HomeMy WebLinkAboutNC0046728_Authorization to Construct_20030520NPDES DOCUHENT SCANNING COVER SHEET
NC0046728
Mooresville / Rocky River WWTP
NPDES Permit:
Document Type:
Permit Issuance
Wasteload Allocation
n.Y ..••!f.: Y-MLIs"Yh11Yr u+- .,. .,ar.
Authorization to Construct
(AtC)
Permit Modification
Complete File - Historical
Engineering Alternatives (EAA)
Approval
Instream Assessment (67b)
Speculative Limits
Environmental
Assessment (EA)
Permit
History
Document Date:
May 20, 2003
This document is printed on reuse paper - ignore any
content on the reverse side
TOWN OF
MOORESVILLE
litillties Deparbnent
May 20, 2003
NPDES Unit
DENR/DWQ
1617 Mail Service Center
Raleigh, NC 27699-1617
Attn: Mr. David Goodrich
Wilce Martin
Utilities Director
Town of Mooresville
P. O. Box 878
Mooresville, NC 28115
(704) 663-7282
Fax 663-7362
Mobile 980-722-6251
RE: Authorization to Construct Permit Issuance ATC Number 046728A03
Mooresville -Rocky River WWTP NPDES Permit NC0046728
Iredell County
Mr. Goodrich:
Upon receiving your authorization to construct in February 03 the Town asked the Town
Engineering Consultant to update the costs of the project because it had been three years
since the project was originally estimated. This was due to some delays on our part and a To co s L 4 l
long review by the State because of personnel shortages and work Toad from what we J
understand.
The Town's engineers updated the estimated costs and they went up from $2.89 million to
$6.1 million dollars. As a result the Town cannot afford to build this project at this time. We
are planning to build it in several years. We are still meeting our NPDES permit
requirements and land applying sludge on about 1,200 acres of farm land.
I discussed this matter with Mr. Charles Weaver of your office who suggested that I contact
you in writing to inform you that the Town of Mooresville will not be able to construct the
sludge dewatering project at this time, so that it would be a matter of record. He stated that
there isn't really any time limit, but you do want it constructed within a reasonable amount of
time. However, as I stated above we will be planning to construct it within several years.
Should you require additional information regarding this matter please contact me.
Wilce Martin
Utilities Director
CC: Rick McLean
Carson Fisher
Joe DeBruhl
• Page2
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
Michael F. Easley, Governor
William G. Ross, Jr., Secretary
Alan W. Klimek, P.E., Director
AC;rA
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
January 21, 2003
Mr. H. Carson Fisher, P.E., Town Engineer
Town of Mooresville
P.O. Box 878
Moorseville, North Carolina 46728
Subject: Authorization to Construct Permit Issuance
ATC Number 046728A03
Mooresville - Rocky River WWTP
NPDES Permit NC0046728
Iredell County
Dear Mr. Fisher:
A request for an Authorization to Construct (ATC) was received by the Division and final plans
and specifications for this project have been reviewed and found to be satisfactory. Authorization is
hereby granted for the Mooresville - Rocky River Wastewater Treatment Plant improvements.
Specifically, this ATC allows:
• Addition of residuals thickening equipment and associated equipment (after clarification prior
to aerobic digestion),
• Thickener building sized for two, 3 m.gravity belt thickeners,
• Polymer feed system for gravity belt thickeners,
• Air compressors for gravity belt thickeners,
• Belt washwater pumps, three, (using chlorinated effluent),
• Thickened sludge return pumps (2, positive displacement -variable speed pumps)
• Addition of a 1 MG concrete aerated sludge holding tank,
• 180 inch submerged impeller and sparge ring for aeration (1800 scfm),
• 2 blowers at 1000 scfm,
• Addition of a tanker loading pump station,
• 2 variable speed (up to 1200 gpm)drive tanker loading pumps,
• Associated equipment for residuals transfer to tanker trucks,
• Equivalent replacement parts for the following:
• 2 digester aerators (100 inch submerged impeller and sparge ring , 1800 scfm)
• 2 waste sludge pumps (25 Hp, variable speed drive up to 840 gpm),
• 2 digester transfer pumps (15 Hp, 250 gpm),
• 2 plant water pumps, (25 Hp, variable speed, up to 400 gpm - increased for thickening),
• Drainage system for all filtrate and decant to divert back to the headworks,
• and all additional piping, valves, control equipment and appurtenances.
Once modifications approved under this ATC have been completed and an Engineer's Certificate
has been submitted, the permittee is authorized to operate the units listed above. This Authorization to
Construct does not alter the current design flow of 5.2 MGD for the Town of Mooresville.
1617 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1617 - TELEPHONE 919-733-5083/FAX 919-733-0719
AN EQUAL OPPORTUNITY AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/ 1 0% POST -CONSUMER PAPER
VISIT US ON THE WEB AT http://h2o.enr.state.nc.us/NPDES
4
d
Mr. Fisher
NC0046728
2
This Authorization to Construct is issued in accordance with NPDES Permit No. NC0046728
issued January 26, 2001, and shall be subject to revocation unless the wastewater treatment
facilities are constructed in accordance with the conditions and limitations specified in the permit.
