HomeMy WebLinkAboutSW6220203_Supplement-EZ Form_20220225SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1
1 Project Name
Dollar General - Raeford (Hoke County)
2
Project Area (ac)
2.84
3
Coastal Wetland Area ac
-
4
Surface Water Area ac
-
5
Is this pro ect High or Low Density?
High
6
Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H.1003(4)f
7
Width of vegetated setbacks provided (feet)-
8
Will the vegetated setback remain vegetated?
N/A
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)?
No
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
1
12
Bioretention Cell
Wet Pond
0
13
0
14
Stormwater Wetland
0
15
JPermeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Ba filter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Matt Lowder, PE
28
Organization:
Bowman North Carolina, Ltd.
29
Street address:
4006 Barrett Dr, Suite 104
30
City, State, Zip:
Raleigh, NC 27609
31
Phone numbers :
919-553-6570
32
Email:
mlowder@bowman.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Si nature ❑ esigner
2/0fill-
Sea/
Date
DRAINAGE AREAS
1
Is this a hioh densitv proiect?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
No
4
If so, number of low density draina a areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
i
4
Type of SCM
Infiltration Basin
5
Total drainage area (sq ft
142297
93972
6
Onsite drainage area (sq ft
123745
75420
7
Offsite drainage area (sq ft)
18552
18552
8
Total BUA in project (sq ft)
58416 sf
58211 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft
-
10permitting)
New BUA not on subdivided lots (subject to
s
-
-
11
Offsite BUA (sq ft
15492 sf
15492 sf
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
29892 sf
29892 sf
Sidewalk (sq ft)
2392 sf
2187 sf
Roof (sq ft
10640 sf
10640 sf
Roadway s ft
-
Future (sq ft)-
Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
16
Existing BUA that is already permitted (sq ft)
-
17
Existing BUA that will be removed (sq ft
-
18
Percent BUA
35%
62%
19
IDesiQn storm (inches)
1.0 in
20
IDesign volume of SCM cu ft
4763 cf
21
lCalculation method for design volume
Simple Method
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
INFILTRATION SYSTEM
1 Drainage area number 1
1 2 1 Minimum required treatment volume (cu ft) 4763 cf
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V or enter "Vertical' for
trenches)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC 12 ?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
lWas the SCM desinned by an NC licensed orofessional7
Yes
18 Proposed slope of the subgrade surface 0
19 Are terraces or baffles provided? No
20 IType of pretreatment: Forebay
Snik Onfn
21
Was the soil investigated in the footprint and at the elevation of the
infiltrations stem?
Yes
22
SHWT elevation (fmsl)
369.90
23
Depth to SHWT per soils report (in)
121.20
24
Ground elevation at boring in soils report (fmsl)
380.00
25
Is a detailed hydrogeologic study attached if the separation is
between 1 and 2 feet?
N/A
26
Soil infiltration rate (in/hr)
5.00
27
1 Factor of safety (FS) (2 is recommended):
2.00
I Fiavallons
29
Bottom elevation fmsl
374.8 ft
30
Storage elevation fmsl
377. ft
31
bypass elevation (fmsl)
380.2 ft
For Basins Onl
32 Bottom surface area (ft) 1599 ft
33 IStorage elevation surface area (ft) 3385. ft
Fnr TrwnrhBc Anly
34
Length (ft)
35
Width (ft)
36
Perforated pipe diameter, if applicable (inches)
37
Number of laterals
38
Total length of perforated piping
39
IStone type, if applicable
40
Stone orosit
41
Is stone free of fines?
42
Is the stone wrapped in geotextile fabric?
43
Has at least one inspection port been provided?
Volumes/Drawdown
44 IDesign volume of SCM (cuff)
45 1 Time to draw down (hours)
ADDITIONAL INFORMATION
46 Please use this space to provide any additional
infiltration system(s):
about the
4763 cf
Infiltration 1 6:33 PM 2/9/2022