Loading...
HomeMy WebLinkAboutNCC203230_NOT Closeout Documents_20220301North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Moore Project: Aberdeen Police Department River basin: Lumber Person financially responsible: Town of Aberdeen -Paul Sabiston, Manager Project #: MOORE-2020-033 NCC203230 Address: 115 N. Poplar Street, Aberdeen, NC 28315 1. Project Location: N. Sandhills Boulevard, Aberdeen Pictures: No 2. Weather and soil conditions: sunny/partly cloudy workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: January 21, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Date of inspection: January 19, 2022 Time arriving on site: 10:20 AM Time leaving site: 10:30 AM cc: