Loading...
HomeMy WebLinkAbout20210773 Ver 1_USACE More Info Requested_20220302Strickland, Bev From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Wednesday, March 2, 2022 2:33 PM To: Michael Brame; David Michaels Cc: Homewood, Sue Subject: [External] Request for Additional Information: SAW-2021-00814 (Flemingfield Road tract / McLeansville / Guilford County / residential) Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. All, Thank you for your PCN, dated 2/1/2022, for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permit (NWP) 29 (https://saw- reg.usace.army.mil/NWP2021/NWP29.pdf). Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file: 1) NWP 29 General Condition 23(a) requires that the activity be designed and constructed to avoid and minimize adverse effects, both temporary and permanent, to waters of the US to the maximum extent practicable (available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes). It is not clear that the design of the proposed development meets this requirement. Namely: a. Slate Ridge Trail, including proposed Impacts 1 and 2, is routed to cross Stream SA at a tangent at the widest portion of Wetland WD, and directly through a disjunct section of Wetland WC 12-58. Additional avoidance and minimization would be shown by adjusting the route to follow closer to the existing driveway of the site across Stream SA, and or re -aligning this road to the north of Wetland WC 21-58; b. Longfield Drive is routed through the upper -most portion of Wetland WE (Impact 5). Retaining walls and other slope -steepening techniques are often used to eliminate or limit fill slope footprints in wetlands; c. Elk Horn Drive, is routed through one of the wider sections of Wetland WE 1-58 (Impact 7). Additional avoidance and minimization would be shown by adjusting the route to cross this wetland closer to the existing dirt path crossing to the north, or re -aligning this road to cross this wetland slightly to the south; d. Wetland impacts are proposed for Lot fill at Lots 16, 17, 48, 62, and 63 (Impacts 3, 4, 6, and 8). It is not clear that project viability is dependent on the inclusion of these 5 Lots, when the overall development proposes 99. Further, retaining walls and other slope -steepening techniques are often used to eliminate or limit fill slope footprints in wetlands; Please re -design the project accordingly, or provide documentation that such avoidance and minimization measures are not practicable. 2) Item la above notwithstanding, revisions are required on Sheets 2 and 3 of the plans provided with the PCN: a. The culvert pipe footprint is not visible on Sheet 2. This information is needed to show the pipe alignment vs. the location of the stream, the culvert width vs. the width of the stream, etc., to ensure that the project meets NWP 29 Regional Condition B.9c; b. Sheet 2 does not clearly indicate the footprint of stream impacts for each of the 110 If of stream impact, 50 If of embedded rip rap, and 10 additional If of temporary impacts; 1 c. Sheet 3 indicates that two 60" culvert pipes are proposed at Impact 1. In order to comply with NWP 29 Regional Condition B.9b, one pipe should act as the low flow pipe (inverts buried 1' below the stream bed), and the other pipe should act as the high flow culvert (only to receiving bank -full flows). High flow culverts are typically designed by placing its invert at bankfull level, or at least a foot or two above the existing stream bed. Another way to comply with this condition it to design sills at the inlet and outlet of the high flow culvert to only allow flow in the high flow culvert at the above referenced flow level; d. The top and bottom of the culvert is not visible on the profile view; this information is needed to ensure that the culvert meets NWP 29 Regional Condition B.9 pertaining to culvert burial. Ensure that this drawing clearly labels the top and bottom of the high and low flow culverts; e. Items la and 2a above notwithstanding, Sheet 2 indicates that the culverts would be oriented such that the stream exits the culverts aimed directly at the stream bank. Furthermore, the stream alignment would then run parallel to the proposed fill slope only a few feet to the south for approximately 37 linear feet. This information indicates that maintaining a functioning stream channel in its current location under these conditions is extremely unlikely. How would the design minimize the risk of indirect impacts to this portion of the stream channel? Based on the current proposal the Corps would consider this portion of stream as an indirect reduction of stream function, potentially calculated cumulatively with the proposed direct permanent stream impacts when considering compensatory mitigation thresholds, per NWP General Conditions "District Engineers Decision;" f. Items la above notwithstanding, the portion of unimpacted Wetland WD between the south side of the proposed fill slope and Stream SA includes a remanent fringe of wetland too small (-0.016 acre) and narrow to be expected to retain its previous function. As such, and the fact that grading for the adjacent direct impact would eliminate any upslope drainage to this area, the Corps would consider the remainder of the south side of this wetland as a reasonably foreseeable indirect impact. This area would be added to the required compensatory mitigation amount. 