HomeMy WebLinkAboutNC0046728_Approval_20120124NPDES DOCUMENT SCANNING COVER SHEET
NC0046728
Mooresville / Rocky River WWTP
NPDES Permit:
Document Type:
Permit Issuance
Wasteload Allocation
Authorization to Construct (AtC)
Permit Modification
Complete File - Historical
Engineering Alternatives (EAA)
Approval
Instream Assessment (67b)
Speculative Limits
Environmental Assessment (EA)
Permit
History
Document Date:
January 24, 2012
This document is printed on reuse paper - ignore any
content on the reYez-se side
iCD
AT&
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild, P. E. Dee Freeman
Governor Director Secretary
1/24/2012
Mr. N. Erskine Smith Jr., Town Manager
Town of Mooresville, Post Office Drawer 878
Mooresville, NC 28115
SUBJECT: Town of Mooresville
Rocky River WWTP Improvements
SRF Project No. CS-370409-04
5/11/2011, FINAL Progress Meeting
5/11/2011, FINAL Construction Inspection
1/24/2012, Project Close Out
Dear Mr. Erskine Smith:
The Construction Grants and Loans Section funded your SRF Project No. CS-370409-04.
to the amount of $ 13,275,000, I have attended the monthly progress meetings, conducted
construction inspections, and reviewed this project for both loan administration requirements and
construction activities. The Project Engineer was CH2M Hill. The contractor was: Pizzagalli
Construction Company and the original construction contract was for $10,255,000. The
assistance of Jim Nagle, P.E. and others with CH2M Hill, John Tarreto and others with Pizzagali
Construction Company, and Mr. Mike Lamberth, Cliff Webb, and Mr. John Vest with the Town
of Mooresville is greatly appreciated. Congratulations, construction was completed ahead of the
original scheduled completion date of 10/1/2011.
Construction began on 5/4/2010.
The FINAL progress meeting was held on 5/11/2011.
The FINAL site visit and construction inspection was on 5/11/2011.
The FINAL Change Order was dated 5/23/2011.
The Engineer's Certification was dated 6/1/2011.
Construction was 100% complete on 7/15/2011,
Project was completed 78 Days Ahead of the Scheduled completion date of 10/1/2011.
The Owners Certification was signed by Erskine Smith, Town Manager on 7/19/2011.
704-663-3800 ersmlith@ci.mooresville.nc.us
All work has been completed. All Items on the attached Final Project Closeout Checklist
have been completed. signed copies have been submitted and filed, and the project, is ready for
final reimbursement of funds and Close -Out.
File name: Mooresville-SRF,Insp-2011-M05-D11,FINALdocx
NC-DENR, DWQ, Infrastructure Finance Section, (http://portal.ncdenr.org/web/wq/ifs)
1633 Mail Service Center, Raleigh, North Carolina 27699-1633
Location: 8`" Floor Archdale Building, 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-707-9160 \ FAX: 919-715-6229, DWQ Internet: www. ncwaterquality.org
An Equal Opportunity \ Affirmative Action Employer
Naylc
North No Carolina
2Vai Vataraiij
Mr. N. Erskine Smith Jr., Town Manager
Town of Mooresville, Post Office Drawer 878
Mooresville, NC 28115
DATE: 1/24/2012
PAGE: 2 of 2.
The requirements for these publically funded SRF projects are very important.
Information about these requirements has been provided and they were discussed and reviewed
at all progress meetings. Documentation is to be kept on file for possible future audits or review.
If you have any questions or comments, please contact me at 919-733-6900, or at e-mail address.
(tom.poe@ncdenr.gov).
Sincerely,
s Pam.
Tom S. Poe, Construction Inspector
Attachments:
Final Project Close -Out Checklist
Engineers Certificate signed 6/1/2011.
