Loading...
HomeMy WebLinkAboutGW1-2021-02239_Well Construction - GW1_20210722 ='YELL CONSTRUCTION RECORD.(GW-Il For Internal Use Orly: Well Contractor Information: Grant Mason 19:WATE.20N '',; Contractor Name _ FROM TO DESCRIPTIO 4254A qgofL ys ft. ft. fit. N.W. Poole Well & PumpCo. FAOA1t[TES-GTOSING.foFmDlAhiEIERe� THICKNESS Well-Contractor Certification Number ESS MATERIAL +� rL ft. g In. 188 gals. ..ompany Name 16 INNER.CASII G..0AT.UBINM ."' g6iW:16661 Well Construction Pernlit N: FROM TO DIAMETER THICKNESS I MATERIAL 'A/all applicable ivell conso uction permits(i.e.U1C,County.Slat,Variance,etc.) ft. ft. In. �'dell Use(check well use): ft. ft. In. -dater Supply Well: `;1't:SCREEN:- _�, ;;: ,..:. ,:.. .. --- FROM TO DIAMETER.I SLOT SIZE THICKNESS I MATERIAL ;Agricultural E)Municipal/Public H, fL in. ^Geothermal(Heating/Cooling Supply) XDResidential Water Supply(single) R. ft. In. JIndustrial/Commercial D Residential Water Supply(shared) 18,GIRD .U:'T::: - _r)Irrrzi alion FROM TO MATERIAL EDIPLA7.EMENT METHOD&AMOUNT 24on-Water Supply Well: fL ft. ;_:Monitoring Recove rY fL ft. srjection Well: rhAquifer Recharge Groundwater Remediation ft. ft. .19 SANDIGRUVEI °ACK ifa""Ilceble �.quifer Storage and Recovery Salinity Barrier FROM TO I MATERIALI EMPLACEMENT h1EIHOD (!Aquifer Test OStormwater Drainage fL ft. �1Experimental Technology DSubsidence Control fL ft. Geothermal(Closed Loop) 13Tracer 30i;I)RILLINGLOG itticFiiiddltiotral.§heetflfltecessa'; _'.Geothermal(Heating/Cooling Return) nOther(explain under#21 Remarks) FROM TO DESCRH'TION(color hardness,solllroek min sin etc. U fft. 2 ft. s.Date Well(s)Completed: —.22- Z f Well IDN lJIf fL fL f t ;;.Well Location: / fL !�5 fL r�� V ft. J ft. /-.cilitydOsvner Name f J Facility IDN(i applic�able) ft. ft. L 5 re pl 202� F In4�rrf ari r Messing Unit 'h}sical Address,City,and Zip SO ft. ft. �1R See �n Parcel Identification No.(PIN) I Used hardened steel drive shoe. Latitude and longitude in degrees/minutes/seconds or decimal degrees: ell field,one latlong is sufficient) 3 k-0 J g U�7 J 55� 1 22.Certification: Aare)the vvell(s)Ex Permanent or OTernporary Signature of Certified Well Contra for Date 0y signing this form,I hereby cert yy that the ivelgs)was(were)constructed in accordance €s this a repair to an existing well: [D Yes or EJNo with 15A NCAC 02C.0100 or 15A NCAC 02C.0100 Well Construction Standards and that a f this is a repair,fill nut krtoivn well construction information and explain the nature of fine copy of this record has been provided to t/ne well owner. o:nair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: w'Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well onstruc(1on,only I GW-I is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. frilled: SUBMITTAL INSTRUCTIONS Total well depth below land surface: (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well nudtiple wells list all depths iJdereiu(example-3@200'and 1@!00') construction to the following: Z �Static water level below lop of casing: " (ft.) Division of Water Resources,Information Processing Unit, .rarer level is above casing,use 1617 Mail Service Center,Raleigh,NC 27699-1617 :.Borehole diameter: 6 (in.) 24b.For Iniection Wells: in addition to sending the form to the address in 24a Well construction method: above,also submit one copy of this form within 30 days of completion of well _e.auger,rotary,cable,direct push,etc.) construction to the following: j ^OR WATER SUPPLY WELLS ONLY: Division of Water Resources,Underground Injection Control Program, 1636 Mail Service Center,Raleigh,NC 27699.1636 ^'•Yield(gpnr) Method of test: Blow 24c.For Water SunDiv&Injection Wells: in addition to sending the form to HTH 1 lb. the address(el) above, also submit one Opy of this form within 30 days of i.Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016