Loading...
HomeMy WebLinkAbout20140351 Ver 1_More Info Received_20140415Strickland, Bev From: Arrance, Keven <karrance @hazenandsawyer.com> Sent: Tuesday, April 15, 2014 11:41 AM To: Strickland, Bev Cc: Diebolt, Linda Subject: FW: DDWR# 140351 T Z Osborne Reclamation Attachments: Plans for PCN App.pdf Attached is . PDF of the drawings that were submitted for DDWR# Please Principal need anything additional or have any problems with the attached file. 4011 WestChase Blvd., Suite 500, Raleigh, 1 1 karranceft, haze nand sawyer. com I haze nand sawyer. com -- - - - - -- Original Message -- - - - - -- Subject: DDWR# 140351 T Z Osborne Reclamation From: "Strickland, Bev" <bev.strickland @cdenr.gov> To: " Diebolt, Linda" <Idieboltghazenandsawyer.co >,steve.drew@greensboro-nc.gov CC: Good Morning, Could you please send me an electronic copy of the site plans you submitted with the above project? PDF is fine. Thanks for all your help, Bev Beverly Strickland, Administrative Officer Division of Water Resources N.C. Department of Environment and Natural Resources Mail Service Center 1617, Raleigh, NC 27699 -1617 Phone# 919 - 707 -8789 Email Address: Bev.Stricklanda,ncdenr.gov E -mail correspondence to and from this address mar° be subject to the Forth Carolina Puhlic Records Larti°and mar° be disclosed to thlr-d parties. 1 u a ti 0 0 �o aLL os CITY OF GREENSBORO, NORTH CAROLINA DEPARTMENT OF WATER RE SOURCES WRF EXPANSION AND BNR UPGRADES PROJECT T.Z. OSBORNE - PACKAGE 3 JANUARY 2013 ME '�71c�=__ � . BUFFALp W(E BU :F GREENSBORO 7 0 t 2 3 4 MILES scxE : t z = t h9LE LOCATION „ MAP CK)M- smimth Camp Dresser McKee & Smith Glenwood Avenue -Suite 300 Raleigh, North Carolina 27612 Tel: 919 -787 -5620 NC License No. F -0412 SEE Yl MY MAP CONTRACT NO. 2011 -038 90% SUBMITTAL NOT FOR CONSTRUCTION r L� GREENSBORO 0 RATER sources City of Greensboro WRF GREENSBORO 1 u t MILE SCALE : t 1/2' - t MILE VI I ITY M P / ( Br k / k k § ( $ � § � \ \ � k ) � } \ 2 ° J } ) � § £ k�� \ §J� ) j�$ k `r@me §�()� §e3,M \$)j§ ) } \i) kk }�§ N 0 0 3 0 0 a N R V 0 0 a w g i �i 0 r � [[LL 0 G O Q a g% c7 � o ¢ 0 V � Q I z o 16 5 0 c z N p O ~ 8 n o � 8 U �E' m utO R1=h �w m g x � a Ny °NS n VO m� w� x3 m.0- PIPING SYMBOLOGY DOUBLE FINE SYMBOL (9 e E lur ewwry EEMRE FLANGED JOINT COMPLEX REPRESENTATION. E MECHANICAL JO1Nr COMPLEX REPRESENTATION, DIRECTION OF FLOW PLAIN END x PLAIN 1�� END PIPE COJPUNG L�J3L.� PLAIN END x PLAIN END PIPE COUPLING RESTRAINED FLANGE x PLAIN ENO PIPE COUPLSNC QIpE IAG (3) 3/4" SHC -PVC FOR MULTIPLE IDENTICAL NUMERICAL INDICATOR `PIPE MATERAL (OPTIONAL) FLOWSLREAMS NOMINAL PIPE SIZE ABBREVIATED PROCESS LINT DESCRIPTION VALVE SYMBOLOGY FEATURE UNCLASSIFIED. TYPE AS SHOWN ON THE DRAWINGS ADJACENT M SYMBOL FLOW METER -� GATE VALVE PLUG VALVE I' V CHECK VALVE, GENERAL SYMBOL ECCENTRIC REDUCER OR REDUCING BUSHING CONCENTRIC REDUCER DR REDUCING BUSHNG PIPELINE APPURTENANCES S-YMBO')LOGY DOUBLE LINE SYMBOL 2NOLE� LINE L,SYMBOL FEATURE FLOW METER. GENERAL SYMBOL VENTURI FLOW METER MIRE MU DONG SYMBOL NOTES 1. SIMPLIFIED JOINT SYMBOL IS USED FOR ALL SINGLE LINE PIPING SHOWN ON THE INTERIOR AND LXTERfOR PIPING DRAWINGS. 2. BOTH SIMPLIFIED AND COMPLEX JOINT REPRESENTATIONS MAY BE SHOWN ON THE DRAWINGS. 3. UNLESS MODIFIED BY THE GENERAL PROJECT NOTES OR DETAILED ON THE LAYOUT AND SCHEMATIC DRAWINGS PIPE AND FITTING JOINT REQUIREMENTS FOR THE VARIOUS PIPE MAIERWS ARE DEFINED IN THE SPECIFICATIONS. SUBTITLE OR DESCRIPTION (AS REQ'D) PLAN 1/4" - 1' -0' SECTION NUMBER SECTION c T') SHEET WHERE CUT IS 3/4' m 1' -0' S -6 TAKEN REMARKS GENERAL ------ 20" Y19.N ---- -- EXISTING WATER MAIN M C_� _- SAN S - -- EXISTING SANITARY SEWER W/ MANHOLE `-70' FM -- -- EXISTING FORCE MAIN --T--- EXISTING BURIED TELEPHONE IF SECTION OR DEAL 15 DRAWN ---- -OHP -. ON THE SAME SHEET THAT R 6 CA TV- - - - - -- TAKEN FROM, THE SHEET NUMBER CB IS REPLACED WITH A HYPHEN, IF THE V 15' .SS SECTION IS REFERENCED ON ' EXISTING UTILITIES AND STRUCTURES SHOWN IN PROJECT DOCUMENTS MAY NOT REFLECT AN MULTIPLE SHEETS, THE SHEET NUMBER DETAIL A SHOWN INDTES THE FIRST SHEET THE SECTION 5 TAKEN FROM. 3/4- - 1' -0- A -3 R/W - RIGHT OF WAY I ( SHEET WHERE DETAIL IS DRAWNG, SECTION-AND TAKEN DETAIL TIRE$. REMARKS GENERAL ------ 20" Y19.N ---- -- EXISTING WATER MAIN M C_� _- SAN S - -- EXISTING SANITARY SEWER W/ MANHOLE `-70' FM -- -- EXISTING FORCE MAIN --T--- EXISTING BURIED TELEPHONE CIVIL NOTES EX15ITNG POWER DUCTS OR CABLES ---- -OHP -. OVERHEAD POWER CA TV- - - - - -- EXISTING CABLE TFl.£OASION CB ENGINEER. V 15' .SS EXISTING STORM SEWER W /CATCH BASIN EXISTING UTILITIES AND STRUCTURES SHOWN IN PROJECT DOCUMENTS MAY NOT REFLECT AN FIRE HYDRANT ASSEMBLY (EXISTING) ACCURATE/COMPLETE PLETE REPRESENTATION OF ACTUAL CONDITIONS. THE PROJECT DRAWINGS 00 NOT FIR£ HYDRANT ASSEMBLY (PROPOSED/RELOCATED) CLAIM TO SHO CLAIM 70 SHOW ALI. EXISTING UTILITIES AND FEATURES. ALL CONTRACTORS ARE DIRECTS PRIOR €O R/W - RIGHT OF WAY I ( it - PROPERTY LINE T MECHANICAL JOINT WHICH THEIR BIDS WILL BE EASED. NEW MAN TO BE CONST. UNDER EXISTING UTILITY 2. LOCATIONS. ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OTHER FEATURES STATED ON THIS SHEET AND STATED IN THE PROJECT DOCUMENTS AT NO ADDITIONAL COST TO THE OWNER AND ENGINEER. ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF THE PREPARATION OF NEW MAIN TO BE CONST, OVER EXISTING UTILITY THESE PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. THE CONTRACTOR SHALL VERIFY NORTH CAROLINA 4 or o PP EXMING POWER POLE 13 o c LP EXISTING LIGHT POLE PROVIDED ON THE DRAWINGS. PRIOR TO INITIATING CONSTRUCTION, CONTRACTOR SHALL NOTIFY BUSINESS HOURS. THE FINAL CEOTECHNICAL REPORT CAN BE FURNISHED IF DESIRED FOR THE se -1 YYYQ SOIL BORING PZ -1 PIEZOMETER BM 1 BENCH MARK -X x- EXISTING CHAIN UNK FENCE WITH THE SPECIFICATIONS. EXISTING CONDITIONS ARE BASED ON RECORD DRAWINGS PROVIDED BY HAZEN AND SAWYER. NEW CHAIN LINK FENCE ON 7200 EXISTING CONTOUR 72.00 NEW CONTOUR T2.00 EXISTING SPOT ELEVATION 1200 NEW SPOT ELEVATION NAME NEW STRUCTURES, STRUCTURAL PUMP STATION COMPONENTS OR EQUIPMENT CLEAN OUT EXISTING STRUCTURES I I (TO REMAIN) CONCRETE EXISTING STRUCTURES RIGHT -OF -WAY (TO BE MODIFIED) CONDENSER WATER RETURN (SUPPLY) EXISTING STRUCTURES /I1fIi/I/ (TO BE REMOVED) BRAIN EXISTING PIPES REINFORCED CONCRETE PIPE (0 BE CUT AND CAPPED) ANAIE FUTURE I---- - -..._ STRUCTURES DIAMETER NEW CONCRETE SLAB RESTRAINED JOINT OR SIDEWALKS CIVIL NOTES AIR 1. THE INFORMATION PROVIDED IN THESE PUNS IS SOLELY TO ASSIST THE CONTRACTOR IN ASSESSING 25. CONTRACTOR SHALL CLEAR AND GRUB THE PROJECT AREA IF REQUIRED FOR PROJECT ACTIVITIES THE NATURE AND EXTENT OF CONDITIONS WHICH WILL BE ENCOUNTERED DURING THE COURSE OF WHILE PRESERVING THE GENERAL SITE TOPOGRAPHY AT NO ADDITIONAL COST TO THE OWNER AND WORK. ACTUAL CONDITIONS MAY DEVUTE FROM THE INFORMATION SHOWN IN PROJECT DOCUMENTS. ENGINEER. CONTRACTOR SHALL NOT HOLD OWNER OR ENGINEER RESPONSIBLE FOR ANY SUCH DEVIATIONS. AIR COOLED CONDENSING UNIT EXISTING UTILITIES AND STRUCTURES SHOWN IN PROJECT DOCUMENTS MAY NOT REFLECT AN THE OWLWING THE BUBBLES ARE STALKED ACCURATE/COMPLETE PLETE REPRESENTATION OF ACTUAL CONDITIONS. THE PROJECT DRAWINGS 00 NOT 26. CONTRACTOR SHALL STOCKPILE EARTIRWORK AND MATERIALS fN THE AREAS SPECIFICALLY DESIGNATED CLAIM TO SHO CLAIM 70 SHOW ALI. EXISTING UTILITIES AND FEATURES. ALL CONTRACTORS ARE DIRECTS PRIOR €O FOR STAGING. CONTRACTOR SHALL PROVIDE AOEOUATE PROTECTION TO AVOID AND MINIMIZE RUN -ON T HT ANY BIDDING TO CONDUCT WHATEVER INYE5TICATION THEY MAY DEEM NECESSARY TO ARRIVE AT THEIR AND RUN -OFF FROM SUCH ARM, OWN CONCLUSION REGARDING THE ACTUAL CONDITONS THAT WILL BE ENCOUNTERED AND UPON MECHANICAL JOINT WHICH THEIR BIDS WILL BE EASED. 27. CONTRACTOR SRALL BE REQUIRED TO MEET THE GENERAL CONDITIONS AND PROJECT REOUIREMEKTS 2. LOCATIONS. ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OTHER FEATURES STATED ON THIS SHEET AND STATED IN THE PROJECT DOCUMENTS AT NO ADDITIONAL COST TO THE OWNER AND ENGINEER. ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF THE PREPARATION OF BLIND FLANGE THESE PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. THE CONTRACTOR SHALL VERIFY NORTH CAROLINA THE LOCATIONS, ELEVATIONS, AND OTHER FEATURES AFFECTING HIS WORK PRIOR TO CONSTRUCTION. 28, A GEOTECHNICAL INVESTIGATION REPORT IS AVAILABLE FOR REVIEW BY THE CONTRACTOR FOR CONTRACTOR SHALL VERIFY THE EXISTENCE AND ACCURACY OF BENCHMARKS AND CONTROL DATA PREPARATION OF HIS BID AT THE OFFICE OF THE OWNER AND THE ENGINEER DURING REGULAR PROVIDED ON THE DRAWINGS. PRIOR TO INITIATING CONSTRUCTION, CONTRACTOR SHALL NOTIFY BUSINESS HOURS. THE FINAL CEOTECHNICAL REPORT CAN BE FURNISHED IF DESIRED FOR THE ENGINEER IF DISCREPANCIES ARE FOUND. AMOUNT OF $50 PAYABLE BY CHECK IN ADVANCE TO THE ENGINEER. THIS PAYMENT IS BFV NON - REFUNDABLE GEOTECHNICAL REPORTS AND DRAWINGS ARE NOT PART OF THE CONTRACT 3. LOCATION OF EXISTING UTILITIES ARE APPROXIMATE, THE CONTRACTOR SHALL FIELD VERIFY ALL DOCUMENTS, BUT THE TECHNICAL DATA CONTAINED THEREIN UPON WHICH THE CONTRACTOR IS UTILITIES AND NOTIFY THE INDIVIDUAL UTILITY COMPANIES PRIOR TO CONSTRUCTION IN ACCORDANCE ENTITLED TO RELY, AS PROVIDED IN THE SPECIFICATIONS. ARE INCORPORATED HEREIN BY REFERENCE WITH THE SPECIFICATIONS. EXISTING CONDITIONS ARE BASED ON RECORD DRAWINGS PROVIDED BY HAZEN AND SAWYER. OUTSIDE DIAMETER 4. THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY ON ANY CONFLICTS ARISING DURING CONSTRUCTION OF ANY IMPROVEMENTS SHOWN ON THESE DRAWINGS. ANY DEVIATION FROM PROPOSED GENERAL GRADING AS SHOWN ON DRAWINGS SHALL BE PROHIBITED, WITHOUT APPROVAL FROM ENGINEER AND OWNER. PROPOSED ELEVATIONS REPRESENT FINISHED PAVEMENT OR GROUND SURFACE UNLESS OI MMSC NOTED ON DRAWINGS. 5. