Loading...
HomeMy WebLinkAboutNCC220938_Site Plan or Location Map_20220302vucuaiyn cnvciuNC i WO-t U/:/c-Yl.iSc /1 I OU— cc I I c000y4v ITE DATA PROJECT: CAROLINA GARDENS BY DEL WEBB SUBDIVISION SECTION 3 ENGINEER: TIMMONS GROUP 5410 TRINITY ROAD; SUITE 102 RALEIGH, NC 27607 PHONE: 919-866-4507 FAX: 919-859-5663 MIKE ZACCARDO, PE EMAIL: MIKE.ZACCARDO@TIMMONS.COM DEVELOPER: PULTE HOME COMPANY, LLC 1225 CRESCENT GREEN DRIVE, SUITE 250 CARY, NC 27518 PHONE: 919-816-1146 RANDY. KING@PULTEGROUP.COM PROPERTY LOCATION: PURFOY ROAD PINS: 0665-96-8722, 0665-98-2183, 0666-70-5143, 0675-17-2458, 0675-27-1608, 0675-27-5371 ZONING:_ RMD - CZD TOWNSHIP:; MIDDLE CREEK PROPOSED USE: RESIDENTIAL TOTAL TRACT AREA: 73.21 ACRES (EXISTING) PROPOSED TRACT AREA: 73.03 ACRES . R/W DEDICATION AREA: 0.16 ACRES THESE IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FOLLOWING PLANS, AND THE STANDARD SPECIFICATIONS OF THE TOWN OF FUQUAY-VARINA. THE ENGINEER WHOSE SEAL AND SIGNATURE APPEAR BELOW CERTIFIES THAT THE STANDARD SPECIFICATIONS OF THE TOWN OF FUQUAY-VARINA HAVE BEEN THOROUGHLY CHECKED AND ARE APPLICABLE TO THIS PROJECT. ANY EXCEPTIONS TO THE STANDARD SPECIFICATIONS APPLICABLE ARE SHOWN ON THIS SHEET. VICINITY MAP SCALE: 1 " = 850' REFER TO CONSTRUCTION DRAWINGS FOR INFRASTRUCTURE PLANS. Sheet List Table Sheet Number Sheet Title CE0.0 COVER SHEET CE1.0 EROSION & SEDIMENT CONTROL PLAN PH3 (STAGE 1) CE1.1 EROSION & SEDIMENT CONTROL PLAN PH3 (STAGE 1) CE1.2 EROSION & SEDIMENT CONTROL PLAN PH3 (STAGE 1) CE1.3 EROSION & SEDIMENT CONTROL PLAN PH3 (STAGE 1) CEIA STREAM CROSSING DETAIL (STAGE: 1) CE2.0 EROSION & SEDIMENT CONTROL PLAN PH3 (STAGE 2) CE2.1 EROSION & SEDIMENT CONTROL PLAN PH3 (STAGE 2) CE2.2 EROSION & SEDIMENT CONTROL PLAN PH3 (STAGE 2) CE2.3 EROSION & SEDIMENT CONTROL PLAN PH3 (STAGE 2) CE3.1 EROSION & SEDIMENT CONTROL DETAILS PH3 CE3.2 EROSION & SEDIMENT CONTROL DETAILS PH3 CE3.3 EROSION &"SEDIMENT CONTROL DETAILS PH3 CE3.4 SCM DETAILS CA/?o'-.. 0D42AQgf#8B46B... 3 022321 o: O. %may FNGINEE� QQ`.. s V. 8/25/2021 E U � to O N E W ZE p W 76 LU r4 Q W oo z a W W0c'jM O oq Olt J X U I cc � 1¢i W m m In 0 H p �O U N .tea ai W L rn J H (n O O C7 O Z W O04 O W a �' zz 0 CD 0 U) DATE 0812512021 D 0 DRAWN BY 331 . DESIGNED BY • 331 . CHECKED BY . M.ZACCARDO . . SCALE AS SHOWN • 0 N N fV 1 In � Q l0 T--I z O U a � W �-� z tl) r-ij0�UA\r-\/A- R NA W< z w ENGINE I D PPROVAL Z ow T W Signature j H Q ,/^� VJ ® f; ✓� _j Z O U Q w W z 17'Q> U) J 0 00 z U 1 U 7 > 1,%,- EROSION AND SEDIMENT CONTROL APPROVED PLAN DATE: PERMIT NO: SIGNATURE �ocy 0 LL o z 0 0 No U JOB NO. 0 UL 40697 0 SHEET NO. z CEO.O L DocuSign Envelope ID: 4C86B634-079E-4C9E-A186-42217E88892D pr+u u N CA rh DITCH 10A.1 340 Y' i} �1 1 w w w w '3 \w w s i i 1 ; w w w 4, c vCmw < a ,» ; � � ; �' ","" � � . # ,!^ f � w, `�..,. °��. r.. � � � � . `�. a"`°✓ ate.. m,.a `� �' � ~t \ . ' �, i ,, �, , „r..„„ r DITCH 10A.2 8 i : ��'� �� #� ,€. SKIMMER BASIN 10A ` x t rw www wow 1V -w " _ # �. 'f t, .� ._w. TOP OF BERM ELEV: 329.00' 1 `'' . �a, .a,`.� �..,, a,., 1 TEMPORARY CHANNEL AND DIVERSION SCHEDULE (Chapter 8.05 of the NCDEQ E&SC Planning and Design Manual) NAME LENGTH DA ACCUM' DA C 110 Q10 SLOPE N VALUE V SHEAR FLOW DEPTH FLOW AREA Wp R I SWALE DEPTH SIDE SLOPE TEMPORARY LINING (FT) (AC) (AC) (INIHR) (CFS) I (FT/FT) (FTIS) (PSF) (FT) (FT A2) (FT) (FT) (IN) (H:V) DITCH 10C.1 690 4.94 0.50 7.52 18.57 2.7% 0.021 6.88 1.62 0.96 2.77 6.07 0.46 24 3:1 NAG C125 DITCH 10C.2 160 4.54 0.50 7.52 17.07 1.8% 0.021 5.78 1.12 1.00 3.00 6.32 0.47 24 3:1 NAG C125 DITCH 1013.1 1045 10.28 0.50 7.52 38.65 1.8% 0.020 7.34 1.49 1.33 5.31 8.41 0.63 24 3:1 NAG C125 DITCH 10B.2 1290 6.44 0.50 7.52 24.21 3.5% 0.020 8.40 2.16 0.99 2.94 6.26 0.47 24 3:1 NAG C125 DITCH 10B.3 170 2.65 0.50 7.52 9.96 0.7% 0.021 3.55 0,43 0.98 2.88 6.20 0.46 24 3:1 NAG C125 DITCH 10A.1 325 1.14 0.50 7.52 4.29 0.5% 0.021 2.53 0.24 0.76 1.73 4.81 0.36 24 3:1 NAG C125 DITCH 10A.2 210 1.85 0.50 7.52 6.96 1.4% 0,021 4.20 0.66 0.75 1.69 4.74 0.36 24 3:1 NAG C125 DITCH 10.1 315 3.28 0.50 7.52 12.33 1.8% 0.021 5.34 1.00 0.89 2.38 5.63 0.42 24 3:1 NAG C125 DITCH 10.2 1225 1 4.04 0.501 7.52 15.19 3.5% 1 0.021 7.22 1 1.86 0.85 2.17 5.38 10.40 24 3:1 NAG C125 W w< w 3 w w \ a ®} w i✓ rJ w J/ eb �V Jv �Ea V� w vad O w - f C s " �i wi-,V; w•\P ®v w?„w 'ww-� w �\.I-w^ '"w ° w� \-Iwt' «� w�� i�iv" �a• ! �"a � ,� _,t ��,,. �a� �l ^� J ,,,°° .- �. , '� „t - ���'�`'� .}Y; ^. „M:- \� ��.. SKIMMER BASIN 1 TOP OF BERM ELEV: 345.000C S w o BOTTOM OF POND ELEV: 341.00' tt t r 1 -✓ r w e s CONSTRUCTION 4, TION I _r- `t; , w DITCH 1013.1�~ ENTRANCE i( tq y t `�V a' '�V 1.✓ ,`ftg' ,9° ! p f° ,r•. r' .r, °'„ r b°° ,gq �" '�,.. '_"" ,r a,„, .re. ^.,�, cI { g$g �, a{ ) e 6 ro ""'^ } gam-•, . f w f 4 ip > s< � 4 w V' . f . � � ��¢ �Y � t. \�" \� .-.0 ® .F l 4 .,✓ � � } �. .,w' � .w, ,,,,e � °'^`' y y } g „4 y �"'. � i,, N^' �y w.._ .li• � "wN .o", f"`` 1� .� � C � "A�2 \Y' �4w✓w baM ``' � � 4 �,wd. 4 T at' i '{ ��` } 1 "� � - - �' 1 rt � d�` > ' _j �� .,.,,k. ...,... ..,,, �u-'��°, �. `� � ✓ � �I „y ; f 1\ d� •. y.; i w w f _ a s a; i 1 w. m' d a t} 1 N-_` #/ ' �t 1 ' ,\ �' . a,,,w+°•„ t � � rs w�t w�V3 g\wts ws,` w� ,� . "�, w,E w� w�M�ils • i,Lt,. �►n o M;i�arr, t I} 's .# ;,� g t q �t � .,s s} $ ,*w ;d-J 11 � DITCH x f .34 DITCH 10C.2 10 X 10 CONCRETE t I 0 4- ' l�✓ \ WASHOUT PIT p ' 3 � I •"" � .i w w w w w w Vi h, � P �` � F / � � t' "w. -»� ..,. t` w. � l � � n� a �.� � � d �„, e„ ,«- � � ,i �' °», " I i ✓ `\ � � � � � �` t� w,a ...� ,- I4J \{,� _w w �w d ¢ li f }� w w IV w1 i p y I l y� g ! i ` 'IV `� tt! j� s L w ". w w \� \is ws . ' } 3 I 4`; r r SEDIMENT' BASIN 10B �� \, g r r v , I� OP OF BERM ELEV: 326.00' DITCH 10B.2 �ri I § w w \( �` wr . " T q , w w w C \€r \!d pw w C ,y* *Y I C BOTTOM OF POND ELEV: 322.00 , � � � � �` �aw w �`��} �' ,� -•' � i i I }) � �, ' � ;sr `\L \� �+ w 1� � g# ` p .I f � '.- `� # 1 �" " r I � ~ �° , � ',_"�-, r� c' -�,. `� t i --, `` �' � " e `� 1 '� � � '`� ,,. ; .,..~ P °--- ..- � � � � 1 ,,, •-~` � i � "" � 1 F' .,� i 1 ,- � ''' F °, �, -,a } � � p �! �� U_10X1000NCRETE i} d f 1 r `s # 1 �s l i' 3 w� 1% w ✓ p get }s WASHOUT PIT e I DITCH 106.3 r � { ; I a \ e\ s J t a r I � I � t' � � � -~ �. � � � �' _ � � � �' � t � € � �, L � \ �"' y � r 1 � � a� r` -�' `� � 1 � i t � � 4 y � � .�. � � ; � � � �� ,� � ,} • ,� � �� � " � � � � �« �' €� «.. �° � � 1 t � # � � � � �" � y i% �. ', e f i k CULVERT 19-B e ;.