Loading...
HomeMy WebLinkAboutWQ0006245_Compliance Evaluation Inspection_20220225R.OY COOPER. Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director Mr. Andy Smith (via email) Assistant Director Water Resources City of Statesville P.O. Box 1111 Statesville, NC 28687 Dear Mr. Smith: NORTH CAROLINA Environmental Quality February 25, 2021 Subject: City of Statesville, Iredell County Compliance Evaluation Inspection Report Permit WQ0006245 Sta—Lime Distribution Program On February 21, 2022, the North Carolina Division of Water Resources conducted a Compliance Evaluation Inspection of the Sta-Lime Distribution Program. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in Permit No. WQ0006245. A recent copy of the permit was provided to Mr. Galloway during the site visit. The Sta-Lime Distribution Program appears to be in compliance with the permit. If you have any questions concerning this matter, please contact Edward Watson at (704) 235-2199 or by email at Edward.Watson@ncdenr.gov. Sincerely, 1- DocuSigned by: 44.01414w H P:ze. F161FB69A2D84A3... Andrew H. Pitner, P.G., Assistant Regional Supervisor Mooresville Regional Office Water Quality Regional Operations Section Division of Water Resources, NCDEQ Attachment: BIMS Inspection Report CC: DWR-WQROS Mooresville Regional Office — File (Laserfiche) Ken Galloway, City of Statesville (via email) NO 1:1E n.n.m.enn of e..iron.Mn.i mwitv North Carolina Department of Environmental Quality 1 Division of Water Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704.663.1699 Compliance Inspection Report Permit: WQ0006245 Effective: 10/01/20 Expiration: 04/30/26 Owner : City of Statesville SOC: Effective: Expiration: Facility: City of Statesville DCAR County: Iredell 693 Bell Farm Rd Region: Mooresville Contact Person: Andy Smith Statesville NC 28687 Title: Phone: 704-878-3438 Directions to Facility: From the intersection of 1-77 North and NC Hwy. 70, travel east on NC Hwy. 70 to Bell Farm Road. Turn left and travel north on Bell Farm Road to the Fourth Creek WWTP. The WWTP is on the right-hand side of the road. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: NC0031836 City of Statesville - Fourth Creek WWTP NC0020591 City of Statesville - Third Creek WWTP Inspection Date: 02/21/2022 Entry Time 10:OOAM Exit Time: 12:30PM Primary Inspector: Edward Watson Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Distribution of Residual Solids (503) Facility Status: II Compliant Not Compliant Question Areas: ▪ Miscellaneous Questions Record Keeping Treatment ▪ Sampling Pathogen and Vector Attraction Storage (See attachment summary) Page 1 of 4 Permit: WQ0006245 Owner - Facility: City of Statesville Inspection Date: 02/21/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On February 21, 2022, MRO staff conducted a Compliance Evaluation Inspection for permit number WQ0006245, Sta-Lime Distribution permit. The analytical data presented during the site visit is included as part of the AR. A separate report will be issued for the AR. Analytical data reviewed during the site visit indicates that Pasteurization was achieved. During the site visit, the uncovered residual storage pad was reviewed. Synagro has removed most of the Class "B" product for LA under their permit. However, the pad is still in need of upgrades to prevent the residuals from being able to flow off of the pad during a rain event. Page 2 of 4 Permit: WQ0006245 Owner - Facility: City of Statesville Inspection Date: 02/21/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Type Land Application Distribution and Marketing Record Keeping Is GW monitoring being conducted, if required? Are GW samples from all MWs sampled for all required parameters? Are there any GW quality violations? Is GW-59A certification form completed for facility? Is a copy of current permit on -site? Are current metals and nutrient analysis available? Are nutrient and metal loading calculating most limiting parameters? a. TCLP analysis? b. SSFA (Standard Soil Fertility Analysis)? Are PAN balances being maintained? Are PAN balances within permit limits? Has land application equipment been calibrated? Are there pH records for alkaline stabilization? Are there pH records for the land application site? Are nutrient/crop removal practices in place? Do lab sheets support data reported on Residual Analysis Summary? Are hauling records available? Are hauling records maintained and up-to-date? # Has permittee been free of public complaints in last 12 months? Has application occurred during Seasonal Restriction window? Yes No NA NE • Yes No NA NE ❑ ❑ • ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ • ❑ ❑ ▪ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑•❑ ❑ Comment: This is a distribution permit for Class "A" Lime Pasteurized residuals. Haul records were present for 2021 as part of the site visit. The City of Statesville distributes an instruction pamphlet to those companies or individuals that receive the lime pasteurized residuals. Pathogen and Vector Attraction a. Fecal coliform SM 9221 E (Class A or B) Class A, all test must be <1000 MPN/dry gram Geometric mean of 7 samples per monitoring period for class B<2.0*10E6 CFU/dry gram Fecal coliform SM 9222 D (Class B only) Geometric mean of 7 samples per monitoring period for class B<2.0*10E6 CFU/dry gram b. pH records for alkaline stabilization (Class A) Yes No NA NE • ❑ ❑ ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ Page 3 of 4 Permit: WQ0006245 Owner - Facility: City of Statesville Inspection Date: 02/21/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine c. pH records for alkaline stabilization (Class B) Temperature corrected d. Salmonella (Class A, all test must be < 3MPN/4 gram day) e. Time/Temp on: Digester (MCRT) Compost Class A lime stabilization f. Volatile Solids Calculations g. Bench -top Aerobic/Anaerobic digestion results ❑ ❑ • ❑ • ❑ ❑ • ❑ ❑ ❑ • ❑ • • ❑ ❑ • ❑ ❑ ❑ • ❑ Comment: PVAR is achieved by Lime Stabilization. Temperature records indicate pathogen reduction is meeting the standard time on temperature for 24, 48, and 72 hr. pathogen reduction. Treatment Check all that apply Aerobic Digestion Anaerobic Digestion Alkaline Pasteurization (Class A) Alkaline Stabilization (Class B) Compost Drying Beds Other Comment: Primary treatment is by Aerobic Digestion. Final treatment and reduction is by Lime Pastuerization. Sampling Describe sampling: Sampling is performed within the time over temperature standards to determine if adequate pathogen reduction has occuirred to meet the requirements of a 503 residual distribution permit. Is sampling adequate? Is sampling representative? Yes No NA NE • • Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: Seven individual grab samples are collected from different areas of the lime stabilized residual mounds to obtain a Mean representation of the residuals on the individual sampling dates. Page 4 of 4