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH HAVE OCCURRED SY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES. STRUCTURES, AND OTHER FEATURES AFFECTING HIS WORK. ITEMS SHALL BE REPLACED WITH THE SAME TYPE OF MATERIAL THAT WAS REMOVED OR DAMAGED DURING CONSTRUCTION OR AS DIRECTED BY THE ENGINEER. 6. THE CONTRACTOR SHALL COMPLY WITH OSHA EXCAVATION SAFETY STANDARDS (29 CFR PART 1926.650 SUBPART P) AND SPECIFICATION 02200. THE CONTRACTOR SS RESPONSIBLE FOR PROVIDING ADEQUATE SAFETY TRAINING AND EQUIPMENT FOR THE WORK. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE ENGINEER AND OWNER ON ALL CONNECTIONS TO THE EXISTING PIPING TO ENSURE CONTINUOUS OPERATION OF THE T.Z. OSBORNE WRF WHILE UNDER CDNSTRUCTION. B. ALL EXISTING UNDERGROUND PIPING THAT IS IN CONFLICT WITH THE PROPOSED STRUCTURES AND NEW PIPING ARE TO BE RELOCATED UNLESS SPECIFICALLY INDICATED TO BE REMOVED, 9. IF A SYMBOL AND CALL.OUT CONFLICT WITH EACH OTHER, THE CALLOUF SHALL BE USED FOR IDENTIFICATION. 10. R SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ACHIEVE THE DESIRED HORIZONTAL AND VERTICAL PIPELINE ROUTING BY DEFLECTION OF PIPE JOINTS USING NO MORE THAN 75X OF THE MAXIMUM DEFLECTION RECOMMENDED BY THE PIPE MANUFACTURER. 11. SHOP DRAWINGS SHALL BE FURNISHED TO THE ENGINEER FOR APPROVAL OF ALL PIPE CONNECTIONS, TRANSITIONS AND SPECIALS PRIOR TO INSTALLATION. 12, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING ACTUAL FIELD DIMENSIONS AND COORDINATES TO ALL VALVE LOCATIONS AS CONSTRUCTED. 13. BEFORE STARTING ANY EXCAVATION CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES. ALL EXISTING UTILITY LOCATIONS MUST BE MARKED PRIOR TO ANY CONSTRUCTION ACTIVITIES. E4. ALL CONSTRUCTION TO COMPLY WITH CITY OF GREENSBORO STANDARDS. CITY OF GREENSBORO STANDARDS ARE ACCESSIBLE VIA THE COT( OF GREENSBORO WEBSITE http: / /-r .9-nsbam -no.gw 15. STORM WATER MANAGEMENT FOR THIS PROJECT IS BEING PROVIDED ON -SITE. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ANY TEMPORARY STORMWATER CONTROL MEASURES DURING CONSTRUCTION. 16. THE TOO -YR FLOODPLALN ELEVATION AT NORTH BUFFALO CREEK IS 718-fT (RAVDBB) PER FEMA FIRM PANEL 37107875J. EFFECTIVE DAZE JUNE 10, 2007. THE 10D -YR FLCODPLAIN ELEVATION AT TZ OSBORNE WRF 1S 69S-FT (NAVD08) PER FEMA PANEL 37107995J, EFFECTIVE DATE JUNE 18, 2007, CONTRACTOR SHALL SCHEDULE WORK WITHIN THE FLOODPLAIN SO AS TO AVOID CONSTRUCTION WITHIN THE FLOODPLNN DURING FLOODING EVENTS AND WET SEASON. 17. MAINTENANCE OF ALL $OIL EROSION AND SEDIMENTATION CONTROL MEASURES AND PRACTICES. WHETHER TEMPORARY OR PERMANENT, SHALL BE AT ALL TIMES THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES PER THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (http: / /Podal.nedenf"g/ eh /Ir /publimtlomiespuba) AS DEEMED NECESSARY BY THE ENGINEER DURING CONSTRUCTION. 18. PROPERTY OWNER CITY OF GREENSBORO FACILITIES CONSTRUCTION DIVISION 1001 4TH STREET. GREENSBORO, NC 27401, 336- 373 -7760 CONTACT FOR THIS PROJECT: BURCH SHUMATE 19. ENGINEER DOM SMITH 54GO GL.ENWOOD AVENUE, SURE 3110, RALEIGH, MC 27612 CONTACT FOR THIS PROJECT: JAMES BUTCHER (919)787 -5620 20. CONTRACTOR SHALL CLEAN OUT ACCUMULATED SILT IN STORM DRAINS AT END OF CONSTRUCTION WHEN DISTURBED AREAS HAVE BEEN STABILIZED. 21. A 25 -FOOT UNDISTURBED BUFFER SHALL BE MAINTAINED ADJACENT TO ALL STREAMS. 22. NO DEBRIS, WASTE AND EXCESS MATERIALS SHALL BE DISPOSED OF IN A WATER OF THE STATE, UNDER ANY CIRCUMSTANCE SUCH MATERIALS SHALL BE MANAGED PER SPECIFICATION 01110. 21 CONTRACTOR SHALL COMPLY WRIT ANY APPLICABLE RULES, LAWS AND REGULATIONS INCLUDING BUT NOT LIMITED TO CITY STANDARDS, PLOODPWN DEVELOPMENT RULES /PERMIT AND COORDINATE WORK WITH OWNER NEW PAVEMENT DETAIL LETTER 24, CONTRACTOR TRUC STRUCTURAL AND G OTECHNICAL STABILITY LITY F THE PROJECT ES EA LACK THEREOF FOR MAINTAINING 57RUCTURW. PAID GEOTECHNICAL STABILITY pF THE PROJECT AREAS GORING CONSTRUCTION. SECTION NUMBER E A - 1 1 M_I M -1 LEADER LINE -ON LIVE J SHEET WHERE SECTION SHEET WHERE DETAIL IS LOCATED IF THE IS LOCATED 29. CONTRACTOR TO VMFY LOCATIONS OF EXISTING TIE -IN POINTS, EXISTING UTILITIES WHICH MAY REQUIRE REPLACEMENT AND LAYOUT YARD PIPING ACCORDINGLY. FITTINGS MAY BE REQUIRED TO BE ROTATED AS NEEDED TO MAKE CONNECTIONS TO EXISTING YARD WIPING AND FACILITIES. 30. UNLESS OTHERWISE STATED ALL METALLIC YARD PIPING 4r AND LARGER SHALL BE RESTRAINED JOINT PIPE. 31. ALL YARD PIPING INCLUDED IN THIS PROJECT SHALL BE REVIEWED AND APPROVED IN THE SHOP DRAWING PROCESS FOR COMPLIANCE WITH SPECIFlCA710M 01300, INCLUDING DETAILED LAYOUT DRAWINGS AND A DETAILED BILL OF MATERIALS 32. ALL PIPING CONNECTIONS NOT SPECIFICALLY CETAILEO IN THESE DRAWINGS SHALL BE SUBMRTEO BY THE CONTRACTOR TO ENGINEER AS SHOP DRAWINGS FOR REVIEW AND APPROVAL THESE SUBMITTALS SHALL BE PREPARED BY A PROFESSIONALLY LICENSED ENGINEER REGISTERED IN THE STATE OF NORTH CAROLINA THE SUBMITTAL SHALL INCLUDE THRUST ANALYSIS OF PIPING SYSTEMS INCLUDING BUT NOT LIMITED TO TRANSITIONS OF PIPES FROM BELOW GROUND TO ABOVE GROUND ASSEMBLIES, TIE -TN TO EXISTING PIPING AND OR DISSIMILAR MATERIALS AND OR PIPE SIZES, INCLUDING CONNECTIONS, COUPUNGS. EXPANSION AND DISMANTLING JOINTS AND ROLLER SYSTEMS. CIVIL ABBREVIATIONS A AIR SECTION IS SHOWN ON THE SAME SHEET R IS MAXIMUM THIS SYMBOLOGY TO BE AGGREGATE BASE COURSE CUT. THE SHEET IF MULTIPLE DETAILS REFER TO THE SAME AREA OF USED FOR SHORT SECTION AIR COOLED CONDENSING UNIT NUMBER IS REPLACED THE OWLWING THE BUBBLES ARE STALKED CUTS ONLY SECTION CUT WITH A DASH. SYMBOLS SIDE BY SIDE DETAIL CALL OUT SYMBOLS APPROX DESIGNED BY: J. WILLIAMS MECHANICAL JOINT ASPH DRAWN Bri Y. CARRION CITY OF GREENSBORO BF BLIND FLANGE NCRW NORTH CAROLINA BFP SHEET CKICD 6Y J. KOFFMAN Smith NATURAL GAS ' BFPF CROSS Cw'D BY: WILLIAMS . WILMS WRF EXPANSION AND BNR UPGRADES PROJECT BFV APPROVED BY: J. MILES C- VOleseerMd(eeL 5100QdnwooeAVa e T_Z. OSBORNE PACKAGE 3 BM DATE: _ -'- - :M19)° - JANUARY tots Rrkidn. kC 27612 1 ^Td: DiilIl7fi7smD 29. CONTRACTOR TO VMFY LOCATIONS OF EXISTING TIE -IN POINTS, EXISTING UTILITIES WHICH MAY REQUIRE REPLACEMENT AND LAYOUT YARD PIPING ACCORDINGLY. FITTINGS MAY BE REQUIRED TO BE ROTATED AS NEEDED TO MAKE CONNECTIONS TO EXISTING YARD WIPING AND FACILITIES. 30. UNLESS OTHERWISE STATED ALL METALLIC YARD PIPING 4r AND LARGER SHALL BE RESTRAINED JOINT PIPE. 31. ALL YARD PIPING INCLUDED IN THIS PROJECT SHALL BE REVIEWED AND APPROVED IN THE SHOP DRAWING PROCESS FOR COMPLIANCE WITH SPECIFlCA710M 01300, INCLUDING DETAILED LAYOUT DRAWINGS AND A DETAILED BILL OF MATERIALS 32. ALL PIPING CONNECTIONS NOT SPECIFICALLY CETAILEO IN THESE DRAWINGS SHALL BE SUBMRTEO BY THE CONTRACTOR TO ENGINEER AS SHOP DRAWINGS FOR REVIEW AND APPROVAL THESE SUBMITTALS SHALL BE PREPARED BY A PROFESSIONALLY LICENSED ENGINEER REGISTERED IN THE STATE OF NORTH CAROLINA THE SUBMITTAL SHALL INCLUDE THRUST ANALYSIS OF PIPING SYSTEMS INCLUDING BUT NOT LIMITED TO TRANSITIONS OF PIPES FROM BELOW GROUND TO ABOVE GROUND ASSEMBLIES, TIE -TN TO EXISTING PIPING AND OR DISSIMILAR MATERIALS AND OR PIPE SIZES, INCLUDING CONNECTIONS, COUPUNGS. EXPANSION AND DISMANTLING JOINTS AND ROLLER SYSTEMS. CIVIL ABBREVIATIONS A AIR MAX MAXIMUM ABC AGGREGATE BASE COURSE MGD MILUON GALLONS PER DAY ACCU AIR COOLED CONDENSING UNIT MH MANHOLE AL ALUMINUM MISC MISCELLANEOUS APPROX APPROXIMATE (LY) MJ MECHANICAL JOINT ASPH ASPHALT N NORTH BF BLIND FLANGE NCRW NON - CHLORINATED RECLAIMED WATER BFP BACK (LOW PREVENTER NG NATURAL GAS ' BFPF BELT FILTER PRESS FEED NPW NON- POTABLE WATER BFV BUTTERFLY VALVE NTS NOT TO SCALE BM BENCHMARK 00 OUTSIDE DIAMETER ON BOTTOM OVFL OVERFLOW BTWN BETWEEN PLW PLANT WATER CMU CONCRETE MASONRY UNIT PS PUMP STATION CO CLEAN OUT PW POTABLE WATER CONC CONCRETE R/W RIGHT -OF -WAY CWR CONDENSER WATER RETURN (SUPPLY) RAD RADIUS 0 BRAIN RCP REINFORCED CONCRETE PIPE DIP DUCTILE IRON PIPE RED REDUCER DIA DIAMETER RJ RESTRAINED JOINT DWG DRAWING RPZ REDUCED PRESSURE ZONE E EAST S SOUTH CA EACH SAN SANITARY EL ELEVATION SBS SODIUM BISULFITE FCE FINAL CLARIFIER EFFLUENT SC SCUM fEQI FLOW EQUALIZATION INFLUENT SPD SUMP PUMP DISCHARGE HEQR FLOW EQUALIZATION EFFLUENT SO SQUARE FFE FINISHED FLOOR ELEVATION SS SANITARY SEWER FIL FILTRATE STA STATION FILE FILTER EFFLUENT 5W SERVICE WATER rLG FLANGE/FLANGED TIED TO BE DETERMINED FSE FINAL SETTLING TANK EFFLUENT TEL TELEPHONE FT FEET /FOOT TYP TYPICAL GIs GEOGRAPHICAL INFORMATION SYSTEM W WATER GR GRIT WHS WASH HOSE STATION GS GALVANIZED STEEL WM WATER MAIN GV GATE VALVE HOCL HYPGCHLOROE SOLUTION HW HEAD WALL 10 INSIDE DIAMETER IE INVM ELEVATION IN INCH LL LINFAI FEET PROJECT NO. 5145 -52159 CODISYP CIVIL ABBREVIATIONS, SYMBOLS FILL NAM SHEET NO.LIDWI AND GENERAL NOTES I C -1 � � { § § § 2 § § E E k \ | } \ � ° § § ! § � [ § 7 E J � 2 § 5.k � � \a § }!f § § {)$| \rY g . xk ) ; ; »#kk 77} §B §!k §) TRAFFIC FLOW DIRECTION N t PACKAGE 3 ONLY v ^--- -••-•- CONTRACTOR'S USE AREA p ALL CONTRACTORS aPACKAGE 1 CONTRACTOR o / PACKAGE 2 CONTRACTOR ® PACKAGE 3 CONTRACTOR / _x ® INCINERATOR IMPROVEMENTS a j w CONTRACTOR PACKAGE 3 PROJECT UMTS 3 � 5 PROJECT LIMITS D CONSTRUCTION E PACKAGE 3 CONTRACTOR SEE DETAIL PARKING, STAGING AND SPOILS HOLDING AREA t4.4 AC PROJECT LIMITS- r v iA• p .add I " WE RANDS V �` '•r, S. BUFFACO'CREEK PROJECTLIMITS a / CITY OF GREENSBORO PACKAGE 2 CONTRACTOR PROJECT LIMITS CONTROL POINT 218 PARKING, STAGING AND SPOILS _ _ PACKAGE 2 CONTRACTOR a / � � N= 855693.33 HOLpiNC AREA � � � � STAGING AREA o E= 1795452.67 13 AC •PUNT ROAD t2 AC e EL 748.97 �' I CITY OF GREENSBORO 1 i I a„ CONTRACTOR'S TRAILER CONTROL POINT 215 S r ENGINEER'S TRAILER = 856411.70 7i 1 DUMPSTER(S) E= 1796935.90 O / AND INCINERATOR IMPROVEMENTS EL 744.94 i0.7 AC - ROJECT LIMITS ADMINISTRATION 1 i - BUILDING IVETLANQS APPROXIMATE LIMITS E ♦ �OJEIMBS { F CONSTRUCTION C7 L 369.2' 1,� PACKAGE 2 BLOWER AND SERWCE 611XVINGj 0 1• x " % CONSTRU ON ENTRANCE SEE DETAIL A/CO -2 - 1 PROJECT LIMITS PROJECT LIMITS , FINAL SETTLING `� r TANK 8 4I a � UUU I r 5f BY OTHERS 1� r o - I Ai6naAi TANKS I I I AERATION TAt�XB y �� a 1. CONTRACTOR SHALL NOT BE PERMITTED TO USE MAIN PLANT ENTRANCE FOR n AERAriOi TANKS ' i No.5 -8 i I I I ; No.f3 -r5 w CONSTRUCTION TRAFFIC. ALL CONSTRUCTION TRAFFIC SHALL BE ROUTED PACKAGE 1 No. f -4 I ' !