°` � t a 1 i r r I RT 19-A 60.00' OF t r < t _ t \ i� 'I z I l l i $4 0 0 i l �, i} ` 1 1 @ 1.65 /o � " l � ; � i^ � `� � �� \' \ ,k 1 '� 0 ? i � 1 t.. '� `�` \, r� E �.. ~.z `» � I � � �a- � ,~.- ,,� r. `�` ..,, -•`~ I# 2.97% t t ?\\ 1 t y € \ r° t f ° } 8 ; CONSTRUCTION w I \ \°, m ENTRANCE � a r• � • �i = � ~' � �`1 �,�� \ � �\ t � �`° 3 � � �� � `�, � � � e i 1I I q DITCH 10.1 ;e \ o _\ € r s J < r I I r 1 � °\ „\ ' � � �° , � `�� t � °� 1 � �� ., '` � �. � � °� `�" ,w "" `" . � r � �. .� � .,� � � . � .�t �. --�` ,� TEMPORARY I tyy t bed i >�L \ 6 " w_ t� �� �. ¢ I e t - �. - -tt STOCKPILE 1 w ;czar ; c r1 _ _.' i , t i < r; r TEMPORARY _� 1` 1 t, \Bi .\ \ l a 3 4 f / t f' t I c+-rni+vni� n _w x U 1 r m ", [ 0 Q z SCALE 1 "=100' 0 100, 200' TOTAL DISTURBED AREA = 51.87 ACRES ,oil ,al, c` �� �., LEGEND 022321 41 %may FNGINEE� • 8/25/2021 8 � N O C O O E N W z E F- a u N ¢LL- o d U. N W 0 O M a z J (n 3: X g g -LL o 0 Ln F- HtO 00 0) to 01 J W H z _0 N Z Lf) U) OLA N Z j � N W LOD LIMITS OF DISTURBANCE 0 SILT FENCE o TREE PROTECTION TP FENCE N N W TREE PROTECTION00 LU I-- a 0 N TPSF SILT FENCE 4 0 N N DU 1-A DD 1-8 z - -�+► - DIVERSION DITCH 0 DATE 14 �j� DITCH REINFORCEMENT _ 0812512021 ® INLET PROTECTION O DRAWN BY 331 SEDIMENT BASIN DESIGNED BY 331 0 0 0 0 0 POROUS BAFFLES • CHECKED BY SILT FENCE OUTLET • M.ZACCARDO ®---- SKIMMER 0• SCALE 0 r 1 if=100' �► COIR WATTLE RIPRAP CHECK DAM • GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) ZONE 7 DAYS NONE SLOPES STEEPER IF SLOPES ARE 10' OR LESS IN THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 14 DAYS 7-DAYS FOR SLOPES GREATER OR FLATTER THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE WITH SLOPES 14 DAYS (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) * "EXCEPTIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICAL." - (SECTION II.B(2)(b)) \� �1``,,- €1 f Ir`>,#� 1 P t I 1 t i \ a 4 l f+ i f 1 I4 1f ; 5 i�� , t I "` t t I I t $ I p' ° ` 1 # `` . 1. AREAS WILL BE STABILIZED PER THE GROUND STABILIZATION CHART I t e / I r # r 3 I \ «• e i i I I b 1 ( i rf z br i VELOCITY DISSIPATORS OUTLET NAME # PIPE SIZE (in) PIPE SLOPE Q10 (cfs) VELOCITY (fps) Zane PAD LENGTH 00 PAD WIDTH 00 PAD DEPTH (in) STONE SIZE (in) SEDIMENT BASIN 10 30 0,58% 36.25 7.38 2 15 8 18 12 SEDIMENT BASIN 10B 30 1,00% 74.49 1 15.17 1 3 1 20 1 8.0 1 26 1 17 SKIMMER BASIN 10A 15 2.4U% 14.33 1 11.68 4 18 4 1 18 1 12 SKIMMER BASIN 10C 15 3°00% 36.89 1 30.06 6 1 13 1 4,0 1 36 1 23 NOTES: 1. NO MORE THAN 75 ACRES SHOULD BE LEFT BARE AT ANYTIME. 2. ALL TEMPORARY DITCHES SHALL BE COVERED WITH GROUNDCOVER AT END OF WORKDAY. 3. SILT FENCE AND TREE PROTECTION ARE SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR PLAN CLARITY. 4. ALL STREAM CROSSING INSTALLATIONS TO BE DONE DURING DRY WEATHER PATTERNS STOCKPILE AREA NOTES: 1. MAXIMUM SIDE SLOPES: 2:1. 2. MAXIMUM HEIGHT SHALL NOT EXCEED 35 FEET. 3. ENSURE STOCKPILE AREAS ARE SUFFICIENTLY STABILIZED TO MINIMIZE SEDIMENT RUNOFF. 4. STOCKPILE AREAS SHALL BE KEPT WITHIN PROPOSED LIMITS SHOWN ON PLANS STOCKPILE MAINTENANCE: 1. SEEDING OR COVERING OF PILES WITH TARPS OR MULCH IS REQUIRED AND WILL REDUCE EROSION PROBLEMS. TARPS SHOULD BE KEYED IN AT THE TOP OF THE SLOPE TO KEEP WATER FROM RUNNING UNDERNEATH THE PLASTIC. 2. IF A STOCKPILE IS TO REMAIN FOR FUTURE USE AFTER THE PROJECT IS COMPLETE (BUILDERS, ETC), THE FINANCIAL RESPONSIBLE PARTY MUST NOTIFY FUQUAY-VARINA OF A NEW RESPONSIBLE PARTY FOR THAT STOCKPILE. 3. THE APPROVED PLAN SHALL PROVIDE FOR THE USE OF STAGED SEEDING AND MULCHING ON A CONTINUAL BASIS WHILE THE STOCKPILE IS IN USE. 4. ESTABLISH AND MAINTAIN A VEGETATIVE BUFFER AT THE TOE OF THE SLOPE (WHERE PRACTICAL). AFTER ANY GRADING. 2. ALL BASINS SHOULD BE CLEANED AFTER ANY RAIN EVENT THAT EXCEEDS V IN 24 HOURS. 3. SEDIMENT BASINS WILL BE INSTALLED WHERE STORM DRAINAGE PIPE IS LOCATED. I.E. PIPES WILL BE LEFT SHORT AND EXTENDED THROUGH BASIN AREAS AFTER SITE HAS BEEN STABILIZED. 4. MAXIMUM IMPERVIOUS AREA SQUARE FOOTAGE ON EACH INDIVIDUAL LOT WILL BE STRINGENTLY ENFORCED WITH NO EXCEPTIONS INTO PERPETUITY. 5. (LOD) INDICATES THE LIMITS OF ULTIMATE DISTURBANCE FOR PURFOY SOUTH. SLOPE STABILIZATION REQUIREMENTS: FUQUAY-VARINA 3:1 AND FLATTER --GRASS ENGIN RI G WDP.T APPROVAL 3:1 TO 2:1 SLOPE --ADAPTIVE PLANTS (SHRUBS AND VINES 2:1 TO 1.5:1--RIP RAP Sena re Oate STEEPER THAN 1.5 TO 1-RETAINING WALL SEDIMENT BASIN REMOVAL: 1. REMOVE BASINS ONLY AFTER SITE IS STABILIZED AND WITH PERMISSION FROM WAKE COUNTY ENGINEER. 2. REMOVE TARP AND ALL NON DIRT AND/OR ROCK MATERIAL. 3. USE BACKHOE TO FILL IN AND LEVEL BACK TO NATURAL GROUND ELEVATION. 4. SEED AND STRAW APPROPRIATELY. 5. INSTALL CHANNELS AND EXTEND PIPE IF REQUIRED, :7 r-1 LLI N < N W u Q M kD T" J Uw Q Z O U ► W s z (n ' EL W Q z J z = O J = U Z Q W O z F-a U F_ °D�w Q Q UUj > I..L O O LL � � z o;S Z a, O W O W O U fti � JOB NO. 0 40697 O SHEET NO. Z CE1, 0 L u H NOTES: 1. NO MORE THAN 75 ACRES SHOULD BE LEFT BARE AT ANYTIME. 2. ALL TEMPORARY DITCHES SHALL BE COVERED WITH GROUNDCOVER AT END OF WORKDAY. 3. SILT FENCE AND TREE PROTECTION ARE SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR PLAN CLARITY. 4. ALL STREAM CROSSING INSTALLATIONS TO BE DONE DURING DRY WEATHER PATTERNS GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) ZONE 7 DAYS NONE SLOPES STEEPER IF SLOPES ARE 10' OR LESS IN THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 14 DAYS 7-DAYS FOR SLOPES GREATER OR FLATTER THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE WITH SLOPES 14 DAYS (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) * „EXCEPTIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICAL." - (SECTION II.13(2)(b)) LEGEND LOD LIMITS OF DISTURBANCE - X X SILT FENCE TP TREE PROTECTION FENCE TPSF TREE PROTECTION SILT FENCE DD 1 A DD 1-13 --f► — DIVERSION DITCH A DITCH REINFORCEMENT ® INLET PROTECTION SEDIMENT BASIN . POROUS SILT FENCE OUTLET 03 SKIMMER I*"'* COIR WATTLE A& RIPRAP CHECK DAM , I P.le' FUQUA-Y \/Ap, IAA ENGINE I ®EP PPROVAL Signature.4P pate / �j TOTAL DISTURBED AREA = 51.87 ACRES 00 0 z 70, il1.� Jim' ! • ! 1 z O U D z 0 Lv 0 O z -JCH L 022321 O O. V. �anm�n� 8/25/2021 E 0 v n N o � 0 0 'N� E E w z� 2' a) O W i0 t,u G7 OC N Q W 00 a tL N LU0 04 z W O� :5: _j in i �t F-tD O OR 01 Ln(31 J w F- z _O iz J _! ce Wr LU Co Co 0 » z m cn 0�z W DATE 0812512021 DRAWN BY 331 DESIGNED BY 331 CHECKED BY M.ZACCARDO SCALE 1 "=60' W N N U) Lnn a M kD T-j z _ OV-4 a C9V � �z 6W�15 z Cn o a W Q z z = �: O U �" J =°z Q W O z F—QU F_ ce 0 w Q U �O W O LL�v7 0 z c;6 z O W O cyc W JOB NO. 40697 SHEET NO CE1.1 L_ \\I/ \l lei, \d L \� \ \ SKIMMER (SEE TABLE CE1.0) �,t/ / � \\ � \ VELOCITY DISSIPATOR t , f \! a � `} ;\ . ° ; � ` a� r �J,,,__ FOR SKIMMER BASIN 10C N4/4 (SEE TABLE CE1A)r \ f r ` SILT FENCE \ r \ ` 1 _b \ OUTLET (TYP.) / t I a f / \ \i/ cif \iPo \V \ �✓p �/; �'� \!