLS,
AND DITCHES ARE STABILIZED FOR THAT 2000' SECTION. UPON STABILIZATION OF THAT SECTION MAINTENANCE:
RE —FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE, RE —SEED,
ANOTHER 2000' SECTION CAN BE CONSTRUCTED AND STABILIZED. RE —FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION
7. ALL STREAM CROSSINGS AND PERENNIAL STREAMS WILL BE ALIGNED WITH THE NATURAL STREAM OR OTHER DAMAGE.
PATTERNS ABOVE AND BELOW THE PROPOSED ROAD. ARCH CULVERTS WILL BE USED AND FOOTERS CUT/FILL SLOPES SEEDING SPECIFICATIONS - STEEPER THAN 3:1
\ NOTES:
\\
1.
IMMEDIATELY
FILTER
BARRIERS SHALL BE INSPECTED
AFTER EACH RAINFALL AND
2.
DAILY
REPAIR
FABRIC
DURING PROLONGED RAINFALL.
SHALL BE MADE AS NECESSARY.
SHALL BE REPLACED PROMPTLY
SLOPE SLOPE
<2%
2 TO 5%
5 TO 10%2
20% 20%
LENGTH(FT)
100
75
50
125
MAXIMUM AREA(SQFT)
10,000
7,500
5,000
1,500
IF
3.
4.DESIGNECTIONNI
FOUND
SEDIMENT
AFTER
DEPOSITS
HEIGHT
TO BE IN DISREPAIR.
DEPOSITS SHALL BE REMOVED
EACH STORM EVENT AND WHEN
REACH APPROXIMATELY 1/3
OF BARRIER.
D MANUAL:6.62.TY
SILT FENCE
PLAN
WILL BE CONSTRUCTED IN UNDISTURBED BANKS AWAY FROM THE STREAM FLOW. SEEDING MIXTURE:
SPECIES RATE (lb/acre)
8. PROCEED WITH GRADING, CLEARING AND GRUBBING. NOTE: NO OFF SITE DISPOSAL OF MATERIAL IS TALL FESCUE 100
ALLOWED UNLESS THE DISPOSAL SITE HAS AN APPROVED EROSION CONTROL PLAN. SWITCHGRASS AND PARTRIDGE PEA MIX 30
KOBE LESPEDEZA 10
9. SEED AND PLACE EROSION CONTROL MATTING ON ALL CUT AND FILL SLOPES THAT ARE NOT ROCK NURSE PLANTS:
IMMEDIATELY UPON COMPLETION OF SLOPE STABILIZATION. BETWEEN MAY 1 AND AUG 15, ADD 10Ib/ac GERMAN MILLET
OR 15 lb/ac SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG 15,
10. ALL TEMPORARY STREAM AND CREEK CROSSINGS FOR EQUIPMENT DURING CONSTRUCTION SHALL BE ADD 40 lb/ac RYE (GRAIN). IT MAY BE BENEFICIAL TO PLANT THE
MADE USING TEMPORARY BRIDGES. NO STREAM BANK OR STREAM BED DISTURBANCE SHALL BE GRASSES IN LATE SUMMER AND OVERSEED THE LESPENDEZAS
ALLOWED FOR EQUIPMENT CROSSINGS. IN MARCH.
11. SEED AND MULCH DENUDED AREA WITHIN TIME FRAME SPECIFIED (SEE TABLE). SEED AND SOIL SEEDING DATES:
AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE. BEST POSSIBLE
STRAW MULCH SHALL BE TACKED WITH TACKING AGENT APPLIED BY HYDROSEEDER. AUG 25 — SEPT 15 AUG 20 — OCT 25
FEB 15 — MAR 20 FEB 1 — APRIL 15
LIME 4,000 LBS
SOIL AMENDMENTS:
FERTILIZER (10-10-10) 1,000 LBS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR
KY-31 FESCUE (POA PRATENSIS) 100 LBS (MOWED AND MAINTAINED AREAS ONLY) APPLY 4000 lb/ac GROUND AGRICULTURAL LIMESTONE AND
OR 750 lb/ac 10-10-10 FERTILIZER.
CREEPING RED FESCUE 100 LBS (NATURAL AREAS AND STREAMBANKS)
STRAW MULCH 60-80 BALES MULCH:
FOR SUMMER SEEDING ADD TO THE ABOVE: APPLY 4000 lb/ac GRAIN STRAW OR EQUIVALENT COVER OF
GERMAN MILLET (SETARIA ITALICA) 40 LBS ANOTHER SUITABLE MULCHING MATERIAL, ANCHOR MULCH BY
SMALL —STEMMED SUDAN GRASS (SORGHUM BICOLOR) 50 LBS TACKING w/ ASPHALT, ROVING OR NETTING, NETTING IS THE
PREFERRED ANCHORING METHOD ON STEEP SLOPES.
FOR WINTER SEEDING ADD TO THE ABOVE:
RYE GRAIN (SECALE CEREALE 120 LBS MAINTENANCE:
) MOW NO MORE THAN ONCE A YEAR, RE —FERTILIZE IN THE
SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE.
IF HYDROSEEDING, WOOD CELLULOSE MAY BE USED IN ADDITION TO STRAW MULCH AT THE RATE OF RE —SEED, RE —FERTILIZE, RE —MULCH DAMAGED AREAS IMMEDIATELY.
1,000 LBS PER ACRE. DITCH/OPEN AREA PERMANENT SEEDING SPECIFICATION
EC
SYMBOL
1
UPDATED MARCH, 2017
NOT TO SCALE
POST
STANDARD HARDWARE
CLOTH — EXTEND 12"
BELOW GRADE
RIP RAP FACED WITH
WASHED STONE — 6"
#57
THK.
MIN.
GROUND
/\/
= .
� \
mi
-
/ /\\
\�i�\�i\\�i\\�i
s"
�
—OPTIONAL
EXCAVATE s" 12"
SEDIMENT
TRENCH
5' x 10' x 2' DEEP
TRAP
x
UPSLOPE ALONG LINE
EXTENHARDWARE CLOTH
EXTEND
TRENCH. BACKFILL TRENCH
COMPACT
SECTION
OF POSTS.
SOIL.
INTO
AND
ADDITIONAL HORIZONTAL
BRACE AT OPENING
s'—o" MAX.
4' O.C.
I
IL
-
ALL SEEDING SHALL BE MAINTAINED, WATERED ETC.., UNTIL A PERMANENT VEGETATIVE GROUND COVER SEEDING MIXTURE:
IS ESTABLISHED OVER ALL DISTURBED AREAS. FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE: SPECIES RATE (Ib/ac)CD/II
PURGE LIVE SEED SWITCHGRASS 4 LBS TALL FESCUE 250 (6 Ib/1000 sq ft)
B R O WN TO P MILLET OR PEARL MILLET (PENNISETUM GLAUCUM) 8 LBS
GRAIN SORGHUM (SORGHUM BICOLOR (L.) MOENCH SSP. BICOLOR) 2 LBS NURSE PLANTS:►i�������������������������•
ALL SLOPES 2:1 OR STEEPER SHALL BE COVERED BY EROSION CONTROL MATTING.
BETWEEN MAY 1 AND AU 15, ADD 10 lb/ac GERMAN MILLET
OR 15 lb/ac SUDANGRASS, PRIOR TO MAY 1 OR AFTER AUG 15,
NATIVE SEEDING: ADD 40 lb/ac RYE (GRAIN).
I;
I►��������������������������
u
'�������������
�.", ... A.�,�������4�
STANDARD HARDWARE
CLOTH — EXTEND 12"
BELOW GRADE
u
,,,,, ����������,�,�,�_�.�
�i����•���',�i�i�i�•
u
ELEVATION SILT
ATTACH HARDWARE CLOTH TO
POST SECURELY WITH TIES
u
THE CORRECT SEEDBED pH IS 5.5 TO 6.5. SOIL AMENDMENTS:
APPLY LIME AND FERTILIZE ACCORDING TO SOIL TEST, OR APPLY
APPLY ZERO NITROGEN AT PLANTING. 4000 lb/ac GROUND AGRICULTURAL LIMESTONE AND 750 lb/ac
10-10-10 FERTILIZER.
INCORPORATE SOIL AMENDMENTS INTO TOPSOIL/ROOT ZONE BEFORE SEEDING. MULCH:
USE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF DITCHES.
FIRM SEEDBED BEFORE SEEDING (TRAVEL WITH DOZER CLEATS). THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH
AND IN OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THE HEIGHT,
SEEDING DEPTH FOR ALL NATIVE SSP. EXCEPT E.GAMAGRASS (TRIPSACUM DACTYLOIDES) NEED TO BE DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4000 lb/ac
1 /4" — 1 /2". GREATER DEPTHS CAUSE HIGH SEED MORTALITY. GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP.
MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH
SPECIALIZED SEEDING IMPLEMENTS ARE REQUIRED. SEED MIXES AND RATES TO MATCH SEEDER USED. A DOWN SLOPE WHERE THEY CAN CLOG DRAINAGE DEVICES.
NO —TILL, DROP SEEDER OR BROADCASTER WITH PRECISION METERING TO CONTROL SMALL SEED FLOW MAINTENANCE:
AND PICKER WHEEL AGITATORS TO HANDLE FLUFFY SEED ARE BEST SUITED FOR NATIVE SEED. INSPECT AND REPAIR MULCH FREQUENTLY. RE —FERTILIZE IN LATE WINTER
ACCORDING TO SOIL TESTS OR APPLY 150 lb/ac 10-10-10 FERTILIZER
(3 Ib/1000 sq ft). MOW REGULARLY TO A HEIGHT OF 2" TO 4".
NOTES:
1. FILTER BARRIERS SHALL BE
IMMEDIATELY AFTER EACH RAINFALL
DAILY DURING PROLONGED RAINFALL.
REPAIR SHALL BE MADE AS
INSPECTED 3. SEDIMENT DEPOSITS SHALL BE REMOVED
AND AFTER EACH STORM EVENT AND WHEN
DEPOSITS REACH APPROXIMATELY 1/3
NECESSARY. HEIGHT OF BARRIER.