_ AERATION TANKS I I BY O i ERE I FINAL SETTLING i THROUGH THE CONSTRUCTION ENTRANCE THE CONSTRUCTION ENTRANCE CONTRACTOR I No.-9-12 j Q TANK No. 9 ; ;I 4+ r� SHALL RE STABILIZED PER DETAIL A/CD --2 (TYP 2 PLACES). " STAGING AREA ? E i i f1.2 AC BY OTHERS v i1 I I a ? 2. CONSTRUCTION ACTA/ITIES, TO INCLUDE TRAFFIC AND CONTRACTOR EMPLOYEE �' + I ek L w FOOT TRAFFIC, SHALL REMAIN WITHIN THE PROJECT LIMITS SHOWN. APPROXIMATE LIMOS 3. TRAFFIC FLOW PATTERNS REQUIRE ADJUSTMENT IF PACKAGE 2 AND 3 OF CONSTRUCTION j PROJECT LIMITS Em a CONTRACTORS ARE ON -SITE AT THE SAME TIME. IF REQUIRED THE PACKAGE 1 -9 a° ° CONTRACTORS SHALL CONFIRM TRAFFIC FLOW PATTERNS WITH OWNER AND FINAL SETTLING FINAL SETTLING 'FINAL SETTLING- FINAL SETTLING 1 FINAL SETTLING FINAL SETTLING ENGINEER PRIOR TO COMMENCING CONSTRUCTION ACTNRES. I TANK No. f TANK No.2 TANK Na.5 TANK No.6 / 1 t TANK No.7 TANK No. IO �- / \ •• I BY OTHERS r' 4. PACKAGE 3 TOTAL PROJECT AREA X79 AC AND INCLUDES; CONSTRUCTION, 4' x ' FINAL SETTLING TAN °u INGRESS. EGRESS, STAGING, STORAGE, LAY GOWN, HOLDING AND TRAILER PROJECT LIMITS AREAS. rPROJECT LIMITS B ,AS PUMP STATION No.2 5. o DISTRIBUTION CH4MHER 1 PROJECT LIMITS \ PRIMARY SETRfNG 1 - c 1 S. UMffB OF CONSTRUCTION SHOWN FOR PACKAGES 1 &2 ARE APPROXIMATE AND TANKS No. f -4 RAS PUMP STATON Na. f RASr PUMP STATION No.,7 !, v ° o SHOWN FOR INFORMATION PURPOSES ONLY / I ._ 203.3' FINAL SETTLING FWAL SETTLING INCENERATOR II TANK No.3 TANK N°.4 W 6. CONTRACTOR USE AREAS SHALL BE RESTORED TO PRE CONSTRUCTION �4' CONDITION DR BETTER. /�'�. PRIMARY SETTLING IMCONTRACT, 1 �, \ / ` EFFL 4 UENT ��� TANK No.5 a \`I �- `� �'' a PRIMARY SETTLING o STAGING AREA n FILTERS n I \ ` -7. THE WALKWAY BETWEEN THE ADMINISTRATION BUILDING AND THE ROADWAY r� ' TANK No.6 3) SHALL REMAIN OPEN AND ACCESSIBLE TO PLANT PERSONNEL AT ALL TIMES. F / a \� C '° +� F P FLOW EOUAUZA7FDN,� PACKAGE 3 i z ° s 8. SEE SHEET C -4 FOR SURVEY INFORMATION. �1 j a TANK BY OTHERS PROJECT UMIT5 i O' -'� -- - t CONTRACTOR I mv< STAGING AREA 2 10.6 AC 9. CITY OF GREENSBORO SITE CONTROL POINTS; �•-+ ! 570RMWAT,ER SCUM I E j RETENT/ON xe N t 4 PRECONCENTIRATOR ` !I rAROJECT LIMITS POND a° ° COG 215 N 856411.7008E 1796935.8990 EL 744.9396 {SEE THIS SHEET) }' ` l ._FLOW FQ 7AT7ON� 1B' a° rl Y n ~o COG 216 N 855081.5195 E 1797642.1199 EL 705.9057 (SEE C -4) 1 \ \ I 17• Y L_ -� Io I / n / ° SOLIDS HANDLING ❑ CHLORINATION n h COG 218 N 855693.3154 E 1795452.8752 EL 748.9690 (SEE THIS SHEET) .\ @ 1� i a $ ` _ G� _ BUILDING j BUILDING o00 / a n `�� -GRAVITY SLUDGE r�J-_ m � °w � � � - THICKENERS AND I PUMP STATION c f I CHLORINE CHLORIN£ I / AND PRE - AERATION INCINERATOR M/`n THICKENED SLUDGE CHLORIN E CONTACT CONTACT I // TANKS AND PS IMPROVEMENTS HOLDING TANKS a CONTACT I TANK AND TANK AND k/ �� ,J I- - \ rJ - CONTRACTOR ' .•'� TANK GA3GADE'S CASCADES I i % 3 STAGING AREA - 14 I y - MATCH LINE 1 t0.3 Ac a ��ao4 U� �qW DESIGNED By ----_,ft DRAWN BY• Y. CARRION SHEET CHILD 8Y: J• HOFFMAN CROSS CHK "D BY.---,R . WILL IA.MS REV. APPROVED Bh J. MILLS NO. DATE ORWN CHKD REMARKS DATE; JANUARY, 2,013 MATCH LINE 2 WILLIAMS CDM CITY OF GREENSBORO PROJECT NO. 6145 -82159 Siiil #h NORTH CAROLINA CONTRACTOR STAGING FILE MIME. C006CSAP.DWi Ge°GWe o MC1(aea6uo IV. WRF EXPANSION AND BNR UPGRADES PROJECT AND LAY DOWN AREAS C -3 �`°°M'°"C°°'A"°"'s I!093 T-Z, OSBORNE - PACKAGE 3 leblph NC27612 I TN: pT8JT87� NC Llmrge NO F[F112 94% SUBMITTAL - NOT FOR CONSTRUCT10P B C LEGEND : : i� r i iL D CONSTRUCTION E PACKAGE 3 CONTRACTOR SEE DETAIL PARKING, STAGING AND SPOILS HOLDING AREA t4.4 AC PROJECT LIMITS- r v iA• p .add I " WE RANDS V �` '•r, S. BUFFACO'CREEK PROJECTLIMITS a / CITY OF GREENSBORO PACKAGE 2 CONTRACTOR PROJECT LIMITS CONTROL POINT 218 PARKING, STAGING AND SPOILS _ _ PACKAGE 2 CONTRACTOR a / � � N= 855693.33 HOLpiNC AREA � � � � STAGING AREA o E= 1795452.67 13 AC •PUNT ROAD t2 AC e EL 748.97 �' I CITY OF GREENSBORO 1 i I a„ CONTRACTOR'S TRAILER CONTROL POINT 215 S r ENGINEER'S TRAILER = 856411.70 7i 1 DUMPSTER(S) E= 1796935.90 O / AND INCINERATOR IMPROVEMENTS EL 744.94 i0.7 AC - ROJECT LIMITS ADMINISTRATION 1 i - BUILDING IVETLANQS APPROXIMATE LIMITS E ♦ �OJEIMBS { F CONSTRUCTION C7 L 369.2' 1,� PACKAGE 2 BLOWER AND SERWCE 611XVINGj 0 1• x " % CONSTRU ON ENTRANCE SEE DETAIL A/CO -2 - 1 PROJECT LIMITS PROJECT LIMITS , FINAL SETTLING `� r TANK 8 4I a � UUU I r 5f BY OTHERS 1� r o - I Ai6naAi TANKS I I I AERATION TAt�XB y �� a 1. CONTRACTOR SHALL NOT BE PERMITTED TO USE MAIN PLANT ENTRANCE FOR n AERAriOi TANKS ' i No.5 -8 i I I I ; No.f3 -r5 w CONSTRUCTION TRAFFIC. ALL CONSTRUCTION TRAFFIC SHALL BE ROUTED PACKAGE 1 No. f -4 I ' !_ AERATION TANKS I I BY O i ERE I FINAL SETTLING i THROUGH THE CONSTRUCTION ENTRANCE THE CONSTRUCTION ENTRANCE CONTRACTOR I No.-9-12 j Q TANK No. 9 ; ;I 4+ r� SHALL RE STABILIZED PER DETAIL A/CD --2 (TYP 2 PLACES). " STAGING AREA ? E i i f1.2 AC BY OTHERS v i1 I I a ? 2. CONSTRUCTION ACTA/ITIES, TO INCLUDE TRAFFIC AND CONTRACTOR EMPLOYEE �' + I ek L w FOOT TRAFFIC, SHALL REMAIN WITHIN THE PROJECT LIMITS SHOWN. APPROXIMATE LIMOS 3. TRAFFIC FLOW PATTERNS REQUIRE ADJUSTMENT IF PACKAGE 2 AND 3 OF CONSTRUCTION j PROJECT LIMITS Em a CONTRACTORS ARE ON -SITE AT THE SAME TIME. IF REQUIRED THE PACKAGE 1 -9 a° ° CONTRACTORS SHALL CONFIRM TRAFFIC FLOW PATTERNS WITH OWNER AND FINAL SETTLING FINAL SETTLING 'FINAL SETTLING- FINAL SETTLING 1 FINAL SETTLING FINAL SETTLING ENGINEER PRIOR TO COMMENCING CONSTRUCTION ACTNRES. I TANK No. f TANK No.2 TANK Na.5 TANK No.6 / 1 t TANK No.7 TANK No. IO �- / \ •• I BY OTHERS r' 4. PACKAGE 3 TOTAL PROJECT AREA X79 AC AND INCLUDES; CONSTRUCTION, 4' x ' FINAL SETTLING TAN °u INGRESS. EGRESS, STAGING, STORAGE, LAY GOWN, HOLDING AND TRAILER PROJECT LIMITS AREAS. rPROJECT LIMITS B ,AS PUMP STATION No.2 5. o DISTRIBUTION CH4MHER 1 PROJECT LIMITS \ PRIMARY SETRfNG 1 - c 1 S. UMffB OF CONSTRUCTION SHOWN FOR PACKAGES 1 &2 ARE APPROXIMATE AND TANKS No. f -4 RAS PUMP STATON Na. f RASr PUMP STATION No.,7 !, v ° o SHOWN FOR INFORMATION PURPOSES ONLY / I ._ 203.3' FINAL SETTLING FWAL SETTLING INCENERATOR II TANK No.3 TANK N°.4 W 6. CONTRACTOR USE AREAS SHALL BE RESTORED TO PRE CONSTRUCTION �4' CONDITION DR BETTER. /�'�. PRIMARY SETTLING IMCONTRACT, 1 �, \ / ` EFFL 4 UENT ��� TANK No.5 a \`I �- `� �'' a PRIMARY SETTLING o STAGING AREA n FILTERS n I \ ` -7. THE WALKWAY BETWEEN THE ADMINISTRATION BUILDING AND THE ROADWAY r� ' TANK No.6 3) SHALL REMAIN OPEN AND ACCESSIBLE TO PLANT PERSONNEL AT ALL TIMES. F / a \� C '° +� F P FLOW EOUAUZA7FDN,� PACKAGE 3 i z ° s 8. SEE SHEET C -4 FOR SURVEY INFORMATION. �1 j a TANK BY OTHERS PROJECT UMIT5 i O' -'� -- - t CONTRACTOR I mv< STAGING AREA 2 10.6 AC 9. CITY OF GREENSBORO SITE CONTROL POINTS; �•-+ ! 570RMWAT,ER SCUM I E j RETENT/ON xe N t 4 PRECONCENTIRATOR ` !I rAROJECT LIMITS POND a° ° COG 215 N 856411.7008E 1796935.8990 EL 744.9396 {SEE THIS SHEET) }' ` l ._FLOW FQ 7AT7ON� 1B' a° rl Y n ~o COG 216 N 855081.5195 E 1797642.1199 EL 705.9057 (SEE C -4) 1 \ \ I 17• Y L_ -� Io I / n / ° SOLIDS HANDLING ❑ CHLORINATION n h COG 218 N 855693.3154 E 1795452.8752 EL 748.9690 (SEE THIS SHEET) .\ @ 1� i a $ ` _ G� _ BUILDING j BUILDING o00 / a n `�� -GRAVITY SLUDGE r�J-_ m � °w � � � - THICKENERS AND I PUMP STATION c f I CHLORINE CHLORIN£ I / AND PRE - AERATION INCINERATOR M/`n THICKENED SLUDGE CHLORIN E CONTACT CONTACT I // TANKS AND PS IMPROVEMENTS HOLDING TANKS a CONTACT I TANK AND TANK AND k/ �� ,J I- - \ rJ - CONTRACTOR ' .•'� TANK GA3GADE'S CASCADES I i % 3 STAGING AREA - 14 I y - MATCH LINE 1 t0.3 Ac a ��ao4 U� �qW DESIGNED By ----_,ft DRAWN BY• Y. CARRION SHEET CHILD 8Y: J• HOFFMAN CROSS CHK "D BY.---,R . WILL IA.MS REV. APPROVED Bh J. MILLS NO. DATE ORWN CHKD REMARKS DATE; JANUARY, 2,013 MATCH LINE 2 WILLIAMS CDM CITY OF GREENSBORO PROJECT NO. 6145 -82159 Siiil #h NORTH CAROLINA CONTRACTOR STAGING FILE MIME. C006CSAP.DWi Ge°GWe o MC1(aea6uo IV. WRF EXPANSION AND BNR UPGRADES PROJECT AND LAY DOWN AREAS C -3 �`°°M'°"C°°'A"°"'s I!093 T-Z, OSBORNE - PACKAGE 3 leblph NC27612 I TN: pT8JT87� NC Llmrge NO F[F112 94% SUBMITTAL - NOT FOR CONSTRUCT10P CDM CITY OF GREENSBORO PROJECT NO. 6145 -82159 Siiil #h NORTH CAROLINA CONTRACTOR STAGING FILE MIME. C006CSAP.DWi Ge°GWe o MC1(aea6uo IV. WRF EXPANSION AND BNR UPGRADES PROJECT AND LAY DOWN AREAS C -3 �`°°M'°"C°°'A"°"'s I!093 T-Z, OSBORNE - PACKAGE 3 leblph NC27612 I TN: pT8JT87� NC Llmrge NO F[F112 94% SUBMITTAL - NOT FOR CONSTRUCT10P 94% SUBMITTAL - NOT FOR CONSTRUCT10P § [ § / . [ § « 2 ( \ k § i K \ � � § f \ � / \ } dz§ ` 22! � )�/ 7 §�� ! a22§\ §r { ®| cl �2)�k �� \2) kff §& k\}(§ rn V 0 0 H a 3 x 0 a w 0 0 �x z °w w 0 °z Zed 4 V 0 a w rc x o iX a o In ? c� U go � c7 +w^ z 0 N U � 0 a a z ° Eas" z 0 wo n an�i °s M >>V Y h W a E m o� 1 H a� p e J w REMOVE APPROXIMATELY 5OLF GUARDRAIL INSTALL BUFFERED END SECTION ' - /, yyyyrtta- ttf,�t/-- ,!"585y-/m,F,� -�,�.� 4 PER NCDOT STANDARDS I i REMOVE 12" CWS PIPE REMOVE CHAIN LINK FENCE E 1797150.92 ^, N 855019.89 N 854983.27 d--- - - - --i '' E 1797152.19 1 REMOVE 6" PLANT WATER i E 179721 1.97 � to N 855044.43 �� 1 YES ,,REMOVE 6" NATURAL GAS E 1797210.69 'N 855035.32 REMOVE APPROXIMATELY 300Lf A i Y,rE 7797205.05 11 6" NATURAL GAS ! i 'REMOVE 6' SUMP DRAIN �� 1 "iA N 855023'02 ¢ E 1797207.34 fO 'T a `' REMOVE 6" SUMP PUMP DISCHARGE ' f �12- CRIV .I. . .; N 855020.05 y / 2 -4" NOCL fill �I r E 1797206.13 �' 2_3" NOCL � REMOVE APPROXIMATELY 15OLF o � ' ,� ADANDON£O6" SUMP DRAIN Y. o Ii Ii/1 I SC/ REMC IOLF 1} 1 / / ," HG _>J 6" PLANT WATER i I y SPD I„ V q •j ����/ j 1 4" � REMOVE APPROXIMATELY 15OLF "/ J7 I I I / I• I 6" SUMP PUMP DISCHARGE ; 'Y f'I I� f; CRW 8 PW z /I I " REMOVE 30' EXHAUST -RCP I 11111 1 REMOVE APPROXIMATELY 55LF OUTFACE STRUCTURE AND 047.5D g^ BLDG STORM DRAIN -DIP'\ N 755247.50 I 1 ; I E 1797270.00 rx REMOVE 36' EXHAUST -RCP ABANDONED IIEi 12 "CR SPD--\ 'EMOVE ABANDONED LINES AS AP ENDS OF REMAINING PIPE IIIY REMOVE 6' NATURAL GAS N 855103.35 E 1797195.42 ill 1111i"111 HHI -5 OUTFALL STRUCTURE AND RIPRAP }' I i t/ i f 3O" EXHAUST J N 855065.84 RELOCATE EXIST FH } y / HHT -6f mall REMOVE APPROXIMATELY E 1797301.27 ASSEMBLY SE£ YARD iI I ITELE, LNI£RCOM 111 350LL OF CHAIN ,PIPING PLAN FOR NEW LINK FENCE LOCATION I II / AND SYSTEM AMH 3 1 I REMOVE CHAIN LINK FENCE //� / ,Y y I ; j / 1 REMOVE APPROXIMATELY 45 854940.21 / �/ �' • Y y I l / 1 I 30" EXHAUST -RCP E 1797.3 _11 �� -�' fi I II /1 FROM FIRST JOINT OUTSIDE • /��!