Loading...
HomeMy WebLinkAboutGW1-2022-02877_Well Construction - GW1_20220228 WELL IrUNa!ltlUtrilUN t'lClrU11U [i7W-11 For tificinal Use(hiy: 1.Weft ractor information: lit J/✓ 14 WATERZONES m FROM To OES"N'TlOR �-73 E � o % ga. l!- Gym NC W t ccniseation Number , a$5 a o F E B e� (Q ' 15:OUTER CASING md)6 mod: OR lNER = e �r+,,p fROM TD DIAMETER It THICKNESS MATERIAL J IX3 Campany Name ®ft Tel ei .q I�n'" � ' fL B ` ' Z� UO 11L G + Q/Soii 16:1NNER CASING ORTUBING rttdosed-lou 2.Well Construction Permit3 FROM TO DIAMETER THICKNESS MATERIAL Listallapplirable�B nperart (e UIC,Comely,SM Uaniza ,fife) fL fL 3_Well Use(check well use): in. FWater SuPPh►Well: 17:SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL ft fLhermal(lieati*Cooling Supply) Water Supply(single) ft % in. striallC amacrcial Oac"dent d Water Supply(OW00 is GROUT.. FROM TO MAZERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ft. 0 Recavay fL It, Injection well: fL ft Recharge OCroundwaterRemediation _ 11 SAND/GRAVEL PACK'rt StorW and Recovay 0SatinityBffirer FROM TO MATERIAL EMPLACEMENT METHOD Z Test lStnrmwater DraQiage IL tL ental Technology OSubside=Qatiml tt � (Closed Loop) Tracer 21:DRILLING LOG attach additional:dieefsif necessar FROM TO DESCRIPTION char, soKt . sib (Ileaimg/Coo6ug Rebun) _Mcr(e#,=muter d21 Remafs) fit fL 4.Date Weil(s)Completed: Well If) � d�� o It /�3 fL a :9104. 8��1- 18�II ' $'5a.Well Location: fL fL /Owner Name ray II (ifapplicatle}'- ft tt Physical Addc-ss,aty,and Zap it R 0u leAg-K 21.REMARKS '^ 31 PazCel IdeohStal[oIINo.(PIN} = -- 5b.Latitude and longitude in degrees(minutes(seconds or decimal degrees: G-ao7 i- (tt'-mll field,—larnong is saffic+ed} -,� 22 Certification: N W 6.is(are)the wells) Permanent or Temporary Sigmime ofcertifiea Well contractor Irate By s pafng this Town;1 hereby cwviy that the nell(s)was(Rare)constructed in accordance 7.Is this a repair to an existing well: byes or ONO with 15A NCAC 02C.0100 or 15A NCAC 0W AM Well Construction Standards and that a Udds is a repair,fill outfino►m weffewwnwhin IMormadon and eaylaln the nature ofthe copyofthls rerordbubeen prov►ded to the well owner. repairrmder#21 rmnarftsecdonoronme back ofmis Iona . 23.Site diagram or additional well details: 8.For GeoprobPAPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-1 is needed Indicate TOTAL NUMBER ofwells construction details. You may also attach additional pages if necessary drilled SUBMITTAL INSTRUCTIONS 9.Total well depth below land surfacer (fL) 24a. For All Wells: Submit this foam within 30 days of completion of well Formoldple wells Bstall depths ifdiflerertt(®rumple-3(a)200'and 2@1M construction to following: 10.Static water level below top of casing: /� (fL) Division of Water Resources,Information Processing Unit, Ifw&rImlisabmeasbrg.we"+ 1617 Mail Service Center,Raleigh,NC 276999-1617 11.Borehole diameter (tn.) 24b. For Iniection Welts: In addition to sending the form m the address in 24a above also submit one copy of this ED=within 30 days of completion of well 12.Weil construction method: ,(/ constructionto the fi louring Cie-an,rotary,cable,dnectpusb,etc.) Division of Water Resourc m!Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mai!Service Center,Raleigh,NC MW1636 r F 13a_Yield(gpm) Method of test Lino24c-For Water Supply & Iniectlon Wells In addition to sending the fort to the address(es) above, also suI - one copy of this form within 30 days of 131L Disinfectiontype: Amount: /0 'O�- in the camity bcd&department of the county