/ \�' � � '�° �" -•. \I/ ,. d 41 �k ` t ` ' r EXISTING , \t/ w � \I/ \1/ / \I.�` � �q/ \!� \is \!i POROUS BAFFLES /. r � .� . � � SILT FENCE WETLANDS, t €` ,� � � � � � _ r OUTLET TYP. \4/ a SKIMMER BASIN 10C �\ � EMERGENCY SPILLWAY � = = '`� TOP OF BERM ELEV: 347.00 f f \ Yr BOTTOM OF POND ELEV: 343.00 % RY '- ' ELEVATION: 346.001 — t f / AIL w ,� \ LENGTH: 35.00' )\io \y / \ t� \ �/�\i \ 1 rf �"3`�.f \ COORDINATE ENTRANCE GRADING \V\Ir \V-j°�ti�`Ji \ / f`�y` r DITCH 10C.1 WITH NCDOT NC CONSTRUCTION ' I/ r f V. / W F -4/ i % ram y i TEMPORARY 15" RCP UNDER CONSTRUCTION ENTRANCE 18 HDPE TEMPORARY / t \ _ / t SLOPE DRAIN (TYP.) r \ e DITCH 10B.1 \ -'--_ ` ... TEMPORARY a " CHECK DAM (TYP.) I`\ i p / A /� _ f h DITCH 10C.2 CONSTRUCTION ENTRANCE °/ f µ CONCRETE WASHOUT PIT / ff�fsf \ l 5 t1 � K fr � � � �' a,• .../ w-�, p '"' w' � Y" "`J 1.� � 9 .a; � fi € S."� � � � `...,. � ?<`' M' x t � �'' \ t - �� a µ /FUTURE LOCATION OFF { PROPOSED ROAD ?` pf a if 00 (0 f �� ? � � .. I I � � . �"" \ ? "`^ '-.. � � `'- a✓ � � P .,., .,� , � i i' `` � � � \ f `sT w., ..a _„ � ,,�' � d / l � � �%ff�f f�dr' ?f t ,,.- '` w_ ^- . `` ,.x "` `" � '"� �° L � ' � } \ 11 � `" a. �.- t" - l � . `� " `" ., � � �"°" .� f `' f p � -'` � (� d `�\ �` •� ^� ,' «`� i `" ,; J � ✓ t � { \, .s t `., \ o � ,�- a p 11 ` 1 4 r � I � ✓ /p y 1I tiA/350 40 ,.. --- , , .��°° � ,- ,..- � `e�� r � 3 ' � - °`" , '° .,,,� „, ,/ -- \ � �' g° ° -� ,/ � .., 4 �'' `t� � \I 1 '~- � ♦ `' "` ' �' f /'t�fPfffppd fF { „ gyp$ ',, \ yy..... ✓ } ;f e ,.°` ,,,,� '« _ / t �` 1 .° .""` ,-- --•. .*, � C f 1 qq �, � #g � ! J , I ♦ � �� 8 y � �Jyy` g>p�t y �, �, .d• °t"' ..w, "r. «A" ^"'° -..s "^ +. tl \ \ t T 4„ j `'-\ p ,. "'"" t '"b f'" --,..' �, Y ° i° i qk F/ w,.. °".✓ "� b: }4 F Y , ` " t fltfff f1 f j# 14 sa pp TEMPORARY STOCK PILE l ( s r I 1df fsfs TEMPORARY t � / STOCK PILE � � � � � \ � � � \ • µ ^ > f r r / o f 1 t Z 1 I 1p/ ss DITCH 1013.2 / , 1e�t off ; 1. o f ♦ a- f 1 I i pas \ tp m f/ i f t �I✓ wy \ r / y 1IV / i 1 alp Jlp ft1 f ♦.n e r ` / f d 1 l I tldfffplp v `I lffp a l r TEMPORARY CHECK DAM (TYP.)ape � •', / �.... � � � � .... � / , a � ,,, (� � €; r lt£fgj • t °� � ' pl f {�I�,r f� V .fir' f� p o f a .,. / ,� a i ; f till l£ 1 f I f ff f ll f fj� 1 91 � � �.. �, `" � \ " ��.. � f �^^ .. ! ? 1 i11;�' 9 I ✓/ f 1i f f1� f f �.. � i € i � W f/1 ►- ^` f s €`°" ..,. :,s _ ,� / .''� ., �"`'�,-w----""� ~° , d , fit ,, ptp sp £`�p � f f ff��� ELsf af1 p \, d Ip p' f ptf ff I fp �Il f fr' 1flpltf/ flf% a----�.� i"- � Lob f ffffpfpff1/ t I f p C� � � v f•f � � ff v V \ `4 -\ q / g ;e` f %, ^^ LOU "^, ♦ g $g i � f S• � ``-LOO•^-.----'�0��- Z`" .,y l 4 '¢ LOO•-r•-_ 1 i pd `i \ \ 1 \ > t f 1 p ss f f #i'i Il'stt°t�i 6fflp 06 06 `' TEMPORARY t t 11t t 1lt I t°1 0 ter' \, -\ < -9°> / `` 1 \ R 1 CHECK DAM (TYP.) 1 f s4 1 `` 11 c� r DITCH 10.2 \ / 1 --41 \ — 1% � � �,. , - � � \ `® \ � — ? � I %, \ \ \ \ \ t \� \ \ 11 1� � � f # f f I oiS .> „- -.. . ,� °, ...•. 1 � � � � i � "°1 `° b„ -'" ,yam» `»" ,\ „� '� """ ) / .` \ \ \ � i { S � , \ � � £ � (^ � } � i t ' � O ,,, `" y R \\ h µ" .._ •..' \ "..,°`. "' " »w..i. � `".'"� °P ' „<e � *, 3 r% \ � .,,' \ '� �°- y � � r d � t ,� 7 € r •O L is > t p s# SILT FENCE t ----- _______— ao,- _______de; s\ t s 4 \ OUTLET TYP. t ( �"'°° >'°°` `'^ ( } '"�.-' � 1 J 0 f ° Loo p a 9 L LOD LOD w LO i` � +• E S [ ,1 � �--_��oJ yoo �, 3' h µ it fp 1 \ t �f�par � .—....; � 1 \ i 1 Il IIOukX/ i— GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) ZONE 7 DAYS NONE SLOPES STEEPER IF SLOPES ARE 10' OR LESS IN THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 14 DAYS 7-DAYS FOR SLOPES GREATER OR FLATTER THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE WITH SLOPES 14 DAYS (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) * "EXCEPTIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICAL." - (SECTION II.13(2)(b)) LEGEND LOD LIMITS OF DISTURBANCE SILT FENCE TREE PROTECTION TP FENCE TPSF TREE PROTECTION SILT FENCE DD 1-A DD 1-13 --- DIVERSION DITCH A DITCH REINFORCEMENT INLET PROTECTION SEDIMENT BASIN TOTAL DISTURBED AREA= 51.87 ACRES . POROUS SILT FENCE OUTLET m —�-- SKIMMER �'•�► COIR WATTLE ® RIPRAP CHECK DAM NOTES: 1. NO MORE THAN 75 ACRES SHOULD BE LEFT BARE AT ANYTIME. 2, ALL TEMPORARY DITCHES SHALL BE COVERED WITH GROUNDCOVER AT END OF WORKDAY. 3. SILT FENCE AND TREE PROTECTION ARE SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR PLAN CLARITY. 4. ALL STREAM CROSSING INSTALLATIONS TO BE DONE DURING DRY WEATHER PATTERNS FUQU4r-VAPIRA ENGINE I G T PPROVAL 1 Slpature Dated co 00 z 'tH CARo,�'% uuwcr»rc�powuo.., i '�. OVV2232L1 � O: FN-INS�R V. 8/25/2021 o � � o r' E N E W z 01 in uj N W VIx 1.4 a W6 — °� U. 0 z � � m a=� O J J aQQ Z X N at�C LL LU o Ca Ca 0 ,� � � z 10E-0 LO z L ti N o O w cn N W h- O C7 00 > wuj uj Z 00 C1 DATE j 0812512021 O DRAWN BY 331 DESIGNED BY . 331 • CHECKED BY • M.ZACCARDO . SCALE • 1I1=60' 0 • am W '_ N Q •> NIrr-n— VJ m a N 0 Ll Q 1 H 3 ,s � , w U V1 azD WU co o z V / 0 Q 0 c W z � L L N Z = � O c m Lu `�z cl�C c mr u A? 0 Q W0L J H0 o o� z Z W o Q � � U > @-6 Q �i OQ W a 3 o t.t_ L m g Z OZS cD 3 zcn z00, m a ^axi S.i O ri��'I o V ) 0t Oo a� � w V y N O w v, La c o c 06 tOj 4S c ya m2 JOB NO. co 0 c 0.2 40697 SHEETi NO. a 2 SH 1. E1 . G E L %'tpl►11J,,,, CAR t 0 e 18" HDPE TEMPORARY of r%n� nontKi i-rvn X NOTES: 1. NO MORE THAN 75 ACRES SHOULD BE LEFT BARE AT ANYTIME. 2. ALL TEMPORARY DITCHES SHALL BE COVERED WITH GROUNDCOVER AT END OF WORKDAY. 3. SILT FENCE AND TREE PROTECTION ARE SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR PLAN CLARITY. 4. ALL STREAM CROSSING INSTALLATIONS TO BE DONE DURING DRY WEATHER PATTERNS GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) ZONE 7 DAYS NONE SLOPES STEEPER IF SLOPES ARE 10' OR LESS IN THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 14 DAYS 7-DAYS FOR SLOPES GREATER OR FLATTER THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE WITH SLOPES 14 DAYS (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) * "EXCEPTIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICAL." - (SECTION II.13(2)(b)) LEGEND LOD LIMITS OF DISTURBANCE SILT FENCE TREE PROTECTION TP FENCE TREE PROTECTION TPSF SILT FENCE DD 1-A DD 1-15 — elm. — DIVERSION DIVERSION DITCH A DITCH REINFORCEMENT INLET PROTECTION C� SEDIMENT BASIN SILT FENCE OUTLE-1 ®---- SKIMMER $*"", COIR WATTLE RIPRAP CHECK DAM r-U0UA-Y-VAP.IRA ENGIN RI DEP/T P ROVAL Signature 0ate2 2' Ed 2�1 TOTAL DISTURBED AREA = 51.87 ACRES cM 00 0 Q z marth8li Ina, 1 •1 1 vwaG.nK �Lnvuo... 