3) Please provide zoomed -in details, including a plan and profile view, for Impact 7. Ensure that these details clearly show the size and number of culvert pipes (placed at -grade rather than buried), head walls, rip rap, etc. 4) Items 1 a-c above notwithstanding, how would the project maintain appropriate hydrology to the remainders of Wetlands WC 21-58 and WE 1-58. The Corps is concerned that upland grading in these areas would re-route overland flow away from these areas and into downslope stormwater basins. If onsite hydrology is expected to be maintained via culverts under roadways, swales, or other methods, please include plan detail sheets to demonstrate. Note that, in addition to compensatory mitigation requirements for direct, the Corps would consider requiring compensatory mitigation reasonably foreseeable indirect impacts resulting in a loss of hydrology and therefore aquatic function, per NWP General Conditions "District Engineers Decision;" 5) For proposed Impact 9, sanitary sewer crossing of Stream SD and Wetland WC 21-58: a. Per NWP 29 General Condition 10.c., please provide a plan to restore and re -vegetate wetland areas within the utility corridor; b. Given that the project exceeds the compensatory mitigation ratio for wetland impacts, the Corps will also require compensatory mitigation for the permanently maintained sewer corridor through forested wetlands. Compensatory mitigation for permanent conversion of forested to herbaceous wetlands is typically required at a 1:1 ratio unless otherwise justified based on resource quality (NCWAM/NCSAM). 6) We acknowledge the statement in the PCN pertaining to endangered species (Section 7 of the Endangered Species Act), that "Potential habitat for these species is not located within the proposed project areas." However, given the general nature of potentially suitable habitat for Schweinitz's sunflower and small whorled pogonia, the existence of both open and forested areas within the project area, and given recent USFWS concerns regarding these species, the Corps cannot currently reach a No Effect determination for these species within the Section 7 Action Area based on the information provided. Note that, given the distribution of proposed impacts throughout the property, the entire proposed Flemingfield Reserve development would be considered the Action Area for Section 7 purposes. As such: a. If you do not believe that any suitable habitat exists in the Action area for these species, please provide a more thorough justification so that the Corps could evaluate the potential for a No Effect determination; 2 b. If suitable habitat for either of these species does exist in the Action Area, please complete a pedestrian survey for these species within the appropriate survey window. Following the survey, please provide the survey report to the Corps (copy also the USFWS) for review; Please note that, per NWP 29 General Condition 18, the Corps cannot verify the use of a NWP until Section 7 consultation is complete. 7) Items 1a and c notwithstanding, to demonstrate further avoidance and minimization, would it be possible to remove the existing driveway crossing of Stream SA or dirt road crossing of Wetland WE 1-58 and stabilize with appropriate sloping and matting? 8) Please note that responses to the questions above may prompt additional information requests to allow full evaluation of the proposed project. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Office: (919) 554-4884, Ext. 30. Mobile: (919) 817-2436 Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Wednesday, February 2, 2022 10:41 AM To: Michael Brame <mbrame@pilotenviro.com> Cc: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Subject: SAW-2021-00814 (Flemingfield Road tract / McLeansville / Guilford County / residential) Good Morning We have received your Pre -Construction Notification (PCN) NWP request for the above project. Dave- docs forwarded in your folder Thank you, Josephine Schaffer From: Michael Brame <mbrame@pilotenviro.com> Sent: Tuesday, February 1, 2022 1:23 PM To: RaleighNCREG <RaleighNCREG@usace.army.mil> 3 Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Subject: [URL Verdict: Unknown][Non-DoD Source] SAW 2021-00814 - Pilot Project 6663.1 - Flemingfield Road - PCN Application Find attached a PCN Application for a site in Greensboro. Please let me know if you need additional information in order to process the PCN. Thank -you. Sincerely, Michael T. Brame 336.708-4620 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com mbrame@pilotenviro.com PIIwCIT PILOT E N V I R O N M E N T A L, I N C 4