Loading...
HomeMy WebLinkAbout20140337 Ver 1_Emails_20140421Fox, Tim From: ted672 @comcast.net Sent: Wednesday, April 16, 2014 4:38 PM To: Fox, Tim Subject: Re: Shoreline Stabilization form Tim, the information you needed is,181' of shoreline. Below normal pool is 181'x 2' = 362'. Above pool is 181' x7'= 1,267'. thanks, ted r. pacocha ted672 com cast. net 847 - 991 -8446 From: "Tim Fox" <tim.fox ncdenr.gov> To: ted672 com cast. net Sent: Wednesday, April 16, 2014 2:21:35 PM Subject: Shoreline Stabilization form Ted, You have indicated 4500 sq. feet on your application for work below the normal lake level and disturbance with minimal excavation above normal pool level. I will need to discuss this with you. How did you get the 4500 sq feet and I will need to know how much sq foot coverage above, which is basically the area the rip -rap will be placed. For example if someone's lot is 150 linear feet long and they are placing 4 feet of material below the lake level that would be 600 sq. feet and if they are placing in that same 150 linear feet above normal pool say around 15 feet that would be 2250 sq. feet above pool. That is what I need. I will be here until 4:30 today but will be out of the office until Monday morning. I can get the approval out as soon as I discuss with you. If I don't catch you this afternoon I will call you on Monday morning. Thanks and Happy Easter, Tim Tim Fox - tim.fox @ncdenr.gov North Carolina dept. of Environment and Natural Resources Asheville Regional Office Division of Water Resources — Water Quality Programs 828-296-4500 .. 828-299-7043 Notice: Email correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties.