Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0032867_Report_20220131
RECEIVED/NCDE©/DWR 2022 Plant Maintenance Update F E R -; 9 Kings Mountain Travel Plaza, Kings Mountain, NC WORDS M ORESVILLE REGIONAL OFFICE Date: 1 /31 /2022 To: Laeeq Khan, Owner From: Daniel Dougherty, WWTP ORC Subject: Plant maintenance/Upgrade schedule This is an annual report of repairs, installation of new equipment and upgrades needed at the wastewater treatment plant (WWTP) to achieve compliance and provide for more efficient operations. WWTP — Equipment associated with Outfall 001 The first five tasks are items listed in previous Notice of Violation (NOV) of NC DEQ.from past inspections * Corrective actions on flow measurement at effluent — new flow meter * Repair leaks in septic tanks at influent and reconnect to flow * Install blowers on inactive aeration basin and make operational * Check for leaks from aeration tanks and make repairs * Provide and install new grating on aeration basins * (*see NOV letter of 8/15/18, 2/25/19, 2/5/20 and 1/26/21) New Tasks Check for and repair leaks in the chlorine contact chamber Scum return for clarifier has malfunctioned and needs to be replaced Oil/Grease Separator at Outfall 002 Continue to remove soil buildup at drainage features along the open concrete channel along Dixon Road and at the entrance past the diesel dispensers. Excessive stormwater is reaching the oil/water separator from areas not exposed to the truck diesel dispensers because soil and debris is blocking the original channels. Poor drainage at the lower entrance causes accumulation of stormwater that overflows the sampling point for Outfall 002 creating flow into the system and preventing sampling during and after rain events. (see page two) 1 2022 Plant Maintenance Update Cont'd 1/31/2022 The following are safety items for the WWTP: Electrical Install new lighting for night illumination of process units Install new outlets and rewire existing outlets Miscellaneous Obtain and install new manhole covers on upper septic tanks Treatment and traps for mosquito and other insect pests must be installed at the wastewater plant before the summer months. Cc: Ori Tuvia NC DEQ Submitted by: Daniel J. Dougherty, ORC 2