Loading...
HomeMy WebLinkAboutNCC211421_Modification Review_20220303Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 3/2/2022 11:07:00 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany A 3/3/2022 7:48:24 AM (Construction COC ADD TO FILE Review - NCC211421) The task was assigned to Georgoulias, Bethany A. The due date is: March 7, 2022 5:00 PM 3/2/2022 11:07 AM i �M1 itowl�a NORTH CAROLINA EnNlmnmrnfel QuoN1y Certificate of NCC211421 Coverage (COC) No.* Enter the Certificate of Coverage Number (Use capital letters) Information associated with this permit: Project Name Mayo Ash Basin Landfill Erosion and Sediment Control Address Boston Road, Roxboro, NC County Person Latitude 36.5260 Longitude-78.8970 Permittee Listed Duke Energy Progress, LLC Legally Responsible Duncan Brewer Individual NC Reference No. NCG01-2021-1421 E&SC Plan ID PERSO-2021-008 Original NOI Tracking 47461 No. * Date COC Issued* 03/11/2021 Prior Rescission Date This field will populate only if COC has already been rescinded. Modification Information: Reason for Closed -Out Lots/Outparcels in E&SC Plan Modification* Additional Lots/Outparcels Approved - E&SC Revised Other Revision(s) to E&SC Plan Legally Responsible Individual and/or Site Contact Has Changed Multiple Reasons (List) Addional Explanation More information (e.g., new Site Contact details). If lots are being added, please include specific lot numbers You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (Revised E&SC Approval, Close -Out Doc, etc.) Documentation PERSO-2021-008_20220216_LOA.pdf 258.95KB Must be PDF format North Carolina General Statute 143-215.613 (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). * I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* The Legally Responsible Individual Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Duncan Brewer Title* Project Director Organization* Duke Energy Progress LLC Date * 03/02/2022 Email Address* duncan.brewer@duke-energy.com Email for confirmation Telephone Number* 13363302058 Contact number if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email lori.tollie@duke-energy.com (Optional) Additional email for confirmation Original Permittee duncan.brewer@duke-energy.com Email Original Site Contact mike.kendrick@duke-energy.com Email Review Date 03/03/2022 Rescinded Since Submitted? Request Date 20220302 Formatted Review Date 20220303 Formatted