` / / / 7�-✓-`� -F fE HLORINATION BUILDING UP TO / / ;L�'% / / REMOVE APPROXIMATELY 22OLF (EA) !-' / - /-� f I ��/j AND INCLUDING THE WINGWALL • / / / /-! f / / OF ABANDONED 8' CWR AND 12" CWS N 855084.59 CAP ENDS OF REMAINING PIPE •� d I l , l E 1797248.25 / REMOVE APPROXIMATELY 15OLF 1" SBS .� I li /i I 36' EXHAUST IIEIE � I Ii �4 -1" NOCL REMOVE 14" NPW N 8552 E 17971, REMOVE APPROXIMATELY 4OLF MH 14' NPW - SYSTEM _- ' - /, yyyyrtta- ttf,�t/-- ,!"585y-/m,F,� -�,�.� 4 ---- -1" NOCL -�-- - --- �� I REMOVE 14' NPW PIPE N 855219.23 �- ---y�� i E 1797150.92 REMOVE 1" SBS PIPE / €/ REMOVE 6' SUMP PUMP DISCHARGE REMOVE 2 EXHAUST FANS 480V SYSTEM AND ASSOCIATED N 855009.78 �JI/ N 855090.66 , CHLORINATION BUILDING E 1797384.01 E 1797330.44 fir- =z" 5- __'- -_2^ S- N 855273.65 E 1797160.22 I I REMOVE APPROXIMATELY 120LF 3' SERVCE WATERl SERVICE WATFR- = ABANDONED 48" FSE NC lk»rue No. F-o�u 8" SERVICE WATER= j;I 1 1 I REMOVE 6' PLANT WATER N 855115.90- / E 1797330.49 • �> 'u / Y�111I i REMOVE 1" SBS PIPE / / • \� \ �i - -Nf}- N 855116.09- / / , E E 1797301.94 REMOVE 12" CWS WS PIPE N 855125.06- E / 1797327.11 CHLORIN£ REMOVE 6" SUMP DRAIN CONTACT TANK AND N 855126.27" CASCADES I E 7797321.27 111 / CUT AND RIEMOVF, AS NECESSARY, REMOVE APPROXIMATELY 95' OF 2" NPW TO EXISTING VALVE (9) 1" HOCI LINES FROM THE f / BOX NEAR THE OUTFALL JUNCTION BOX ADJACENT TO THE - STRUCTURE ±320 Lf SODIUM HYPOCLORfTE FACiL11Y TO THE \� �l l I Ili CHLORINATION BUILDING � I Ii �4 -1" NOCL REMOVE 14" NPW N 8552 E 17971, REMOVE APPROXIMATELY 4OLF MH 14' NPW - SYSTEM _- ' - ---- -1" NOCL -�-- - --- �� I REMOVE 14' NPW PIPE N 855219.23 �- ---y�� i E 1797150.92 - MH 4 -1 REMOVE 2 EXHAUST FANS 480V SYSTEM AND ASSOCIATED DRAWN 8Y• Y. CARRION SHEET CRK'D BY: J. NOFFMAN CROSS CHKD 1TY: 9, WILLIAMS APPROVED BY- 3. MIUS UCT WORK IN CHLORINATION BUILDING SEE S14T M -13 i I I REMOVE 48' ESE PIPE N 855273.65 E 1797160.22 I I REMOVE APPROXIMATELY 120LF i [ ABANDONED 48" FSE REMOVE APPROXIMATELY 45LF r' I 36' EXHAUST -RCP { 1 I i i \ I FROM FIRST JOINT OUTSIDE I EMOVE HOCI PIPING 1 ! HLORINATION BUILDING UP TO •i,1. AND INCLUDING THE WINGWALL 11111 855102.931 1, 'E 1797279.51 CHLORINA77ON BUILDING E' REMOVE APPROXIMATELY 45' OF 1' PVC HOCI FEED LINE REMOVE 8" PW PIPE 11, TO FILTER INFLUENT N 855324.98 E 1797259.96 REMOVE APPROXIMATELY 60LF ABANDONED 42' ESE li I I O ,Ilf 1 1 REMOVE 42' ESE PIPE N 855302.4''FF--\ / 1 1 i i f I fi 1 E 1797293.7 6 1 11 42" FSE . ,ILL -4 REMOVE 48" FLE PIPE 11 fIf j I CHEMIC,gL�I I I' 11 11 1 N 855317.14 / 1 1 STORAGE 1797302.2 ] , 1 f E 1 FACILITY' -� _ -... 48' FLE REMOVE B" PW PIPE ! Ili I N 855308.22 / r 7797322.52 REMOVE APPROXIMATELY 70LF I l 1 ABANDONED 8" PW CAP REMAINING PIPE REMOVE CHEMICAL I r 111 f REMOVE APPROXIMATELY 65LF RACEWAY VAULT ! ii ABANDONED 48" FLE �- SODIUM NYPOCHLORITE 1 1 FAClL!!Y ,� � 3 REMOVE APPROXIMATELY 85' OF I I E ! E I IA1 i '\ 1" PVC HOCI FILTER INFLUENT FEED >/ 0 o II o AND •z 311 i ,� / 6 WAS fi" SC JO FSE_ i y -- HHf -4 PLC SIGNAL SYSTEM MH NO 1 2" NPW HOC[ `t..� --- 1 y o ' -r 7" NPW/ OCL I" NPW /HOCL T" NPW /HOCL 1" NPW /HOCL I RELOCATE HY� LORtTE 3 SPLTITER BOX l 1 C 2 -7 C I I EFFLUENT 1 FILTERS s II I k 1 ! REMOVE 48! FSE PIPE � N 855330.91 E 1797262.23 E!I 1 I IEMOVE 60 FTTTINGS REMOVE APPROXIMATELY 195' OF '1" PVC HOCI FEED LINE TO THE FILTER EFFLUENT CITY OF GREENSBORO NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT T"Z" OSBORNE - PACKAGE 3 6" 16" WAS -1 " NPW /h NPW /HOCL NOTES: D 1. CONTRACTOR SHALL COORDINATE ALL DEMOLRION-OF CHEMICAL FEED LINES INSIDE THE CHLORINATION BUILDING WITH THE ENGINEER AND OWNER PRIOR TO PERFORMING THE WORK. THE LINES THAT SHALL BE REMOVED ARE BEING RELOCATED TO OUTSIDE THE BUILDING SUCH THAT ALL CURRENTLY ACTIVE LINES REMAIN ACTIVE AFTER THE WORK IS COMPLETE. UTILITY RELOCATION DEMOLITION PLAN �N 1. - 20. 100 PROJECT NO, 6145 -62[59 FILE NAME C005DMPLDWG SHEET NO. C -5 DESIGN ® 8Y J. YALL1AM5 DRAWN 8Y• Y. CARRION SHEET CRK'D BY: J. NOFFMAN CROSS CHKD 1TY: 9, WILLIAMS APPROVED BY- 3. MIUS P Smith 54M Gle wdA m, gSu " RFV_ DATE DRWN CHKD N0. REMARKS DATE 2011 Rnbiph,NC 27272 I TN:I NC lk»rue No. F-o�u AND •z 311 i ,� / 6 WAS fi" SC JO FSE_ i y -- HHf -4 PLC SIGNAL SYSTEM MH NO 1 2" NPW HOC[ `t..� --- 1 y o ' -r 7" NPW/ OCL I" NPW /HOCL T" NPW /HOCL 1" NPW /HOCL I RELOCATE HY� LORtTE 3 SPLTITER BOX l 1 C 2 -7 C I I EFFLUENT 1 FILTERS s II I k 1 ! REMOVE 48! FSE PIPE � N 855330.91 E 1797262.23 E!I 1 I IEMOVE 60 FTTTINGS REMOVE APPROXIMATELY 195' OF '1" PVC HOCI FEED LINE TO THE FILTER EFFLUENT CITY OF GREENSBORO NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT T"Z" OSBORNE - PACKAGE 3 6" 16" WAS -1 " NPW /h NPW /HOCL NOTES: D 1. CONTRACTOR SHALL COORDINATE ALL DEMOLRION-OF CHEMICAL FEED LINES INSIDE THE CHLORINATION BUILDING WITH THE ENGINEER AND OWNER PRIOR TO PERFORMING THE WORK. THE LINES THAT SHALL BE REMOVED ARE BEING RELOCATED TO OUTSIDE THE BUILDING SUCH THAT ALL CURRENTLY ACTIVE LINES REMAIN ACTIVE AFTER THE WORK IS COMPLETE. UTILITY RELOCATION DEMOLITION PLAN �N 1. - 20. 100 PROJECT NO, 6145 -62[59 FILE NAME C005DMPLDWG SHEET NO. C -5 C: \7 I w F 77 ------------- PVC 8 "x45' BEND 5/8" PACL LOCATED INSIDE I (TYP 3) 1 !;i RECONZ" R ..2' flDPE INSIDE 4' CASING PIPE-PVC SCH40 HOCL CUT AND REPLACE 4�" VCP t" LF 4' PVC I 4-1- WITH 9 1" 20' DRILL EXIST WING WALL CONNECT TO EXIST 6" NG )��j SPD CORE ts" SS INSTALL (2) 4' COUPUNGS z /Ar rl MATCH EXIST ELEVATION INSTALL 8" BLDG STORM GRAIN --PVC 2-4" HOCL 2- NPW 6" SC INV EL 705.3 p H I J" SPD GROUT IN PLACE wrrH NON- 2-J" HOCL j ------ f SHRINK GROUT SS .0 22' CT I ' HOCL _A&AND01VE --CONNECT TO Z7 12° CRw" MATC H EXIST ELEVATION 4"- Sp9_ RELOCATED 14" NPW-01 EXISTING CONNECT to EXIST 6" CONNECT TO -14" COUPLINGS SPUTTER sox INSTALL 2 EXIST 6" NG 6" NG EXIST tLEVATON 4 If" HOCL___ .1 4"x45' SEND rMATCH T FEED LINES CONNECT 10 EXIST 6' SPD-DI HYPOCHLORITE /B\ 6' COUPLING SIGNAL SYSTEM UHk - t15 'CR-W � I I � �-= 1 2-14"x9Or BENDS PLC, RELOCATED 54-AIY BEND SPUTTER BOX 6' TEE -x 154XI 1.25' SEND 54XI 1.28' BENZ) 13 ___L 48 TEE I 3-13"X45' BEND 55136-28 N=855343.51 �'45' BEND_ END __ E=179721i.54 N=855104.83 =8 ;k E=1797161.38 EN=17137162.9,3 I. o -54" INF-DI 48 SEND E= 1797073.87 F 'N=85.5'3!4.7 2" S 6' SPD 54'xgO' BEND 48'xgcr SEND 1 855326.28 RELOCATE., 1' Pw, ELEC OG '11437-51 -N=855152 E15 N= 855226.36 REMOVE PLUG 1797083,92 1" NPW/HOCL, 2' NPIN P I" SBS FEE: 1 0 t1HI-5 E=1797153.21 E=17971 4 INSTALL COUPLING AS REQUIRED SIDEWALK SHALL BE 18" SW-DIP- Ild PLC *41' REPLACED To EQUAL K-0-- mpw-H- 1-4" Spo MH 4 12 3 -OR GREATER CONDMON_._ SIGNAL SYSTEM MH ELEC UG---.1 480V SYSTEM UG -THAN THE EXISTING. .. I f - -ELEC BYPASS -_ -_ i i CONNECT TO EXIST 14* NPW-DI 1�711 - - - - - - MN NO 1 I ELITC m 14-4¢' TAPPING SLEEVE -Di- 60" FSE 1--y2" TAPPING VALVE TELE, INKERCOM__116114, floc, I'c-- r -14" Npw-----f HH -6 ALARM WAS— INSTALL MASONRY PLUG 2- r"c __J" SpD_ Nk� Sysrrm mly TELE, INTERCOM o IN 30" EXHAUST - ALARM 4-17 ABANDON IN PLACE 'ED MH 48cv SYSTEM 2- NPby_ CONNECT TO EXIST B" BLDG STOIiM'D1RIAN-DIP HOCL "-rl �- _36' 5D- OCT 5 APPROX INN EL 712,25 (FIELD VER" T- -----ELEC 1 11 SLOPE TO PROPOSED OUT FALL 61-1" RED 48" FSE-0 42' FSE CONTACT TANKS -2" SAMPLE 1. Np CHLORINE CO N "85 xg(r BEND 1 1/2" NPWZZ-- 1" Sas CHLORINATION 5243.82 Npw1140CLv \_T NPWIHOCL PKG 3 E= 1797169.95 CL OCT 5 8" PW`-DI`-- BUILDING 1/2' PACL-FVC ED 54"x45' SEND 2-2" S I E=1797097.61 - 96 SCHEID (TYP OF 6) N=855011.7 1 1 E!=' 1 ;;,7017,8"24 E=1797352.99 EXHAUST D-DI'­ J6" J (2) 48-x45- BENDS (VERT) /-A Sw-DIP--__ INSTALL MASONRY PLUG I N=855330.5 I - NPWIHO CL E=1 797 t 11 �0 N 36, EXHAUST EE SHEET CD-4 ........ 7�ELOCATED FH ASSEMBLY S OR AOMOON IN PLACE F' ENLARGED VIEW OF THIS AREA SEND (2) 48-x45- BENDS (VERT) 60"X45 CONNECT TO EXIST 6' SPD-:111 N=aM55422-98- N-855356.65 COUPLING E-1797096-21 IE-1797051,30 TEE ff I CONTRACTOR TO FIELD LOCATE AND so' PLUG Li. S. I RELOCATE STING CHEMICAL PIPES IF 60" LINE INSTALLED SEE SHEET C-6 18, SW -DI I I SPO 4 2" SAMPLE LINES PACKAGE 2 FOR CONTINUATMIN +11 1 't- /--FROM NEW CHLORINE - - - -_1' SB - - - - - - - - - - - - 4r' I REMOVE 60" PLUG m -- -Z. -- 2 CONTACT TANK CONNICET USING 60' COUPLING EFnUENT S= 31 SW--- RL TERS 18' Npw I WI Ei CONNECT TO EXIST 1* SBS CONNECT TO EXIST is- NPWI VI-HOCI CUT IN 18" WYE coupuw; 6D. FSE is' + By -H- CONNECT CONNECT TO EXIST 6- 0 w TO EXIST CONNECT TO EXIST 18' NPW I 1 1 1< SPUTTER BOX 18" TAPPING SLEEVE MATCH EXIST ELEVATION I 18' TAPPING VALVE MAINTAIN CONSTANT SLOPE 54'xgCr .... 2� BETWEEN CONNECTION N= 855247.7 CONNSCT To EXIST NECTION POTNTS E=1797314.94 SPUrrER BOX 0 z CCT 2 II _j 11 D 0 'C '7 53 16 E-1797279.36 1. CONTRACTOR SHALL INCLUDE IN THEIR BID TO EXCAVATE AND I JHI I r 42' FLE--­-- NOTES: 6WX42' TEE SURVEY/LOCATE ALL EXISTING UTILITIES PRIOR To PREPARING N=855333.75 I YARD PIPING SUBMITTALS- ADJUST YARD PIPING AS REQUIRED fI CHEMICAL CHLORINE CONTACT IIANK AND WxW RED E-1797292.30-- TO ACCOMMODATE FIELD VERIFIED LOCATIONS. 