'V 022321 O FNGINEi� ZpGG V '�nun►n►�'` 8/25/2021 E U N O (V E "' z .1.1 3 HLu W V .2 N ¢LL — o IL N ri z O a=Q� h �.aX x � � � ��- o ut wmm in 0.-� Z > U) Ln 0U)o N ►-� ,- t O OR Ln ON W F_ vi O Q D 0 r-1 ri LI N N LLJ O O rl co o0 � DATE H 0812512021 0 O BY >_ 1DRAWN 331 DESIGNED BY • • 331 . CHECKED BY . M. ZACCARDO • • SCALE 1 "=60' • • • W '- U C N Q N ~ 0 0 Lr) z M a a ,--I 0 CL U Cis Q 46- Z ULu z �� 0 a w o z -� z = O m ULU U z F a =uz 0 Q w 0 3 z ¢Vaa J 20 o Z o(n z �z w �o v > > _ >- '- p o=W� U O U. N 0 z cz0. ' 3 Z� z Q o ow M o ° � Y z W 'N O N O _ N V f" U C 0 lj•�L� � O v////�� ♦ U Z O U JOB NO. y o O o 0 40697 � U O SHEET NO. a o z CE1.3 = m DocuSign Envelope ID: 4C86B634-079E-4C9E-A186-42217E88892D ■■■■ ■■■■ � ■■■■■■" ■,■■"■ ■■■■■■■■■■■■■■ ■■ �■�■■�■ go O ' ' IN � ° ■ �i CULVERT 20-A \ ,73.02'OF �■ 8411 IN IN IN t ` INJ — i PROPOSED STREAM IN�° t iM CROSSING (SEE ■ f t CONSTRUCTION �.1f ■ ` l o SEQUENCE) vdD ■ /'� z ■e,~ ` TEMPORARY PUMPS°, �■ i P I PASS AROUND (SEE0 0 I DETAILS ON CE1.4) I °, mmamwimmom MORON INSET A - STREAM CROSSING ■■■■w■■■■■■m'■■ MOM ii%■i. ■■�■■■■� ■■■46 IN IN a0i IN ■� CULVERT 19-B t ..,,I IN ■y �. 60.00' OF e ; IN t 84 ININt t @ 1.65% I CULVERT 19-A I I 4 I IN ,I ■ t 1 60.00' OF I t I I ■ pin \ °� � ""� 1 1 ■ @ 2.97% t 1 a I t p IN r^ 3 3 IN ■ } f I I i t iI 1 tl PROPOSED STREAM I I CROSSING (SEE IN IN t 1 CONSTRUCTIONok ■ a t SEQUENCE) t I IN TEMPORARY PUMP _ ' " F ; t ` , ■ PASS AROUND (SEE I ' t ■ DETAILS ON CE1.4) ■ ■ i ! '� '° `OO I a � 1 lI 1 i I � � t � i � m ■ coo MEN 0 ON m"No-wamm INSET B STREAM CROSSING Co 00 Q Z SCALE 1 "=20' 0 20' 40' NOTES: 1. NO MORE THAN 75 ACRES SHOULD BE LEFT BARE AT ANYTIME. 2. ALL TEMPORARY DITCHES SHALL BE COVERED WITH GROUNDCOVER AT END OF WORKDAY. 3. SILT FENCE AND TREE PROTECTION ARE SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR PLAN CLARITY. 4. ALL STREAM CROSSING INSTALLATIONS TO BE DONE DURING DRY WEATHER PATTERNS APPROVED SEDIMENT FILTERING DEVICE (SEDIMENT FILTER BAG). PROVIDE POSITIVE DRAINAGE FROM SEDIMENT STREAM DIVERSION PUMP FILTER BAG TO STREAM. DISCHARGE HOSES INTAKE HOSE DISCHARGE ONTO „_ DEWATERING PUMP STABLE RIPRAP _''--_—= PAD TO PREVENT �_�.-• . � • :P .• - • _ .. `:" .'`_ ---_-_;: .= '-R�AMgp,N SCOUR HOLE T FLOW FLOWSEDIMENT INTAKES---- HOSE CLEAN WATER SUMP —HOLE FOR POOL DIKE DIKE " f (12" TO 18" DEEP, 2—FT DIAMETER) ♦•s:..'ic-_a•`..++•'^. a.:_.•-;.ii..lq i.`.tis Y.- o; c ati,w`. sYe?+?: _• � •. aai :':�X.�:✓-•a._.+�.. _ • w•:,ti-i.!•Y.;i:. ^!' .r:i`�C." '-�-C ..•lay?`.." � - 4 vy.M � _ - - " _ •- cou�r EFFECTIVE: 01/31 /08 WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY TEMPORARY PUMP AROUND SEQUENCE 1. SET UP PUMP WITH SUCTION AND DISCHARGE HOSE. 2. INSTALL UP —STREAM SANDBAG DAM. 3. INSTALL DOWN —STREAM SANDBAG DAM. 4. THE PUMP MUST RUN CONTINUOUSLY WHILE WORKING IN THE STREAM. 5. STREAMBANKS MUST BE STABILIZED AT THE END OF EACH DAY. NOTES: 1. SANDBAG DIKES SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA, AND STREAM FLOW SHALL BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIPRAP OR SANDBAGS. 2. WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A SEDIMENT BAG OR OTHER APPROVED DEVICE. THE MEASURE SHALL BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE WITHOUT CAUSING FURTHER EROSION BETWEEN THE SEDIMENT FILTER BAG AND THE STREAMBANK. EXISTING TERRAIN TEMPORARY STREAM C 1 arC® n A f% CPYC 11CUiA TCdiAM_ OF ♦- 57 STONI PROVIDE STABILIZED OUTLET TO STREAM BANK. WOOD PALLETS MAY BE USED IN LIEU OF STONE AND GEOTEXTILE AS DIRECTED. A SUFFICIENT NUMBER OF PALLETS MUST BE PROVIDED TO ELEVATE THE ENTIRE FILTER BAG FOR DEWATERING ABOVE NATURAL GROUND. STANDARD FILTER BAG FOR DEWATERING ACTIVITIES 1/2 - DIAMETER OF PIPE — OR GREATER FILTER FABRIC ­7 ,CAPACITY OF PIPE CULVERTS — TOGETHER = BANK FULL FLOW G- TO SCALE: I=U 0UNM/AR 11 NA ENGINE IN D- P APPE Signature C C=2,0.2,1-2 251 MINIMUM TOP OFBANK L�N 022321 8/25/2021 E 0 �o ,,4E W z a 0 Lu V N U.U. z a=l"+0000 O J z W J 01 x U) � o 0 m m z0 > cn In cn rn z N 0 00 w �rn H O z S I— W W O O \ N Q zz O O O DATE 08/2512021 DRAWN BY 331 DESIGNED BY 331 CHECKED BY M. ZACCARDO SCALE 1 11=20' cV N �UJ � Q U c Q O W H �../ z (n F W ~ Lu �C z Q :2f W � W u op Q H z Q D (W OHO U > U O = W z I.i_ U- � � CL O U O U JOB NO. 0 40697 117— SHEET NO. O Z CE1. 4 L DocuSign Envelope ID: 4C86B634-079E-4C9E-A186-42217E88892D a \ \ \ \\ \ \ \ NI ». ,,: "� n «« — ". °e •, } � `\ -"" `` ... » '"� �, � 4 °art `�� \ � � ,. � f 1 � �- ", _. � � `° «, °; \ � >` �. \ `, b ;" �. m & „^,."" w fir"'^ �'+.."" \ "\ `i \ry d"""a 'p«,"°"• `i"^ --^ ,.... 1, °e t, ..m," """ '„ „`w �' \I 0 \ \ i j— l \ \ ffi 1 rtr w w t '4 � i ✓ «.' ,-m f �,, 77 VA 4kOtt 4t , l ® i w w w 809 a w w *!® w5 € $ \ a , 5 e.. \ " f " ` i r� � L� 1, ,V (y, EXISTING L L EXISTING `\ d w w w y a ' i fr\ POND �v \\ Y POND i \ 4,%t+ �✓ ,v w ar pwC L V� �i/ ray LV �!r �!+ �L b $ �\ a a 1 w w 1 \ r w w+ w ws • ! ,. ak �* w rj { 4r w 1 FUQUAY-V/- RINA EN�IN R GDMP PROVAL Mwill4i Date f � 2, F-c— t-�3 --------C' ®� y LEGEND t ——=-" }� j fa,� { ii� ! I� lt 3 \ I�d €' . ! � �f•*Y�g •�ww.i&"°`�pk' 4r1.."..` w` � w � b '\� �r°` .\� .I�--fir ` ^�ws Y�-\ I(Is , ` �,°�•`�r `�°'�I�� �"t'w`i/ }w' °a �' ��•� � L �� �/�, `�'it' �w wr ,� `��r �1vr :� � f r f LOD J� LIMITS OF DISTURBANCE �e� W- 1k 4 111 4,i4, v �4 Aw w ! w SILT FENCE wWww�ww�r, 14, �wwY �i U TP 9 J w \w pa, i TREE PROTECTION FENCE / >., S w \\ �Y �S �ii �� %V Vr `dr a C "'` " �R 'k � �v \,* , \P —\V " g i f u 1 ., =�-- .�:� TPSF TREE PROTECTION i 5 1 w w w w w \w via w w w ?' C 8 3 C Q Q / \ 3 w } :�°� yG t w. -_\ -° \ ! SILT FENCE T� / { ` ` E \ w w w ww�www}.. \ sot1 P \ \,� \ w w w "� DEL r� w a , i ! t t , DD1-A DD1-B i w w w .lii 335 - EBg wa° 'to ! f t ! 59a} w .�� w w �. t _ i GARDENS' t F --f► DIVERSION DITCH � _r `� '' � � � d ✓ f• �' .� � � DR�V .(✓� �€✓ °°Ji, � a f � *dr '�y° .V �L°......(✓ �w >v� w �°°' ` < � ��•� � � _ , s�_ � � .� � � DITCH REINFORCEMENT ra 1 a 1 j I w w w w 68 585r 1 a ' 9 I w» Xy 6Q p a � � �� � � � � 7 `Y � `� �',». -,fir ,f ,�,t.