Owners Certification signed 7/19/2011
Log of Progress Meetings and Inspection Dates
cc: Jim Nagle, P.E., CH2M Hill, Charlotte, NC
Leslie Rogers, PMB, CIG, & DWQ-MRO files
File name: Mooresville-SRF,lnsp-2011-M05-D11,FINALdocx
NC-DENR, DWQ, Infrastructure Finance Section,{http://txtrtal•nedenr.nrgjwab/wgrfsj
Formerly, DWQ-Construction Grants and Loans Section
NC Construction Grants & Loans Project Closeout Checklist
It 3
OWNER / NAME:
ENGINEER:
PROJECT NO:
DESCRIPTION :
ENGINEER'S RESPONSIBILITIES:
1. Approved Plans and Specifications in owner's possession.
2. As-Built/Record Drawings (certified/sealed) provided to owner
3. Test Reports: pipe/pressure tests recorded, concrete, compaction etc.
4. Inspector's Daily Logs
5. Approved shop drawings and submittals provided to owner
6. Warranty Information provided to owner.
7. Spare Parts Inventory and List provided to owner.
Training, training sessions done by whom, when, what. subject.
-9. Release/Approval from NC -DOT and/or Rail Roads (if Applicable)
10. Engineer's Certification
11. Operation and Maintenance Manuals (O&M), if required (SRF projects only)
FOR EACH CONTRACT:
12. Final adjusting Change Order (must match ° Final Reimbursement Request)
13. Release of Liens & Consent of Surety to final payment
14. Final Sales Tax Report
OWNER (Prepare, sign, submit or confirm, as applicable, the following):
15. Final Reimbursement Request and supporting invoices. All costs must be approved by CG&L.
16. Owners Certification of Completion, acceptance of the completed project.
(This form now satisfies the requirement for a separate Initiation of Operation:letter.)
17. Clear Site/Easement Certification (a) by Owner & (b) by Owner's Counsel (Done during
design & prior to construction, IF easements were added or changed, this must be redone)
18. Required for STAG projects- closeout items include a final MBE/WBE report. and Quarterly
Project Status Report, the. Final Reimbursement Request form, and the Lobbying Certification.
Forms can be found on website, (httpa/portal ncdenr.orglweb/wq/cglslfap/apps).
19. Performance Certification (is required an a few Treatment Plant Projects [SRF only] and is
due one year after the completion date.)
20. Is Closing cost Paid? If yes, provide the date of Payment. If No, forward to Leslie Rogers.
21. Required for ARRA Projects: Make available for review - Davis -Bacon interviews (Standard
Form 1445), Certified payroll records for ALL primes and subs as required in guidance, and
Buy American documentation for all materials, equipment and manufactured goods
incorporated into project.
22. Submittal of form 6100-2, indicating actual amounts paid to DBE firms (SRF projects Only).
Turn Over to, or provide copies to the Owner Items Nos. ..1, 2, 3, 4, 5, 6, 7, 8, 9, 13, and 21
Submit items listed to the following. Construction Grants & Loans staff:
Kavitha Ambikadevi 919-715.-6200 (SRF), Nos.. ..10, 11, 16,17,18,19, 20, and 22
or Don Evans 919-715-6216 (State Programs, STAG), Nos. 10,11, 16, 17,18,19, 20, and 22
Leslie Rogers 919-715-6218 (Reimbursements), Nos: 14, 15 and 20 if applicable.
CG&L Inspector: At Final Inspection, CG&L inspector will wish to have available for review or discussion
ALL applicable items listed 'above. To closeout project loan and/or grant, please provide any other
documentation CG&L inspector requests at Final Inspection or states in the Final Inspection report.
Executed item 12 with all backup information should be sent to the CG&L inspector.
Phone (919)-733-6900; FAX (919) 715-6229. Forms & other Information available at http://portal.ncderir.org/webfwgkgis/
Division of Water Quality. Construction Grants & Loans Section 1833 Mail Service Center, Raleigh. NC 27699..1833
Fite name: Forms-2011,Closeout-Checklist-22-items,tsp ver0l.doc
Town of Mooresville
A To C No.'046728A06
Project No. CS370409-O4
March 24, 2010
Engineer's Certification
L.: r144,t:: /14, . as a duly registered Professional Engineer in
the State of North Carolina, having. been authorized io observe (periodically/weekly/full time)
the construction of the modifications and irupmvements to the Rocky River WWTP, located on
Johnson Dairy Road in Iredell County for the Town of Mooresville, hereby state that, to the best
ofmy abilities, due care and diligence was used in the observation of the following construction:
Installation of MGGD package wastewater treatment system, as tttt interim •
expansion to the 5.2 MC:,D existing WW1 P,. consisting`of n spiral -type fine screen
with 1,4-inch fine openings rated at:5 MGD peal: flow, two:(2) 0.8 MG gallons
each aeration tanks with fine bubble disk -type diffusers, two <2) 8-fit diameter
clarifiers each with. 15-ft side water depth,three (3).2;300 SCFM_blawers; and.
