HomeMy WebLinkAbout20140309 Ver 1_Approval Letter_20140414NCDENR
North Catolina'Department,of Environment and Natural Resources,
.Pat "McCrory,
Governor'
April'-14, 2014
Mabry'Desormeaux
Wake County.Board,of'Education,
5;625 Dillard Drive
Cary, NC,275,18
John E. Skvarl'a,, III
Secretary
�DWR #14 -0309
Wake Courity
Subject: ,APPROVAL OF 401 ,WATER,QUALITY,CERTIF,ICATION WITH ADDITIONAL
CONDITIONS
AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER, BASIN RIPARIAN BUFFER,
'PROTECTION RULES (15A;NCAC 0'-B. 0233),W�ITH' ADDITIONAL CONDITIONS
South Garner'High,School
Dear'Mr. Desormeaux•:
You have our,approval for the impacts listed ,bel'ow °for the purpose described, in your application
dated March 28, 2014 and' received by°the, Division ,of Water Resources (DIVI Slob )' on March 28;
2Q14. These impacts�are covered I y th_e- ,attached Water Quality General Certification Number
3890'a_nd the, conditions� list ed below. This certification,, is associated With'the use of,Natio'nWide
Permit,Number 18,arid 39 once,they'are issued to you byth'e U':S. Army Corps of Engineers. Please,
note that you should get,,any other federal;�state -or local' permits before proceeding Huth -your'
project, including1hose,required by (Ii-utriotlimited to) Sedimeni•and Erosion Control, Non -
Discharge, andWater, Supply, Watershed, regulations.
'This approval requires you;to follow�the,conditions Iisted,in the enclosed certification and,the
following,additional conditions:
1., The,fojiowing imtpacts are, hereby approved provided that all ofthe other specific 'and .general'
conditions of�the�Certification; General Perm it' and /or'Buffer Rules are met. No other- impacts,.
are approved,. includi,ng;iricidental'impacts:
'NotthCarol'
a=ura!
North'Carolma Didi'siowof Water °Resources; ;1628, Mail. Service, Center Raleigh, NG2,7699 =1628 Phoner(919)'791 -4200 Custonner,SeruIce
Internet www ncwaterqualfty or Location- 3800 Barrett Dave Raleigh, Ng- 27609 Fax- '(919) 788 -,7159 1'- 877 - 623 -6748
An,EQal OpportunitylAffrmabve Action Employer -50% Re6yc1edl10% PostConsumer Paper,
South iGarnerHigh School
RWR# 14 -0309
401 AND BUFFE_ R,APPROVAL
Page�2 of 5
Type of Impact
Amount Approved-
(units)
Permanent
Amount Approved
(units)
Temporary
Wetland
0.062 (acres)
0 (acres)
Site 1A
Wetland
0.086 (acres)
0 (acres)
Site'1B
Wetland
0.014 (acres)
;0 (acres)
Site 2
Wetland
0 (acres),
6.015 (acres)
Site 5A
Wetland
0 (acres)
0.008 (acres)'
Site 5B
Buffers —Zone 1
0 (square feet)
0 ('square feet)
Site 3
'Buffers,.— Zone 2
A, ("square' feet)
71& (square feet)
Site 3
Buffers —,Zone 1
0' ( squarre feet)
0 (square feet)
Site 4
Buffers - Zone 2
0 (square feet)
9,14 (squarefeet),
Site 4
Buffers— Zone,1
0 (square_feet)_
0 (square feet)
Site 6A
Buffers _Zone 2
1,138 (square feet)
0 (square feet)
Site 6A
Buffers= Zone -1
(square:'feet)
0 (square feet)'
Site, 6B_
Buffers— Zone 2
0 (sgfuare feet)
621 '(squarefeet)
Site 66
I Stormwater,Manasement Plan (SMP) Approval from Local Community Required
The Division considers the SMP,approved by °the local'government,with�the stormWater pond
that removes 909/6 of the total suspended solids and'the two detention wetland best
,management practices,(BMP)', as, meetingthe requirement,for,diffuse flow of,the outflow-from
the,stormwater BMP's. Please send one, copy (hard copy or digital) of the approved •SMP;
including plan,d'etails on�full -sized plan sheets; wfth proof of,the Town of- Ga "rner'sapproval °to
`the DWR Webscape, Unit (1650 Mail Service Center,, Raleigh, NC' 27699-1650), ,before any
impacts authorized in,this certification occur: Ifthe SMP is modified in the future, then,you
South Garrier,High School
DWR# 14 -0309
401 AND BUFFER APPROVAL
Page 3 of 5
shall provide one modified SMP with proof of ap_ proval to,the DWR Websca;pe Unit'prior to the
commencement of:th'e modifications.,
3. 'No Waste, Spoil, Solids, or Fill of Any Kind _
No wasteispoil, solids, or, fill of any kind'shall occur in wetlands, waters, or riparian areas
,beyond the footprint of the impacts depi'cted,'iii the Pre - Construction. Notification.. All
construction activities„ including the design, installation, operation, and,maintenance,of
sediment and erosion control ,Best,Management;Practices, shall' be performed so that no
violations of state water'quality standards „ statutes; or rules occur.