� � S � '$ 3 /" '°�"'-,� r «. � " f O '' °' � M" t °,�. ,„, _ .,, p0-S '�iS �, •.. ,� � INLET PROTECTION .VI w, -4, a v 3 I FJ t r i I a `V ptf'l t SEDIMENT BASIN �9w ab w� 1 d f I I81 ¢17 I �a4 14, "" � �799 j Iv l i ° \ r " zC ✓ 93 i p d p _ / d % °j 1 � � � 79 c t // 9n / f f P 1 e c E— d w w / \ 94 POROUS BAFFLES i 1 1 C r �r4 l 4 j t 1� f { s z { i j n 4 t, w V V Bi w € j { F \ m r 79 t 746 97 f 1 °\ (98J VJr I \ 1 zaL n w sb5 w Er Q € 77 It ✓ \ �7 92 �?Q / f I = a M xi /�>iir ' SILT FENCE OUTLET +j .,,,:,,yr w njnJ Ups e f d f 695 9 i 78 e I 6 f �— w w ! 0 67 g p V SKIMMER \ w �f a f Jj f t^,.j31 COI R WATTLE1 Iw 0 , J ' � 7�3 `°° ..,� } / «s� � -' ,'• s w 67, mow„„« w d «... � / y -«•, � °... � 1 � � 1 77a " �! ��!�'r�t RIPRAP CHECK DAM _`#k.I ..^mot t -----. '`�`�.,,..a.— ----_`. . �� - s �- --� �. ,.. /,n/p� �-:.... � -•�,: ,_—,—_. _____� .1�� �; i; �/ �`�""rr►� � -_:�.awn':"�;w,?!�r..a.�n�.�.��..�'�'�"'� % °!!'. i _ '�<7 `""-�!�r'=�" j! `_��ir ��.-.wm.! ,:: it//j/Jj // //,i�•_� I , • �'I � .I I, 11 ..r i<.¢ _ I� q < iLT— "`� `+w.�rwr.�rrs. • �' i i. In' � '' � '!i 0�`"��+►� � _---_-°_ ----. n I �1lil ,I:�i������'__--_--.... -..__.-_.aia�...,.. zy�usa�.>'�� r<a�+�"" /��,� /i �r./i/i/! ' 8. � ._-_.._.1��: .:-----,.. �.�1) � ���� - �.......�I�a �,lu� ■ NOTES: 1. NO MORE THAN 75 ACRES SHOULD BE LEFT BARE AT ANYTIME. 2. ALL TEMPORARY DITCHES SHALL BE COVERED WITH GROUNDCOVER AT END OF WORKDAY. 3. SILT FENCE AND TREE PROTECTION ARE SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR PLAN CLARITY. 4. ALL STREAM CROSSING INSTALLATIONS TO BE DONE DURING DRY WEATHER PATTERNS STOCKPILE AREA NOTES: 1. MAXIMUM SIDE SLOPES: 2:1. 2. MAXIMUM HEIGHT SHALL NOT EXCEED 35 FEET. 3. ENSURE STOCKPILE AREAS ARE SUFFICIENTLY STABILIZED TO MINIMIZE SEDIMENT RUNOFF. 4. STOCKPILE AREAS SHALL BE KEPT WITHIN PROPOSED LIMITS SHOWN ON PLANS STOCKPILE MAINTENANCE: 1. SEEDING OR COVERING OF PILES WITH TARPS OR MULCH IS REQUIRED AND WILL REDUCE EROSION PROBLEMS. TARPS SHOULD BE KEYED IN AT THE TOP OF THE SLOPE TO KEEP WATER FROM RUNNING UNDERNEATH THE PLASTIC. 2. IF A STOCKPILE IS TO REMAIN FOR FUTURE USE AFTER THE PROJECT IS COMPLETE (BUILDERS, ETC), THE FINANCIAL RESPONSIBLE PARTY MUST NOTIFY FUQUAY-VARINA OF A NEW RESPONSIBLE PARTY FOR THAT STOCKPILE. 3. THE APPROVED PLAN SHALL PROVIDE FOR THE USE OF STAGED SEEDING AND MULCHING ON A CONTINUAL BASIS WHILE THE STOCKPILE IS IN USE. 4. ESTABLISH AND MAINTAIN A VEGETATIVE BUFFER AT THE TOE OF THE SLOPE (WHERE PRACTICAL). NOTES: 1. AREAS WILL BE STABILIZED PER THE GROUND STABILIZATION CHART AFTER ANY GRADING. 2. ALL BASINS SHOULD BE CLEANED AFTER ANY RAIN EVENT THAT EXCEEDS 1" IN 24 HOURS. 3. SEDIMENT BASINS WILL BE INSTALLED WHERE STORM DRAINAGE PIPE IS LOCATED. I.E. PIPES WILL BE LEFT SHORT AND EXTENDED THROUGH BASIN AREAS AFTER SITE HAS BEEN STABILIZED. 4. MAXIMUM IMPERVIOUS AREA SQUARE FOOTAGE ON EACH INDIVIDUAL LOT WILL BE STRINGENTLY ENFORCED WITH NO EXCEPTIONS INTO PERPETUITY. 5. (LOD) INDICATES THE LIMITS OF ULTIMATE DISTURBANCE FOR PURFOY SOUTH. SLOPE STABILIZATION REQUIREMENTS: 3:1 AND FLATTER --GRASS 3:1 TO 2:1 SLOPE --ADAPTIVE PLANTS (SHRUBS AND VINES) 2:1 TO 1.5:1--RIP RAP STEEPER THAN 1.5 TO 1-RETAINING WALL SEDIMENT BASIN REMOVAL: 1. REMOVE BASINS ONLY AFTER SITE IS STABILIZED AND WITH PERMISSION FROM WAKE COUNTY ENGINEER. 2. REMOVE TARP AND ALL NON DIRT AND/OR ROCK MATERIAL. 3. USE BACKHOE TO FILL IN AND LEVEL BACK TO NATURAL GROUND ELEVATION. 4. SEED AND STRAW APPROPRIATELY. 5. INSTALL CHANNELS AND EXTEND PIPE IF REQUIRED. TOTAL DISTURBED AREA = 51.87 ACRES GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) ZONE 7 DAYS NONE SLOPES STEEPER IF SLOPES ARE 10' OR LESS IN THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 14 DAYS 7-DAYS FOR SLOPES GREATER OR FLATTER THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE WITH SLOPES 14 DAYS (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) * "EXCEPTIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICAL." - (SECTION II.B(2)(b)) M 00 0 Q z _A T, OVAL r022321 O 'qOO F� 8/25/2021 n O N �O 0 O n E N w z E ~ e Q (� LuH �,Ni U. IL OR LU0oM Go C7 N Jch A W­4 U rn �ko oOR V, � O� J M O D H 0 W d O U) > D O oi Q IUW DATE 0812512021 DRAWN BY 331 DESIGNED BY 331 CHECKED BY M.ZACCARDO SCALE 1 "=100' n N Lu N H N � Lnn Q M lfl 1� z O U Cn < z c9c; m: z�oa W Q z J z = O U LLJ C' z QQ 1-4 _ ° z <t w O z a U J In°c 0 z uj U �11-4 �0 WI O LL�� z 06 z' 1.L O i M O uj JOB NO. 40697 SHEET NO. CE2.0 L DocuSign Envelope ID: 4C86B634-079E-4C9E-A186-42217E88892D 11111111 H CA NOTES: 1. NO MORE THAN 75 ACRES SHOULD BE LEFT BARE AT ANYTIME. 2. ALL TEMPORARY DITCHES SHALL BE COVERED WITH GROUNDCOVER AT END OF WORKDAY. 3. SILT FENCE AND TREE PROTECTION ARE SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR PLAN CLARITY. 4. ALL STREAM CROSSING INSTALLATIONS TO BE DONE DURING DRY WEATHER PATTERNS GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) ZONE 7 DAYS NONE SLOPES STEEPER IF SLOPES ARE 10' OR LESS IN THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 14 DAYS 7-DAYS FOR SLOPES GREATER OR FLATTER THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE WITH SLOPES 14 DAYS (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) * "EXCEPTIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICAL." - (SECTION 11.13(2)(b)) LEGEND LOD LIMITS OF DISTURBANCE SILT FENCE TP TREE PROTECTION FENCE TPSF TREE PROTECTION SILT FENCE DD 1-A DD 1-13 --f► — DIVERSION DITCH DITCH REINFORCEMENT INLET PROTECTION SEDIMENT BASIN POROUS BAFFLES SILT FENCE OUTLET SKIMMER COIR WATTLE RIPRAP CHECK DAM FU0U/�`(-\//- R.1 NA ENGINE RI G D U PPROVAL Signaturre, /J Date -lam 21 Flo- 202-1— -3- TOTAL DISTURBED AREA = 51.87 ACRES M co a z 0] n 01" .1 vvvcn��povvo... � _ 022321 O r NGINEEG46.�, ., V. ZP, �.• 8/25/2021 E 0 c o N E LV Z 4-! F- 3 c aW 1p� uj U rj W �- W N tX1 LU 0 o M �jx o � �rn F 0 � 00 U*)cn J uj H ui M O O 0 w Lu a z O 0 z O _ H _.I ..J °; � UN uj CO CO a » z m cn O a z W T-4 -I 00 o r, 00 0 0 DATE 0812512021 DRAWN BY 331 DESIGNED BY 331 CHECKED BY M.ZACCARDO SCALE 1 11=601 am IN LU N N � 0 n a M 1,O rq z _ U o LLJ <z z Cn o a Lu Q z J z = � O Lu z oC U �- o �- =uz Q W O z �_<U J F- oC 0 W ZU1 � r � 0cy Ocn O LL L 0z 06 z a O cn O O W U M V +O U Ly JOB NO. 0 40697 LL SHEET NO. Z CE2.1 i 0 r m 0 0. m 0 13 0 5) a m t: m n 0 0 c 3 c Do- 0 20 mZ 0o m o o = c � m 1 0 D c n z N � m a o� CL 3 a� > Y 2 ca m o C U �N O f" U E o v c U m DLu = N � U o c m U o22 U O zo n N nE L DocuSign Envelope ID: 4C86B634-079E-4C9E-A186-42217E88892D h L 5 L J Y z D z L ji n NOTES: 1. NO MORE THAN 75 ACRES SHOULD BE LEFT BARE AT ANYTIME. 