2. FABRIC SHALL BE REPLACED
IF FOUND TO BE IN DISREPAIR.
PROMPTLY 4. SILT FENCE OUTLETS SHALL BE LOCATED
AT LOW POINTS IN CONTINUOUS RUNS OF
SILT FENCE.
FINAL DESIGN
FOR REVIEW PURPOSES ONLY
RELEASED FOR CONSTRUCTION
EC
SILT FENCE - OUTLET
NO
UPDATED MARCH, 2017
NOT TO SCALE
,,,,,`N'�AR''�,,,,
. �� °°°°°°°°°°°o,''-;
oa�oFEss�oti°°ti
= zaQ� 9<�� :
a SEAL a _
QS° 034999 0
= v %°oF,y �;� J
'', �O ,c!NE°yG�,``
HONE �`�
����������`��
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
AS NOTED
EROSION CONTROL DETAILS
SHEET
C .5 0 1
mcg
1011A 5 Regional Circle
Suite A
Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
,�EFORFy
�
N9
'
°�
���'
o
�
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
TO
N OF
EL
CITY
WILSON COUNTY, NORTH CAROLINA
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
.
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
E-SRP-W-17-0030
��GING PP
mcgillassociates.com
NO.
DATE
BY
DESCRIPTION
L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:18 AM WYNN WILSON
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH
THE NCGO1 CONSTRUCTION GENERAL PERMIT
Implementing the details and specifications on this plan sheet will result in the construction
activity being considered compliant with the Ground Stabilization and Materials Handling
sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The
permittee shall comply with the Erosion and Sediment Control plan approved by the
delegated authority having jurisdiction. All details and specifications shown on this sheet
may not apply depending on site conditions and the delegated authority having jurisdiction.
SECTION E: GROUND STABILIZATION
Required Ground Stabilization Timeframes
Site Area Description
Stabilize within this
many calendar
days after ceasing
land disturbance
Timeframe variations
(a) Perimeter dikes,
swales, ditches, and
perimeter slopes
SAME DAY
None
(b) High Quality Water
(HQW) Zones
SAME DAY
None
(c) Slopes steeper than
3:1
SAME DAY
If slopes are 10' or less in length and are
not steeper than 2:1, 14 days are
allowed
(d) Slopes 3:1 to 4:1
SAME DAY
-7 days for slopes greater than 50' in
length and with slopes steeper than 4:1
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQW
Zones
-10 days for Falls Lake Watershed
(e) Areas with slopes
flatter than 4:1
SAME DAY
-7 days for perimeter dikes, swales,
ditches, perimeter slopes and HQW Zones
-10 days for Falls Lake Watershed unless
there is zero slope
Note: After the permanent cessation of construction activities, any areas with temporary
ground stabilization shall be converted to permanent ground stabilization as soon as
practicable but in no case longer than 90 calendar days after the last land disturbing
activity. Temporary ground stabilization shall be maintained in a manner to render the
surface stable against accelerated erosion until permanent ground stabilization is achieved.
GROUND STABILIZATION SPECIFICATION
Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the
techniques in the table below:
Temporary Stabilization Permanent Stabilization
• Temporary grass seed covered with straw or
other mulches and tackifiers
• Hydroseeding
• Rolled erosion control products with or
without temporary grass seed
• Appropriately applied straw or other mulch
• Plastic sheeting
• Permanent grass seed covered with straw or
other mulches and tackifiers
• Geotextile fabrics such as permanent soil
I reinforcement matting
• Hydroseeding
• Shrubs or other permanent plantings covered
with mulch
• Uniform and evenly distributed ground cover
sufficient to restrain erosion
• Structural methods such as concrete, asphalt or
retaining walls
• Rolled erosion control products with grass seed
POLYACRYLAMIDES (PAMS) AND FLOCCULANTS
1. Select flocculants that are appropriate for the soils being exposed during
construction, selecting from the NC DWR List of Approved PAMS/Flocculants.
2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.
3. Apply flocculants at the concentrations specified in the NC DWR List of Approved
PAMS/Flocculants and in accordance with the manufacturer's instructions.
4. Provide ponding area for containment of treated Stormwater before discharging
offsite.
5 Store flocculants in leak -proof containers that are kept under storm -resistant cover
or surrounded by secondary containment structures.
EQUIPMENT AND VEHICLE MAINTENANCE
1. Maintain vehicles and equipment to prevent discharge of fluids.
2. Provide drip pans under any stored equipment.
3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the
project.
4. Collect all spent fluids, store in separate containers and properly dispose as
hazardous waste (recycle when possible).
5. Remove leaking vehicles and construction equipment from service until the problem
has been corrected.
6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products
to a recycling or disposal center that handles these materials.
LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE
1. Never bury or burn waste. Place litter and debris in approved waste containers.
2. Provide a sufficient number and size of waste containers (e.g dumpster, trash
receptacle) on site to contain construction and domestic wastes.
3. Locate waste containers at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
4. Locate waste containers on areas that do not receive substantial amounts of runoff
from upland areas and does not drain directly to a storm drain, stream or wetland.
5. Cover waste containers at the end of each workday and before storm events or
provide secondary containment. Repair or replace damaged waste containers.
6. Anchor all lightweight items in waste containers during times of high winds.
7. Empty waste containers as needed to prevent overflow. Clean up immediately if
containers overflow.
8. Dispose waste off -site at an approved disposal facility.
9. On business days, clean up and dispose of waste in designated waste containers.
PAINT AND OTHER LIQUID WASTE
1. Do not dump paint and other liquid waste into storm drains, streams or wetlands.
2. Locate paint washouts at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
3. Contain liquid wastes in a controlled area.
4. Containment must be labeled, sized and placed appropriately for the needs of site.
5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from
construction sites.
PORTABLE TOILETS
1. Install portable toilets on level ground, at least 50 feet away from storm drains,
streams or wetlands unless there is no alternative reasonably available. If 50 foot
offset is not attainable, provide relocation of portable toilet behind silt fence or place
on a gravel pad and surround with sand bags.
2. Provide staking or anchoring of portable toilets during periods of high winds or in high
foot traffic areas.
3. Monitor portable toilets for leaking and properly dispose of any leaked material.
Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace
with properly operating unit.
EARTHEN STOCKPILE MANAGEMENT
1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least
50 feet away from storm drain inlets, sediment basins, perimeter sediment controls
and surface waters unless it can be shown no other alternatives are reasonably
available.
2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of
five feet from the toe of stockpile.
3. Provide stable stone access point when feasible.
4. Stabilize stockpile within the timeframes provided on this sheet and in accordance
with the approved plan and any additional requirements. Soil stabilization is defined
as vegetative, physical or chemical coverage techniques that will restrain accelerated
erosion on disturbed soils for temporary or permanent control needs.
0
0
0
co to 0
�A
PLAN
ONSITE CONCRETE WASHOUT
STRUCTURE WITH LINER
SILT FENCE
BELOW GRADE WASHOUT STRUCTURE
WASHOUT
„k.."Es II
aa,AP�E o=TVP �LOCATION DETERMINED HFIELD
ICININI,112 INCHES OF FREEBOARD
CONCRETE WASHOUT STRUCTURE NEEDS
NOTING DEVICE
ABOVE GRADE WASHOUT STRUCTURE
CONCRETE WASHOUTS
1. Do not discharge concrete or cement slurry from the site.
2. Dispose of, or recycle settled, hardened concrete residue in accordance with local
and state solid waste regulations and at an approved facility.
3. Manage washout from mortar mixers in accordance with the above item and in
addition place the mixer and associated materials on impervious barrier and within
lot perimeter silt fence.
4. Install temporary concrete washouts per local requirements, where applicable. If an
alternate method or product is to be used, contact your approval authority for
review and approval. If local standard details are not available, use one of the two
types of temporary concrete washouts provided on this detail.
5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk
sections. Stormwater accumulated within the washout may not be pumped into or
discharged to the storm drain system or receiving surface waters. Liquid waste must
be pumped out and removed from project.
6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it
can be shown that no other alternatives are reasonably available. At a minimum,
install protection of storm drain inlet(s) closest to the washout which could receive
spills or overflow.
7. Locate washouts in an easily accessible area, on level ground and install a stone
entrance pad in front of the washout. Additional controls may be required by the
approving authority.
8. Install at least one sign directing concrete trucks to the washout within the project
limits. Post signage on the washout itself to identify this location.
9. Remove leavings from the washout when at approximately 75% capacity to limit
overflow events. Replace the tarp, sand bags or other temporary structural
components when no longer functional. When utilizing alternative or proprietary
products, follow manufacturer's instructions.
10. At the completion of the concrete work, remove remaining leavings and dispose of
in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance
caused by removal of washout.
HERBICIDES, PESTICIDES AND RODENTICIDES
1. Store and apply herbicides, pesticides and rodenticides in accordance with label
restrictions.
2. Store herbicides, pesticides and rodenticides in their original containers with the
label, which lists directions for use, ingredients and first aid steps in case of
accidental poisoning.
3. Do not store herbicides, pesticides and rodenticides in areas where flooding is
possible or where they may spill or leak into wells, stormwater drains, ground water
or surface water. If a spill occurs, clean area immediately.
4. Do not stockpile these materials onsite.
HAZARDOUS AND TOXIC WASTE
1. Create designated hazardous waste collection areas on -site.
2. Place hazardous waste containers under cover or in secondary containment.
3. Do not store hazardous chemicals, drums or bagged materials directly on the ground.
NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING
EFFECTIVE: 04/01/19
SELF -INSPECTION,
SECTION A: SELF -INSPECTION
PART III
RECORDKEEPING AND REPORTING
normal business hours in accordance with the table
site conditions would cause the safety of the inspection
may be delayed until the next business day on
In addition, when a storm event of equal to or
of normal business hours, the self -inspection shall be
of the next business day. Any time when inspections
Inspection Record.
