Loading...
HomeMy WebLinkAbout20140275 Ver 1_Stream Call Request_20140321MARINE CONSTRUCTION. LLC P.O. Box 125, Pantego, NC 27860 Phone 252- 943- 6677•Fax 252 - 943 -3949 tobin@gotricounty.com �LC1<cL4� RECE'stfLEE D MAR 2 1 2014 p r., lk ,5, /�T FAST COAST FOR OVER 30 YEARS /NE CONSTRUCT /ON INDUSTRY Pat McCrory Governor MA w NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Thomas A. Reeder Acting Director John E. Skvarla, III Secretary DWQ Use Only: Project, #= Stream Origin /Buffer Applicability Determination Additional Requested Information Required Information 4a. Name, Company 1. Owner Information (corporation /individual who is legally responsible for the property and its compliance) n 415 //1e 0 G 72' O 1 a. Name(s) on Recorded Deed %7 `S 0/741 I 4d. Email ad ress -tO ; 1 b. Responsible Party (for LLC) 7-0k,'(1 0 " E e! YTAl 5b. County 1c. Mailing Address , Q, dox 4qvhru o G �6d 5d. River Basin 1d. Telephone Number 5e. Provide a brief lia�description� of this project (attach site plan if available): ,5e e, eO/nL t'Projec,-f- /Glarf4`t',Jr=�. le. Email Address ;n 07rP�C04/l� •L'0�11 2. Location of Project Site - please include the county, nearest named town and highway number: 3. Has anyone from DW6 visited the site? I YON I Staff Name I I Date of Visit? Additional Requested Information 4. Agent/Consultant Information (if applicable) 'Tc7 ` ZlInd Vede4w4NA-t - 4 Ci 4a. Name, Company Tob: G B! 1J 4b. Mailing address n 415 //1e 0 G 72' O 4c. Telephone no. _ _ 6 !J I 4d. Email ad ress -tO ; 5. Project and Site Information 5a. Name of project 5b. County 5c. Nearest Named Stream 5d. River Basin 5e. Provide a brief lia�description� of this project (attach site plan if available): ,5e e, eO/nL t'Projec,-f- /Glarf4`t',Jr=�. Please a t a map of the site indicating project boundaries on the USGS 1:24,000 Topo and /or NRCS Soil Survey. If you are unable to locate either of these maps, please contact the Regional Office for assistance. DWQ Use Only: Is this stream call for the purpose of bu ecmi iga ion _nutrient offset credit Please return form to: Anthony Scarbraugh mrin 2 1 2014, 943 Washington Square Mall Wa shington, NC 27889 Note: Submittals on Friday after 12:00 pm Washington, i,. 1 A.^ * ! I Vq I stamped as received on the Fax: (252) 946 -9215 - -' "'�usiness day. Email: anthonv.scarbraugh(alncdenr.gov Please contact Anthony Scarbraugh at (252) 946 -6481 if you have any questions. PROJECT NARRATIVE The purpose of this Major CAMA Permit Application is to seek authorization to construct a 62 slip marina on property owned by T.J.'s Land Development LLC located at 1711 Yeatsville Road (SR 1718) adjacent Pungo Creek near bath in Beaufort County, North Carolina. Plans for this proposed marina was discussed at a scoping meeting held at the DENR regional office in Washington, North Carolina on 21 June 2013. The proposed marina will provide dockage for both the general public wishing to rent a slip as well as dockage to patrons of a planned RV park. Plans for the proposed RV Park have not been finalized. Once all plans for proposed upland development have been completed, an erosion control and stormwater plan will be submitted to the Division of Land Resources. Total acreage of the property is 46.5 acres, of which 37 acres is cleared agriculture land. There is a large area of both wooded 404 scrub shrub wetlands and Coastal Wetlands marsh between the fields /upland area and Pungo Creek. The proposed docking system will consist of an 8' x 530' section over the wetlands to another 8' x 150' pier section into Pungo Creek to a dock system 8' wide x 504' long parallel to the shoreline with 62 slips. Three individual gazebos with a total 2,150 ftz will be constructed, one on either end of the dock system 25' x 25' and one at the end of the access pier 30' x 30'. The landward side of the dock system will be for smaller vessels moored on 38 — boatlifts each with a footprint of 13' x 13' accessed by 28- 3' x 20' finger piers. The offshore side of the dock will have 24 - ±20' x 40' wet slips for larger vessels. Use of the site by larger vessels will be limited to those that can pass beneath the newly completed HWY 99 bridge over Pungo Creek which has a horizontal navigable clearance of 15'. A marine pumpout is planned to be located at the end of the access pier on the 30' x 30' platform. Marine sewage will be pumped to a tank in the field area and either be disposed of in a septic system or hauled offsite. The landowner has done a cursory review for bald eagle nest on the tract and did not find any. Bald eagle nesting in the vicinity of the project was an issue discussed during the 21 June 2014 scoping meeting. The location of the landward Coastal wetland line was not flagged and located by survey. However, the seaward edge of the shrub line was located on the plan view plat using satellite imagery. The only development in or near the Coastal Wetlands is the access pier which will have a consistent elevation and dimension spanning all wetlands. The landward edge of the entire wetland system was flagged and surveyed. Water depths shown on the plan view were located using survey data taken onsite. 'r Nan 7!' 1A At At At This map was compiled by U.S. Department of Soil Conservation Servicom d cooperating agencies on 1974 Photography obta ined fr Geological Survey. U.S. Department of Interior, At AaA At At At 0 To At s000 4000 3000 2000 t 000 0 5 0 ..e 43' 4.8 t �` b N35 30'36"