Loading...
HomeMy WebLinkAboutGW1-2021-02728_Well Construction - GW1_20210809 t r►C�_W ��19_ _..�. �� ,.,�•ra -�o - Lascrur WeII Contractor Name _-..__...._...__ _ __. Tq.__.viz __ i of l ��(�� ft. iG NC Well Contractor Certification Number � 15.OUTER CASING for multi-cased wells OR LIIVGR �a pGetrble O��� FROM To DIAMETER croacss Ts YADKIN WELL COMPANY,INC. nJ'�` c� Company Name n/ 16. CASING OR TUBING otbermal closed-loop) Q 2.Well Construction Permit#: a FROM To I)LUMTER THIGO S I NUTERrAL 1, List all applicable well construction permlls rLe.TAC,County,State,Valiance,etc) ' Zg ft. t 'a- L _ PV �+ 3.Well Use(check well use): ft. ft. m, i1 37.SCFS2i'l Water Supply Well: e e ON TO DIArAZTEa SLOT SIZE Ta'rC1cf ss r:1-Ii1111L 7/ ❑Agricultural ❑Municipal/Public ft. ft ire• ❑Geothermal(fieating/Cooliug Supply) Residential Water Supply(single) rt g 01ndustrisUConmmeroial ❑Residential Water Supply(shared) iq GROUT ❑Irrigation ❑Wells>100,000 GPD rsmorrl TO mATGR4*_V EnPLACe,W-E aT t:MTHOD c,1-tOUN T Non-Water Supply Well: tt' 3' ft ❑Monitoring ❑Recovery 3 23 ft Injection WeU: ft. ft ❑Aquifer Recharge ❑Groundwater Remcdiation 19.SAS+/G)RAITL PACE:(if applicable) ❑Aquifer Storage and Recovery ❑Salinity Barrier reor.I TO MATERIAL cr. E ACEraW i rrMMOD ❑Aquifer Test ❑Stormwater Drainage R' ❑Experimental Technology ❑Subsidence Control ft ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG(attach additional sheets if oeressa ❑Geothermal(lleating/CoolingRehun) ❑Other(explain under#21 Remarks) PROM To DESCRIPTION color,hardness saa/rark type,rain size,eta o ft' /Z rr. ft 4.Date Well(s)Completed: ��Well 1D# ^57� Z ft' 3 � Q S�S�jnL Sa.Well Location: Phone # 710 ft'164Q� 31 ft 90 11 it X ri'lo-8a`?�-S`tr® 0 1&7 A, Facility/Owner Name Facility ID#(if applicable) R' ft ft. fr. Physical Address.City,and Zip l•� I sh e- .2L REMARKS county Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (dwell field,one lat/lougg iis's�sufficient) 22.Certification' ?,t?rR 1 G / 3 N ?Z 23v, Ki� fKZ W - �—� -7-13e21 Signature of Certifi 6.Is(are)t.bewell(s): Atermanent or ❑Temporary Well Con tar Date By signing this form,l hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an eidsting well: ❑Yes or Ppo 15ANCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy if this is a repair,fill out known well construction information and explain the nature of the ofthit record has been provided to the well owner. repair under#21 remade section or on the back of thisform. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW 1 is rded. Indicate TOTAL NUMBER ofwells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: / 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: b (ft) Submit this GW-1 within 30 days of well completion per the following: Fornni tiple wells list all depths ifdifferent(e=ple-3@20 'and2(tr)1001 3 (�) 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 Ifwater level it above casing,use"+" I 11.Borehole diameter: (�) Bit Off: 6 ' 12 311 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) Program,1636 MSC,Raleigh,NC 27699-1636 12.Wellconstruction method: AIR ROTARY 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,eable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) 2 Method of test: a A✓ 1 j J.�� a 13b.Disinfection type: 70%HTH Amount: 1 L OZ DATE SITE VISITED: J 141AC— Ma* T("i VISITED BY: Form GW-1 AMMON,.. North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018