Self -inspections are required during
below. When adverse weather or
personnel to be in jeopardy, the inspection
which it is safe to perform the inspection.
greater than 1.0 inch occurs outside
performed upon the commencement
were delayed shall be noted in the
Inspect
Frequency
(during normal
business hours)
Inspection records must include:
(1) Rain gauge
maintained in
good working
order
Daily
Daily rainfall amounts.
If no daily rain gauge observations are made during weekend or
holiday periods, and no individual -day rainfall information is
available, record the cumulative rain measurement for those un-
attended days (and this will determine if a site inspection is
needed). Days on which no rainfall occurred shall be recorded as
"zero." The permittee may use another rain -monitoring device
approved by the Division.
(2) E&SC
Measures
At least once per
7 calendar days
and within 24
hours of a rain
event >1.0 inch in
24 hours
1. Identification of the measures inspected,
2. Date and time of the inspection,
3. Name of the person performing the inspection,
4. Indication of whether the measures were operating
properly,
5. Description of maintenance needs for the measure,
6. Description, evidence, and date of corrective actions taken.
(3) Stormwater
discharge
outfalls (SDOs)
At least once per
7 calendar days
and within 24
hours of a rain
event > 1.0 inch in
24 hours
1. Identification of the discharge outfalls inspected,
2. Date and time of the inspection,
3. Name of the person performing the inspection,
4. Evidence of indicators of stormwater pollution such as oil
sheen, floating or suspended solids or discoloration,
5. Indication of visible sediment leaving the site,
6. Description, evidence, and date of corrective actions taken.
(4) Perimeter of
site
At least once per
7 calendar days
and within 24
hours of a rain
event > 1.0 inch in
24 hours
If visible sedimentation is found outside site limits, then a record
of the following shall be made:
1. Actions taken to clean up or stabilize the sediment that has left
the site limits,
2. Description, evidence, and date of corrective actions taken, and
3. An explanation as to the actions taken to control future
releases.
(5) Streams or
wetlands onsite
or offsite
(where
accessible)
At least once per
7 calendar days
and within 24
hours of a rain
event > 1.0 inch in
24 hours
If the stream or wetland has increased visible sedimentation or a
stream has visible increased turbidity from the construction
activity, then a record of the following shall be made:
1. Description, evidence and date of corrective actions taken, and
2. Records of the required reports to the appropriate Division
Regional Office per Part Ill, Section C, Item (2)(a) of this permit
of this permit.
(6) Ground
stabilization
measures
After each phase
of grading
1. The phase of grading (installation of perimeter E&SC
measures, clearing and grubbing, installation of storm
drainage facilities, completion of all land -disturbing
activity, construction or redevelopment, permanent
ground cover).
2. Documentation that the required ground stabilization
measures have been provided within the required
timeframe or an assurance that they will be provided as
soon as possible.
NOTE: The rain inspection resets the required 7 calendar day inspection requirement.
SELF -INSPECTION, RECORDKEEPING
SECTION B: RECORDKEEPING
PART III
AND REPORTING
deviation shall be kept on the site. The
throughout the coverage under this permit.
plan shall be documented in the manner
1. E&SC Plan Documentation
The approved E&SC plan as well as any approved
approved E&SC plan must be kept up-to-date
The following items pertaining to the E&SC
described:
Item to Document
Documentation Requirements
(a) Each E&SC Measure has been installed
and does not significantly deviate from the
locations, dimensions and relative elevations
shown on the approved E&SC Plan.
Initial and date each E&SC Measure on a copy
of the approved E&SC Plan or complete, date
and sign an inspection report that lists each
E&SC Measure shown on the approved E&SC
Plan. This documentation is required upon the
initial installation of the E&SC Measures or if
the E&SC Measures are modified after initial
installation.
(b) A phase of grading has been completed.
Initial and date a copy of the approved E&SC
Plan or complete, date and sign an inspection
report to indicate completion of the
construction phase.
(c) Ground cover is located and installed
in accordance with the approved E&SC
Plan.
Initial and date a copy of the approved E&SC
Plan or complete, date and sign an inspection
report to indicate compliance with approved
ground cover specifications.
(d) The maintenance and repair
requirements for all E&SC Measures
have been performed.
Complete, date and sign an inspection report.
(e) Corrective actions have been taken
to E&SC Measures.
Initial and date a copy of the approved E&SC
Plan or complete, date and sign an inspection
report to indicate the completion of the
corrective action.
2. Additional Documentation
In addition to the E&SC Plan documents above, the following items shall be kept on the
site
and available for agency inspectors at all times during normal business hours, unless the
Division provides a site -specific exemption based on unique site conditions that make this
requirement not practical:
(a) This general permit as well as the certificate of coverage, after it is received.
(b) Records of inspections made during the previous 30 days. The permittee shall record
the required observations on the Inspection Record Form provided by the Division or
a similar inspection form that includes all the required elements. Use of
electronically -available records in lieu of the required paper copies will be allowed if
shown to provide equal access and utility as the hard -copy records.
(c) All data used to complete the Notice of Intent and older inspection records shall be
maintained for a period of three years after project completion and made available
upon request. [40 CFR 122.41]
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
SECTION C: REPORTING
1. Occurrences that must be reported
Permittees shall report the following occurrences:
(a) Visible sediment deposition in a stream or wetland.
(b) Oil spills if:
• They are 25 gallons or more,
• They are less than 25 gallons but cannot be cleaned up within 24 hours,
• They cause sheen on surface waters (regardless of volume), or
• They are within 100 feet of surface waters (regardless of volume).
(a) Releases of hazardous substances in excess of reportable quantities under Section 311
of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA
(Ref: 40 CFR 302.4) or G.S. 143-215.85.
(b) Anticipated bypasses and unanticipated bypasses.
(c) Noncompliance with the conditions of this permit that may endanger health or the
environment.
2. Reporting Timeframes and Other Requirements
After a permittee becomes aware of an occurrence that must be reported, he shall contact
the appropriate Division regional office within the timeframes and in accordance with the
other requirements listed below. Occurrences outside normal business hours may also be
reported to the Division's Emergency Response personnel at (800) 662-7956, (800)
858-0368 or (919) 733-3300.
Occurrence
Reporting Timeframes (After Discovery) and Other Requirements
(a) Visible sediment
deposition in a
stream or wetland
• Within 24 hours, an oral or electronic notification.
• Within 7 calendar days, a report that contains a description of the
sediment and actions taken to address the cause of the deposition.
Division staff may waive the requirement for a written report on a
case -by -case basis.
• If the stream is named on the NC 303(d) list as impaired for sediment -
related causes, the permittee may be required to perform additional
monitoring, inspections or apply more stringent practices if staff
determine that additional requirements are needed to assure compliance
with the federal or state impaired -waters conditions.
(b) Oil spills and
release of
hazardous
substances per Item
1(b)-(c) above
• Within 24 hours, an oral or electronic notification. The notification
shall include information about the date, time, nature, volume and
location of the spill or release.
(c) Anticipated
bypasses [40 CFR
122.41(m)(3)]
• A report at least ten days before the date of the bypass, if passible.
The report shall include an evaluation of the anticipated quality and
effect of the bypass.
(d) Unanticipated
bypasses [40 CFR
122.41(m)(3)]
• Within 24 hours, an oral or electronic notification.
• Within 7 calendar days, a report that includes an evaluation of the
quality and effect of the bypass.
(e) Noncompliance
with the conditions
of this permit that
may endanger
health or the
environment[40
CFR 122.41(1)(7)]
• Within 24 hours, an oral or electronic notification.
• Within 7 calendar days, a report that contains a description of the
noncompliance, and its causes; the period of noncompliance,
including exact dates and times, and if the noncompliance has not
been corrected, the anticipated time noncompliance is expected to
continue; and steps taken or planned to reduce, eliminate, and
prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6).
• Division staff may waive the requirement for a written report on a
case -by -case basis.
NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING
EFFECTIVE: 04/01/19
FINAL DESIGN
FOR REVIEW PURPOSES ONLY
NOT RELEASED FOR CONSTRUCTION
10'
EXISTING ROAD
6" HUMP TO DIVERT RUNOFF
FROM EXISTING ROAD
6" HUMP TO DIVERT RUNOFF
FROM EXISTING ROAD
2"-3" COARSE AGGREGATE
(RAILROAD BALLAST)
4'
FILTER FABRIC
FILTER FABRIC
NOTES:
36' MIN.
1. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL
BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM AN EXISTING ROAD.
2. STONE TO BE 2 - 3 INCH WASHED STONE RAILROAD BALLAST.
3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING
PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE
AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES
USED TO TRAP SEDIMENT.
4. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS
MUST BE REMOVED IMMEDIATELY.
5. WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO
ENTERING A PUBLIC STREET, WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON
AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED
SEDIMENT BASIN.
6. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.06.
TEMPORARY CONSTRUCTION ENTRANCE
UPDATED MARCH, 2017
NOT TO SCALE
6" MIN.
MATERIALS
STORAGE
FUEL STORAGE
NOTES:
EARTHEN BERM
STABILIZED
CONSTRUCTION
ENTRANCE
DUMPSTER
SELECT FILL/
STONE
TEMPORARY
SPOILS
STORAGE
SILT FENCE
PRIMARY SILT
FENCE AROUND
STOCKPILES
(TYP.)
1. SITE TO BE ESTABLISHED TO PREVENT TRANSPORT OF SEDIMENTS/ CONTAMINANTS
FROM SITE.
2. FUEL STORAGE AREA TO COMPLY WITH SPCC REQUIREMENTS FOR PETROLEUM/
OILS/ LUBRICANTS (POL) STORAGE.
3. CONTRACTOR SHALL MONITOR BMP'S ON A WEEKLY BASIS AND FOLLOWING
SIGNIFICANT STORM EVENTS; MAKING REPAIRS AND/ OR PROVIDING ADDITIONAL
BMP'S AS WARRANTED.
LAYDOWN / STORAGE YARD
UPDATED MARCH, 2017
NOT TO SCALE
r
mcgi
Regional Circle
I I Suite A
Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcgillassociates.com
0%1 1111111//,/
SSS‘'‹N•C•ARo//0/
0,c)C ESSioti•°4
=o� -1%7
_ oQ <o
SEAL o E
a o 034999 0 .