three (3).700 gptn constant speed R1 :pumps; modification of the existing
influent purnp station consisting oft :.addition of three (3),.1,740 gpm pumps
with VFDs: three (3) 4,511 gpm seaon&3ry effluent: pumps; cascade aerator;
effluent filter system consisting of fitter influent box and four clomedia filters
each rated for petikflow.of 6 MGD,. UV disinfectionth system consisting of two
banks each rated for a peak flow of 18 MOD; a 750 kW standby generator; and
associated yard piping and appurtenances, eleetsxcili work and control systems to
provide a complete treatment system, in conformity With the project plans;
specifications; and other supporting data subse luently filed and approved by the
Department of Environment and Natural Resoi.trecs,
1 certify that the Construction of the above referenced prolcct,was observedto be built within
substantial compliance and intent of the approved plans and specifications.
We understand that the new limits associated with the modifications to expand to'5:5 .MGD now
apply.
Send to:
Registration No.
Construction Grants & Loans
DENR/DWQ
1633 Mail Service. Ccntcr.
Raleigh, NC 27699-1633
\`\\ 1111111J1j�,
\•� � C A2? 01,42/
i
4,
It. SEAL .fir;
`-.032323 •
•
2 • GINS':
0i �5lM:1 NPG ���
CERTIFICATION OF COMPLETION
Unit of Govemment: Town of Mooresville
Proj act ,Descripti on: Rocky River WWTP Interim -Plant Expansion
Project Number: CS370409•04
The Town of Mooresville certifies that all of the
(Unit of Government)
construction for this project has been completed in.accordance with the
approved plans and specifications. Construction was completed
on July 15, 2011
_ (Date)
AL Eitski #I JoLtu.1Yl
Name enceTitie Q�rw
Mite
,.011901 lief
M
w
fikte#..1,. 1873 04.;tiewej
Q � �
Pik CAlk
File Name: C:lUsers\alvaft\A,ppData1Loca1 icrosaft\Windowst?emporary Internet
File$1C:oratent.Outlook\LFIGRTXstowner Certification ofComptetion.doc
Rev Date. 03/22/2006
Mtg. No.
DATES:
g
4
Report 1
Eng
Mtg.
Mins.
v,
o
e-
NOTES:
10 / 29 / 2009
Yes
Pre-Bid Mtg.
BID DATE,
NTP-Start 5/4/2010, 455/515 Days, Finish 8/2/2011, 10/1/2011
5 / 25 / 2010
PRE -CON, Typiically 2nd Wednesdays at 10:am
1
6/9 /2010
Yes
Missed
2
7 / 14 / 2010
Yes
Typ. FI RST TUESDAYS at 10am and 1 pm
7/28/2010
Drive by
3
8/11 /2010
Yes
,
4
9/8/2010
; Yes
5
10/13/2010
Yes
6
11/10/2010
Yes
7
12/8/2010
Yes
i
8
Yes
I
I
1 / 12 / 2011
Icy Roads, id not attend Mtg.
9
2/9/2011
Yes
10
3/9/2011
—
No Fotos
1
11
4/13/2011
Yes
12
5 / 11 /2011
Yes
1
FINAL,
w/ Michael and Jessica
6/8/2011
_
6/8/2011
7/13/2011
7/27/2011
Y
'Change Orders #6 & #7 FINAL
CLOSE OUT
0
0
V)
t
SRF CS 370 409-04
OMR
11111111111111
co
_
TOM POE
!e name: 2012,Vertical-Dates-41,A-M.xisx
IC1?72$ — e,,,,/„,e►eliN/UMV?? etego1S199 l'Og
Noa�ah
Belnick, Tom
From: Belnick, Tom
Sent: Friday, June 24, 2011 10:03 AM
To: Krebs, Rob Subject: Town of Mooresville/eh tic, t ''‚ W W1'f
Jeff and I talked with Town of Mooresville and their consultant CH2M on Wednesday. They were just touching upon
previous discussions to have ultimate discharge to Lake Norman, and whether DWQ would entertain. Sounds like they
want to retain the 7.5 MGD discharge to Dye Creek, and put new outfall (10 MGD or less) to Lake Norman. Still
reviewing reuse potential. IBT issues might drive process. They said Catawba Riverkeeper was on board with proposed
discharge. We don't see any huge red flags at this time, and said we would get back with them next week. Any MRO
concerns?
