HomeMy WebLinkAbout_External_ USACE authorization - Site 14 repair on U-3301 Buncombe
Carpenter,Kristi
From:Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil>
Sent:Friday, March 04, 2022 4:34 PM
To:Allen, Yates
Cc:Mitchell, Robert K; Matthews, Monte K CIV USARMY CESAW (USA)
Subject:\[External\] USACE authorization - Site 14 repair on U-3301 Buncombe
Attachments:Site 14.docx; Site 14 plan sheet.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Yates,
Due to headcutting and erosion at Site 14, NCDOT has requested a modification to the permit for the U-3301 project in
Buncombe County (SAW-2014-01633).
As noted in the request, NCDOT proposes to repair the banks and add stone in bottom of the relocated stream from STA
231+55 to 231+75 (20 feet) and line the banks and bottom from STA 226+00 to 228+88 (288 feet).
The USACE does not object to this modification if the work is conducted in accordance with (1) the description of your
email of March 2, 2022; (2) the general and special conditions of the original permit for this project (as modified by this
additional work in waters), and; (3) the following special condition:
1. NCDOT shall embed the stone/rip rap to the maximum extent practical to form a defined channel. NCDOT shall
ensure that this work neither over-widens nor restricts the channel.
As such, by this email NCDOT is authorized to add fill material (stone/rip rap) in the bottom of the relocated stream from
STA 231+55 to 231+75 (20 feet) and line the banks and bottom with fill material (stone/rip rap) from STA 226+00 to
228+88 (288 feet).
Please let me know if you have any questions.
Thank you,
Lori
Lori Beckwith
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District
Asheville Regulatory Field Office
828-271-7980, ext. 4223
From: Allen, Yates <ryallen@ncdot.gov>
Sent: Wednesday, March 2, 2022 4:34 PM
To: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil>; Mitchell, Robert K
<kevin.mitchell@ncdenr.gov>
Subject: \[Non-DoD Source\] Site 14 repair on U-3301 Buncombe
1
Good afternoon,
I was contacted recently by the Asheville Resident’s Office regarding the condition of Site 14 on the U-3301 project in
Buncombe County (NC 63 Leicester Highway widening). The permits covered the relocation of a stream to a newly
constructed ditch at Site 14 and mitigation was provided for the impact, per Lori. A portion of the new ditch was
designed with stone lined banks(STA 231+55 to 231+75) and a portion did not have stone (STA 226+00 to 228+88). The
ditch flows into a driveway pipe and finally enters Dix Creek at Site 13. The ditch is headcutting where it enters the pipe
and is depositing sediment into Site 13A. Some of the stones in the armored section have slid off the banks. We would
like to amend the permit to allow us to repair the banks and add stone in bottom of the ditch from STA 231+55 to
231+75 (20 feet) and line the banks and bottom from STA 226+00 to 228+88 (288 feet). Detail 6 on plan sheet 20 shows
what we want to do. We believe this would prevent further headcutting and sediment deposition.
These actions would not impact the historic properties on the project; they are at a different location farther up the
road.
Thanks for your assistance. If you have any questions please call me.
Yates Allen
Division Environmental Specialist
Division 13
North Carolina Department of Transportation
828 250 3002 office
828 713 1568 mobile
ryallen@ncdot.gov
55 Orange Street
Asheville, NC 28801-2340
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2