•
��LiO'o,Nc t.1
HON
''"llllllltttt�`
NO.
DATE
BY
DESCRIPTION
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
TOWN OF ELM CITY
WILSON COUNTY, NORTH CAROLINA
AS NOTED
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
EROSION CONTROL DETAILS 2
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
E-SRP-W-1 7-0030
SHEET
0-502
14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY
L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:18 AM WYNN WILSON
UNDISTURBED
EARTH
CONCRETE
THRUST BLOCK
BEND
CONCRETE
THRUST BLOCK
\ \ \\ \ \
TYPICAL THRUST BLOCKS FOR BENDS
TRENCH
WIDTH
THREADED ROD (GALVANIZED
OR BITUMINOUS COATED)
BLOCK CONCRETE THRUST \//\t/ \ \\\\/{\\//\\ \
y/\//\\ \/i
\\\\\\\\\��, \ THREADED ROD (GALVANIZED
/\/\/, . • ° - •" \//// OR BITUMINOUS COATED)
II•
• 0 E
UNDISTURBED EARTH
U ,
zo
wN
P
47,• • °M •
r •
• II °
i
UNDISTURBED EARTH
//1 PIPE
�AMETERS
E
////k\\\//>/,/.
TYPICAL THRUST BLOCK FOR REDUCERS
THREADED ROD (GALVANIZED
OR BITUMINOUS COATED)
TRENCH
WIDTH
CONCRETE THRUST
BLOCK \
iN
3=
!Es
3J
THREADED ROD (GALVANIZED
OR BITUMINOUS COATED)
PLUG
/\/ \/\//\
UNDISTURBED EARTH
/\/\/\\
//\//A \\i /
TYPICAL THRUST BLOCK FOR PLUGS
UNDISTURBED
EARTH
CONCRETE
THRUST BLOCK
3/4" TAP W/
CORPORATION
STOP FOR AIR
PRESSURE RELIEF
CONCRETE
THRUST BLOCK
A /\
A
TEE '— UNDISTURBED EARTH
TYPICAL THRUST BLOCKS FOR TEES
NOTES:
1. FITTING JOINTS SHALL NOT BE POURED IN CONCRETE OR HAVE CONCRETE SPILLED ON THE BOLTS OR NUTS.
THE FITTING SHALL BE WRAPPED IN A LAYER OF POLYETHYLENE PLASTIC PRIOR TO POURING THE THRUST BLOCK.
2. ROD AND EYE BOLT DIAMETER SHALL BE A MINIMUM OF 3/4" AND SHALL MATCH THE SIZE OF THE BOLT
PROVIDED WITH THE FITTING.
3. CONTRACTOR SHALL REPLACE FITTING BOLTS WITH THREADED ROD FOR 1/2 OF THE BOLTS SUPPLIED WITH
EACH FITTING. RODS SHALL BE EQUALLY SPACED.
TYPE
SIZE
11-1 /4° BEND
22-1 /2° BEND
45° BEND
90° BEND
TEE
PLUG
2-6
12
12
12
16
16
14
8
12
12
16
22
22
18
10
12
14
20
28
28
22
12
12
18
24
32
32
28
14
14
20
28
38
38
32
16
16
22
32
42
42
36
18
18
26
36
48
48
40
20
20
28
40
52
52
44
24
24
34
46
64
64
54
30
30
42
58
78
78
66
36
36
50
70
94
94
80
42
40
58
80
108
108
92
48
46
66
90
124
124
104
THRUST BLOCK DIMENSION "A"
S THRUST BLOCKING - ALL
28
UPDATED MARCH, 2017
NOT TO SCALE
BACKFILL
MATERIAL
COMPACTED
IN 6" LIFTS
BACKFILL
MATERIAL
COMPACTED
IN 3" LIFTS
No.12 COATED
COPPER TRACING ,\
WIRE \/\\/
APPROVED WARNING TAPE
24" ABOVE PIPE
\\/\\�\\‘ V\\%\\` \-\/\/. \ / * / / / /
UNDISTURBED
EARTH
BACKFILL
MATERIAL
COMPACTED
IN 6" LIFTS
SPRING LINE
OF PIPE
No.12 COATED
COPPER TRACING
WIRE
CLASS I
EMBEDMENT
NOTES:
STANDARD EXCAVATION
UNDISTURBED
EARTH
BACKFILL
MATERIAL
COMPACTED
IN 6" LIFTS
BACKFILL
MATERIAL
COMPACTED
IN 3" LIFTS
No.12 COATED
COPPER TRACINGWIRE
APPROVED WARNING TAPE
24" ABOVE PIPE
UNDISTURBED
EARTH
OVERCUT EXCAVATION
DUCTILE IRON GRAVITY SEWER
BACKFILL
MATERIAL
COMPACTED
IN 6" LIFTS
SPRING LINE
OF PIPE
No.12 COATED
COPPER TRACING
WIRE
CLASS I
EMBEDMENT
APPROVED WARNING TAPE
24" ABOVE PIPE
>
UNDISTURBED
EARTH
STANDARD EXCAVATION
PVC GRAVITY SEWER
APPROVED WARNING TAPE
24" ABOVE PIPE
\\ \12�' MAX/, \\
STANDARD EXCAVATION
IN WET CONDITIONS
BACKFILL
MATERIAL
COMPACTED
IN 6" LIFTS
SPRING LINE
OF PIPE
No.12 COATED
COPPER TRACING
WIRE
CLASS I
EMBEDMENT
FOUNDATION STONE
FOR UNDERCUT
EXCAVATION ONLY
AS DIRECTED BY
ENGINEER
UNDISTURBED
EARTH
APPROVED WARNING TAPE
24" ABOVE PIPE
MAX'
UNDERCUT EXCAVATION
IN UNSTABLE SOILS TYPES
PIPE IN WET OR UNSTABLE CONDITIONS
ALL PIPE TYPES
(AS DIRECTED BY ENGINEER)
1. CONSTRUCTION OF TRENCHES SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY AND HEALTH
REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
BE FAMILIAR WITH THE APPLICABLE REGULATIONS AND FOLLOW THEM ACCORDINGLY.
2. FOR UNIT PRICE CONTRACTS ONLY, PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH
SHALL BE FOR ACTUAL QUANTITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH SHOWN ON THIS DETAIL.
3. FOR UNIT PRICE CONTRACTS ONLY, PAYMENT FOR FOUNDATION STONE UNDERCUT SHALL BE FOR THE LENGTH
OF THE TRENCH REQUIRING UNDERCUT X 6" DEPTH INCREMENTS TO THE DEPTH REQUIRED.
4. CLASS I EMBEDMENT SHALL BE NCDOT STANDARD # 67 STONE OR APPROVED EQUAL. FOUNDATION STONE
SHALL BE NCDOT STANDARD # 57, # 67 STONE, RAILROAD BALLAST OR APPROVED EQUAL.
GRAVITY SEWER
TRENCHING DETAILS
UPDATED MARCH, 2017
NOT TO SCALE
BACKFILL MATERIAL
COMPACTED IN 6" LIFTS
/\
BACKFILL MATERIAL /
COMPACTED IN 3" LIFTS
APPROVED WARNING TAPE
24" ABOVE PIPE
BACKFILL MATERIAL
COMPACTED IN 6" LIFTS
BACKFILL MATERIAL
COMPACTED IN 3" LIFTS
No.12 COATED COPPER
TRACING WIRE
UNDISTURBED J UNDISTURBED
EARTH
STANDARD EXCAVATION
NOTES:
NOTE:
BELL HOLES NOT SHOWN
EARTH
OVERCUT EXCAVATION
1. CONSTRUCTION OF TRENCHES SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY AND
HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE REGULATIONS AND FOLLOW THEM ACCORDINGLY.
2. PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL
QUANTITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH SHOWN ON THIS DETAIL.
S SEWER FORCE MAIN TRENCHING
24
UPDATED FEBRUARY, 2018
NOT TO SCALE
FINAL DESIGN
FOR REVIEW PURPOSES ONLY
NOT RELEASED FOR CONSTRUCTION
J
mcgill
5 Regional Circle
Suite A
Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcgillassociates.com
NO.
DATE
BY
DESCRIPTION
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
TOWN OF ELM CITY
WILSON COUNTY, NORTH CAROLINA
AS NOTED
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
SANITARY SEWER DETAILS
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
E-SRP-W-17-0030
SHEET
0-503
14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY
L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:18 AM WYNN WILSON
FINISHED GRADE
i
e
a
/
COMPACTED BACKFILL—
CONCRETE BRICK
SUPPORT
a
d
\ ' ♦ ♦ and
? d
♦ ♦ < ♦ ad
WORD "SEWER" CAST IN TOP
24"x24"x4"
CONCRETE PAD
ADJUSTABLE CAST IRON
VALVE BOX (SCREW TYPE)
7 CONCRETE BRICK
SUPPORT
PLUG VALVE
COMPACTED BACKFILL
CONCRETE SUPPORT PAD 6"
LARGER THAN VALVE
(REQUIRED ON VALVES 10"
AND LARGER ONLY)
PLUG VALVE
UPDATED MARCH, 2017
NOT TO SCALE
9"
27 1 /2"
36" MIN. BURY DEPTH
1" PVC
CONCRETE BLOCK
1" VALVE WI
HANDWHEEL OPERATOR
18"
YARD HYDRANT WOODFORD
IOWA MODEL Y1 OR
APPROVED EQUAL
i" STANDARD NOZZLE WITH
OPTIONAL 1" NOZZLE
24"
6x6 10/10 WWF—\_
\-3'-6"x2'-6"x4"
CONCRETE SPLASH BLOCK
STD. VALVE
BOX AND LID
11" GALVANIZED
STEEL CASING PIPE
1" VALVE BODY
WITH 1" NPT INLET
#67 STONE
YARD HYDRANT
UPDATED MARCH, 2017
NOT TO SCALE
CORNER POST CAP
BARBED WIRE
(3 STRANDS)
V V V V V V V 1/ V V V V'"V V V V V V V V'"V V V V V
2r CORNER POST
TENSION BAR
WIRE TIES
15" O.C. (TYP)
No.9 GAUGE WIRE
2" MESH (TYP.)