Tom Belnick
Supervisor, Complex NPDES Permitting Unit
NC DENR/Division of Water Quality
1617 Mail Service Center, Raleigh, NC 27699-1617
(919) 807-6390; fax (919) 807-6495
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
1
Belnick, Tom
Subject:
Location:
Start:
End:
Mooresville NPDES call w/ DWQ
conference call
Wed 6/22/2011 11:00 AM
Wed 6/22/2011 12:00 PM
Recurrence: (none)
Meeting Status: Accepted
Organizer: Jaime.Robinson@CH2M.com
Call -in: 866-203-7023
Code: 1462304214
John — please forward to others at Town that will be participating
Agenda:
1. Review of Mooresville's current situation: managing both wastewater flows and interbasin transfer
2. Future plan to avoid IBT by returning water to Catawba River basin with reuse and a Lake Norman
discharge
3. History of water quality modeling for Lake Norman
4. Potential for an NPDES permit to Lake Norman building from water quality modeling efforts
5.
1
Belnick, Tom
Ex00 nkvi+ �WiII /1'/Cffj
n7/Oil
Jv�.rc Mewa7 wU�'�
From: Belnick, Tom
Sent: Wednesday, July 20, 2011 12:38 PM
To: 'Kraft, Allison'
Cc: Rase, Ryan
Subject: RE: Mooresville NC future NPDES permit questions
Attachments: Lake Norman_Hwy 150 Comments.pdf
Allison/Ryan- a few clarifications:
�wK
c
141,44 06/111
Gvn� ial�,t �y /a MW tidtje to Cic A/1114.•..
• I was referring to State rules within 15A NCAC 2H.0138(a), which includes... " If an
has not been applied for in accordance with the requirements of the NPDES permit during the term of the
permit, the permit will be considered void upon expiration and future actions will be considered as a new
application."
• This section requires that an ATC permit be applied for (does not mention "obtained") within the NPDES permit
term, otherwise the NPDES permit will be considered void upon expiration. Based on this, I think you would
need to go through SEPA, then apply for NPDES permit upon FONSI determination, then submit ATC application
within permit term. If NPDES permit is issued but there is no subsequent ATC application, it could open legal
challenge to NPDES permit at next permit renewal. This would be unusual, but it's possible. Generally we are
operating on the flip side- where the permittee needs to start construction ASAP, and is doing whatever they
can to expedite SEPA/NPDES permitting/ATC issuance.
• I'm also attaching recent comments received from Catawba Riverkeeper concerning the proposed permit
renewal for Hwy 150 WWTP, which discharges to Lake Norman. I can envision similar comments to a proposed
Town of Mooresville discharge to Lake Norman.
If you have further questions, feel free to call or email.
Tom Belnick
Supervisor, Complex NPDES Permitting Unit
NC DENR/Division of Water Quality
1617 Mail Service Center, Raleigh, NC 27699-1617
(919) 807-6390; fax (919) 807-6495
E-mail correspondence to and from this address is subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
From: Kraft, Allisonjmailto:akraft@ci.mooresville.nc.usl
Sent: Tuesday, July 19, 2011 4:22 PM
To: Belnick, Tom
Cc: Rase, Ryan
Subject: RE: Mooresville NC future NPDES permit questions
Tom,
Thank you again for taking the time to speak with Ryan and I regarding the process and rules regarding NPDES permits.
I've read the State Statute 15A NCAC 2H.01398, and understand it to state that, if we were to obtain an NPDES permit
for a new discharge to Lake Norman, we would have to have received (not just applied for) an Authorization to
Construct prior to expiration of the NPDES permit. As I understand our conversation, you had stated that an NPDES
permit is valid for 5 years.
1