4. Protective'Fencing,
The outside buffer, wetland, or water boundary an'd, along the, construction corridorwithin
these'f;oundaries approved underthis ,author'izati'on shall, be,clearly marked with,orange
warning fencing,(or similar high visibility',material) for the areas,that have,been�approved to
I nfringe within the,buffer, wetland or water prior to any land disturbing activities to ensure.
compliance with 15 NCAC Q0 H .05,00.
5: This approval is for the'purpose and design described' in your ap=plication. The plan_s'�and
specifications for -this project are'incorporated� by reference. as part,of't'he Certification and
Buffer Authorization. If you change 'your project ;'you must notify the Div'isi'on and you' may be'
required to submit a new, application package with the appropriate fee, If the property is sold,
the new-owner Must 'be;givena copy of °thisapprovalil'etter and General,Certifi'cation and is
respons-ible°forcomplying.with all conditions.
6. This approval' and its,,conditions are final and binding unlesscontested. -
This Certification and, Buffer Authorization can be contested' as provided in Articl'e's 3 ,and 4 of
General Statute .1'506 by'filing a written petition for,an administrative hearing to the-Office of
Administrative Hearings (hereby,known,as,OAH). A; petition form may be obtained from the OAH
at htt0: / /www.nco4h.com/ or by-calling the,,OAH Clerk's Office av(919), 431 -3000 for information.
Within thirty (30) calendar days of receipt of this,notice; a; petition must be4iled with the OAH. A
petition; is,considered filed when the.,original and one (1) copy alon&with any applicab=le OAH filing,
fee is received in the OAH during normal, office hours. (Monday through Friday between 8 60am
and-5 00pm; ekcluding official'state'holidays).,
The petition may be.,faxed to the OAF at (9,19) 431 - 3100, ;provided the original ands one copy of the
petition,alongwith any'applicable OAH'filingfee isreceived bythe,OAH within,five (5) business
,days following the faxed transmission_
Mailing ;address -for the OAH:
r5outh,64rner High Schoof
DWR #''14' -0309
x401 AND,BLIF,FER APPROVAL,
Ifsending�'byFirst, CIass,Mail 'If sending via rdefivery5ervice,,
- via,'the,US,Postd[Seivice (e g, UPS, FedEzJ:,,
0 fffice ;,of Adrninistrative`Heari'ngs. Office,of Administr'ati've Hearings,°
6714 Ma_'ill- Service Center, 1`711'NeW Hope, Church Road
- „ Raleigh, NC'27699 -6714 Raleigh; NC'27609 =6285'
One (1), copy,of the' petition m'Ust 'als6, be served to. DENR:
Lacy, Presnell';,General Counsel,
Department of Enwronment,and�Natural Resources
1601 Mail Service Center'
Raleigh, NC's27699- ,,1601.
Please,send onejl) copyoffihe,petition'to DWR:
Ifssending by First-Class Mail ,If sending via,delivery service
-via `the ,`US Postal, Seivi=e: (e: g. UPS,, Feq&x):
;Karen Higgins Karen Higgins
NC DENR- DWR.= .V',1/ebscape,.Uhit 'NC 'D'ENR -DWR Webscape`Unit
1650, Mail Servi'be,,Center 5-12 N'.,Sa'lisbury',Street'--
Raleigh;, NC 27699 -1650 Raleigh; ,NC- 27604-
This leit'er completes th,e-review of the_ Division under secti66,401 ofthe Clean Water Act and the: `
Neuse`Riparian Buffer'RUles as described in i5A NCAC,028 .0233',. Please,contact;Cherri Smith at,
' or corcerns, 9,19= 79.1- 42,51,or-- cherri:sriiith n dene., ov ifyou have anyquestions -
Si a ely,
Danny'Smi _
Supervisor, Water Quality' Regional, Operati'ons Section
Enclosures: 60890
cc: U-S. Arm,y'Corps'of-Engineers; Raleigh, Regulatory Field Office,! 3331,Her'itage Trade
Drive, St. 105; Wake Forest; NC 27597
Deborah`Shi'rley; Soil,& E_nviro"nment-a) Consultants44,'12 Falls of N'euse'Road;;Ste. 104;;
Raleigh,,NC27615