TENSION WIRE
—)42500 PSI
�j CONCRETE (TYP)
2" CLEARANCE
(TYP)
10'-0" MAX. (TYP.)
f V V V V V VVVVV V V V V VVVV V V V V VV
2" LINE POST
i:!rrri►:!:!:!i►:!Ati►:!:!:!:! _AtAti►.44.
\,\\\\\\\\\ \\
\//\\/�\/�\\��\\ice\��\/�\\\��\ j\
\/3'-0" �\\
MN.
%\ (TYP.)
\ %�
9"
MIN.
(TYP.)
1-3" MIN.
(TYP.)
BARBED WIRE (3 STRANDS)
FABRIC TO MATCH THAT
USED IN LINE OF FENCE
• e\/ GALV. 8"S D. PIPE
we
\//�/��//, /\
\/4\/
MIN.
CHAIN LINK FENCE and DOUBLE GATE
UPDATED MARCH, 2017
NOT TO SCALE
WELD ALL JOINTS
PADLOCK HOLE
6'-0"
`. ��.YV/i�/��/i�/YV/i�/\\/
2500 PSI J7t.4/17\,_9;.\\\,\
d it
CONCRETE ((TYP.)
SEMI —SELF DRAINING
CENTER STOP
MIN.
(TYP.)
—3" MIN.
(TYP.)
EXISTING BASE COURSE
DRY/
cUNDISTURBED
EARTH
8" MIN. CABC COMPACTED
TO 100% SD._ PROCTOR'
4" LIFTS
TO MATCH EXISTING GRAVEL SURFACE
EXISTING BASE COURSE
6" LIFTS OF SUITABLE SOIL
OR CABC AT OPTIMUM
MOISTURE COMPACTED 95%
STANDARD PROCTOR
GRAVEL DRIVE REPAIR
UPDATED MARCH, 2017
NOT TO SCALE
FINAL DESIGN
FOR REVIEW PURPOSES ONLY
NOT RELEASED FOR CONSTRUCTION
mcgill
5 Regional Circle
Suite A
Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcgillassociates.com
, 0FE /04;o/j,Pct
% SEAL O ad 034999 0
'�Gi�',�G I N E� yG`�
0aoddISs
��, 4. H ONE ,.
NO.
DATE
BY
DESCRIPTION
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
TOWN OF ELM CITY
WILSON COUNTY, NORTH CAROLINA
AS NOTED
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
SITE DETAILS
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
E-SRP-W-17-0030
SHEET
0-504
14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY
L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:19 AM WYNN WILSON
GENERAL PERMIT REQUIREMENT NOTES
NOTES: STATEMENT OF PERMIT AND CONTRACTOR RESPONSIBILITIES
1. PROJECT SITE CONTAINS JURISDICTIONAL WATERS OF THE U.S (WOTUS).
2. PROJECT INVOLVES IMPACTS TO WOTUS IN SEVERAL LOCATIONS.
3. PROPOSED IMPACTS TO WOTUS ARE REGULATED BY THE CLEAN WATER ACT SECTIONS 404 AND 401.
4. PERMITS HAVE BEEN OBTAINED BY SCOTLAND COUNTY ECONOMIC DEVELOPMENT, LAURINBURG, NC TO AUTHORIZE THE PROPOSED IMPACTS TO WOTUS
AND ARE SUBJECT TO THE TERMS AND CONDITIONS OF THE PERMITS.
5. CWA 404/401 PERMIT REQUIREMENTS, TERMS, AND CONDITIONS ARE SUMMARIZED ON THIS SHEET ALONG WITH VARIOUS ASSOCIATED DETAILS AND
SPECIFICATIONS.
6. A COPY OF THE PERMITS HAVE BEEN PROVIDED TO THE CONTRACTOR AT THE PRE -CONSTRUCTION MEETING. THE CONTRACTOR IS RESPONSIBLE FOR
READING THE PERMITS, PLANS AND SPECIFICATIONS, AND UNDERSTANDING HIS/HER RESPONSIBILITIES UNDER THE PERMITS, WHICH INCLUDE BUT ARE
NOT LIMITED TO: AVOIDANCE OF IMPACTS TO WETLANDS OUTSIDE PERMITTED AREA, WORKING IN THE DRY, STOCK PILING AND REUSE OF WETLAND SOILS
IN THE PERMITTED CROSSING AREA, RESEEDING WITH NATIVE SPECIES FOR PERMANENT COVER.
A) COMPLIANCE WITH ALL PERMIT CONDITIONS RELATING TO CONTRACTED CONSTRUCTION ACTIVITIES BOTH ON -SITE AND OFF -SITE, IF OFF -SITE AREAS ARE
USED FOR PROJECT RELATED PURPOSES (EG: ACCESS, LAYDOWN, STAGING, BORROW, WASTE, ETC.)
B) COMMUNICATION OF PERMIT COMPLIANCE RESPONSIBILITIES TO SUBCONTRACTORS WORKING ON THE PROJECT.
C) COORDINATION WITH PROJECT ENGINEER REGARDING PERMIT COMPLIANCE RELATED ISSUES AND QUESTIONS.
D) IMMEDIATE REPORTING TO PROJECT ENGINEER OR OWNER OF ANY VIOLATION OR SUSPECTED VIOLATION OF PERMIT CONDITIONS.
E) A COPY OF ALL PERMITS AND CONDITIONS SHOULD BE MADE AVAILABLE AT THE PROJECT SITE DURING CONSTRUCTION AND MAINTENANCE ACTIVITIES.
PERMITTED WETLAND SEEDING REQUIREMENTS
ALL SEEDING SHALL BE MAINTAINED, WATERED ETC.., UNTIL A PERMANENT VEGETATIVE GROUND COVER IS
ESTABLISHED OVER ALL DISTURBED AREAS.
FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE:
PURE LIVE SEED SWITCHGRASS
BROWNTOP MILLET
GRAIN SORGHUM
4 LBS
8 LBS
2 LBS
ALL SLOPES 2:1 OR STEEPER SHALL BE COVERED BY EROSION CONTROL MATTING.
NATIVE SEEDING:
THE CORRECT SEEDBED pH IS 5.5 TO 6.5.
APPLY ZERO NITROGEN AT PLANTING.
INCORPORATE SOIL AMENDMENTS INTO TOPSOIL/ROOT ZONE BEFORE SEEDING.
FIRM SEEDBED BEFORE SEEDING (TRAVEL WITH DOZER CLEATS).
SEEDING DEPTH FOR ALL NATIVE SSP. (EXCEPT E.GAMAGRASS) NEED TO BE 1/4" - 1/2".
GREATER DEPTHS CAUSE HIGH SEED MORTALITY.
SPECIALIZED SEEDING IMPLEMENTS ARE REQUIRED. SEED MIXES AND RATES TO MATCH SEEDER USED. A NO -TILL,
DROP SEEDER OR BROADCASTER WITH PRECISION METERING TO CONTROL SMALL SEED FLOW AND PICKER WHEEL
AGITATORS TO HANDLE FLUFFY SEED ARE BEST SUITED FOR NATIVE SEED.
NATIVE PLANT SEEDING MIX FOR WETLAND. STREAM OR RIVERBANK STABILIZATION
SEEDING FOR WETLAND, STREAM OR RIVERBANK STABILIZATION SHALL BE A MIXTURE OF NATIVE GRASSES, PLANTS
AND TREES. NATIVE PLANT MIX SHALL INCLUDE THE FOLLOWING:
GRASSES - BIG BLUESTEM, INDIAN GRASS, LITTLE BLUESTEM, SWITCHGRASS
AUGUST THRU MAY - GREENRYE
MAY 1 THRU AUGUST - MILLET
5 LBS/ACRE EACH
25 LBS/ACRE EACH
25 LBS/ACRE EACH
WETLAND GRASSES - HOP SEDGE (CAREX LUPUUNA), BLUNT BROOM SEDGE (CAREX SCOPARIA), FOX SEDGE (CAREX
VULPINOIDEA), DEERTONGUE (PANICUM CLANDESTINUM), EASTERN BUR REED (SPARGANIUM AMERICANUM), SOFT
RUSH (JUNCUS EFFUSUS).
TREES - SILKY DOGWOOD (CORNUS AMONUM), SILKY WILLOW (SALIX SERICEA), HAZEL ALDER (ALMUS SERRULATA)
AND ELDERBERRY (SAMBUEUS CANADENSIS)
NATIVE PLANT MIX VARIATIONS SHALL BE APPROVED BY ENGINEER.
NOTE: NO FERTILIZER SHALL BE USED WITHIN 10' OF TOP OF STREAM OR RIVER BANK.
COIR MATTING
BASE FLOW
WATER ELEVATION
-III III III III II'
ELEVATION
BANK OR BENCH
• TRENCH TOP OF MATTING TO A
DEPTH OF AT LEAST 12", STAKE
OR STAPLE IN PLACE, &
BACKFILL TO DESIGN GRADE
• MINIMUM 24" ECO-STAKES®
INSTALLED ALONG TOE OF
MATTING (INTERCEPT BETWEEN
WATER SURFACE AND BANK)
• 0.75" X 0.75" OPENINGS
460 G/M WEIGHT
12" ECO-STAKE®
(TYP.)
24" ECO-STAKE®
(TYP.)
r
24" ECO-STAKE®
(TYP.)
COIR MATTING DETAIL
NOT TO SCALE
•♦4.,.���`♦�0-0,�♦�♦��`♦♦�.�♦�A�,
44,
P'Oiii♦i�►��������i����
PLAN
12" ECO-STAKE®
(TYP.)
