Loading...
HomeMy WebLinkAboutNC0036269_Sampling Inspection_20220217United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) 1 21IIIIII 671 Transaction Code IN I 2 I5 NPDES yr/mo/day Inspection I 3 I NC0036269 111 121 22/02/01 117 Type 18 [ e IIIIIIIIIII Inspector Fac Type 191 S I 201 IIIIIIIIIIIIIIIIII I IIIIII P6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved I 70I3 I 711 1 72 I N I 731 I 74 71 I I I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES Dermit Number) Rocky River WWTP 6400 Breezy Ln Concord NC 280256972 Entry Time/Date 07:30AM 22/02/01 Permit Effective Date 21/11/01 Exit Time/Date 11:43AM 22/02/01 Permit Expiration Date 26/10/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// James Christian Sims/ORC/704-788-4164/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Travis M Fowler,232 Davidson Hwy Concord NC 280270428/Facilities Director/704-788-4164/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran Sludge Handling DispoFacility Site Review Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signa Roberto Scheller ure btpfjlwycytor(s) Agency/Office/Phone and Fax Numbers CSCIAILA., DWR/MRO WQ/707-235-2204/ Date 2/16/2022 "-91C2A007838943E... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date �Docusig� w 2/17/2022 �A14CC681AF27425... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 31 NPDES yr/mo/day N C 0036269 111 121 22/02/01 I17 Inspection Type 18i i (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The subject treatment facility is a 26.5 MGD Two stage, pure oxygen WWTP. The Permit became effective on November 1, 2021 and expires on October 31, 2026. Permit is for discharge to Rocky River which is listed as Class C waters in the Yadkin -Pee Dee River Basin. Flow is tiered for 26.6 MGD, 30 MGD and 34 MGD with current instream waste concentrations (IWC), pecent effluent, of 66.5% @ 26.5 MGD, 69% @ 30 MGD, 71.8% @ 34 MGD. Split samples for Chronic Toxicity were collected at time of inspection and results will be forwarded under separate cover. Toxicity samples were collected on February 1st and 3rd. Yearly average flow for calendar year 2021 was caculated @ 79.35% of permitted flow. At time of inspection effluent was clear with no visible suspended soilds. At point of discharge a small amount of foam was being generated but dissipated 50-60 feet downstream from discharge point. Page# 2 Permit: NC0036269 Inspection Date: 02/01/2022 Owner - Facility: Rocky River WWTP Inspection Type: Compliance Sampling Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ ❑ application? Is the facility as described in the permit? • ❑ El El # Are there any special conditions for the permit? • ❑ ❑ ❑ Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑ Comment: Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Comment: Records reviewed were readily available and orderly. Laboratory Are field parameters performed by certified personnel or laboratory? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE Page# 3 Permit: NC0036269 Inspection Date: 02/01/2022 Owner - Facility: Rocky River WWTP Inspection Type: Compliance Sampling Laboratory Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Comment: Yes No NA NE II El El El • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable MODE Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Bar Screens Yes No NA NE Type of bar screen a.Manual ❑ b.Mechanical • Are the bars adequately screening debris? • ❑ ❑ ❑ Is the screen free of excessive debris? • ❑ ❑ ❑ Is disposal of screening in compliance? • ❑ ❑ ❑ Is the unit in good condition? • ❑ ❑ ❑ Comment: Grit Removal Yes No NA NE Type of grit removal a.Manual El b.Mechanical • Is the grit free of excessive organic matter? • ❑ ❑ ❑ Is the grit free of excessive odor? • ❑ ❑ ❑ # Is disposal of grit in compliance? • ❑ ❑ ❑ Comment: Page# 4 Permit: NC0036269 Inspection Date: 02/01/2022 Owner - Facility: Rocky River WWTP Inspection Type: Compliance Sampling Influent Sampling # Is composite sampling flow proportional? Is sample collected above side streams? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is sampling performed according to the permit? Comment: At time of inspection Influent sampler was recorded at 0 degrees Celsius. Primary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the sludge blanket level acceptable? Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) Comment: Pure Oxygen Type of pure oxygen system Is there a back-up source for the system? Are mixers operational? Are samples port/points easily accessible? Comment: Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ • Yes No NA NE Generated on -site • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 5 Permit: NC0036269 Inspection Date: 02/01/2022 Owner - Facility: Rocky River WWTP Inspection Type: Compliance Sampling Secondary Clarifier Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Chemical Feed Yes No NA NE Is containment adequate? • ❑ ❑ ❑ Is storage adequate? • ❑ ❑ ❑ Are backup pumps available? • ❑ El El Is the site free of excessive leaking? ■ ❑ ❑ ❑ Comment: Pumps-RAS-WAS Are pumps in place? Are pumps operational? Are there adequate spare parts and supplies on site? Comment: RAS, WAS pumps consist of 5 screw lift pumps. Yes No NA NE • ❑ ❑ ❑ Effluent Sampling Yes No NA NE Is composite sampling flow proportional? • ❑ ❑ ❑ Is sample collected below all treatment units? • ❑ ❑ ❑ Is proper volume collected? • ❑ ❑ ❑ Is the tubing clean? ■ ❑ El ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 • El El El degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type • ❑ El El representative)? Comment: At time of inspection effluent sampler was recorded at 3 degrees Celsius. Page# 6 Permit: NC0036269 Inspection Date: 02/01/2022 Owner - Facility: Rocky River WWTP Inspection Type: Compliance Sampling Flow Measurement - Effluent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: Disinfection -Liquid Is there adequate reserve supply of disinfectant? (Sodium Hypochlorite) Is pump feed system operational? Is bulk storage tank containment area adequate? (free of leaks/open drains) Is the level of chlorine residual acceptable? Is the contact chamber free of growth, or sludge buildup? Is there chlorine residual prior to de -chlorination? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ De -chlorination Yes No NA NE Type of system ? Liquid Is the feed ratio proportional to chlorine amount (1 to 1)? ❑ ❑ ❑ • Is storage appropriate for cylinders? ❑ ❑ • ❑ # Is de -chlorination substance stored away from chlorine containers? ❑ ❑ • ❑ Are the tablets the proper size and type? ❑ ❑ • ❑ Comment: Sodium Bisulfite is used for dechlorination. Are tablet de -chlorinators operational? ❑ ❑ ■ ❑ Number of tubes in use? Comment: Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 7 Permit: NC0036269 Inspection Date: 02/01/2022 Owner - Facility: Rocky River WWTP Inspection Type: Compliance Sampling Solids Handling Equipment Is the equipment operational? Is the chemical feed equipment operational? Is storage adequate? Is the site free of high level of solids in filtrate from filter presses or vacuum filters? Is the site free of sludge buildup on belts and/or rollers of filter press? Is the site free of excessive moisture in belt filter press sludge cake? The facility has an approved sludge management plan? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: Solids handling equipment consist of two gravity -flow sludge thickners, sludge conditioning (plolymer addition), two centrifuges, sludge incinerator, sludge -ash settling basin. Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 8