HomeMy WebLinkAbout20140275 Ver 1_Stream Call Request_20140321MARINE
CONSTRUCTION. LLC
P.O. Box 125, Pantego, NC 27860
Phone 252- 943- 6677•Fax 252 - 943 -3949
tobin@gotricounty.com
�LC1<cL4�
RECE'stfLEE D
MAR 2 1 2014
p r., lk ,5, /�T FAST COAST FOR OVER 30 YEARS
/NE CONSTRUCT /ON INDUSTRY
Pat McCrory
Governor
MA
w
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Thomas A. Reeder
Acting Director
John E. Skvarla, III
Secretary
DWQ Use Only: Project, #=
Stream Origin /Buffer Applicability Determination
Additional Requested Information
Required Information
4a. Name, Company
1.
Owner Information (corporation /individual who is legally responsible for the property and its compliance)
n
415 //1e 0 G 72' O
1 a. Name(s) on Recorded Deed
%7 `S 0/741
I 4d. Email ad ress
-tO ;
1 b. Responsible Party (for LLC)
7-0k,'(1 0 " E e! YTAl
5b. County
1c. Mailing Address
, Q, dox 4qvhru o G
�6d
5d. River Basin
1d. Telephone Number
5e. Provide a brief lia�description� of this project (attach site plan if available):
,5e e, eO/nL t'Projec,-f- /Glarf4`t',Jr=�.
le. Email Address
;n
07rP�C04/l� •L'0�11
2.
Location of Project Site - please include the county, nearest named town and highway number:
3.
Has anyone from DW6 visited the site? I YON
I Staff Name I
I Date of Visit?
Additional Requested Information
4. Agent/Consultant Information (if applicable) 'Tc7 ` ZlInd Vede4w4NA-t - 4 Ci
4a. Name, Company
Tob: G B! 1J
4b. Mailing address
n
415 //1e 0 G 72' O
4c. Telephone no.
_ _ 6 !J
I 4d. Email ad ress
-tO ;
5. Project and Site Information
5a. Name of project
5b. County
5c. Nearest Named Stream
5d. River Basin
5e. Provide a brief lia�description� of this project (attach site plan if available):
,5e e, eO/nL t'Projec,-f- /Glarf4`t',Jr=�.
Please a t a map of the site indicating project boundaries on the USGS 1:24,000 Topo and /or NRCS Soil Survey.
If you are unable to locate either of these maps, please contact the Regional Office for assistance.
DWQ Use Only: Is this stream call for the purpose of bu ecmi iga ion _nutrient offset credit
Please return form to: Anthony Scarbraugh mrin 2 1 2014,
943 Washington Square Mall
Wa shington, NC 27889 Note: Submittals on Friday after 12:00 pm
Washington,
i,. 1 A.^ * ! I Vq I stamped as received on the
Fax: (252) 946 -9215 - -' "'�usiness day.
Email: anthonv.scarbraugh(alncdenr.gov
Please contact Anthony Scarbraugh at (252) 946 -6481 if you have any questions.
PROJECT NARRATIVE
The purpose of this Major CAMA Permit Application is to seek authorization to construct a 62
slip marina on property owned by T.J.'s Land Development LLC located at 1711 Yeatsville
Road (SR 1718) adjacent Pungo Creek near bath in Beaufort County, North Carolina. Plans for
this proposed marina was discussed at a scoping meeting held at the DENR regional office in
Washington, North Carolina on 21 June 2013. The proposed marina will provide dockage for
both the general public wishing to rent a slip as well as dockage to patrons of a planned RV park.
Plans for the proposed RV Park have not been finalized. Once all plans for proposed upland
development have been completed, an erosion control and stormwater plan will be submitted to
the Division of Land Resources. Total acreage of the property is 46.5 acres, of which 37 acres is
cleared agriculture land. There is a large area of both wooded 404 scrub shrub wetlands and
Coastal Wetlands marsh between the fields /upland area and Pungo Creek.
The proposed docking system will consist of an 8' x 530' section over the wetlands to another 8'
x 150' pier section into Pungo Creek to a dock system 8' wide x 504' long parallel to the
shoreline with 62 slips. Three individual gazebos with a total 2,150 ftz will be constructed, one
on either end of the dock system 25' x 25' and one at the end of the access pier 30' x 30'. The
landward side of the dock system will be for smaller vessels moored on 38 — boatlifts each with a
footprint of 13' x 13' accessed by 28- 3' x 20' finger piers. The offshore side of the dock will
have 24 - ±20' x 40' wet slips for larger vessels. Use of the site by larger vessels will be limited
to those that can pass beneath the newly completed HWY 99 bridge over Pungo Creek which has
a horizontal navigable clearance of 15'. A marine pumpout is planned to be located at the end of
the access pier on the 30' x 30' platform. Marine sewage will be pumped to a tank in the field
area and either be disposed of in a septic system or hauled offsite.
The landowner has done a cursory review for bald eagle nest on the tract and did not find any.
Bald eagle nesting in the vicinity of the project was an issue discussed during the 21 June 2014
scoping meeting.
The location of the landward Coastal wetland line was not flagged and located by survey.
However, the seaward edge of the shrub line was located on the plan view plat using satellite
imagery. The only development in or near the Coastal Wetlands is the access pier which will
have a consistent elevation and dimension spanning all wetlands. The landward edge of the
entire wetland system was flagged and surveyed. Water depths shown on the plan view were
located using survey data taken onsite.
'r Nan
7!'
1A
At
At
At
This map was compiled by U.S. Department of
Soil Conservation Servicom d cooperating agencies on 1974
Photography obta ined fr
Geological Survey. U.S. Department of Interior,
At
AaA
At
At
At
0
To
At
s000
4000
3000 2000
t 000
0
5
0
..e
43' 4.8
t �` b
N35 30'36"