2. ALL TEMPORARY DITCHES SHALL BE COVERED WITH GROUNDCOVER AT END OF WORKDAY. 3. SILT FENCE AND TREE PROTECTION ARE SHOWN OFFSET FROM THE LIMITS OF DISTURBANCE FOR PLAN CLARITY. 4. ALL STREAM CROSSING INSTALLATIONS TO BE DONE DURING DRY WEATHER PATTERNS GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) ZONE 7 DAYS NONE IF SLOPES ARE 10' OR LESS IN SLOPES STEEPER 7 DAYS LENGTH AND ARE NOT STEEPER THAN 3:1 THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 14 DAYS 7-DAYS FOR SLOPES GREATER OR FLATTER ` THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE WITH SLOPES 14 DAYS (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) * "EXCEPTIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICAL." - (SECTION II.13(2)(b)) LEGEND LOD LIMITS OF DISTURBANCE SILT FENCE TREE PROTECTION TP FENCE TREE PROTECTION TPSF SILT FENCE DD 1-A DD 1-13 — —f•- — DIVERSION DITCH A DITCH REINFORCEMENT ® INLET PROTECTION 0 SEDIMENT BASIN POROUS BAFFLES SILT FENCE OUTLET [B SKIMMER I"�► COIR WATTLE _ RIPRAP CHECK DAM F'UQ UA` A/AP.I nA ENGINE RING DEPAPPROVAL Signature Datell Z/ fr c TOTAL DISTURBED AREA = 51.87 ACRES .1 OP, 1,r .6�x w w ON\ w' w A c 0 H CAR, 022321 a+ P�©N %�y9 FHGINEE�G `• 8/25/2021 E 0 U Vf lO 0 N E W z ~ '_ ?r Q w �+ O W 16 WGiOCN < U _ co Uj0CN a � N � O� fn 0-- ra w ­f I=— E OR O � Lnrn _I W f- vi D O x c� 0 x F 0 W W_ z O u7 0 z _O Q U LU Co in 0 -n :) z m O F- 0 j U')z W N r.1Tq N N W 00 N N Q V-4 Ln DATE 0812512021 DRAWN BY 331 DESIGNED BY 331 CHECKED BY M.ZACCARDO SCALE 1 "=60' fV W (D N < N � 0 LLnn 4) a co z z _ a U U o Wz O = z (,n o2 W Q z z z z ce � O =°z Q WO z a U DC O z U > W 1-1 = a F- O = W O LL 5 V) 0 z C6 z rL O to O I� O W U O U JOB NO. 0 40697 O SHEET NO. Z CE2.2 L DocuSign Envelope ID: 4C86B634-079E-4C9E-A186-42217E88892D �j• '� / .a' V•r i `*.�. kk .yew �`Y r.✓ "^a OD. gLD Ca I tom( I I �b t 60i 711��j I ca # € ' g/ I 1 ' t r I s t e� 1 SILT FENCE ° Q1 i OUTLET TYP. n -( r Aill" �{ )� _ �( m I s�� CL � � ( �J i f � � � �� J�m LEA� �� � � � � � `� mi sit I If i 2 It g J Y i d ~ vCCJJii 0D42A[g �l3B46B... � w zy 022321 0 0 Q'- ���'Fl V. ZPG�.P��• 8/25/2021 E 0 U C Q N E Z a Uj w G� oG ry ate- o z �OoM co O F~- J 0.. = _i z0) � "" J U i—+ NOTES: p 1. NO MORE THAN 75 ACRES SHOULD BE LEFT BARE Ln °v O u7 z AT ANYTIME. �O � *-� N 2. ALL TEMPORARY DITCHES SHALL BE COVERED WITH GROUNDCOVER AT END OF WORKDAY. ino, 3. SILT FENCE AND TREE PROTECTION ARE SHOWN j OFFSET FROM THE LIMITS OF DISTURBANCE FOR i PLAN CLARITY. 4. ALL STREAM CROSSING INSTALLATIONS TO BE DONE DURING DRY WEATHER PATTERNS 0 x GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) ZONE 7 DAYS NONE SLOPES STEEPER IF SLOPES ARE 10' OR LESS IN THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 14 DAYS 7-DAYS FOR SLOPES GREATER OR FLATTER THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE WITH SLOPES 14 DAYS (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) * "EXCEPTIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICAL." - (SECTION 11.6(2)(b)) D F- w a zz w QIN 0 rqii �00 00 0 04 (11 DATE 0812512021 D 0 DRAWN BY 331 • DESIGNED BY . 331 • CHECKED BY • M.ZACCARDO • • SCALE 1 "=60' • ANIL W v U c N Q> c N c cc ntD 0 z M > <czLLJ b V IV m z (n W a 0 z J m z Z 0 U = a J=°z� 0 Q z W 0 U 3 _j J F U � D DQZ2 z Q W ZU1 Q � a c O W a 0 z 06 FUQUAY l/A-R1NA Z c ENGINE RING D T APPROVAL 0 9 -2 i p� Signature Date O Ec °'2® Lt- 3 Ln H 0 EC t 0 .y z W X 0 N TOTAL DISTURBED AREA = 51.87 ACRES U � m 00 ' zcl c v 0 Z m �U JOB NO. SCALE 1 "=60' 0 40697 ca ° m SHEET NO. f6 0 60' 120' Z CE2.3 r L DocuSign Envelope ID: 4C86B634-079E-4C9E-A186-42217E88892D LINER,WITH OGRAVEL APPROACH n DUSTING SLOPES KEYED RIP RAP III II 11=11 II Ilel I ILA I! II tl. _III 5 WASHED STONE FRONT REMOVESEDIMENT -OM. BEHIND CHECK DAMS M PREVENT DAMAGE TO CHANNEL VEGETATION. FLOW SHOULD BE MAINTAINED THROUGH THE DAM. W, r r�r:M�lrrrrrrrr�rr. � � I. _ _ ,�,rrrrrlrl�,rrl�rl..r HEIGHT & WDTH DETERMINED BY ENSRNG TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. KEY RIP RAP INTO THE DAM FOR STABILIZATION. ��'IAIC Nti UNCE GRAVELNOTES: NCrrE: . P NOT 1. PLACE GRAVEL HIGHER THAN TOP OF CURB AND ALLOW SEDWNT TO SEPARATE FROM RUNNOFF. 2. USE SAND BAGS OF WOVEN GEOTE)MLE FABRIC (NOT BURLAP) AND FILL WITH J!NcH OR WMJ.ER) GRAVEL. BAGS MUST BE LAYERED SUCH THAT NO GAP$ ARE EVIDENT 3. INSPECT BARRIERS AND REMCIVE SEDIMENT AFTER EACH STOMA EVENT, SEDIMENT AND GRAVEL MUST BE REMOVED FROM THE 4. WHEN INSTALLING CURB INLET .. C k §@gjLqN VIEW :t STANDARD GRAVEL BAG CURB INLET PROTECTION I Il III II KQML 1, DIVERSION TO BE USED UPS.OPE OF A CONSTRUCTION SITE TO PREVE14T STORM RUNOFF FROM ENTERING THE DIS7URBED AREA, 2, IMMEDIATELY LINE AND STABILIZE BEFORE ANY DOWNSLOPE GRADING BEGINS (STABILIZATION MUST OCCUR BEFORE ISSUANCE OF A CERTIFICATE OF' COMPLIANCE). STABILIZATION METHOD 1S BASED ON VELOCITY OF OFFSITE DRAINAGE. I DIVERSIONS MOULD ONLY BE USED FOR DRAINAGES 5 ACRES OR LESS. 4. ANY SEDIMENT LADEN WATER PRIOR TO STABILIZATION OF THE DIVERSION MUST BE DIVERTED INTO AN APPROVED EROSION AND SEDIMENT CONTROL BMP, CLEAN WATER SHOULD EMPTY'INTO AN APPROVED OUTLET DEVICE. —� 2' MIN. �- 0 ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER 10'-0" MIN. O SANDBAG SjtYP.) 0 OR STAPLES � 10 MIL 1:1 PLASTIC Q Q d SANDBAGS (TyP.) SIDE SLOPE LINING OR STAPLES 0 Ca C 0 5'95< A CLEARLY MARKED SIGNAGE SECTION A -A COANCRRETTE NOTING DEVICE (18"X24" MIN.) 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE HIGH 10'-0" MIN. COHESIVE & B SANDGS ( LOW LOW FILTRATION 010 OR STAPLES SOIL BERM 0 CD CD ® HIGH MIL r COHESIVE & PLASTIC LINING LOW FILTRATION z 0 0 1:1 SIDE SLOPE SOIL BERM /�(TYP.) a o M q� ® 0 0/ M� U CD CD s" N i ''IN: 1, SECTION B-B 2 0" B SANDBAGS (TYP.) NOTES: OR STAPLES 1. ACTUAL LOCATION DETERMINED IN FIELD CLEARLY MARKED SIGNAGE 2. THE CONCRETE WASHOUT STRUCTURES CONCRETE NOTING DEVICE (18"X24" MIN.) SHALL BE MAINTAINED WHEN THE LIQUID WASHOUT ANDIOR SOLID REACHES 16% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE PRELIMINARY DESIGN NOT FOR CONSTRUCTION STREAM CROSSING CONSTRUCTION SEQUENC 1. SCHEDULE A PRECONSTRUCTION CONFERENCE WITH FUQUAY-VARINA ENGINEER PRIOR TO BEGINNING CONSTRUCTION. OBTAIN A LAND -DISTURBING PERMIT. 