1 1 1, STORAGE' CASCADES i ill FACIUTY 2. EXCAVATION SUPPORT SYSTEM SHALL BE INSTALLED AS REQUIRED TO FACILITATE THE CHLORINE CONTACT TANK \L------------ ._.._.i CONSTRUCTION SUCH THAT NO ADVERSE IMPACTS OCCUR TO :E THE CHLORINATION BUILDING AND ADJACENT STRUCTURES, _8' Pw - - - - - - - - - V2-HOCI fp r-1 -4 Ccr I CONNECT To 42' N-855300.05 3. PRIOR TO INSTALLATION OF EXCAVATION SUPPORT SYSTEM f 1797293.76 CONTRACTOR SHALL RELOCATE AND PLACE INTO SERVICE THE 6" SCH so PVC �2-42N46' BENDS (IN VERT) PLANT WATER, NATURAL GAS, SUMP DRAINS, CHEMICAL LINES I RIER PIPE WITH AND SAMPLE U14ES WITHOUT DISRUPTION TO SERVICE CONNECT To EXIST 48" (3) 1" PVC HOG LINES ALTERNATIVELY TEMPORARY BYPASS LINES WAY BY INSTALLED AND MAINTAINED BY THE CONTRACTOR. 48" COUPLING N=855315.17 6x4S BEND SODIUM HYPOCmLORITE E=1797302.29 2-48'x45• BENDS (IN VERT) FACILITY h/ b. =8S534D.G5 4. THE RELOCATED FIRE HYDRANT MAY BE INSTALLED AFTER - - - - - - - - --- - - - - - E=17S7329.67 COMPLETION OF THE CHLORINE CONTACT TANK INSTALLATION. I 48"x6O' R IF DIRECTED BY THE ENGINEER THE CONTRACTOR WILL INSTALL THE FIRE HYDRANT AT AN ALTERNATE LOCATION (NEAR THE CHLORINATION BUILDING) WITHOUT ADDITIONAL COMPENSATION. i 5. EXCAVATION SUPPORT SYSTEM SHALL BE DESIGNED AND .... - - - - - - - - da Qq Ccr 3 4 LOCATED 13Y THE CONTRACTOR, SIGNED AND SEALED BY A 7- - - - - - - - - PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF NORTH. f I Svp " Svc CAROLINA AND SUBMITTED TO THE ENGINEER FOR APPROVAL f 6. THE BOTTOM TWO THIRDS OF EXCAVATION SUPPORT SYSTEM BETWEEN CCT#2 AND CCT#5 SHALL REMAIN IN PLACE. 22 CTW_ 3, Spq G".-S 2- S PW 15E" DESIGNED EIY��VnQJAXS DRAWN BY, Y. CARRION CDMI CITY OF GREENSBORO PROJECT 90. 6m-aZI59 FILE WE-, coo6yp NORTH CAROLINA PLM4 X SHED CHWO BY. ___.L- _HOFFMAN U. B. WILIAM Smith SHEET NO. .00 GROSS CHK'D BY, WRF EXPANSION AND BNR UPGRADES PROJECT YARD PIPING PLAN REV APPROVED W��- �MIUS 540 GW..M A� &A. C=PCIArWM OWN CHKD REMARKS C-6 '5 iE N No. 'A -mm T.Z. OSBORNE - PACKAGE 3 DAM JANLI� IF NC Lkxxae NO. F'-0atz 90% SUBMITTAL - NOT FOR CONSTRUCTIOF 4 l' N 1 p ' o Ij I DESILT EXISTING �UTFALL STRUCTI REGRADE AREA IN!FRONT OF OUTF a i SEE PROI ff I J1 INSTALL RIPRAP; 19' THICK rc ! A � w F � I o f o INSTALL COFFER DAM AS REQUIRED TO FACILITATE CONSTRUCTION. COFFER DAM SHALL BE DESIGNED BY THE CONTRACTOR, SIGNED z AND SEALED BY A PE REGESTERED IN THE STATE OF NORTH CAROLINA, °w AND SUBMITTED TO THE / ENGINEER FOR APPROVAL PRIOR TO SUBSTANTIAL m COMPLETION CONTRACTOR o SHALL REMOVE THE COFFER '-' DAM IN ITS ENTI �d Vl U w O O K w w �d z :u E 0 7i a b O a a Q s O K a w z � � O U d TIE E a � w o N8 I h v W 9 m O Z G � 4 VF � rn �F�¢w r'ti °0.l aw «Vw a c V O DATE ORWN CHKO x� nOx f PLAN 1/4• F 1' -O' CITY OF GREENSBORO NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT T.Z. OSBORNE - PACKAGE 3 710' 700- m E 9 zz zo fi9D- r a 680- 670 0-x00 c7::>' N—o 1' = 20- 100 \. IOT.CONTRACTOR SHALL INCLUDE IN THEIR BID TO EXCAVATE AND SURVEY /LOCATE ALL EXISTING UTILITIES PRIOR TO PREPARING YARD PIPING SUBMTTTAiS. ADJUST YARD PIPING AS REQUIRED TO ACCOMMODATE FIELD VERIFIED LOCATIONS. EXISTING 1 Mil 1!: . JUNCTION BOX 1' = 20' HORZ 1' = 5' PERT. m BY: J. CARRION CDM Err, Y. CARRION CH1i CONNECT TO EXIST 6" SCUM -DI I 6 "x45' BEND, TYP� o ! 2 -6 'x45' BEND CL EL 716.50 N f € m I j SEE CONFECT SECTION 2 i I i z + I F r -10' PW -DIP -' 0. - - \ "ELEC SKV SYSTI o �..__- _��_8 \ \ \" SCUM- D!P_ -- Ix 6" SCUM -DIP 4 V SY, 6" SCUM - DIP -- _ A -6" SCUM -DIP - 3 i a CUT AND REMOVE EXIST 6" SCUM -DI- - -6 WAS- 01-- ...�`- I AS REQUIRED TO \ - N- '-- _.. - -- { FACILITATE NEW PIPE I - `,. t\ -14" 0 -D! o I INSTALLATION. r ! CAP AND ABANDON IN i f a PLACE REMAINING LINE '6 "x45' BEND, TYP 4- 6'x45' BEND 0 4�\• I �n SEE CONFLICT SECTION 1 I I I I z q i 1 `14. SOLIDS NANDUNG BUILDING Gtr � SEE CONFLICT SECTION 3 1 SCUM PRECONCENTRATOR YARD PIPING PLAN - - - - -- _ £X GRADE EL 722.6 10• PW -Dl CL EL 719.50 480 V 5 KV m z 12 - SER W -DID f CL EL 718.00 6' SCUM -DI CL EL 716.50 UTILTIY CONFLICT SECTION 2 1" = 5'-•0' - DESIGNED 9Y. J. WILIAMS 1 a DRAWN 61r Y. CARRION a NS smfth pang SHEET Cwc'D 61': J. HOFFMAN CROSS CHK'D BY. B. VALL IAM T, } Rb DATE ORWN CHKB RELY RI(9 APPROVED BY: J. MILLS � I 3W S a 4¢ IIATE: _. JANUARY 2013 5e:t,NCZTSI2 I"TOIOHB7_ O `_I cs) j E O ELECTRICAL SUB - STATION NO. 3 I F0 2 -2" C £L £C DUCT £CEC DUCT mZ 6" SCUM -DI 6 'x90' BEND --RA-- - --BEND-------------------------------------------------------------- BEND ;P BEND SEE COI - -- " ---_� / CUT AND REMOVE EXIST 6• SCUM-DI _ AS REQUIRED TO 30 FACILITATE NEW PIPE INSTALLATION. OR � {E f f ' I of Cl I CLEANOUF -6' GR -DI -- ° LLo THICKENED SLUDGE HOLDING TANK a i I r _ o a I I W Z ---------------------------------- - - - - -- cuaDF_EC_7z3 - ° CONNCET TO EXIST 6" SCUM -DI - --- -_ 6 "45' BEND 6" 45' BEND -- -- ----- IA COUPLING, RJ CL EL 719.75 CL EL 739JS 0 8" PW -DI C. EL 719.50 4" PW -D! CL EL 7 f 9.5p c CL8 EL 19.50 = a o Y - - - -14' RL -01 CL EL 71725------ - ----_ -- - - - -- Uv °Q 6" SCUM -OF 6" 45' BEND 6" SCUM -DI CL EL 716.50 BEYOND - -- 6" 45' BEND CL o EL 716.50 z a UTILTIY CONFLICT c6 EL 736.50 SECTION rl 1. U Z 4°f ° � o a N � �hn ¢U WI �oici� SOLIDS NANDUNG BUILDING Gtr � SEE CONFLICT SECTION 3 1 SCUM PRECONCENTRATOR YARD PIPING PLAN - - - - -- _ £X GRADE EL 722.6 10• PW -Dl CL EL 719.50 480 V 5 KV m z 12 - SER W -DID f CL EL 718.00 6' SCUM -DI CL EL 716.50 UTILTIY CONFLICT SECTION 2 1" = 5'-•0' - DESIGNED 9Y. J. WILIAMS 1 a DRAWN 61r Y. CARRION a NS smfth pang SHEET Cwc'D 61': J. HOFFMAN CROSS CHK'D BY. B. VALL IAM T, } Rb DATE ORWN CHKB RELY RI(9 APPROVED BY: J. MILLS � I 3W S a 4¢ IIATE: _. JANUARY 2013 5e:t,NCZTSI2 I"TOIOHB7_ O `_I cs) j E O ELECTRICAL SUB - STATION NO. 3 I F0 2 -2" C £L £C DUCT £CEC DUCT mZ 6" SCUM -DI 6 'x90' BEND --RA-- - --BEND-------------------------------------------------------------- BEND ;P BEND SEE COI - -- " ---_� / CUT AND REMOVE EXIST 6• SCUM-DI _ AS REQUIRED TO 30 FACILITATE NEW PIPE INSTALLATION. O `_I cs) j E O ELECTRICAL SUB - STATION NO. 3 I F0 2 -2" C £L £C DUCT £CEC DUCT mZ 6" SCUM -DI TO EXIST 6' SC 6'x90' 6' 45" BEND EL 716.59 45' SEND EL 716.50 480 V 14'x45' o XJU rltNL? ♦. 8'x6" RED -8 "x6" TEE 2 -8 "x45' BEND -TO CLEAR EXIST UTILITIES, TYP ----- -.CUT AND REMOVE - EXIST 14" D -DI AS REQUIRED z� -_- INSTALL; 14' WYE 14 "x4' TEE 2 -14' COUPLING 14' DIP AS REQUIRED J2- B'x45' BEND - -- - TO CLEAR EXIST UTILITIES, TYP I 12"x8' RED 6 "x45' BEND _ T2 "x6' TEE 1 SCUM jj PRECONCENTRATOR 722.43 UTILTiY CONFLICT SECTION 3 1" = 5' -0• - EX CG£ £L 721.83 6 'x90' BEND --RA-- - --BEND-------------------------------------------------------------- BEND ;P BEND SEE COI - -- " ---_� / CUT AND REMOVE EXIST 6• SCUM-DI _ AS REQUIRED TO 30 FACILITATE NEW PIPE INSTALLATION. TO EXIST 6' SC 6'x90' 6' 45" BEND EL 716.59 45' SEND EL 716.50 480 V 14'x45' o XJU rltNL? ♦. 8'x6" RED -8 "x6" TEE 2 -8 "x45' BEND -TO CLEAR EXIST UTILITIES, TYP ----- -.CUT AND REMOVE - EXIST 14" D -DI AS REQUIRED z� -_- INSTALL; 14' WYE 14 "x4' TEE 2 -14' COUPLING 14' DIP AS REQUIRED J2- B'x45' BEND - -- - TO CLEAR EXIST UTILITIES, TYP I 12"x8' RED 6 "x45' BEND _ T2 "x6' TEE 1 SCUM jj PRECONCENTRATOR 722.43 UTILTiY CONFLICT SECTION 3 1" = 5' -0• - EX CG£ £L 721.83 6 'x90' BEND --RA-- - --BEND-------------------------------------------------------------- CITY OF GIREENS90R0 NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT TZ.OSBORNE- PACKAGE 3 6" SCUM -DI 12" STRAP SWR -RCP 1lJV £L 716.83 6" SCUM -D1 CL EL 718.00 CONNECT TO EXI! f" SCUM -DI 6 "x45' BEND BEND - 4'x45' BEND 1 EX GRADE &L ?'27.14 TEE 14• D »DI '- 12 "x8" RED CL £L 714.75 SEE M FOR CONT YARD PIPING PLAN 1" = 10'10' 5 0 70 NOTES. 1. CONTRACTOR SHALL INCLUDE IN THEIR BID TO EXCAVATE AND SURVEY /LOCATE ALL EXISTING UTILITIES PRIOR TO PREPARING YARD PIPING SUBMITTALS. ADJUST YARD PIPING AS REQUIRED TO ACCOMMODATE FIELD VERIFIED LOCATIONS. 2. WHEN CROSSING UNDER EXISTING UTILITIES (PIPES, FIBER OPTIC. ELEC DUCT BANKS, ETC) CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING CONTINUING USAGE OF THE UTILITY DURING CONSTRUCTION. 3, CONTRACTOR SHALL BE RESPONSIBLE FOR SHORING AND PROTECTING UTILITES DURING CONSTRUCTION, 321,6.111 PROJECT NO. 6145 -62159 FILE NAME COOSYPPLDW SHEET N0. { f -8 § � f § � \ \ � / ) 7 } / § » - m { ) ! A k f 7 [!� , §i� § § \ \k\ jk \/§ 2222a k`)4E §( k\.9 In z 0 0 a PRIMARY SET! o TANKS No" 1 z 3 � I U ` It — It o / 4 a q € I a Ilj 0 � � f o z w � m � { I ii✓ N ❑ U 0 a a 2 w W w a ° J ¢ _ r3 w z n U � U E 4w 2 o � I j z - o H o a � z o n m N \a z U F m �zs a o 'I Q � � q uia ayo � � o as o VO IS � °. x� aOrc i 4 flNAL SETTLING 1 I FINAL STRING { TANK No.3 TANK No.4 I / € INSTALL BLOCK AND GRAVEL } I INLET PROTECTION (TYP.) t u I 1, i >~ a � 1 'fir I �, /y�� o •; % —� i 'off' l F 1 � � --- I 11 J L L� SCUM ✓�� TNICKENED SLUDGE PRECONCENTRTOR I GRAVITY SLUDGE HOLDING TANKS I� THICKENERS AND /j-� ) iii���� SOLIDS NANOLTNG \ PUMP STATION \\ j BUILDING '� 1 F INSTALL GRAVEL AND RIP AP FILTER BERM BASIN (TYP.) -/ a EFFLUENT FILTERS e WETLANDS *D -6 CHLORINAAON BUILDING CONTACT TANK AND I - -- Al — a ��1 000 CHLORINE CONTACT TANK AND CASCADES CITY OF GREENSBORO NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT T.Z. OSBORNE — PACKAGE 3 cI f". a STORAGE 100-8 fl I qw5 CHLORINE _.. CONTACT TEMPORARY B SILT FENCE (TYP.) O_ 44he 1. =40. za�o"�40 ` } fF ` \ -.