HomeMy WebLinkAbout20120396 Ver 1_Inspection_20140404Wetland Inspection Report
Project Num: 20120396 Version: 1 Status: Issued
Project Name: Moores Fork Stream Mitigation Project - not an Project Type: Other
application
County: Surry Region: Central
Location: Moores Fork Stream Mitigation Project - not an application
Latitude: +36 °30'24" Longitude: -80 °42'15"
SW Plan Location:
Site Owner Name: Eep
Inspection Date: 04/04/2014
Reason for Inspection: Routine
Inspection Type: Site Inspection (non -DOT)
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Sue L Homewood
Secondary Inspector(s):
Facility compliance Status: E Compliant n Not Compliant
Program Area: 401 (includes isolated /non -404)
Question Areas:
0 Permit (401 WQC)
Inspection Summary:
Phone: 336- 771 -4964
Page: 1
Project Num: 20120396 Owner: Eep
Inspection Date: 04/04/2014 Inspection Type: Site Inspection (non -DOT)
Reason for Visit: Routine
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and /or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment: Mitigation site, just starting construction. Inspected work on Silage Trib
only. Contractor taking care to stabilize immediately after disturbance. Large trees
within upper section of tributary will be protected to the maximum extent practical which
will be based on designers determination. Contractor will continue to work to stabilize
immediately upon disturbing banks due to steep terrain of this stream.
0 0 0 0
nn ■n
■nnn
Page: 2