Loading...
HomeMy WebLinkAboutGW1-2022-03025_Well Construction - GW1_20220228 tILL uutyo I huu i i gim htuuhu (u vv-i) For Internal Use Only: 1.Well Contractor Information: -1'emq .144WATER-ZONES FROM I To I DESCRIPTION Well Contractor kame G%q ft._10-5 ft. I q zon 1 94-f I P=q NC W Contractor Certification Number Zia ft. Q3 1z'_ ft._15.,OUTER CASING(for ulticasedmills),OR LINER- ap q2;;�FROM TO I DIAMETER THICKNESS aL YIN'RiTE We tie,. Z05a' Company Name 1 '41 ft- I SM-V 1&INNER CASING OR TUBING:Toe6ther al closedAoop) 2.Well Construction Permit#: FROM TO DIAMETER I THICKNESS ]MATERIAL _ List all applicable wellconstruction permits e.UIC,county,State, Variance,etc.) ft. ft. in 3.Well Use(check well use): ft. ft. in. Water Supply Well: 17;SCREEN, FROM TO DIAMETER SLOT SIZE I THICKNESS I MATERIAL :)Agricultural 13M[unicipal/Public ft. ft. :—]Geothermal(Heating(Cooling Supply) M19idential Water Supply(single) ft. ft. in. Industrial/Commercial DResidential Water Supply(shared) 18 GROUT _JiIrrigation FROM TO NXTERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft. go It, ft. mg OAVle. eeryzzliO MOnitoring DRecovery ft. ft., Injection Well: '11P. wr Co,-A Aquifer Recharge nGroundwater Remediation ft. ig.SAND/G RAV ErPA C K(if aDDlicable) Aquifer Storage and Recovery OSalinityBarrier FROM TO MATERIAL EMPLACEMENT METHOD Aquifer Test 13Stormwater Drainage ft. ft. Experimental Technology [3Subsidence Control —i Geothermal(Closed Loop) E)Tracer 20.DRILLING LOG(attach additional sheets if necessary) Geothermal(Heating/Cooling Return) 00ther(explain under#21 Remarks) FROM TO DESCRIPTION(Wor,hardnm,soilfrock type,grain size,etc.) It. ft. 4.Date Well(s)Completed: Well I D# 5a.Well Location, % Chelsea ft. Facility/Owner Name Facility ID#ffapplicable) ft. V "W 10-1 CatfM LIM, ft. ft. 7 Physical Address,City,and Zip ft. ft. Uchatlr_ J 21.REMARKS FEB 2 A 202 : � County Parcel Identification No."o 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if'well field,one lat/long is sufficient) 22. Certification: N W 6.Is(are)the well(s)M<ermanent or OTemporary Signature of Certified Well Contractor Date By signing this form, /hereby certify that fire well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: []Yes or ��o with 15A NCA C 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that 8 If this is a repair,fill outknown well construction information and explain the nature offt copy of this record has been provided to the VV//owner. repair under f21 remarks section or on the backofthis form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-I is needed. IridicateTOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: SUBMITTAL INSTRUCTIONS; 9.Total well depth below land surface! 2-45 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths ffdifferant(example-3@200'rued 2@100) construction to the following: 10.Static water level below top of casing: (ft.) Division of Water Resources,Information Processing Unit, If wa ter le vel is abo ve casing,tue 1617 Mail Service Center, Raleigh,NC 27699-1617 11.Borehole diameter: (in.) 24b. For Iniection Wells: In addition to sending the form to the address in 24a above, also submit one copy of this form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,!Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) At Method of test: Ar 24c. For Water Supply & In4ec;iion Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b.Disinfection type: e Amount: completion of well construction to the county health department of the county where constructed.