HomeMy WebLinkAboutWI0700012_Monitoring (Report) Nov 2021 - Jan 2022_20220228Alutrien- CERTIFIED MAIL February 23, 2022 NC Division of Water Resources Groundwater Resources Section Attn: Michael Rogers 1636 Mail Service Center Raleigh, NC 27699 Subject: Underground Injection Control Program Quarterly Groundwater Monitoring Report November 2021— January 2022 Injection Well Permit #WI0700012 PCS Phosphate Company, Inc.' Tank Farm Remedial Action System Please see attached for the groundwater monitoring report associated with Injection Well Permit #W10700012 and the Tank Farm Remedial Action Plan. This report includes the sampling and reporting requirements of the above referenced permit as well as the reporting requirements of the Tank Farm Remedial Action Plan. Enclosed are a) piezometer level monitoring field sheet and b) the operational and maintenance report. The withdrawal system underwent scheduled maintenance repairs during the reporting quarter. Details of the maintenance activities are outlined below. Please do not hesitate to contact me at (252) 322-8573 if you have any questions regarding this information. Sincerely, Shelby S. Wiggins Environmental Engineer Nutrien Attachments pc: 12-07-02 (w/ attach) ec: Eston Herring (w/ attach) J.A. Casey (w/ attach) Jason Corley (w/ attach) H. B. Mills (w/ attach) 1530 NC Hwy 306 South, Aurora, NC USA 27806 nutrien.com 1 Effective January 1, 2018, PCS Phosphate Company, Inc. is an indirect subsidiary of Nutrien Ltd. PCS Phosphate Company, Inc. remains the legal operating entity and permittee. PCS PHOSPHATE - TANK FARM REMEDIAL ACTION PLAN QUARTERLY OPERATIONAL AND MAINTENANCE REPORT FOR THE INJECTION AND WITHDRAWAL WATER WELLS November 2021 — January 2022 The Tank Farm Remediation System consists of a series of seven- (7) injection water wells located on the south side of the Tank Farm Area and a series of fourteen (14) withdrawal water wells located on the north side of the Tank Farm Area. Injection Water Well System The injection water well system operated with the DPW Water - Ultraviolet Light Disinfection system during the period. Daily operational data are collected by the Shipping Department and reported to the Environmental Affairs Department. The total monthly and quarterly volumes of water injected as well as the month end water level in the Water Level Control Tank are: DPW WATER GALLONS TOTAL GALLONS AVERAGE GPM TANK LEVEL FEET, MSL November 0 0 0 0.0 15.0 December 86,572 0 86,572 1.9 15.0 January 295,574 0 295,574 6.6 15.0 TOTALS 1,034,314 0 1,034,314 10/29/2021—The Injection Water Well System was taken out of service to perform any necessary maintenance during the downtime on the Withdrawal Well System. 12/20/2021—The Injection Water Well System was placed back in service. 2 Withdrawal Well S. stem The withdrawal water well pumps are monitored daily by the area Maintenance Department and preventative maintenance work is performed as needed. The total monthly and quarterly withdrawal water volumes for the period are: SAND FORMATION GALLONS CROATAN FORMATION GALLONS TOTAL GALLONS AVERAGE GPM November 0 0 0 0 December 0 0 0 0 January 0 0 0 0 TOTALS 0 0 0 10/29/2021—Pumps were removed from all withdrawal wells to allow for washing and brushing the screened intervals. 11/18/2021—Static water level study completed to determine proper pump depth. During the maintenance activities, it was determined that 5 withdrawal wells (identified below) were non -operational. An application to construction 5 recovery wells to replace the wells identified as non- operational was completed and submitted for approval. O1/27/2022—Received Permit No. WR0700823 to construct the 5 replacement recovery wells. 02/O1/2022 Drilling began. 02/08/2022—Drilling completed 02/10/2022—Stainless steel risers and lockable lids were installed on the 5 replacement wells. Maintenance personnel are preparing to reinstall the withdrawal well pumps. An in -line flow meter has been installed to trial for accuracy and reliability in measuring withdrawal volumes. Confined Sand Formation Withdrawal Well (SWW) Pumps SWW- 1: SWW-2: SWW-3: 3 SWW-4: Redrilled SWW-5: SWW-6: SWW-7: Croatan Formation Withdrawal Well (CWW) Pumps CWW-1: CWW-2: Redrilled CWW-3: CWW-4: CWW-5: Redrilled CWW-6: Redrilled CWW-7: Redrilled 4 PCS Phosphate Co., Inc. - Tank Farm Remediation System Quarterly hLlnitoring Date: I - s - 2 0 22 Time: Tech: is stem Gain e Pressures SWW-1 N/A N/A N/A CWW-7 12111111111111 File: 12-07-02 pc: TLB assume e ..I MI Point I L v NSL Ditch 12.91 Barge Slip 10.59 2-.L10 Water Leval Control Tank % n MSL Sand Layer Pelzometers Level Indicators Well ID TOC Elevation MSL' TOC Stc WLr Level' __. Level Relative To _ MSL Ft. Well ID TOC Elevation MSL' TOC Stc Wtr Level' Level Relative To MSL Ft. Spz-1 10.47 'Z_ $5 r7, 62- Cpz-1 10.51 _ /0• '7I '-o. 2S Spz-2 11.21 ‘. 2 Z. LO J Cpz-2 10.25 9 /9 ]..24 Spins 11.87 fj , g2�• Cpz-3 11.12 G]. IN I- 33 3 Spz-4 11.45 3,97 '{7._ 1 CPW 9.65 2. 4' p. 1141 Spz-6 11.45 7 4: i j MWTF-1A" 14.35 3. lS 1/. 217 Spz-6 11.23 7,73 MWTF-1B * 14.36 3.'2- Iv. 5- Spz-7 11.59 /�r /2. %9 - 1.'-J0 MWTF-1C* 14.44 /0, / 3, Ff Spz-8 11.57 '- Collated ( OM- C MWTF-2A 14.05 /s 7. b /. 99 Spz-9 11.01 t.311 41,2- MWTF-2B 14.02 9, /7/ f +3f Spa-10 12.16 5. `f3 (,•1%3 MWTF-2C 14.08 I 8rDnCf 11i SPW 9.95 /2. 33 -2- Z. MWTF-3A 12.21 -. (7 9 c MWI'F-3B 12.18 I ` 19 ell 39 MWTF-3C 12.19 /14.O " La 5- Revised 7/29/02 NW n nave- nuit a * Riser length added to TOC elevation 1/24/97 D:1DatetFarms1Well Form Tank Farm Remed Wells)ds