2. INSTALL TEMPORARY 6-FOOT WIDE TRAPEXOIDAL STREAM BYPASS CHANNEL WITH 2:1 SIDE SLOPES, INCLUDING WATTLES/CHECK DAMS, SILT FENCE, TREE PROTECTION FENCE OR OTHER MEASURES AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. SEED TEMPORARY DIVERSIONS AND BERMS IMMEDIATELY AFTER CONSTRUCTION. 3. BEGIN CLEARNING AND GRUBBING. KEEP CLEARING AND EXCAVATION OF THE STREAM BANKS AND BED, AND APPROACH TO A MINIMUM. MAINTAIN DEVICES AS NEEDED AND ROUGH GRADE CROSSING AREA. 4. INSTALL PIPE CULVERTS/HEADWALL AND BACKFILL PROPERLY. 5. INSTALL DISSIPATOR PADS AT PIPE OUTLETS WHERE APPROPRIATE. 6. INSTALL PROTECTIVE GROUND COVERS TO PROVIDE PERMANENT EROSION PROTECTION AND IMPROVE VISUAL QUALITY, BUT NOT INTERFERE WITH DRIVER LINE OF SIGHT FROM THE ROADWAY. 7. STABILIZE ALL DISTURBED AREAS BEFORE DIVERTING WATER THROUGH STORM CROSSING. 8. WHEN STORM CROSSING CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED COMPLETELY, CALL FOR AN INSPECTION BY THE FUQUAY-VARINIA ENGINEER. 9. UPON COMPLETION OF CROSSING WITH AREA STABILIZED, THE TEMPROARY STORM BYPASS CHANNEL MAY BE REMOVED, BACKFILLED AS NECESSARY, SEEDED AND STABILIZED. 10. ENSURE THAT PERMANENT MEASURES NEEDED TO CONTROL EROSION FROM ROAD WATER RUNOFF (SUCH AS RIPRAP AND PAVED CHANNELS, PAVED FLUMES, OR RIPRAP OUTLET PROTECTION) MEET ALL CONSTRUCTION REQUIREMENTS FOR THOSE PRACTICES. 2 1=U0U/-Y-\//- R 11 NA ENGIN RING DEPT APPROVAL// � Signature Date _`J CC OPN [ IA R � C' 0D42A1gEWf3B46B... z �3 022321 O. FNGINEE``� ZpC'�.P��` '���Il/lllll►��` 8/25/2021 E U o� � o N w Z + N U lu Lu V 0G rV Q U- 00 z LUCom O 00.2of Z N ._ � ce "- J X V P-I 2 Wmm p 0 i o I:eU Ln z I=— O z F- •-I nI o W ce Ln 01 J H Ui C.9 O W O 0 m a _qLn Q h 00 O 00 U) DATE 0812512021 O DRAWN BY 331 • DESIGNED BY • 331 • CHECKED BY • M. ZACCARDO • • SCALE NA • • • M N _ a N M 0 � J to N � H z F_ f A O W 111 U� / Q (j �I U = J z Cll) O o u Qz� z _ z W z 0 ° U Q � LLI z aLLJ Z clC z ~ 0 U >W I=— � oZS oc Ocy 0 O L. =) z � O w Lu z O U O U 13� JOB NO. O 40697 0 SHEET NO. Z CE3.1 is L DocuSign EnveloF B6B634-079E-4C9E-A186-42217E88892D i 1 SEEDING SCHEDULE (REVISED:1-1-86) ♦♦♦ CA °, SHOULDERS, o SIDE DITCHES SLOPES (MAX 3: 1) TW OF -no f OD42A@FFflE6Cf1`6466 TAM Tl�lZL ... e a � � _ J U7 f M DATE TYPE �3 022321 PLANTING RATE Q AUG 15 - NOV 1 TALL FESCUE 300 LBS/ACRE '��� GQ'�♦` NOV 1 -MAR 1 TALL FESCUE 300 LBS/ACRE �i�� V. ZP`��♦�` SECTiCWTJ "i'HR W ER P�;L• AY Try & ABRUZZI RYE 25 LBS/ACRE 8/25/2021 MAR 1 - APR 15 TALL FESCUE 300 LBS/ACRE APR 15 JUN 30 HULLED COMMON BERMUDAGRASS 25 LBS/ACRE AN VIEW WN WWE �` U JUL 1 -AUG 15 TALL FESCUE AND 120 LBS/ACRE 8 Sim I sT r ***BROWNTOP MILLET 35 LBS/ACRE C _ 1' MIN FRE:E3}DARA Fir er* O INFLC�t BAFFLES tTu� OR SORGHUM-SUDAN HYBRIDS 30 LBS/ACRE N E STR TUB MkWAY = HIMMOM CUR" z E TION~ z 3 SLOPES (3:1 TO 2: 1) Q 3 a toiO DISSIPATERMAR 1 - JUN 1 SERICEA LESPEDEZA (SCARIFIED) 50 LBS/ACRE LU U W �^. RIPAB P LYI gum & a Ida. 00 z INLET SHALL BE � N w C o M O CMP OUTLET PIPE" (MAR 1-APR 15) ADD TALL FESCUE 120 LBS/ACRE a = PROTECTED "CAS NEEDED) 1. REMOVE SEDIMENT HALF t>F` STONE'OUTLET I� C4i�RED. FROM EROSION wiTH 2. REPLAN STELAE AS NEEDED M ENSURE DEWATERINQ 0 0 RIPRAP, TARP, MATTING (MAR 1 -JUN 30) OR ADD WEEPING LOVEGRASS 10 LBS/ACRE z W '� OR EQUIVALENT, (MAR A cLOTnMW (MAR 1- JUN 30) OR ADD HULLED COMMON BERMUDAGRASS 25 LBS/ACRE s g x 011 u g NOTES II 1j �T TIEAT TMet "M JUN 1-SEP 1 ***TALL FESCUE AND 120 LBS/ACRE m w m m S} THE TARP TO P ECT THE N SHALL BE THE WdDTH THE OF WE TARP 91ALL � II o � TO AVAILABLEs>lPP.Y � .,° r�S ,ARE TO r� THEN TARPS HALL BE AT LF.ASi' 1B�' THE u ***BROWNTOP MILLET 35 LBSIACRE _� °� u z � � tx" TAf� THE TARP. THE TARP SHALL BE W MIL. HEAVY DUTY SLW R TARPAULDIS ***OR SORGHUM-SUDAN HYBRIDS 30 LBS/ACRE _ � 01, O z 1 EI tALENT FOR U.it ANOE f H i �O H N PROME A MMUM OF THREE POROUS BAFFUM TO EVENLY DETRIBUTE FLOW ACROSS WE BASIN, REDUONG TURBULENCE. SEP 1 - MAR 1 SERICEA LESPEDEZA (UNHULLED-UNSCARIFIED) 70 LBS/ACRE � > AND TALL FESCUE 120 LBS/ACRE ON w 4 RAFFLE MATERIAI- MUST BE AT TiE BOTTOM AM IDES USCG aIAPL OR BY NG AS FOR A SILT rt OR IY MOST OF THE lIN PHASE Bi THE F T SAY, 4T THIS BE READILY AVAILABLE DE TE M, �%O (NOV 1 - MAR 1) ADD ABRUZZI RYE 25 LBS/ACRE M C DiA%pV0 THE 7FAN PHA OF THE T ST19M6WYAIER SHALL ONLY DEWYA'tER FRE71i T TOP PIPE. - fry M POND SHALL HOT BE CONMTED FOR TER UNTL BY TAL EN STANDARD SILT FENCE OUTLET w tUN CTTVBs DI/31J08 r STANDARDS BASIN [EWC�� 01:11 CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE _ COMBINATIONS ARE POSSIBLE. c� ***TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED 6'-O" MAXIMUM PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12" IN HEIGHT BEFORE MOWING, OTHERWISE FESCUE MAY BE SHADED rq 1-4 OUT. j N 0 w tt MINIMUM 11J GAVE TMv SILT, FENCE FABRIC U LD N N ti• INSTALLED TO SECi}ND Q �• � LINE WIRES ECM TM MINIMUM 12-1/2 GAUGE SEEDBED PREPARATION zz 0 0°0 ! wTM I INTERMEDIATE WIRIES DATE GRADE1.) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP 0812512021 OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2.) RIP THE ENTIRE AREA TO 6 INCHES DEPTH. } DRAWN BY 331 PLAN MEWFRONT - 3.) REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. SUPERPHOSPHATE DESIGNED BY 1, - W > STEEL PEST 4.) APPLY AGRICULTURAL LIME, FERTILIZER, AND UNIFORMLY AND MIX . 331 WO WIRE FABRIC WITH SOIL (SEE BELOW*). • law T. USE SILT FENCE ONLY DRAINAGE AREA ELT FENCE FABRIC • CHECKED BY OEaIs NOT EXCEED 1/4 ACRE AND NEVER IN 5.) CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM INCHES DEEP. IEW&MM AREAS OF CtN CEN T RAT�9 FLOW .o REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 . M.ZACCARDO 2® REMOVE SEDIMENT DEPOSIT AS NEEDED TO FILL SLO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN � 6.) SEED ON A FRESHLY PREPARED SEEDBED AND COVER AFTER SEEDING. . • SCALE AND TO REMOVE PRESSURE ON THE SILT SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK 03 NEEKID FM EROSION TA NA T .t. Tn,l FENCE. �..:4• �rLTH ° pw, HxTrw 7.) MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. EidYAL iP it 4S .S, ON in PADANTI- 6" MINIMUM COVER • CNIX RIP o OVER SKIRT 8.) