Loading...
HomeMy WebLinkAboutNC0021211_Authorization to Construct_20220302 _--;„STATE '. ROY COOPER --.1 .,._l'i Governor l ELIZABETH S.BISER *1°4l 11 n* , Secretary °$` `^°`°-- - = S.DANIEL SMITH NORTH CAROLINA Director Environmental Quality March 2, 2022 Ms. Tonya Mann Utilities Director City of Graham P.O. Drawer 357 Graham,North Carolina 27253 SUBJECT: Authorization to Construct A to C No. 021211A03 City of Graham Graham WWTP NPDES Permit No.NC0021211 Dear Ms. Mann: A letter of request for an Authorization to Construct was received October 29, 2021,by the Division of Water Resources (Division). With additional information received on March 2, 2022, final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 3.5 MGD Graham WWTP, with discharge of treated wastewater into the Haw River in the Cape Fear River Basin. This authorization results in an increase in design and permitted capacity to 5.0 MGD, and is awarded for the construction of the following specific modifications: Installation of one (1) BNR tanks distribution box equipped with two (2) 1 HP vertical mixers; conversion of existing aeration to 5-stage biological nutrient removal tanks with an addition of 1.25 MG volume, the equal four (4) train BNR tanks include eight (8) 211,600-gallon anaerobic zones with eight (8) 1 HP vertical mixers, eight (8) 346,200- gallon pre-anoxic zones with eight (8) 1.5 HP vertical mixers, four (4) 346,200-gallon swing zones with four(4) 1.5 HP vertical mixers, eight(8) 1,055,500-gallon aerobic zones equipped with fine bubble diffusers with air supplied by four(4)2,400 SCFM rotary screw positive displacement blowers with Variable Frequency Drives (VFDs), four (4) 276,600- gallon deoxygenation zones with four (4) 1.1 HP vertical mixers, four (4) 516,200-gallon post anoxic zone with four(4) 1.5 HP vertical mixers, four(4) 165,900-gallon re-aeration zones, four (4) 3,500 GPM nitrogen recycle pumps with VFDs, two (2) 738 GPM BNR drain pumps; Installation of two (2) 869 GPM RAS pumps with VFDs at RAS Pump Station 1, two (2) 868 GPM RAS pumps with VFDs at RAS Pump Station 2, three (3) D_E Q N512 orthNorth Carolina Department of1617 EnMailvironmental Quality RaleighDivision of WaterNorth Resou27rces Salisbury Street Service Center , Carolina 699-1617 NORTH CAROLINA Warbled^I Em,Imnmmbl°wmy 919.707.9000 Ms.Tonya Mann,Utilities Director March 2,2022 Page 2 of 4 645.6 square feet disk filters, one (1) 272,000-gallon liquid chlorination tank with one (1) 10 HP vertical mixer, one (1) 60,000-gallon liquid dechlorination tank, one (1) 24-inch effluent Parshall Flume, two (2) 0.38 GPM sodium hypochlorite metering pumps,two (2) 0.08 GPM sodium bisulfite metering pumps, two (2) 0.21 GPM polyaluminium chloride metering pumps, five (5) 0.14 GPM supplemental carbon metering pumps, two (2) 0.52 GPM caustic metering pumps, one (1) 8,000-gallon polyethylene supplemental carbon storage tank, one (1) 8,000-gallon carbon steel caustic storage tank, one (1) 3,000-gallon polyethylene sodium hypochlorite tank; installation of two (2) 645 GPM sludge transfer pumps with VFDs, two (2) 1.06 MG rectangular aerobic digesters equipped with fine bubble diffusers and three(3)2,900 SCFM positive displacement blowers with VFDs, one (1)20 HP vertical mixer and one (1) 550 GPM truck loadout pump for the existing sludge storage tank 1; conversion of the existing aerobic digester 3 into new sludge storage tank 2 equipped with three(3)20 HP vertical mixers and one(1) 550 GPM truck loadout pump; construction of one (1)maintenance building; installation of all necessary piping,controls, and appurtenances; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0021211 issued effective April 1,2022,and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0021211. It is the Owner's responsibility to ensure that the as-constructed project meets the requirements of all applicable regulations and