�.. e �' WETLANDS URWN CHKD REMARKS DESIGNED B1': J. WILLIAM CDM DRAWN ar SHEET CHK'D BY v- CAHRroN J. HOEFMAN Smith *D -6 CHLORINAAON BUILDING CONTACT TANK AND I - -- Al — a ��1 000 CHLORINE CONTACT TANK AND CASCADES CITY OF GREENSBORO NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT T.Z. OSBORNE — PACKAGE 3 cI f". a STORAGE 100-8 fl I qw5 CHLORINE _.. CONTACT TEMPORARY B SILT FENCE (TYP.) O_ 44he 1. =40. za�o"�40 CROSS CHK'D ar: B. WILLIAAIS APPROVED Ef: J- MILLS DATE:__- JAAHIARY 2013 �' DATE URWN CHKD REMARKS *D -6 CHLORINAAON BUILDING CONTACT TANK AND I - -- Al — a ��1 000 CHLORINE CONTACT TANK AND CASCADES CITY OF GREENSBORO NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT T.Z. OSBORNE — PACKAGE 3 cI f". a STORAGE 100-8 fl I qw5 CHLORINE _.. CONTACT TEMPORARY B SILT FENCE (TYP.) O_ 44he 1. =40. za�o"�40 EROSION CONTROL PLAN T.Z. OSBORNE 90% SUBMITTAL: PROJECT N0, 6145 -82159 FILE NAME 0010ECPL OW SHEET NO, C -10 / EROSION CONTROL PLAN T.Z. OSBORNE 90% SUBMITTAL: PROJECT N0, 6145 -82159 FILE NAME 0010ECPL OW SHEET NO, C -10 \A/ G w c n R 111114 � � �F Hip" lil N H Jill 1' 50' L f-A -J, VsACL V9 -PACL V10-PACL P L AC ' 11 ' 4S 1 iI , i J 1� � A l i i 1 � I( , I V3-PACL D- V15-PACL "j\v X T! I N1- M 3/4" CHEMICAL D TUBING R N 'I F, INSIDE EXISTING % CASING PIUPC SEE CD-5 /-4.4,5' SEND (TYP) -PACE € ll�llli v -PACL 111 ; Iv i 4 REMOVE ALL HDPE PIPING AND CHEMICAL _ FEED TUBING FROM CHEMICAL FEED PUMPS TO FINAL DISCHARGE PIONTS /A 0 0 0 V11-PACL V12-PACL V13-PACL 4- CASING PIPE-PVC NOTES* SCH40 WITH 5/B- PACL TUBING TO HLTFR INFLUENT 1. SEE SHEET CD-S FOR ADDITIONAL INFORMATION ON CHEMICAL FEED VAULTS. <4 DESIONEO DS* ------jL—'MUJAMS CDMI CITY OF GWENSBORO PRW= KO. 6145-02159 DRAWN FILE NAMS.' C011CYPP,DWG SHEET CHK'D BY: J. HO Smith NORTH CAROLINA SHEET NO, CROSS CHK-Q W,- B. yfi WRF EXPANSION AND BNR UPGRADES PROJECT PACL YARD PIPING REV. APPRUVED —MILLS CW6 & C-1 1 IND. DATE DRWN CHKD REMARKS DAM 4MVARY 201 =NCj42:i;.2 I Tdt0;19)7W-R= T.Z. OSBORNE - PACKAGE 3 PLAN 0,12 90% SUBMITTAL NOT FOR ('()NqTRI IrMnN PAYED SURFACES UNIMPROVED SURFACES I, WEARING SURFACE 2 MILL AND RESURFACE ' 1" ENTIRE TRAVEL WAY ° AS SHOWN ON THE PLANS V 0 ORIGINAL PAVEMENT 0 THICKNESS oPAVEMENT F BASE 5 COURSES u K ADDITIONAL ABC DEPTH = ORIGINAL DEPd181111", (MIN THICKNESS EQUAL ORIGINAL BASE COURSE WHICHEVER IS GREATER0 TRENCH 3 UNDER PAVEMENT TRENCH BACKFSLL UNDISTRURBED EA 0 �a a 0 UNWSTURBED EARTH $ OR COMPACTED STRUCTURAL 3 FILL. SEE NOTE 2. z m ° r O z ° C U 0 w a � w1uln - CROWN TRENCH 18' MIN (TYP) BACKFIU 3" WN � _ c PIPE BEDDING/TRENCH BACKFILL DETAIL A NTS - CONCRETE PAD PIPE 00 +6" 12" THICK MIN NOTE ALL JOINTS TO BE HARNESSED SEE SPEC FOR DETAILS 45' BENT) 45' WYE BRANCH 7,-,.N LINE DIAMETER VARIES s" - p PIPE LINE CLEANOUT N 0 KEYWAY AND Y. CARRON DETAIL E ASPHALT OF n NTS - IfIST w U SURFACE COURSE E3�3i O_ ]z� Im 74 1 NEW BASE aU IJW ,� 4 1 & SUBBASE COURSE N m _� 1� HEAVY DUTY CLEANOUT 4 PRIME COAT HOUSING w CLEANOUT FERRULE (W/ PAVING NEW PAVING a RAISED OR O p 6 34 �S$�a z COUNTERSUNK HEAD) PAVEMENT OR = a FINISHED GRADE s 0 DATE � a 0 REMARKS U z No 3 REBARS (TYP) gPg � 4' 01 RISER PIPE a % � o At u w o RESTRAINED K o. PLUG OR LINE $, CONTINUATION--, � o a L a s� w1uln - CROWN TRENCH 18' MIN (TYP) BACKFIU 3" WN � _ c PIPE BEDDING/TRENCH BACKFILL DETAIL A NTS - CONCRETE PAD PIPE 00 +6" 12" THICK MIN NOTE ALL JOINTS TO BE HARNESSED SEE SPEC FOR DETAILS 45' BENT) 45' WYE BRANCH 7,-,.N LINE DIAMETER VARIES s" - p PIPE LINE CLEANOUT N 0 KEYWAY AND Y. CARRON DETAIL E ASPHALT OF n NTS - IfIST w U SURFACE COURSE E3�3i O_ ]z� Im 74 1 NEW BASE aU IJW ,� 4 1 & SUBBASE COURSE N m _� 1� Re�141 1z I T &(RiP)787— 4 PRIME COAT USE TRANSITION SLOPE 1:4 EXIST PAVING NEW PAVING O p 6 34 �S$�a c .°,, 0 DATE ORWN CHKD REMARKS J X � m Z W¢ U W J w vl io 1 1/2" ASPHALT SURFACE COURSE S -9.58 2 1/2" INTERMEDIATE COURSE 1 -19.08 AGGREGATE BASE COURSE MATCH EXISTING THICKNFSS +ID" 8' MINIMUM THICKNESS 10' STABILIZED SUB -r-nr m ace eaci.an r_•a PAVEMENT TRANSITION BETWEEN NEW UNDFSTURSEDJ AND EXISTING ASPHALT PAVEMENTS EARTH z DETAIL B TYPICAL ASPHALT PAVEMENT SECTION Z NOTES: NTS _ DETAIL C . m 0 :F z v NTS w - m 1. WHERE THE PIPES ARE tAID IN UNPAVED AREAS THE REMAINDER OF THE TRENCH SHALL BE FILLED WITH COMMON FILL MATERIAL w a COMPACTED IN LAYERS NOT TO EXCEED V TO 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D698. WHERE Sa PIPES ARE LAID IN PAVED AREAS, THE REMAINDER OF THE TRENCH SHALL BE FILLED WITH COMPACTED CRUSHED STONE IN LAYERS NOT TO EXCEED 6" TO 98% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY PASHTO T180. G 2. UNSUITABLE BEARING MATERIAL (SOFT, LOOSE OR ORGANIC SOILS) ENCOUNTERED AT PIPE SUBGRADE SHALL BE OVER - EXCAVATED TO THE TOP OF NATURALLY DEPOSITED SUITABLE SOIL OR TO A MAXIMUM OF 4 FEET BELOW THE PIPE INVERT (WHICHEVER IS LESS) AND BE REPLACED WITH COMPACTED STRUCTURAL FELL 3. WATER SHALL NOT BE PERMITTED IN THE TRENCH DURING CONSTRUCTION. DEWATER AS NECESSARY. • 10" MAX 4. ALL PIPE TO BE INSTALLED WITH BELL FACING UPSTREAM TO THE DIRECTION OF FLOW. 5. EXCAVATED MATERIALS MIXED WITH DELETERIOUS SUBSTANCES DURING CONSTRUCTION SHALL NOT BE USED FOR BACKFILLING. 6. FOR INSTALLATIONS IN PAVEMENT, ALL EXISTING PAVEMENT SHALL BE CUT SQUARELY WITH A SAW. WEARING SURFACE SHALL BE SAME TYPE AND THICKNESS AS THE EXISTING PAVEMENT. 7. TRENCH WIDTH VARIES WITH SIZE OF PIPE 8. THIS PIPE BEDDING/TRENCH BACKFILL DETAIL SHALL APPLY TO ALL PIPE SIZES. 9. IN PAVED AREAS, THE ENTIRE TRENCH BACKFILL SHALL BE SELECT COMMON FILL TO THE PAVEMENT SUBGRADE COMPACTED TO 98% MAXIMUM DRY DENSITY AS DETERMINED BY LABORATORY TEST ASTM 0698- BACKFILL IN UNPAVED AREAS SHALL BE COMMON FILL EXPANSION SLEEVE - •. PAL O• CORNER POST OR TERMINAL POST BANDS AT Q'0 • • • rF:6e3r BOTTOM TENSION 3001) PSI CONC. FOOTINGS - 72" OW SAW CUT EXISTING ASPHALT, PROVIDE WIRE FASTENERS AT KEYWAY AND Y. CARRON PLACEMENT OF NEW ASPHALT SURFACE BITUMINOUS CONC IfIST w U SURFACE COURSE WIRE &- 12" MIN Im 74 1 NEW BASE J. MILLS 1 & SUBBASE COURSE EXIST BASE COURSE 1� Re�141 1z I T &(RiP)787— 4 PRIME COAT USE TRANSITION SLOPE 1:4 EXIST PAVING NEW PAVING 1 1/2" ASPHALT SURFACE COURSE S -9.58 2 1/2" INTERMEDIATE COURSE 1 -19.08 AGGREGATE BASE COURSE MATCH EXISTING THICKNFSS +ID" 8' MINIMUM THICKNESS 10' STABILIZED SUB -r-nr m ace eaci.an r_•a PAVEMENT TRANSITION BETWEEN NEW UNDFSTURSEDJ AND EXISTING ASPHALT PAVEMENTS EARTH z DETAIL B TYPICAL ASPHALT PAVEMENT SECTION Z NOTES: NTS _ DETAIL C . m 0 :F z v NTS w - m 1. WHERE THE PIPES ARE tAID IN UNPAVED AREAS THE REMAINDER OF THE TRENCH SHALL BE FILLED WITH COMMON FILL MATERIAL w a COMPACTED IN LAYERS NOT TO EXCEED V TO 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D698. WHERE Sa PIPES ARE LAID IN PAVED AREAS, THE REMAINDER OF THE TRENCH SHALL BE FILLED WITH COMPACTED CRUSHED STONE IN LAYERS NOT TO EXCEED 6" TO 98% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY PASHTO T180. G 2. UNSUITABLE BEARING MATERIAL (SOFT, LOOSE OR ORGANIC SOILS) ENCOUNTERED AT PIPE SUBGRADE SHALL BE OVER - EXCAVATED TO THE TOP OF NATURALLY DEPOSITED SUITABLE SOIL OR TO A MAXIMUM OF 4 FEET BELOW THE PIPE INVERT (WHICHEVER IS LESS) AND BE REPLACED WITH COMPACTED STRUCTURAL FELL 3. WATER SHALL NOT BE PERMITTED IN THE TRENCH DURING CONSTRUCTION. DEWATER AS NECESSARY. • 10" MAX 4. ALL PIPE TO BE INSTALLED WITH BELL FACING UPSTREAM TO THE DIRECTION OF FLOW. 5. EXCAVATED MATERIALS MIXED WITH DELETERIOUS SUBSTANCES DURING CONSTRUCTION SHALL NOT BE USED FOR BACKFILLING. 6. FOR INSTALLATIONS IN PAVEMENT, ALL EXISTING PAVEMENT SHALL BE CUT SQUARELY WITH A SAW. WEARING SURFACE SHALL BE SAME TYPE AND THICKNESS AS THE EXISTING PAVEMENT. 7. TRENCH WIDTH VARIES WITH SIZE OF PIPE 8. THIS PIPE BEDDING/TRENCH BACKFILL DETAIL SHALL APPLY TO ALL PIPE SIZES. 9. IN PAVED AREAS, THE ENTIRE TRENCH BACKFILL SHALL BE SELECT COMMON FILL TO THE PAVEMENT SUBGRADE COMPACTED TO 98% MAXIMUM DRY DENSITY AS DETERMINED BY LABORATORY TEST ASTM 0698- BACKFILL IN UNPAVED AREAS SHALL BE COMMON FILL EXPANSION SLEEVE - •. PAL O• CORNER POST OR TERMINAL POST BANDS AT Q'0 • • • rF:6e3r BOTTOM TENSION 3001) PSI CONC. FOOTINGS - 72" OW O" L -SLOPE TOP OF FOOTING TO DRAIN CHAIN LINK FENCE DETAIL F NTS - NED BY: J. WILLIAMS WIRE FASTENERS AT LINE POST Y. CARRON 18" INTERVALS CHILD in'. TOP AND BOTTOM 3 STRAND BARBED RE 3' LATE WIRE . j J. MILLS S1�DDOW -mdA -- SLft3D0 _ O" L -SLOPE TOP OF FOOTING TO DRAIN CHAIN LINK FENCE DETAIL F NTS - NED BY: J. WILLIAMS A By. Y. CARRON CHILD in'. J. HOFFMAN Smith +�sas i CHWD By: B. WILUAMS O" L -SLOPE TOP OF FOOTING TO DRAIN CHAIN LINK FENCE DETAIL F NTS - NED BY: J. WILLIAMS A By. Y. CARRON CHILD in'. J. HOFFMAN Smith i CHWD By: B. WILUAMS WED By: J. MILLS S1�DDOW -mdA -- SLft3D0 _ JANUARY 2013 Re�141 1z I T &(RiP)787— 3 STRAND BARBED WI GATE POST, 4" NOMOD STEEL OR EQUAL BAR BANGS AT 12" INTERVALS STRETCHER BAR LATCH BRACE TUBE y,ll TRUSS ROD }> SLOPE TOP OF FOOTING TO DRAIN -12" DIA TENSION WIRE PEDESTRAIN CHAIN LINK FENCE GATE DETAIL NTS CITY OF GREENSBORO NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT T.Z. OSBORNE - PACKAGE 3 REFER TO� STANDARD IN 45' OR 22 -1/Z BENDS W/ DETAIL P -3 MEGALUG 1100 SERIES (,DESIGN TABLE RESTRAINED JOINT ADAPTERS FOR T1iRU5T SPECIAL UTILtTY CROSSING (TYP.). 13E5M CONCRETE SIDEWALK DETAIL D NT5 - ' 36' MIN. COVER NOTE a, tin. I 91N� FITTING TYPE FOR PIPE LENGTH REQUIREMENTS FINISHED GRADE OBSTRUCTION SEE NOTE 4. SLOPE UP TO Y�36' MIN. COVER r� 10' MIN. 10' MIN. SPECIAL IIiTLITY CROSSING DEFLECTION TYPE 1. THE DEFLECTION TYPE CROSSING SHALL BE USED WHEREVER POSSIBLE. ONLY UNDER SPECIFIC ORDERS BY THE ENGINEER SHALL THE FITTING TYPE CROSSING BE ALLOWED. 2. CONSTRUCT DEFLECTION CROSSING USING 75% OF MANUFACTURER'S MAXIMUM JOINT DEFLECTION. 3. ALL MECHANICAL JOINTS SHALL BE RESTRAINED PER CITY STANDARDS. 4. UNLESS SHOWN OTHERWISE, 18' MEN, CLEARANCE WILL BE REQUIRED FOR WATER AND SEWER MAIN CROSSINGS. 6' MIN, CLEARANCE WILL BE REQUIRED FOR OTHER TYPE OF UTILITIES CROSSINGS. S. IF DEFLECTION CANNOT BE OBTAINED THEN USE PIPE CASING AS SHOWN IN 'PIPE CASING DETAIL' 12' VARIES SEE PLAN 3/4" RADIUS z• a' FTN GRADE TOP sDIL s , 6 K 10 /I0 wrrF 0 WALK SECTION 1 4" EXP `a /c"urRADIUS 4"— EXISTING UTILITY CROSSING DETAIL NTS - -� PAVING AND GRADING DETAILS PROJECT N0. 