• MINIMUM 2' CENTERS ALONG BOTTOM
• MINIMUM 1' OVERLAP AT JOINING
SECTIONS OF COIR MATTING
• 12" ECO-STAKES® INSTALLED IN
BANK FLUSH WITH COIR MATTING
ABOVE BOTTOM ROW OF 24"
ECO-STAKES®
• ECO-STAKES® SPACED AT
MAXIMUM 3' CENTERS (APPROX.)
BOTH DIRECTIONS
NOTES: NCDEQ GENERAL CONDITIONS
1. CONSTRUCTION CORRIDORS IN WETLANDS AND ACROSS STREAM CHANNELS WILL BE MINIMIZED TO THE MAXIMUM EXTENT PRACTICABLE AND WILL NOT
EXCEED 50' WIDE FOR GAS UTILITY LINES AND 40' WIDE FOR ALL OTHER UTILITY LINES. EXCEPTIONS TO THIS CONDITION REQUIRE APPLICATION TO AND
WRITTEN APPROVAL FROM DWR.
FOR CONSTRUCTION CORRIDORS IN WETLANDS AND ACROSS STREAM CHANNELS, STUMPS WILL BE GRUBBED ONLY AS NEEDED TO INSTALL THE UTILITY
AND REMAINING STUMPS SHOULD BE CUT OFF AT GRADE LEVEL. THE GENERAL STRIPPING OF TOPSOIL WITHIN WETLANDS ALONG THE CONSTRUCTION
CORRIDOR IS NOT PERMITTED.
2. PERMANENT MAINTAINED ACCESS CORRIDORS IN WETLANDS AND ACROSS STREAM CHANNELS WILL BE RESTRICTED TO THE MINIMUM WIDTH
PRACTICABLE AND SHALL NOT EXCEED 30' WIDE FOR GAS UTILITY LINES AND 20' WIDE FOR ALL OTHER UTILITY LINES EXCEPT AT MANHOLE LOCATIONS.
15' X 15' PERPENDICULAR VEHICLE TURN-AROUNDS ARE ALLOWED IN ACCESS CORRIDORS BUT MUST BE SPACED AT LEAST 500' APART. EXCEPTIONS TO
THIS CONDITION REQUIRE APPLICATION TO AND WRITTEN APPROVAL FROM DWR.
3. THE CONTRACTOR WILL HAVE A SPECIFIC PLAN FOR RESTORING WETLAND CONTOURS. ANY EXCESS MATERIAL WILL BE REMOVED TO A HIGH GROUND
DISPOSAL AREA.
THE MIXING OF TOPSOIL AND SUBSOILS WITHIN THE WETLANDS ALONG UTILITY CORRIDORS SHOULD BE MINIMIZED TO THE GREATEST EXTENT PRACTICAL.
DURING EXCAVATION, THE SOILS WILL BE PLACED ON FABRIC TO MINIMIZE IMPACTS WHENEVER POSSIBLE. TOPSOIL EXCAVATED FROM UTILITY TRENCHES
WILL BE PILED SEPARATELY FROM SUBSOILS AND WILL BE BACKFILLED INTO THE TRENCH ONLY AFTER THE SUBSOILS HAVE BEEN PLACED AND
COMPACTED.
4. NO WASTE, SPOIL, SOLIDS, OR FILL OF ANY KIND CAN OCCUR IN WETLANDS OR WATERS BEYOND THE FOOTPRINT OF THE IMPACTS (INCLUDING
TEMPORARY IMPACTS) AS AUTHORIZED IN THE WRITTEN APPROVAL FROM DWR; OR BEYOND THE PERMITTED THRESHOLDS WITHOUT WRITTEN
AUTHORIZATION.
NO REMOVAL OF VEGETATION OR OTHER IMPACTS OF ANY KIND CAN OCCUR TO STATE REGULATED RIPARIAN BUFFERS BEYOND THE FOOTPRINT OF
IMPACTS APPROVED IN A BUFFER AUTHORIZATION OR VARIANCE OR AS LISTED AS AN EXEMPT ACTIVITY IN THE APPLICABLE RIPARIAN BUFFER RULES.
5. ALL DEVICES SHALL BE MAINTAINED ON ALL CONSTRUCTION SITES, BORROW SITES, AND WASTE PILE (SPOIL) SITES, INCLUDING CONTRACTOR OWNED OR
LEASED BORROW PITS ASSOCIATED WITH THE PROJECT. SUFFICIENT MATERIALS REQUIRED FOR STABILIZATION AND/OR REPAIR OF EROSION CONTROL
MEASURES AND STORMWATER ROUTING AND TREATMENT SHALL BE ON -SITE AT ALL TIMES.
6. SEDIMENT AND EROSION CONTROL MEASURES WILL NOT BE PLACED IN WETLANDS OR WATERS EXCEPT WITHIN THE FOOTPRINT OF TEMPORARY OR
PERMANENT IMPACTS AUTHORIZED UNDER THE PERMITS. EXCEPTIONS TO THIS CONDITION REQUIRE APPLICATION TO AND WRITTEN APPROVAL FROM DWR.
7. EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE MUST NOT BE USED ALONG STREAMBANKS OR WITHIN WETLANDS.
EXCEPTIONS TO THIS CONDITION REQUIRE APPLICATION TO AND WRITTEN APPROVAL FROM DWR.
8. AN NPDES CONSTRUCTION STORMWATER PERMIT (NCG010000) IS REQUIRED FOR CONSTRUCTION PROJECTS THAT DISTURB ONE OR MORE ACRES OF LAND.
THE NCG010000 PERMIT ALLOWS STORMWATER TO BE DISCHARGED DURING LAND DISTURBING CONSTRUCTION ACTIVITIES AS STIPULATED IN THE
CONDITIONS OF THE PERMIT. IF THE PROJECT IS COVERED BY THE PERMITS, FULL COMPLIANCE WITH PERMIT CONDITIONS INCLUDING THE EROSION AND
SEDIMENTATION CONTROL PLAN, INSPECTIONS AND MAINTENANCE, SELF -MONITORING, RECORD KEEPING AND REPORTING REQUIREMENTS IS REQUIRED.
9. ALL WORK IN OR ADJACENT TO STREAMS SHOULD BE CONDUCTED SO THAT THE FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED
AREA. APPROVED BEST MANAGEMENT PRACTICES FROM THE MOST CURRENT VERSION OF THE NC SEDIMENT AND EROSION CONTROL MANUAL, OR THE NC
DOT CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL, SUCH AS SANDBAGS, ROCK BERMS, COFFERDAMS, AND OTHER DIVERSION STRUCTURES
SHOULD BE USED TO MINIMIZE EXCAVATION IN FLOWING WATER. EXCEPTIONS TO THIS CONDITION REQUIRE APPLICATION TO AND WRITTEN APPROVAL FROM
DWR.
10. CULVERTS WILL BE DESIGNED AND INSTALLED IN SUCH A MANNER THAT THE ORIGINAL STREAM PROFILES ARE NOT ALTERED AND ALLOW FOR AQUATIC
LIFE MOVEMENT DURING LOW FLOWS. THE DIMENSION, PATTERN, AND PROFILE OF THE STREAM ABOVE AND BELOW A PIPE OR CULVERT WILL NOT BE
MODIFIED BY WIDENING THE STREAM CHANNEL OR BY REDUCING THE DEPTH OF THE STREAM IN CONNECTION WITH THE CONSTRUCTION ACTIVITY. THE
WIDTH , HEIGHT, AND GRADIENT OF A PROPOSED CULVERT SHALL BE SUCH AS TO PASS THE AVERAGE HISTORICAL LOW FLOW AND SPRING FLOW
WITHOUT ADVERSELY ALTERING FLOW VELOCITY.
PLACEMENT OF CULVERTS AND OTHER STRUCTURES IN STREAMS SHOULD BE BELOW THE ELEVATION OF THE STREAMBED BY ONE FOOT FOR ALL
CULVERTS WITH A DIAMETER GREATER THAN 48", AND 20% OF THE CULVERT DIAMETER FOR CULVERTS HAVING A DIAMETER LESS THAN OR EQUAL TO
48", TO ALLOW LOW FLOW PASSAGE OF WATER AND AQUATIC LIFE.
IF MULTIPLE PIPES OR BARRELS ARE REQUIRED, THEY SHOULD BE DESIGNED TO MIMIC THE EXISTING STREAM CROSS SECTION AS CLOSELY AS POSSIBLE
INCLUDING PIPES OR BARRELS AT FLOOD PLANE ELEVATION AND/OR SILLS WHERE APPROPRIATE. WIDENING THE STREAM CHANNEL SHOULD BE AVOIDED.
WHEN TOPOGRAPHIC CONSTRAINTS INDICATE CULVERT SLOPES OF GREATER THAN 5%, CULVERT BURIAL IS NOT REQUIRED, PROVIDED THAT ALL
ALTERNATIVE OPTIONS FOR FLATTENING THE SLOPE HAVE BEEN INVESTIGATED AND AQUATIC LIFE MOVEMENT/CONNECTIVITY HAS BEEN PROVIDED WHEN
POSSIBLE (E.G. ROCK LADDERS, CROSS VEINS, ETC.). NOTIFICATION, INCLUDING SUPPORTING DOCUMENTATION TO INCLUDE A LOCATION MAP OF THE
CULVERT, CULVERT PROFILE DRAWINGS, AND SLOPE CALCULATIONS, SHOULD BE PROVIDED TO DWR 60 CALENDAR DAYS PRIOR TO THE INSTALLATION OF
THE CULVERT.
WHEN BEDROCK IS PRESENT IN CULVERT LOCATIONS, CULVERT BURIAL IS NOT REQUIRED PROVIDED THAT THERE IS SUFFICIENT DOCUMENTATION OF THE
PRESENCE OF BEDROCK. NOTIFICATION, INCLUDING SUPPORTING DOCUMENTATION SUCH AS A LOCATION MAP OF THE CULVERT, GEOTECHNICAL REPORTS,
PHOTOGRAPHS, ETC. SHALL BE PROVIDED TO DWR A MINIMUM OF 60 CALENDAR DAYS PRIOR TO THE INSTALLATION OF THE CULVERT. IF BEDROCK IS
DISCOVERED DURING CONSTRUCTION, THEN DWR SHALL BE NOTIFIED BY PHONE OR EMAIL WITHIN 24 HOURS OF DISCOVERY.