statutes,the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office,telephone number 336-776-9800, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on-site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Ms.Tonya Mann,Utilities Director March 2,2022 Page 3 of 4 Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center, Raleigh,NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes,rules,regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Min Xiao, PE at telephone number(919) 707-3644 or by email at min.xiao@ncdenr.gov. Ms.Tonya Mann,Utilities Director March 2,2022 Page 4 of 4 Sincerely, DocuSigned by: M Ln. B0B410C9F6204F7... for S. Daniel Smith Director, Division of Water Resources by Min Xiao, PE NPDES Industrial Permitting Unit With Engineer's Certificate attached: cc: NPDES Files ecopy: Colin Beck, PE Hazen and Sawyer Email: cbeck@hazenandsawyer.com DWR Winston-Salem Regional Office, Water Quality Programs Without Engineer's Certificate attached: cc: Alamance County Health ecopy: DWUTrupti Desai, PE City of Graham Graham WWTP Authorization to Construct No. 021211A03 Issued 3/2/2022 NPDES Permit No.NC0021211 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Graham Wastewater Treatment Plant, located in Alamance County, hereby state that,to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of one (1) BNR tanks distribution box equipped with two (2) 1 HP vertical mixers; conversion of existing aeration to 5-stage biological nutrient removal tanks with an addition of 1.25 MG volume, the equal four (4) train BNR tanks include eight(8)211,600-gallon anaerobic zones with eight(8) 1 HP vertical mixers, eight (8) 346,200-gallon pre-anoxic zones with eight (8) 1.5 HP vertical mixers, four (4) 346,200-gallon swing zones with four(4) 1.5 HP vertical mixers, eight (8) 1,055,500-gallon aerobic zones equipped with fine bubble diffusers with air supplied by four (4) 2,400 SCFM rotary screw positive displacement blowers with Variable Frequency Drives (VFDs), four (4) 276,600-gallon deoxygenation zones with four (4) 1.1 HP vertical mixers, four (4) 516,200-gallon post anoxic zone with four (4) 1.5 HP vertical mixers, four (4) 165,900-gallon re-aeration zones, four (4) 3,500 GPM nitrogen recycle pumps with VFDs, two (2) 738 GPM BNR drain pumps;Installation of two(2)869 GPM RAS pumps with VFDs at RAS Pump Station 1, two (2) 868 GPM RAS pumps with VFDs at RAS Pump Station 2,three(3) 645.6 square feet disk filters, one(1)272,000-gallon liquid chlorination tank with one(1) 10 HP vertical mixer,one (1) 60,000-gallon liquid dechlorination tank, one (1) 24-inch effluent Parshall Flume, two (2) 0.38 GPM sodium hypochlorite metering pumps,two(2)0.08 GPM sodium bisulfite metering pumps, two (2) 0.21 GPM polyaluminium chloride metering pumps, five (5) 0.14 GPM supplemental carbon metering pumps,two (2) 0.52 GPM caustic metering pumps, one(1) 8,000-gallon polyethylene supplemental carbon storage tank, one(1) 8,000- gallon carbon steel caustic storage tank, one (1) 3,000-gallon polyethylene sodium hypochlorite tank; installation of two (2) 645 GPM sludge transfer pumps with VFDs, two (2) 1.06 MG rectangular aerobic digesters equipped with fine bubble diffusers and three(3)2,900 SCFM positive displacement blowers with VFDs, one (1)20 HP vertical mixer and one (1) 550 GPM truck loadout pump for the existing sludge storage tank 1; conversion of the existing aerobic digester 3 into new sludge storage tank 2 equipped with three (3) 20 HP vertical mixers and one (1) 550 GPM truck loadout pump; construction of one (1) maintenance building; installation of all necessary piping, controls, and appurtenances; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance,intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. Date Mail this Certification to: Attn: Min Xiao, PE SEAL NPDES Industrial Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh,NC 27699-1617