The sludge generated from these treatment facilities must be disposed of in accordance with
G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality.
In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required by
this Division, such as the construction of additional or replacement wastewater treatment or disposal
facilities.
The Mooresville Regional Office, telephone number (704) 663-1699, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place
inspection can be made. Such notification to the regional supervisor shall be made during the normal
office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays.
Upon classification of the facility by the Certification Commission, the Permittee shall employ a
certified water pollution control treatment system operator to be in responsible charge (ORC) of the
water pollution control treatment system. The operator must hold a certificate of the type and grade at
least equivalent to or greater than the classification assigned to the water pollution control treatment
system by the Certification Commission. The Permittee must also employ a certified back-up operator
of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0202. The
ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and N facility
at least daily, excluding weekends and holidays, and must properly manage and document daily
operation and maintenance of the facility and must comply with all other conditions outlined in Title
15A, Chapter 8G, .0204. Once the facility is classified, the Permittee must submit a letter to the
Certification Commission which designates the operator in responsible charge within: (A) Sixty
calendar days prior to wastewater being introduced into a new system or (B) within 120 calendar days
of the following, (i) after receiving notification of a change in the classification of the system requiring
the designation of a new ORC and back-up ORC or (ii) a vacancy in the position of ORC or back-up
ORC.
A copy of the approved plans and specifications shall be maintained on file by the Permittee for
the life of the facility.
The Operational Agreement between the Permittee and the Environmental Management
Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with
the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S.
143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit.
Failure to abide by the requirements contained in this Authorization to Construct may subject
the Permittee to an enforcement action by the Division of Water Quality in accordance with North
Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from complying
with any and all statutes, rules, regulations, or ordinances which may be imposed by other
government agencies (local, state, and federal) which have jurisdiction.
Upon completion of construction and prior to operation of this permitted facility, a certification
must be received from a professional engineer certifying that the permitted facility has been installed
in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and
specifications. Mail the Certification to the NPDES Unit, Division of Water Quality, 1617 Mail Service
Center, Raleigh, NC 27699-1617.
Mr. Fisher
NC0046728
3
One (1) set of approved plans and specifications is being forwarded to you. If you have any
questions or need additional information, please contact Ms. Susan A. Wilson, P.E., telephone number
(919) 733-5083, extension 510.
cc: Central Files
NPDES Unit, Permit File
Mooresville Regional Office,
Mr. Charles Willis, Jr., P.E.
Since
On W. Klimek, P.E.
Water Quality
WillisEngineers
1520 South Boulevard
Charlotte, NC 28203
Town of Mooresville Rocky River WWTP Review Comments and Responses
Solids Handling Facilities
The following Comments were received from NCDENR — Division of Water Quality, 18 April
2002. Each comment from DWQ (underlined) is followed by a response from Willis
Engineers
List major components to be added (outside of those listed on PI-2-1 of the specs). For
example, I know that the sludge holding tank is an addition, please state dimensions, etc. for
that component and any other component to be added (it's difficult for me to tell from the
plans — since those components are not in bold to differentiate new from existing).
Major components of the project include the addition of a gravity thickening facility, one
million gallon aerated storage tank, tanker vehicle loading pump station and various
mechanical equipment replacements. Items listed in the Payment Items under PI-2.04
Schedule of Major Mechanical Equipment are limited to mechanical devices ancillary to
those major facilities. The sizes of the facilities and their capacity are found on the attached
Basis of Design.
Provide a flow diagram for the area being modified, with an indication of the flow of all
liquids and solids (for example, I'd like to see that the runoff of liquid from the belt press
reverts back to the headworks or elsewhere in the treatment plant).
A flow diagram for the proposed facilities is attached to the Basis of Design.
Provide calculations for the new components (i.e., the loading rate for the belt press, the
aeration requirement for the holding tank and subsequent aeration supplied, etc.).
Reference the attached Basis of Design.
For the replacement components — are these strict replacements of like components? If not,
lust provide calculations to indicate that those replacement components are still adequate
for what's to be accomplished.
Yes. Replacement components as listed in the Contract are identical to those provided with
the original facility with the exception of the plant water pumps. These pumps are being
increased in size to provide additional washwater for the thickening facilities.
Provide calculations to confirm that the residuals conform to the 503 rules. Is the landfill
option to be abandoned and all of residuals to be land applied?
The facilities as designed are capable of meeting the requirements of 40CFR Part 503. The
dedicated landfill on the treatment plant site was closed at the end of 2000. Since that time
the Town has developed a land application program.
Provide calculations to ensure that the 30 day residuals holding time is being met.
Reference the attached Basis of Design.
Willis Engineers 1 912.102 (34)
Town of Mooresville
Rocky River Wastewater Treatment Plant
Solids Disposal Facilities
Basis of Design
1 Solids Loading
Year 2000
Plant Flow 3.25 MGD
Excess Solids 1,100 DT/Yr
Year 2010
Plant Flow 5.20 MGD (Design Flow)
Excess Solids 1,900 DT/Yr o ...