IF OTHER SITE SPECIFIC TOPOGRAPHIC CONSTRAINTS PRECLUDE THE ABILITY TO BURY THE CULVERTS AS DESCRIBED ABOVE AND/OR IT CAN BE
DEMONSTRATED THAT BURYING THE CULVERT WOULD RESULT IN DESTABILIZATION OF THE CHANNEL, THEN EXCEPTIONS TO THIS CONDITION REQUIRE
APPLICATION TO AND WRITTEN APPROVAL FROM DWR.
11. APPLICATION OF FERTILIZER TO ESTABLISH PLANTED/SEEDED VEGETATION WITHIN DISTURBED RIPARIAN AREAS AND/OR WETLANDS WILL BE CONDUCTED AS
AGRONOMIC RATES AND MUST COMPLY WITH ALL OTHER FEDERAL, STATE AND LOCAL REGULATIONS. FERTILIZER APPLICATION WILL BE ACCOMPLISHED IN A
MANNER THAT MINIMIZES THE RISK OF CONTACT BETWEEN THE FERTILIZER AND SURFACE WATERS.
12. IF CONCRETE IS USED DURING CONSTRUCTION, THEN ALL NECESSARY MEASURES WILL BE TAKEN TO PREVENT DIRECT CONTACT BETWEEN UNCURED OR
CURING CONCRETE AND WATERS OF THE US. WATER THAT INADVERTENTLY CONTACTS UNCURED CONCRETE CAN NOT BE DISCHARGED TO WATERS OF THE
US.
13. ALL PROPOSED AND APPROVED TEMPORARY FILL AND CULVERTS MUST BE REMOVED AND THE IMPACTED AREA RETURNED TO NATURAL CONDITIONS
WITHIN 60 CALENDAR DAYS AFTER THE TEMPORARY IMPACT IS NO LONGER NECESSARY. THE IMPACTED AREAS WILL BE RETURNED TO ORIGINAL GRADE,
INCLUDING EACH STREAM'S ORIGINAL CROSS SECTIONAL DIMENSIONS, PLANFORM PATTERN, AND LONGITUDINAL BED PROFILE. ALL TEMPORARY IMPACTS
SHOULD BE RESTORED AND STABILIZED WITH NATIVE VEGETATION.
14. ALL PROPOSED AND APPROVED TEMPORARY PIPES/CULVERTS/RIP-RAP PADS ETC. IN STREAMS SHOULD BE INSTALLED AS OUTLINED IN THE MOST
RECENT EDITION OF THE NC SEDIMENT AND EROSION CONTROL PLANNING AND DESIGN MANUAL OR THE NCDOT BEST MANAGEMENT PRACTICES FOR
CONSTRUCTION AND MAINTENANCE ACTIVITIES SO AS NOT TO RESTRICT STREAM FLOW OR CAUSE DIS-EQUILIBRIUM DURING USE OF THIS CERTIFICATION.
15. ANY RIP -RAP REQUIRED FOR PROPER CULVERT PLACEMENT, STREAM STABILIZATION, OR RESTORATION OF TEMPORARILY DISTURBED AREAS WILL BE
RESTRICTED TO THE AREA DIRECTLY IMPACTED BY THE APPROVED CONSTRUCTION ACTIVITY. ALL RIP -RAP SHOULD BE PLACED SUCH THAT THE ORIGINAL
STREAM ELEVATION AND STREAM BANK CONTOURS ARE RESTORED AND MAINTAINED, SHOULD NOT RESULT IN THE DE -STABILIZATION OF STREAM BED OR
BANKS UPSTREAM OR DOWNSTREAM OF THE AREA, AND SHOULD NOT RESTRICT AQUATIC LIFE PASSAGE.
16. ANY RIP -RAP USED FOR STREAM OR SHORELINE STABILIZATION WILL BE OF SIZE AND DENSITY TO PREVENT MOVEMENT BY WAVE, CURRENT, OR STREAM
FLOWS, WILL CONSIST OF CLEAN ROCK OR MASONRY MATERIAL. RIP -RAP SHOULD NOT BE INSTALLED IN THE STREAMBED EXCEPT IN SPECIFIC AREAS
REQUIRED FOR VELOCITY CONTROL AND TO ENSURE STRUCTURAL INTEGRITY OF BANK STABILIZATION MEASURES.
17. ALL MECHANIZED EQUIPMENT OPERATED NEAR SURFACE WATERS SHOULD BE INSPECTED, FUELED, LUBRICATED, AND MAINTAINED REGULARLY AND
MAINTENANCE PERFORMED IN A MANNER TO PREVENT CONTAMINATION OF STREAM WATER FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS, OR OTHER TOXIC
MATERIALS.
18. HEAVY EQUIPMENT WORKING IN WETLANDS WILL BE PLACED ON MATS OR OTHER MEASURES TAKEN TO MINIMIZE SOIL DISTURBANCE.
19. THE CONTRACTOR OR OTHER RESPONSIBLE ENTITY WILL REPORT ANY PETROLEUM SPILL OF 25 GALLONS OR MORE; ANY SPILL REGARDLESS OF AMOUNT
THAT CAUSES A SHEEN ON SURFACE WATERS; ANY PETROLEUM SPILL REGARDLESS OF SIZE THAT OCCURS WITHIN 100-FEET OF SURFACE WATER; AND
ANY PETROLEUM SPILL LASS THAN 25 GALLONS THAT CANNOT BE CLEANED UP WITHIN 24 HOURS.
WETLAND NOTES - NCDEQ GENERAL CONDITIONS:
1. FOR ALL UTILITY LINES CONSTRUCTED WITHIN WETLANDS, AN ANTI -SEEP COLLAR
SHALL BE PLACED AT THE DOWNSTREAM (UTILITY LINE GRADIENT) WETLAND
BOUNDARY AND EVERY 150 FEET UP THE GRADIENT UNTIL THE UTILITY EXITS
THE WETLAND. ANTI -SEEP COLLARS MAY BE CONSTRUCTED WITH CLASS B
CONCRETE, COMPACTED CLAY, PVC PIPE, OR METAL COLLARS. WETLAND
CROSSINGS THAT ARE DIRECTIONALLY DRILLED, AND PERPENDICULAR WETLAND
CROSSINGS THAT ARE OPEN CUT AND LESS THAN 150 FEET LONG DO NOT
REQUIRE ANTI -SEEP COLLARS.
2.THE MIXING OF TOPSOIL AND SUBSOILS WITHIN THE WETLANDS ALONG UTILITY
CORRIDORS SHALL BE MINIMIZED TO THE GREATEST EXTENT PRACTICAL. DURING
EXCAVATION, THE SOILS SHALL BE PLACED ON FABRIC TO MINIMIZE IMPACTS
WHENEVER POSSIBLE. TOPSOIL EXCAVATED FROM UTILITY TRENCHES WILL BE
PILED SEPARATELY FROM SUBSOILS AND WILL BE BACKFILLED INTO THE TRENCH
ONLY AFTER THE SUBSOILS HAVE BEEN PLACED AND COMPACTED. WETLAND
CONTOURS SHOULD BE RESTORED TO ORIGINAL CONDITIONS.
3.SEDIMENT AND EROSION CONTROL MEASURES SHALL NOT BE PLACED IN
WETLANDS OR WATERS EXCEPT WITHIN THE FOOTPRINT OF PERMITTED
TEMPORARY OR PERMANENT IMPACTS.
4.EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR
PLASTIC TWINE SHALL NOT BE USED ALONG STREAMBANKS OR WITHIN
WETLANDS.
5.ALL WORK IN OR ADJACENT TO STREAMS SHALL BE CONDUCTED SO THAT THE
FLOWING STREAM DOES NOT COME IN CONTACT WITH THE DISTURBED AREA.
6.PERMANENT CULVERTS SHALL BE DESIGNED AND INSTALLED IN SUCH A MANNER
THAT THE ORIGINAL STREAM PROFILES ARE NOT ALTERED AND ALLOW FOR
AQUATIC LIFE MOVEMENT DURING LOW FLOWS.
7.ALL TEMPORARY FILL AND CULVERTS SHALL BE REMOVED AND THE IMPACTED
AREA SHALL BE RETURNED TO NATURAL CONDITIONS WITHIN 60 CALENDAR
DAYS AFTER THE TEMPORARY IMPACT IS NO LONGER NECESSARY. THE
IMPACTED AREAS SHALL BE RESTORED TO ORIGINAL GRADE, INCLUDING EACH
STREAM'S ORIGINAL CROSS -SECTIONAL DIMENSIONS, PLANFORM PATTERN, AND
LONGITUDINAL BED PROFILE. ALL TEMPORARILY IMPACTED SITES SHALL BE
RESTORED AND STABILIZED WITH NATIVE VEGETATION.
8.ANY RIP -RAP REQUIRED FOR PROPER CULVERT PLACEMENT, STREAM
STABILIZATION, OR RESTORATION OF TEMPORARILY DISTURBED AREAS SHALL BE
RESTRICTED TO THE AREA DIRECTLY IMPACTED BY THE APPROVED
CONSTRUCTION ACTIVITY. THE RIP -RAP SHALL BE OF A SIZE AND DENSITY TO
PREVENT MOVEMENT BY WAVE, CURRENT ACTION, OR STREAM FLOWS, AND
SHALL CONSIST OF CLEAN ROCK OR MASONRY MATERIAL FREE OF DEBRIS OR
TOXIC POLLUTANTS. ALL RIP -RAP SHALL BE PLACED SUCH THAT THE
ORIGINAL STREAM ELEVATION AND STREAMBANK CONTOURS ARE RESTORED AND
MAINTAINED.
9.ALL MECHANIZED EQUIPMENT OPERATED NEAR SURFACE WATERS SHALL BE
INSPECTED AND MAINTAINED REGULARLY TO PREVENT CONTAMINATION OF
STREAM WATERS FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS, OR OTHER
TOXIC MATERIALS. HEAVY EQUIPMENT WORKING IN WETLANDS SHALL BE PLACED
ON MATS OR OTHER MEASURES SHALL BE TAKEN TO MINIMIZE SOIL
DISTURBANCE.
