Loading...
HomeMy WebLinkAboutSW4220301_Application Completeness Review Checklist_20220303Application Completeness Review Checklist Project Name: Wool kwy-L Date Delivered to CO: 03102 BIMS Received/Accepted Date: _3/3 /ZZ Project County/Location: S! �yjy_ Drj%,,Q rsy4h Co, *BIMS Acknowledged Date: V /77 Rule(s): ®Phase I] 1:1OWR/HQW �WSWS Goose NSW Other Permit Action: Ne / Major Mod / Minor Mod / Renewal / Transfer **New Permit #: t,t/ ZZ0 30 ) Existing Permit #: Permit Type: HD / LD Overall / HD &LD Combo General Permit / Offsite / Exempt / Rescission I 1PE Cert on File? SCM Type(s): Offsite to SW: Master PE Cert on File? Development Type: Commerc I / Residential Cher Subdivided?: Subdivision Sin le Lo r For New or Transferee ermits Permittee is: Stream Class: Property Owner(s) 0Developer Lessee ElPurchaser 1_1HOA OSA Map 0ORW Map Paperwork Emailed Engineer on: FASupplement(s) (1 original per BMP) ®O&M with correct/original signatures (1 original per BMP except LS/VFS and swales) ©Application with correct/original signatures Corp or LLC: Sig. Auth. per SoS or Signature Authorization letter or report 0$.50S (within bmo) Lheck#(s): 056 ElNoFee ©Soils Report: w/SHWT or General Report ®Calculations (signed/sealed) ®Deed Restrictions, if subdivided: *Signed & Notarized Template LZJRecorded Covenants Recorded Plats 050% or more Lots Sold List Project Narrative nUSGS Map Plans FX-12 Sets ©Vicinity Map I' Legend q0_1 DA Maps Existing Conditions Grading REVIEWER NAME: ®Email Address: Design Engineer ®Email Address: Property Owner ©Deed Email Address: Lessee ElLease Agreement Email Address: Purchaser Purchase Agreement Email Address: Developer Email Address: HOA Representative tOWetlands: Delineated or o Wetlan ®Project Boundaries ©Layout (proposed BUA dimensions) ®Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Landscape Plan PE Seal NOTES TO REVIEWER: *Enter BIMS Acknowledged Date on this Sheet **FOR NEW Projects -Enter New Permit # on �� ES Supplements & Deed Restiction Templates. G:wQ\\\Reference Library\Procedures\Checklists\Completeness Review Checklist_2018 03 13