6145 -82159 FILE NAME. lr CD0ICDTL -DWI SHEET N0. CD -1 3lLal z N 0 U 0 z 0 N 0 3 0 3 U a a w s s r c a a 0. K 0 3 z m 0 z Q 0 z a iz > 0 a a �d d 0 o U v z 0 ga A � / z 0 i U � O a Z 4 o a N z a o, v � O s In H� o� poNo m x� 4 N /may Xs;io� EXISTING OU GRND 1. MINIMUM EROSION CONTROL REQUIREMENTS ARE AS SHOWN ON THE DRAWINGS. EROSION CONTROL SHALL MEET All APPLICABLE LOCA7, STATE AND FEDERAL LAWS AND REGULATIONS, CONTRACTOR SHALL MODIFY EROSION CONTROL MEASURES AS NECESSARY TO MEET LAWS AND REQUIREMENTS OF REGULATORY AGENCIES AT NO ADDIRONAL COST TO OWNER. d E 2. EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL BE INSTALLED PRIOR TO PERFORMING ANY DEMOLMON WORK OR EXCAVATION IN ANY AREA AND SHALL BE MAiNTAINED DURING WORK AND REMOVED WHEN FINAL RESTORATION IS COMPLETED. 3. CONTRACTOR SHALL MAKE A VISUAL INSPECTION OF ALL EROSION AND SEDIMENTATION CONTROL I FACILITIES AT LEAST ONCE PER WEEK AND PROMPTLY AFTER EVERY RAINSTORM, REGARDLESS OF SIZE, a I AND SHALL REPAIR FACILITIES AS NECESSARY. 4. TEMPORARY SEEDING AND MULCHING SHALL BE PERFORMED WITHIN 14 DAYS OF SACKFILUNG TO FINAL GRADE UNLESS FINAL GRADING AND PERMANENT SEEDING IS ANTICIPATED WITHIN 21 DAYS EXCEPT AS MODIFIED IN NOTE B BELOW. TEMPORARY SEEDING SHALL BE WITH ANNUAL RYE GRASS AT 5 POUNDS PER 1,000 SQUARE FEET. MULCHING SHALL BE WITH STRAW AT 100 POUNDS PER 1.000 SQUARE FEET. 50' MINIMUM PUBLIC EXISTi ROW GROUN UNDERLAY EXTENTS OF CONSTRUCTION ENTRANCE WITH CEOTEXTILE FABRIC (MIRAFI 140N OR EQUAL) 5. PERMANENT SEEDING AND MULCHING SHALL BE PERFORMED AS FOLLOWS (UNLESS NOTED OTHERWISE) - 10 -10 -10 FERTILIZER SHALL BE INSTALLED AT 800 LBS /ACRE - LIME SHALL BE INSTALLED AT 1.5 TONS /ACRE - SEEPING SHALL INCLUDE KY 31 TALL FESCUE AT 150 LBS /ACRE & CREEPING RED FESCUE AT 50 LBS /ACRE - STRAW MULCH SHALL BE INSTALLED AT 2 TONS /ACRE. 6. DIVERSION DITCHES SHALL BE INSTALLED TO DIVERT RUN -OFF AROUND ALL CONSTRUCTION AREAS, INSTALL ROCK OR HAY -BALE CHECK DAMS EVERY 100 FEET IN ALL DIVERSION DITCHES. 7. STABILIZED CONSTRUCTION ENTRANCES SHALL BE PROVIDED PER DETAIL A ON THIS SHEET. CONTRACTOR SHALL FOLLOW ALL LOCAL GUIDELINES AND REGULATIONS REGARDING CONSTRUCTION ENTRANCES. NOTES. 1. PROVIDE APPROPRIATE TRANSHTON BETWEEN STABLIZED CONSTRUCTION ENTRANCE AND PUBLIC RIGHT -OF -WAY. 2. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT -OF -WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE OR ADDING STONE TO THE LENGTH OF THE ENTRANCE. 3. REPAIR AND CLEANOUT ANY MEASURES USED TO TRAP SEDIMENT. 4. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC RIGHT- OF-WAY MUST BE REMOVED IMMEDIATELY. STABILIZED CONSTRUCTION ENTRANCE DETAIL A NTS INSTALL SILT SACK SEDIMENT CAPTURE DEVICE I"' — #5 WASHED STONE TEMPORARY SEDIMENT POOL STAKES )O STAKES (1/4- TO 1/2- GRID OPENING) MESH r CONCRETE BLOCK -- ! ■ ■ II ■ BLOCK AND GRAVEL INLET PROTECTION DETAIL D NTS - REMARKS DROP INLET WITH GRATE BASINS ONLY DUMP LOOPS'ly (IiEiLV1 NOT INIX.Wm) �• p NED 6Y• J. WILLWAS y BY- Y. CARRION CHWD BY. d. HOFFMAN i CNK'D DY: B. WILL44M5 NED Dy- J. W1LL5 ,,MLIARI 2013 DROP INLET OR CATCH BASIN (SEE CIVIL SHEETS C -3 AND C -4) EXPANSION RESTRAINT 06TN.IATON OEfNL 510E VIEW INSTALLED ELEVATION .W1.4 I 100: OF Fi -F 8' TRY 8' TEMPORARY SILT FENCE DETAIL B KITS - MI5 WASHED STONE 6" MIN. THICK X 3' HIGH (MIN) FLOW vti SECTION CLASS I RLP RAP !i Dior I i 3: NOTES: • - 1. PLACE FILTER FABRIC BENEATH RIPRAP. OUTLET PROTECTION SHALL BE PLACED AT ALL STORMWATER PIPE DISCHARGE LOCATIONS. 2, SEE PLAN SHEETS FOR APRON LENGTH, WIDTH, THICKNESS. 3. RIP RAP SHALL BE CLASS B STONE SEDIMENT STORAGE AREA VOLUME REQUIRED: _ (CF) 95 WASHED STONE SEDIMENT STORAGE ZONE ```''' -��� 2 CLASS I RIP RAP GE ZONE H STORMWO R STORA FINISH GRADE �Ip n nm I pip MAX. SEDIMENT DEPTH (CLEAN OUT POINT) GFNFRAI NOTFS' SEC€ION I. GRAVEL AND RIP RAP FILTER BERM BASIN SHOULD BE USED TO PROTECT EXISTING PIPE INVERTS THAT DRAIN 10 ACRES OR LESS. RIPRAP OUTLET PROTECTION DETAIL C NTS 2. DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTED UNLESS OTHERWISE NOTED. INLET SEDIMENT CONTROL DEVICE WITH CURB DEFLECTOR GRAVEL AND RIPRAP FILTER BERM BASIN DETAIL E DETAIL F NTS - NIT _ CDMI CITY OF GREENSBORO Smith NORTH CAROLINA c­Pe_1i1w ft& 5i WRF EXPANSION AND BNR UPGRADES PROJECT EROSION CONTROL DETAILS 5900 GL,% EA,�um some Soo T.Z. OSBORNE - PACKAGE 3 R-wIgN NC27512 I T.1:I9191 m-mal PROJECT NO. 6M-B2159 FILE NAME: CD02CMLOWI SHEET NO. CD -2 - NOT FOR CURB 1" REPAR FOR BAG O OPENING REMOVAL FROM INLET (RER R NOT INCLUDED) OPTIONAL OVERFLOW ` SkTSACK� -�� \ ` FOAM DEFLECTOR TO I INSTALLED IN CURB CATCH B I} I NED 6Y• J. WILLWAS y BY- Y. CARRION CHWD BY. d. HOFFMAN i CNK'D DY: B. WILL44M5 NED Dy- J. W1LL5 ,,MLIARI 2013 DROP INLET OR CATCH BASIN (SEE CIVIL SHEETS C -3 AND C -4) EXPANSION RESTRAINT 06TN.IATON OEfNL 510E VIEW INSTALLED ELEVATION .W1.4 I 100: OF Fi -F 8' TRY 8' TEMPORARY SILT FENCE DETAIL B KITS - MI5 WASHED STONE 6" MIN. THICK X 3' HIGH (MIN) FLOW vti SECTION CLASS I RLP RAP !i Dior I i 3: NOTES: • - 1. PLACE FILTER FABRIC BENEATH RIPRAP. OUTLET PROTECTION SHALL BE PLACED AT ALL STORMWATER PIPE DISCHARGE LOCATIONS. 2, SEE PLAN SHEETS FOR APRON LENGTH, WIDTH, THICKNESS. 3. RIP RAP SHALL BE CLASS B STONE SEDIMENT STORAGE AREA VOLUME REQUIRED: _ (CF) 95 WASHED STONE SEDIMENT STORAGE ZONE ```''' -��� 2 CLASS I RIP RAP GE ZONE H STORMWO R STORA FINISH GRADE �Ip n nm I pip MAX. SEDIMENT DEPTH (CLEAN OUT POINT) GFNFRAI NOTFS' SEC€ION I. GRAVEL AND RIP RAP FILTER BERM BASIN SHOULD BE USED TO PROTECT EXISTING PIPE INVERTS THAT DRAIN 10 ACRES OR LESS. RIPRAP OUTLET PROTECTION DETAIL C NTS 2. DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTED UNLESS OTHERWISE NOTED. INLET SEDIMENT CONTROL DEVICE WITH CURB DEFLECTOR GRAVEL AND RIPRAP FILTER BERM BASIN DETAIL E DETAIL F NTS - NIT _ CDMI CITY OF GREENSBORO Smith NORTH CAROLINA c­Pe_1i1w ft& 5i WRF EXPANSION AND BNR UPGRADES PROJECT EROSION CONTROL DETAILS 5900 GL,% EA,�um some Soo T.Z. OSBORNE - PACKAGE 3 R-wIgN NC27512 I T.1:I9191 m-mal PROJECT NO. 6M-B2159 FILE NAME: CD02CMLOWI SHEET NO. CD -2 - NOT FOR I� I i i I e a � a � v / c o � r, c 2 V O cc DD Z °u � a a C 4 N Z — w Ida N �8 � 4 � S ❑ % � m ¢ w�3 aW d n x_ nO� o a W W 4 2 r[i[erca SECTION 1 1" = 10• 0 CHLORINE NK 60" FSE -DI E EFFLUENT ftLTERS CL EL 715.63 3 / EXIST. 42` ESE �ct EL r7r6.5e EXIST. 36' STORM DRAIN -RCP INV EL 1-707,24 ' EXIST. 42" FSE CL EL 1-704.00 SECTION 1" = 10• C-5 SECTION 2 T" = 10' 2 -6' SUMP C -5 DISCHARGE 4" SPD I 4 -2' SAMPLE EINES -PVC 2" SBS -PVC 8" STORM DRAW -DI I CHLORINATION OUILDING 3" SUMP DISCHARGE TO REMAIN / INSTALL. MASONRY PLUG IN EXHAUST LINE REMOVE REMAINDER TO INCLUDE WINGWALL 14' SW TO REMAIN 12" CWS, ABA[ TO BE RI 8" CWR, AI TO BE Smith c400 Wn W mC ft ft. s+;w Glertnco0 A,rerFln. SuRe3ao REPLACE ASPHALT PAVEMENT AND BASE. MATCH EXIST SLOPES AND ELEVATIONS B° PW -DIP %�18" SW -OIP / 04" CHLORINE -PVC 4" CHLORINE RELOC TO BE mm S Z m = 6- SUMP DISCHARGE . TO BE RELOCATED RELOCATED HYPO SPLITTER BOX EXIST. 35' STORM DRAIN -RCP INV EL 1-714.73 EXIST Y6- WAS -Or INV EL .1 777.06 50 "X46' TEE CL EL 711.35 CONTACT SUMP DISCHARGE BE RELOCATED REMOVE EXHAUST AND WINGWALL 6' STORM DRAIN TED *A54' INF -DI TO BE RELOCATED 'FA ONED IOVEO ! 4 SECTION 5 1' — 5• c —s CITY OF GREENSBORO NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT T.Z. OSBORNE - PACKAGE 3 y O m� y Y L 48 "X45' BEND _W CL EL 715.43 48 "X45' SEND CL EL 711.35 SECTION 3 1" NOTES- 1. EXISTING SPIES SHOWN BASED ON INFORMATION OBTAINED FROM RECORD DRAWINGS. CONTRACTOR TO FIELD VERIFY LOCATIONS. SIZES, AND MATERIAL PRIOR to BEGINNING WORK. 2. WHEN RELOCATING GRAVITY DRAIN LINES PROVIDE A CONSTANT SLOPE FROM THE TIE IN POINT TO THE POINT" OF RECONNECT OR DISCHARGE. 3. MAINTAIN A MINIMUM OF 18- INCHES OF VERTICAL CLEARANCE BETWEEN PROPOSED PIPE WORK AND EXISTING UTILITIES. IF 18- INCHES CANNOT BE ACHIEVED INSTALL A CONCRETE CRADLE BETWEEN THE PROPOSED PIPE AND THE EXISTING UTIEITY. 4. MAINTAIN A MINIMUM OF 36" OF COVER OVER ALL NEWLY INSTALLED PIPES. PIPE PROFILES 90% SUBMITTAL - ECT NO. 6145 -62159 NAME: CDD3CDTLDWG SHEET NO. CD -3 DESIGNED BY; B. W1L JAMS DRAWN BY• Y. [ARNiON SHEET CNKD BY: J. WILLIAM CRGSS CHK•D BY: J. IAIElS NO DATE DRWN CHKD R(]JARK5 APPROVED 6f: B. KILLIAIds DATE: JANUARY 2013 Smith c400 Wn W mC ft ft. s+;w Glertnco0 A,rerFln. SuRe3ao REPLACE ASPHALT PAVEMENT AND BASE. MATCH EXIST SLOPES AND ELEVATIONS B° PW -DIP %�18" SW -OIP / 04" CHLORINE -PVC 4" CHLORINE RELOC TO BE mm S Z m = 6- SUMP DISCHARGE . TO BE RELOCATED RELOCATED HYPO SPLITTER BOX EXIST. 35' STORM DRAIN -RCP INV EL 1-714.73 EXIST Y6- WAS -Or INV EL .1 777.06 50 "X46' TEE CL EL 711.35 CONTACT SUMP DISCHARGE BE RELOCATED REMOVE EXHAUST AND WINGWALL 6' STORM DRAIN TED *A54' INF -DI TO BE RELOCATED 'FA ONED IOVEO ! 4 SECTION 5 1' — 5• c —s CITY OF GREENSBORO NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT T.Z. OSBORNE - PACKAGE 3 y O m� y Y L 48 "X45' BEND _W CL EL 715.43 48 "X45' SEND CL EL 711.35 SECTION 3 1" NOTES- 1. EXISTING SPIES SHOWN BASED ON INFORMATION OBTAINED FROM RECORD DRAWINGS. CONTRACTOR TO FIELD VERIFY LOCATIONS. SIZES, AND MATERIAL PRIOR to BEGINNING WORK. 2. WHEN RELOCATING GRAVITY DRAIN LINES PROVIDE A CONSTANT SLOPE FROM THE TIE IN POINT TO THE POINT" OF RECONNECT OR DISCHARGE. 3. MAINTAIN A MINIMUM OF 18- INCHES OF VERTICAL CLEARANCE BETWEEN PROPOSED PIPE WORK AND EXISTING UTILITIES. IF 18- INCHES CANNOT BE ACHIEVED INSTALL A CONCRETE CRADLE BETWEEN THE PROPOSED PIPE AND THE EXISTING UTIEITY. 