2 Disposal Method Liquid Land Application
Solids Concentration 2% to 3% Unthickened
5% to 6% Thickened
Treatment Type Class B
Operator Private Contractor
Permit Type Individual Site Permits
Application Areas Private Farms
3 Thickening Facilities
Feed Solids Concentration 0.3% to 0.7% O1A
Output Solids Concentration 5% to 6%
Number —Two —
Type Gravity Belt
Size 3 meter
Capacity 750 gpm - each
Throughput Capacity @ 0.3% Solids, 40 Hr/wk 1,170 DT/yr- each
40 Hrs/wk
4 Storage Facilities
Number One
Type Circular Tank
Diameter 100 ft
Depth 18 ft SWD
Volume 1,000,000 gal
Stoage Capacity @ 5.2 MGD, 5% Solids 40 days
aiskf7'54s
Willis Engineers 1 Appendix A
•♦ •
RECYCLE
PUMPING
STATION
SECONDARY
CLARIFIER
8" WASTE
FORCE MAIN
FILTRATE/DECANT
DRAIN TO HEADWORKS
TANKER
PUMPING
STATION -,
SECONDARY
CLARIFIER
SLUDGE
HOLDING
TANK
GRAVITY
THICKENERS
AEROBIC
DIGESTOR
DIGESTED SLUDGE FORCE MAIN
AEROBIC
DIGESTOR
DIGESTOR
PUMP STATION
0
0 0
DRAIN
0
uuilhis ENGINEERS
TOWN OF MOORESVILLE
ROCKY RIVER WWTP
SOLIDS HANDLING FACILITIES
JUNE 2002
NOT TO
SCALE
FLOW
DIAGRAM
/14005.elt �l l C ( 04.67Z S 1
:0_5c1) �i sa 4, r % / A-rf5 t4?,4 Peclie7%/_
(o/z/o2)
C
i)(! IfLs (2 - iVE Ni c L 4-Pld .1 CO- 10 n/ /S Sv 4-E / 7 & 4 ,J5 oi•'
- TA-NKC/2- Vet f rCL G t_apz)'A/y /94,4P .576T/v
Ai-L- /�,�•Kni 5 /2 7\1 E/LT Z , // n/L(CS .
l/i+// ENT o- %asr/n/f
(cYceler t'r.A^1T //zD Pt(MP$ 7 /Nc -5lm/s $/ec #20fill;
19Dv«,a � -L (, //1. /ell i �; F2 f=�2 r/(�c r >✓/ AJ5 F1(f" i / S )
a lriy 70(C 12$
Z Ar'Zzo h,G D/4.&•s776{L, i st.iii & 117
7;1(CKWIlR '3VI1-D1/45 (5G7 UP 73 (qcco(o/oaA-TG Z /NS779t i-/n/s aNE)
5/ — 31i)/fif
cf'a0
/NtL7 ca,.r. O•; SdL/D5
CFI vT t r Conk, -S —
50e-15- GvA-J/i5
(22o24. 5..2Aft) • 3..31 gSaa -0 /30Ds T Cu:,)
g;oo �3a��.e.ntoJeD) . 465 .. stue)yE
5CZ-S S`aDc CC42trs J 4J
Ili-
6,05067-1 r E ,
Pe I
7o bow y (,a,iAa4 si/44J ZA-i/."J (rrf'ckc:N, a BI:F D/4 tsi oeaD - .541E-5
b(4 S,t/t- 5PAc&-) - 11614:7-iv ) ' 6% -4A>fy l s:; 1?I //'J Pi S
NNN
W W W
W W W
NNN
hON
Nsr ct
NNC1
/11aep RCJC� t//G L G Are
Mont Gf"- /7c. s n/ M -Al i,4 (-
p. S 7 • 5 r /c7 . �r�sSGs
62 Ac ji vAT c; /W/-5 rap I- 3
Soy 5 /r.)/ 4 ,RA-rr �W' —MO AgrA oc;Lr
O¢Z8 A 3 (g0
G 7 z/ ZJ
wilf7 = r_;74 24 t.l,t (No RemovAt pie/04 ' fR5s-s
!q� • 5 2 • e-3y= 85co pA-Y
cheipcacocy,.1 = g > a‘) *. ,9 , m4: 5 a 51..,c
. I R&t i
11556 i.e.: v.i S s / 7.2 soc.'r�s
Vo`cit4 - S�s �(00 s. 3/= 7/, 3 V 3
5 % Tf%ci c i SLwJy Z0.5 37 i'D
OP J/-ESS — 40 oPeti
ML7
28 3 7 • 7)/S- 10 G l LJ /acr.- ,r,g — (7 Gu-
(15/ d 2 J n� gr:1- (7o Sf4'
il000v pr? _ 27 ,,,,�
7aot Z
le fits 47 5-0 # sc.P!/yc_ \
(a,os - s.3�)
/fZ77 C
70. fy5
74270 h 4/
f�YiNTi1 - /u,45 na.,S%-- 6ut-59 r3 Fart- /7A-7 /oi2E c ,a !v (PSR?P)
(Fj Prce5 ito 40 .i s ® .B •C)
ken.. MoN, Thl2-/ �S