NOTE: WHERE THERE IS ANY OVERLAP OF REQUIREMENTS
BETWEEN PERMITTED STREAM AND WETLAND DETAILS AND NOTES
(AS SHOWN ON SHEETS C-506 AND C-507) AND ANY EROSION
AND SEDIMENTATION CONTROL DETAIL/NOTE OR ANY OTHER
ASPECT OF THE CONTRACT PLANS AND SPECIFICATIONS,
CONTRACTOR SHALL CONFIRM WITH ENGINEER PRIOR TO
BEGINNING WORK IN WETLAND AREA.
FINAL DESIGN
FOR REVIEW PURPOSES ONLY
NOT RELEASED FOR CONSTRUCTION
PA 5 Regional Circle
Suite A
mcgill Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcgillassociates.com
J
•
NO.
DATE
BY
DESCRIPTION
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
TOWN OF ELM CITY
WILSON COUNTY, NORTH CAROLINA
AS NOTED
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
PERMITTED STREAM AND WETLAND
CROSSING CONDITIONS
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
E-SRP-W-17-0030
SHEET
0-505
14.04042 WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS STATE RESERVE PROJECT NO. E-SRP-W-17-0030 TOWN OF ELM CITY
L:\PINEHURST\DRAWINGS\2014\14.04042\DESIGN\CIVIL\DRAWINGS\14.04042 COVER DETAILS.DWG PLOT DATE 10/13/2020 8:19 AM WYNN WILSON
GEOTEXTILE
FILTER FABRIC
6" #57 STONE
GEOTEXTILE FILTER BAG SIZED
FOR PUMP DISCHARGE
(MIN. 10'X15')
GEOTEXTILE
FILTER FABRIC
6" #57 STONE
NOTES:
PLAN
SEWN -IN PIPE
DISCHARGE SLEEVE
8" MIN.
WATER IN TRENCH
PUMP DISCHARGE
HOSE
ATTACHMENT POINT
FOR PUMP DISCHARGE
ATTACHMENT POINT
FOR PUMP DISCHARGE
PUMP DISCHARGE
HOSE
\/\/\//�\/\\/\\/\/\\�\\��\,\ \/�\/�\\//\\//\\///\//\ INSTALL ON LESS
THAN5% SLOPE
SECTION
UNDISTURBED EARTH
1. FILTER BAG SHALL BE CONSTRUCTED OF NON —WOVEN FILTER FABRIC WITH A MIN. 8 OZ/SQUARE
YARD WEIGHT
2. FILTER BAG FABRIC SHALL HAVE A FLOW RATE OF 80 GPM/S.F. OR SIZED FOR PUMP DISCHARGE
3. SILT BAG SHALL HAVE SLEEVE SEWN —IN SLEEVE FOR RECEIVING THE PUMP DISCHARGE AND PUMP
HOSE SHALL BE SECURELY ATTACHED TO SILT BAG
4. SILT BAG SHALL BE REPLACED WHEN HALF FULL OR PUMP DISCHARGE RATE IS REDUCED ENOUGH
TO CAUSE OVERFLOW. CONTRACTOR SHALL PROVIDE ADDITIONAL BAGS AS REQUIRED.
5. BOTH FILTER BAG AND SILT WITHIN SHALL BE DISPOSED OF IN A PROPER MANNER AFTER
MATERIAL INSIDE IS DRY, RESULTING IN NO DISCHARGE TO THE STREAM
* CONTRACTOR SHALL INSPECT DISCHARGE FROM SILT BAG AND/OR SOCK TO PREVENT SEDIMENT OR TURBIDITY IN RECEIVING WATERS.
SUCTION HOSE
•
Pt
/\/%/%/%/%/
BERM
SECTION / ISOMETRIC
NOTES:
PUMP
INSERT DISCHARGE HOSE
INTO DEWATERING
FILTER TUBE/ SOCK
///\/
WRAP ROP\\
FOR SECURE
SEAL.
PUMP DISCHARGE
HOSE DEWATERING FILTER
TUBE/ SOCK
1. CONSTRUCT A STABILIZED EARTHEN BERM BETWEEN THE DEWATERING DEVICE AND THE TRENCH
TO PROTECT THE TRENCH IN THE EVENT OF A FAILURE.
2. PLACE DEWATERING FILTER TUBE/ SOCK ON THE GROUND OR ON A TRAILER OVER A
RELATIVELY LEVEL, STABILIZED AREA.
3. INSERT DISCHARGE PIPE FROM PUMP SUFFICIENTLY FAR INTO DEWATERING FILTER TUBE/ SOCK
AND SECURE WITH A ROPE WRAPPED AROUND THE SNOUT OF THE BAG, OR PER
MANUFACTURER INSTRUCTIONS. SECURE THE OTHER END OF THE TUBE BY FOLDING THE OPEN
END BACK ON ITSELF, AND THEN WRAPPING THAT END WITH A ROPE, OR PER MANUFACTURER
INSTRUCTIONS.
TYPICAL SILT BAG
4. EMPTY DEWATERING FILTER TUBE/ SOCK WHEN: (1) HALF FULL OF SEDIMENT; (2) WHEN THE
SEDIMENT HAS REDUCED THE FLOW RATE OF THE PUMP DISCHARGE TO AN IMPRACTICAL
AMOUNT; OR (3) PER MANUFACTURER INSTRUCTIONS.
MAINTENANCE AND DISPOSAL:
1. REMOVE AND DISPOSE OF ACCUMULATED SEDIMENT IN A PRE —APPROVED LOCATION AWAY FROM
WATERWAYS OR ENVIRONMENTALLY SENSITIVE AREAS. OPEN BOTH ENDS OF THE DEWATERING
FILTER TUBE/ SOCK, PICK IT UP IN THE CENTER AND DUMP ACCUMULATED SEDIMENT OUT OF
BOTH ENDS, OR PER MANUFACTURER INSTRUCTIONS.
2. ALLOW TO DRY AND STORE FOR RE —USE OR; AS DIRECTED BY ENGINEER OR INSPECTOR.
TRENCH DEWATERING DETAIL
UPDATED FEBRUARY, 2018
NOT TO SCALE
TYPICAL SILT SOCK
— CLOSED END
No.12 COATED COPPER
TRACING WIRE (PVC ONLY)
1'-0" BELOW
BOTTOM OF TRENCH
6"
APPROVED WARNING TAPE
24" ABOVE PIPE (PVC ONLY)
—18"
TRENCH
WIDTH
6"
NOT TO EXCEED 40 FEET
BETWEEN COLLARS
/v v v \/ \/
2
/12",
/\/,-6-4 <-
2 -7
2/
2
2/
2./2./2./2./2./2„
SECTION
d
a' e
°
a°
e G•
°
PLAN
UTILITY LINE
(DIAMETER VARIES)
CLASS B CONCRETE
OR COMPACTED CLAY
CLASS B CONCRETE
OR COMPACTED CLAY
nANTI-SEEP COLLAR
UPDATED MARCH, 2017
NOT TO SCALE
UPDATED MARCH, 2017
NOT TO SCALE
PROPOSED SILT
FENCE
PROPOSED TEMPORARY
PUMP AROUND
X
PROPOSED DIRECT
BURIED SEWER LINE
PROPOSED DIRECT
BURIED WATER MAIN
ENERGY
DISSIPATOR
x
X
r-
2
X
X
TOP OF BANK
EXISTING STREAM
WORK AREA
IMPERVIOUS DIKE\
TO BE INSTALLED \
IN CHANNEL
X
PUMP
DEWATERING
DEVICE
IMPERVIOUS DIKE
PROPOSED SILT
FENCE
CMS
77/
TEMPORARY BYPASS NOTES
1. Install all erosion control measures as shown on Erosion
Control Plan and in this detail.
2. Construct impervious dike (recommend sand bags or other
easily removable material) on upstream side of existing channel
and install temporary bypass pump to divert water around
construction area. All material must be completely removed
following construction.
3. Construct impervious dike (recommend sand bags or other
easily removable material) on downstream side of existing
channel to prevent backing up of stream water into the
construction area.
4. Dewater the construction area using another temporary pump
and discharge water into a dewatering basin until sediment has
settled and water can be discharged back into stream.
Dewatering basin must be outside of any restricted buffer areas,
use wattles instead of earth berm if reasonable.
5. Begin construction of buired water line and elevated sewer
line across existing channel. Contractor shall inspect system
daily before beginning any construction. No construction shall
continue if system is not fully operational.
6. Any wash material removed from bypass area should be
stored outside the flood zone or regulated buffer area until
construction is complete.
7. Upon installation and backfill of water main excavation and
installation of aerial sewer main, remove bypass system within
(2) two calendar days.
8. Stabilize all areas disturbed during construction. Stream bed
and banks must be returned to pre —construction conditions.
9. Contractor shall receive prior approval from engineer if
choosing to use another method in lieu of bypass channel.
PROPOSED
EASEMENT
TEMPORARY STREAM BYPASS
UPDATED APRIL 2018
NOT TO SCALE
PA 5 Regional Circle
Suite A
mcgill Pinehurst, NC 28374
910.295.3159
NC Firm License # C-0459
mcgillassociates.com
J
NO.
DATE
BY
DESCRIPTION
WASTEWATER IRRIGATION SYSTEM IMPROVEMENTS
STATE RESERVE PROJECT NO. E-SRP-W-17-0030
TOWN OF ELM CITY
WILSON COUNTY, NORTH CAROLINA
AS NOTED
OFFICE MANAGER
D. CHAPMAN
DESIGNER
D. HONEYCUTT
STREAM AND WETLAND CROSSING
DETAILS
PROJECT MANAGER
D. HONEYCUTT
REVIEWER
DATE
JANUARY 2020
PROJECT #
14.04042
FUNDING #
E-SRP-W-17-0030
SHEET
0-506