4. MAINTAIN A MINIMUM OF 36" OF COVER OVER ALL NEWLY INSTALLED PIPES. PIPE PROFILES 90% SUBMITTAL - ECT NO. 6145 -62159 NAME: CDD3CDTLDWG SHEET NO. CD -3 - — - — - — - — - — - — - 'S4' INF-DI- i it r T4 6"S PVC TER INFLUENT CARRIECH 40 R PIPE WITH (3) 1" PVC HOCI UNES INS CONNECT TALL APPROXIMATELY .30' OF I" SCH 80 PVC HOCI 4E TO Ex1ST. __�OCI LINE To FILTER INFLUENT 1" To' --T 6" SCH 40 PVC CARRIER PIPE WTH I I" PVC HOCI LINES (Typ '3) (;AS GAS GAS - - - - - - GAS 0 - 7 - - - - - - - - - - - - - TAT" T SODIUM HYPOCHLORITE FACILITY 3j(' F 6"x22.5' BEND -PVC CONNECT EXIST. l' HOCI TO (TYP) NEW 1' HOCI WITH UNIONS 9'x5' CHEMICAL RACEWAY VAULT - - - - - - - - - - - - - - - - - - - - - - IC (VI-HOCI) SEE NOTE I --- CHLORINATION - - - - - - - - -- - - - - - - - - - - - - - - - - 6VILDING y 4" vcp-SS _4 CHEMICAL STORAGE FACILITY NOTE' 1. CONTRACTOR SHALL COORDINATE ALL DEMOLITION OF CHFMiCAL FEED LINES INSIDE THE CHLORINATION BUILDING DETAIL WITH THE ENGINEER AND OWNER PRIOR TO PERFORMING THE WORK. THE LINES THAT SHALL BE REMOVED ARE BEING 1' = lo'-O' RELOCATED TO OUTSIDE THE BUILDING SUCH THAT ALL CURRENTLY ACTIVE LINES REMAIN ACTIVE AFTER THE WORK IS COMPLETE. I- NPW/HOCL TO FILTER INFLUENT (Typ) EXIST PRECAST CONC VAULT r COUPLING (TYP) I- UNION W/ORIFICE 1" BALL VALVE ±6' EXIST 8'- 0 "x4' -O" ALUA4 ACCESS HATCH - F- — Z_ %D 2' BALL VALVE 2- CHECK VALVE nN GRADE EXIST 2' NPW 2" BALL VALVE 2' COUPLING 2" CHECK VALVE CONNECT TO EXIST NPW 2" NPW 2"x1 "x90- BEND 2" COUPLING n1l GR40E EXIST CONNECT TO EXIST NPW 2"Xi" TEE (TYP 6) CONNECT TO EXIST HOCL _ (TYP 6) 2'xl' TEE 00 1' COUPLING 4 11' BALL VALVE EXIST I HOCL 8- 957 STONE SECTION NOTES: PJ.M I. CUT MST HOCL AND NPW LINES, KEEP A MIN OF 12-imcES OF PIPE OUTSIDE 90% SUBMITTAL - NOT FOR CONSTRUCTIOP THE VAULT TO FACILITATE CONNECTING NEW PIPES. RELOCATED SODIUM HYPOCHLORIRE SPLITrER BOX 2, ALL VALVES, FITTINGS AND PIPE WITHIN THE VAULT SHALL BE REPLACED, IN DETAIL KIND, WITH NEW COMPONENTS. Nis (n 3. CALL OUTS AND DIMENSIONS ARE BASED ON RECORD DRAWINGS. FIELD VERIFY AND NOTIFY ENGINEER OF ANY VARIANCES PRIOR TO RELOCATION. OEMNEO 8Y• J. IWLUAMS CDMI CITY OF GREENSBORO PROVECT No. 6145-112159 DRAWN . Y. CARRION NORTH CAROLINA C FILE NAME: DD4YPPi-DW1 SHM CflK.D J. H Smith YARD PIPING PLAN DETAILS SHEET W. Cam CH 'D SY. 13• WIUlwS WRF EXPANSION AND BNR UPGRADES PROJECT C-p Dr— Md(m & tM 5400OW"'wdAvwn&I"M T.Z. OSBORNE WRF CD-4 REMARKS JANUARY 2016 RWW NC=12 I T.I:tqlg)?v-Sw T.Z. TZ OSBORNE - PACKAGE 3 OATS: INC Ll a No. F-0412 90% SUBMITTAL - NOT FOR CONSTRUCTIOP 4 x< PRE'CAF -_ C:J.vCR£TL vAUi i. I" HDPE FJ81NC RUN 1NSIOf 4 X` 'HF' -A5' 3/4" TUBING �� _x4' OF THC ilDPE PIPE CONCRE, VAJ1.T (TYP) c PRECAST -� 1/2" TUBING °s i CJNCRC7F VAVIT (TYP 2) z °w - - - -_ PIPE CLAMP PROVIDE PIPE =' - PROVIDE PIPE �f SUPPORTS AS i "� SUPPORTS AS _- REQUIRED '{ -- .-), REQUIRED' q T.: (TYP) k _. -tom { (TYP) 3/4" 7UBING� I 'a 3/4" TUBING TO CHLORINATION BUILDING. 1 (TYP) -_ ....'T 4" CASING -PVC REMOVE ALL HOPE PIPING SCH40 I L.�4 AND APPURTENANCES AND (TO REMAIN) I +' -0^ T'- R" i -" 17` -Q "I 5/8" TUBING LOCATED INSIDE OF THE HDPE PIPING. 4" PVC CASING PIPE TO REMAIN. 4'x4' PRECAST - 4" CASING -PVC CONCRETE VAULT \ SCH40 (TO REMAIN) 2" HDPE— } `___.: PE' iN ��nyo y. 9 n0 4 aw REV. OA1E ORWN CHKO REMARKS E CDM Smith 1/2" HOSE BARB I AND HOSE CLAMP � 1/2" TUBING °s i o w (TYP 2) z °w NOTE 1) °EJ I PIPE CLAMP j m F I �- 4' G.RSING -PV - C --- A SC440 (TYPj N I °n ! LIh 3/4" TUBING (2) TO SECONDARY CLARIFIERS B -10. 4 -C ! SCH40 (q EL 716.83) SEE NOTE 2. I- - i z FRP INSIDE OF THE HOPE 3/4" TUBING TO CHLORINATION BUILDING. TYPICAL VAULT PLAN ` NOTES: a PLAN 1. 3/4" TUBING SHALL BE ROUTED SECTIONAL PLAN VAULTS VI AND V3 —PACE THROUGH THE EXISTING 4' PVC CASING PIPES. VAULT V2 —PACL DETAIL B )I 2. ONE SPARE PIECE OF TUBING SHALL BE DETAIL C 1/2" = 1' -0" - RUN FROM THE PUMPS TO VAULT V8 -PACL AS A SPARE. SPARE TUBING 1/2" = 1' -0" - SHALL BE PLUGGED AT BOTH ENDS. PE' iN ��nyo y. 9 n0 4 aw REV. OA1E ORWN CHKO REMARKS E CDM Smith 1/2" HOSE BARB o AND HOSE CLAMP � 1/2" TUBING °s f, HOPE o w (TYP 2) z °w NOTE 1) °EJ I PIPE CLAMP j m F I { ! REMOVE ALL HDPE P €PING -'•° (INSTALLED BY OTHERS) (TYP)EQUIRED AND APPURTENANCES AND SCH40 (q EL 716.83) i 5/8" TUBING LOCATED z FRP INSIDE OF THE HOPE 3/4" TUBING TO CHLORINATION BUILDING. TYPICAL VAULT PLAN PIPING. 4" PVC CASING a PIPE TO REMAIN. 6" CASING -PVC d CHEMICAL PIPING DEMOLITION 1" HOCL CHEMICAL TUBING SCH40 CHLORINATION BUILDING DETAIL A (TO FILTER INFLUENT) (SEE M-10 FOR s SODIUM HYPOCHLORITE JUNCTION BOX U 1 1/2" EXP JT MATE BETWEEN BOX AND STRUCTURE 1/2" TUBING (2) TO o WALL OF STRUCTURE STRUCTURE SECONDARY CLARIFIERS 9 -10 a 1/2' TUB= AND V -10 -PACL) °d F F F 6. 0 v 0 3/4" TUBING o a 0 (2) N ° CORE- DRILLED HOLES WITH ° z COMPRESSIBLE _t LINK TYPE SEAL U uhi (TIP) - o r PROVIDE PIPE 3/4" TUBING (SPARE) _I a SUPPORTS AS V -0" TO V70 -PACL !% o(TYP) REQUIRED 4- CASING -PVC 8" STONE BASE - SCH40 (TYP) n n 4'x4' PRECAST _ CONCRETE VAULT 2 o a — NOTES: a u, 1. PLAN SHOWN FOR VB -PACL, V5. V6 AND p1 w V7 -PACL ARE EXISTING (NOT SHOWN) ° AND TUBING CONFIGURATION IS SIMILAR n a ° TO V8 -PACL V9 AND V10 -PACL ARE M ` CHEMICAL RACEWAY VAULT V8 —PACL CONFIGURATION TO VB PA�L� TUBING N2 mZ DETAIL E 2. NUMBER OF 4" PVC CASING PIPES >~� m w°o v 1/2" = 1' -0' - VARIES. A MAXIMUM OF 2 TUBES, MAY BE INSTALLED IN ONE CASING PIPE. ri q � Syr PE' iN ��nyo y. 9 n0 4 aw REV. OA1E ORWN CHKO REMARKS 1 P -L_ VAULTS V8, V9 AND V10 —PACL SECTION 2 1/2" = 1' -0' - NED BY- N ' $Y HAND RAIL CDM Smith 1/2" HOSE BARB i CHK'D BY: AND HOSE CLAMP 1/2 "x90' BEND 1/2" TUBING VALVE -CPVC ACCESS HATCH EL 733.00 (TYP 2) 1/2" OPVC NOTE 1) PIPE CLAMP " ' 4" FLOOR BOX AS eI -'•° (INSTALLED BY OTHERS) (TYP)EQUIRED 1 P -L_ VAULTS V8, V9 AND V10 —PACL SECTION 2 1/2" = 1' -0' - NED BY- N ' $Y F. CDM Smith ROTAMETER i CHK'D BY: TRUE UNION BALL WITH SUNSHIELD 1VED BY VALVE -CPVC (SEE NOTE 1) (TYP 2) 1/2" OPVC NOTE 1) SCHBO "�• WALL OF STRUCTURE 1/2 "x45' BEND -'•° 4" CASING PFPE PVC (TYP) SCH40 (q EL 716.83) PIPE SUPPORTS 1/2" HOSE BARB AND HOSE CLAMP WITH (1) 1" HOCL TUBE FRP 1/2" TUBING 3/4" TUBING TO CHLORINATION BUILDING. 3/4" CROSS -CPVC 4' CASING -PVC SCH40 �p TO SUMP PUMP 1 P -L_ VAULTS V8, V9 AND V10 —PACL SECTION 2 1/2" = 1' -0' - NED BY- N ' $Y J. WILLIAMS M. $MN0,4 CDM Smith I CHICO EY: J. HOFFMAN i CHK'D BY: B. WILLIAMS TUBING 1VED BY J. MILLS CaM Oresfar Mde -aISM GWWMW Avenue. Su JANUARY 013 RM W NGFT, I TGIN BACTOR DUCK SEAL - OR APPROVED EQUAL (SEE NOTE 1) CONNECT NEW 1" PIPING TO EXISTING i PIPING WITH SOLVENT WELD COUPLINGS TO EC TANK � TO PS? SCRUBBER Iva" � TO PST SCRUBBER ND.4 TO PST SCRUBBER N0.7 TO SHB SCRUBBER NO,7 o TO SHB SCRUBBER NO.2 TO 1P5 SCRUBBER NO.I TO IPS SCRUBBER N0.2 NOTES: 1. ROTAMETER SHALL BE INSTALLED ON THE CHEMICAL FEED LINES DISCHARGING TO SECONDARY CLARIFIERS 5 -10 (6 TOTAL }. ROTAME?ERS SHALL BE SECURELY FASTENED TO THE WALL WITH SST316 ANCHORS. ROTAMETER NOT INSTALLED ON FEED LINE TO SECONDARY CLARIFIERS 1 -4_ 2. GENERAL PIPING ARRANGEMENT SHOWN. SEE PLAN VIEWS FOR ADDITIONAL INFORMATION. 3/4" TUBING TO -- ;.IAN;, kAk Y14i.r. OF 57RUCTUR CLARIFIERS 5 -7 1/2" HOSE BARB �' c i - -1 - 1/2 'x90 BEND AND HOSE CLAMP PIPE SUPPORT EL 733.00 1 (TYP} I? 3/4" TUBING ....��._• 1/2 "x45' BEND I , 3 (TYP} 1/2' TUBING ' =f II 3/4" TUBING (2) = PIPE CLAMP 3/4" TUBING .R AS REQUIRED SEE NOTE 2 (1 SPARE) {TYP) TCASING -P ✓C I i 3/4" TUBING TO ' 5C1r4G ,'r'YP'' PROVIDE MPE - f SUPPORTS AS I ` 4' -0" f SECONDARY ROTAMETER Iy. I REQUIRED ! --�i CLARIFIERS 8 -10 (1) WN7i '.€ TRUE UNION BALL (TYP) a 1 SUNSHIELp VALVE --CPVC s 3/4" TUBING (SEE NOTE 1) ,•{ (TYP2) I (1 SPARE) I CONCR£1E VAULT 1 L. - -4` CASING -PVC 1/2" CPVC G -h SCH40 l:'Y?I SCH80 e� j '' L OF- STgUC7URC PLAN Illyy/ CHEMICAL RACEWAY VAULT V4 —PACL 112 "05' BEND I g^ (TYP) //-3/4" HOSE BARB i DETAIL D I`. AND HOSE CLAMP i AND 3/4 "x1/2" RED 1/2" = 1' -0" 3/4" TUBNG k G I EfE I I� 3/4" TUBING I. -• -P, INSTALL 2" CAP -PVC i 1" PVC SCHBO TO - - - -- FILTER INFLUENT BACTOR DUCK r •�t- -- - - -- - [ 1 SEAL OR 2'_D" APPROVED EQUAL 8" STONE \(SEE NOTE I NOTES: 1. ROTAMETER SHALL BE INSTALLED ON THE CHEMICAL FEED LINES DISCHARGING TO LINK SEAL SECONDARY CLARIFIERS 5 -10 (6 TOTAL), I ROTAMETERS SHALL 8E SECURELY VAULTS V4, V5, V6 AND V7 —PACL rE EL 715.19 FASTENED TO THE WALL WITH INSTALLED SECTION 1 ANCHORS. ROTAMETER NOT INSTALLED ON - - FEED LINE TO SECONDARY CLARIFIERS = 1 -4. 1/2" = 1` -0" .. I 2. GENERAL PIPING ARRANGEMENT SHOWN. SEE PLAN VIEWS FOR ADDITIONAL INFORMATION. 1" HOCL FULL COVER WATER CHEMICAL o TIGHT ACCESS HATCH TUBING AND I PRECAST CONCRETE I - - -- PVC SCH40 VAULT 5^ CASING PIPES (TYP 3) FROM �- HYPOCHLORITE BUILDING GRADE ,� ,.,, _ 1" UNION- PVC--- (TYP) 1" BV -PVC (TYP) 1" PVC SCHBO-/ SUPPORT WITH FRP SUPPORTS (TYP) SODIUM HYPOCHLORCIE JUNCTION BOX DETAIL F NOTE: 1. ALL VOIDS BETWEEN PVC CHEMICAL PIPING AND CONCRETE VAULT WHERE NO CASING PIPE IS USED SHALL BE FILLED WITH FLEXIBLE SEALANT (BACTOR DUCK SEAL OR APPROVED EQUAL). CITY OF GREENSBORO NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT T.Z. OSBORNE - PACKAGE 3 SECTION 3 112" = 1' -0" - NOTE: 1. ELEVATION OF 1" PVC SCHBO HYPOCHLORITE LINES SHOWN IS APPROXIMATE. CONTRACTOR SHALL FIELD LOCATE THE EXISTING 1" PVC CHEMICAL LINES AND INSTALL THE PENETRATIONS IN THE VAULT WALL ACCORDINGLY. PROJECT NO. 6145 -82159 FILE NAME: C005YPPLDW YARD PIPING PLAN DETAILS SHEET ND" CD -5 3" HOCL CHEMICAL J APPROX. � TUBING o �� I EL 7I6614 NOTE 1) ,I 1" H PVC ° -- EL 715.11 -- 4" CASING PFPE PVC SCH8O SCH40 (q EL 716.83) PIPE SUPPORTS WITH (1) 1" HOCL TUBE FRP TO CHLORINATION BUILDING. ( 2) �p TO SUMP PUMP 6" CASING -PVC DISCHARGE INSIDE 1" HOCL CHEMICAL TUBING SCH40 CHLORINATION BUILDING NO. 57 STONE (TO FILTER INFLUENT) (SEE M-10 FOR CONTINUATION) SODIUM HYPOCHLORITE JUNCTION BOX SODIUM HYPOCHLORCIE JUNCTION BOX DETAIL F NOTE: 1. ALL VOIDS BETWEEN PVC CHEMICAL PIPING AND CONCRETE VAULT WHERE NO CASING PIPE IS USED SHALL BE FILLED WITH FLEXIBLE SEALANT (BACTOR DUCK SEAL OR APPROVED EQUAL). CITY OF GREENSBORO NORTH CAROLINA WRF EXPANSION AND BNR UPGRADES PROJECT T.Z. OSBORNE - PACKAGE 3 SECTION 3 112" = 1' -0" - NOTE: 1. ELEVATION OF 1" PVC SCHBO HYPOCHLORITE LINES SHOWN IS APPROXIMATE. CONTRACTOR SHALL FIELD LOCATE THE EXISTING 1" PVC CHEMICAL LINES AND INSTALL THE PENETRATIONS IN THE VAULT WALL ACCORDINGLY. PROJECT NO. 6145 -82159 FILE NAME: C005YPPLDW YARD PIPING PLAN DETAILS SHEET ND" CD -5 � € | § § \ \ \ § ƒ § } ) } � ; 2 k / §I § 7 C #/ } `* E f kR �2 � -( \ \ /)\ ! « <k§ ;,��*