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR ANCHOR SKIRT AS DIRECTED.RESEEDINGS WITHIN THE PLANTING SEASON IF POSSIBLE. IF STAND • A'3 �Oa IT cPAan` a revAT ram° THAT THE it ws HA1"�vu BYENGINEER SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ORIGINAL `III TAB+ i9 TO PRti 1 CT WE SHALE- BE THE MADTH . THE LENGTH OF THE TAW ALL BE ACCORDING To AVAILABLEY. R' Mk.TIPLE TARPS ARE TO BE USEE� THEN TARPS SHALL BE AT LEAST 1�'. SHE . LIME, FERTILIZER AND SEEDING RATES. WWREAM ALIT TAW SHALL OWSUP U V THE i 1Sifl M TAM. INC TA OWL BE W MIL HEAVY DUTY SLVEIE TARPAULINS .aev , a PR ME A OF THREE POROUS. BAFFLES 70 r DISTRIBUTE FLAW THE HAWN, TURBULENCE, 9.) CONSULT CONVERSATION INSPECTOR ON MAINTENANCE TREATMENT BAFFLE MA MUST IM SE CIMMURED AT AND slams USING STASHOULD ES BY THE "LA As PYJR A SB.r A NEB ,'() AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. 6 MOST EG` THE NSTRUCI TNLL TE IN THE . P BAY, � TO WATT D IS READILY $HAL A ONLY DI E FOR MAINTFIRM WE IE,7O STANDARD� (�} � SILT FENCE, 6 DURING THE PHASE 9F WE lCi`: BiATEti SHJN.L, .Y tEM&ITER fRaiA WE TQF' iR' PIPE..�" . POND MALL NOT FOR WATER USE tN IL DY ENVIRONMENTAL ENGINEER. BFFI� VE:01/3160& * APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ ACRES (3 TONS/ACRE IN IL CLAY SOILS) STANDARD SKIlVII1rR ATTACHEDTO PER14�ANENT` RISER FERTILIZER - 1,000 Ibs. /ACRE-40-10-10 FFECTiu' 0131105 SUPERPHOSPHATE- 500 Ibs> / ACRE -20% ANALYSIS M MULCH -2 TONS / ACRE - SMALL GRAIN STRAW ANOTHER - ASPHALT EMULSION @ 300 GALS./ ACRE ^' - N �' 1. CONSTRUCT' THE nE TO THE SLOPE DRAIN OF A $? � H FLARED --END OF PIPE WITH A MINIMUM 6-4NCH MEML TOE N _ PLATE_ _siCAgSs vTEWr} ALL FCirildi3S A 3iAri T FYiTtNG MAY ALSO BE USED AT -THE DiLET. ®8 Q 2, USE AN D TO DIREDT SURFACE RUNOFF' INTO * , � • � � H c THE TEMPORARY SLOPE DRAK MWE THE OF TFE .ate ?�a8 x ; ss"W�he. THE CONDUIT A MUM OF 1.5 FT AND AT LEAST a INCHESa �?� �' �'� ra s� � � +g , . •� �s �� I (� � W nHold-dawn stakes U �+ • Q ID T HIGH THE Its ON S9CF � ;�.�� a ,. mRs 3.1 1.$' ►llitl U G O 1�Tii THEPOKr OF E SO THAT FLOW CAN DIVERSION SM SHOULD BE A MIt iU6E FRMYP ;r aka::+ ' ,�y, , «4 �w' � ° o- t eft mawAWV�aaa a �'• o ENTER THE PIPE Mk ^ ' MW � _ L 3 T THE OUTLEr OF THE N W ffN - • - ' z I— rn ISPRAP DIWAPATOR { ( V / � �.O// 0 10` Spaain l J. .� ICI I I..L� = =1 1=) w Q o � z � I I, t �I I II � II 11=1 I z = z plastic , u Corrugated 1 (—i Inlet ((I- W J P`� I 1=� I CL = O 0 Y�A aav,..,., n r U J Stablliz� --� # ,.... Outlet j e v.' Tld OtlTL4T o z Q z o 37 4' min00 .- z 0 lwel Uj r F FU0UA`(-\/AR l NA �. (n ENGIN R G P APi�RC�VAL �"' CZ5 O 1 Cross —Section ilieV� `��,.u. ,.,• Signature CY ®a —2 / O LL p z . k�tExn i�e1A� • AEC-201t_33 1 Standard T--section EC �h NORTH Z i O` - STANDARDO �'• SLOPE DRAIN STANDARDS R DETAIL � . : 0V31108 : 01131/0 3 - W O U U O , �I U s JOB NO. i 0 40697 O ' SHEET NO. Z CE3.2 L DocuSlgn Envelope ID: 4C86B634-079E-4C9E-A186-42217F-88892D R. Pc ofZW6 ---- 1 31146—Ift 3ir Q 0.581q?/Ko� InveftOut. SCM 10 - PERMANENT RISER SCM 1 OB -TEMPORARY RISER Hom 100-401011, FUQU A -"(-VA- R INA ENGINE RI G DERTAPPROVAL 24 r-0 q I 112-WOMOX,46 I .11 Lok"I =Lrwf tu;. EFFECT ICE DklfE11,112/2,020 "I - ------- - ----- ----- - NCG-01 MATERIALS HANDLING Required Ground Stabilization Timelframes Stabilize within Site Area Description this many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones If slopes are 10 feet or less in length (c) Slopes steeper 7 and are not steeper than 2:1, 14 days than 3:1 are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales (e) Areas with slopes ditches, perimeter slopes and H6�4 flatter than 4:1 14 Zones -10 days for Falls Lake Watershed unless there is zero slope Note. After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: I Temporary Stabilization Permanent Stabilization ..... . .. . Temporary grass seed covered .. . ......... . . Permanent grass seed covered with straw with straw or other mulches or other mulches and tackifiers and tackifiers. Geotextile fabrics such as permanent soil Hydroseeding reinforcement matting Rolled erosion control products Hydroseeding with or without temporary grass Shrubs or other permanent plantings seed covered with mulch Appropriately applied straw or Uniform and evenly distributed ground cover other mulch sufficient to restrain erosion Plastic sheeting Structural methods such as concrete, asphalt or retaining walls Rolled erosion control products with grass seed EFFEMCIIVE DATE: 11/121-020 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGOI Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other altematives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the firrieframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. I . ..... — ------- HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMSIFlocculants. 2. Apply flocs ulants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMSIFlocculants and in accordance with the manufacturer's instructions, 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project, 4. Collect all spent fluids, store in separate container's and properly dispose as hazardous waste (recycle when possible). & Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials, Ino M'B416 2 0 V. Z 41111110% 8/25/2021 E 0 o E UJ Z F- Li Ld < W6 —00 0. IL cm" Z 0 LU ':e 0 Oq P CL fnM R; < ­4 LIJ M _J U U_ LU a to Ca Z :) U) M U) Ln M -E V 0 M -.6 Ln Z N OR > LU Ln LU M 0 z: (D 0 W N r4 > UJ 00 � Ln U N r1i < ' ;� Z 0 00 DATE (n 0812512021 0O DRAWN BY 331 DESIGNED BY • 331 CHECKED BY M.ZACCARDO • . SCALE NA • • • 0 < Ln 0 VLU U) 0 U.J < 0 al� Z ULU Z 0 J=) U 0 U uJ F- Z (A _J 1 5LU " 0 0 ;<:" " U LU _17 Ln Z < C;6 0 3 r1r, (y 0 z U. p Z 0 LL 0 Icy- UJ Z 0 Z JOB NO. 40697 U_ 0 SHEET NO. Z CE3.3 L DocuSign Envelope ID: 4C86B634-079E-4C9E-A186-42217E88892D INSTALL 4" PVC TEE WITH SCREW TYPE PLUG ONCE SKIMMER IS REMOVED AND POND NO LONGER OPERATES AS A TEMPORARY SEDIMENT BASIN SKIMMER DEWATERING \ DEVICE Elm Y J CONNECT FLEXIBLE PIPE TO POND DRAIN. GATE FLEXIBLE PIPE VALVE SHALL REMAIN OPEN. REMOVE SKIMMER ONCE POND IS NO LONGER UTILIZED AS TEMPORARY SEDIMENT BASIN. SEE POND PLAN FOR ACTUAL RISER DIMENSION, WHICH MAY EXCEED MINIMUM — X 'ti a ITA V,I X PLAN VIEW NOT TO SCALE PRE -CAST BOX Y OUTLET BARREL AS REQUIRED BY BOX MANUFACTURER 1. DEPTH OF NO MORE THAN ONE-HALF THE HEIGHT OF THE RISER. 2. CLEAN OR REPLACE STONE FILTER WHEN DEVICE NO LONGER DRAINS PROPERLY. 3. PROVIDE PAINT MARK ON RISER AT 12" HEIGHT. CLEAN AND REPAIR ONCE SEDIMENT REACHES MARK. 4. INSTALL ALL COMPONENTS OF POND EMBANKMENT, OUTLET STRUCTURE, SKIMMER, EMERGENCY SPILLWAY, ETC. (UNLESS NOTED) PRIOR TO BEGINING CLEARING OPERATIONS. TOP OF RISER FAIRCLOTH SKIMMER OR APPROVED EQUAL. PRE -CAST BOX WATER -TIGHT SCREW ON CAP I WITH ORIFICE DRILLED INTO CAP. SEE POND PLAN SHEET FOR 3/4" HINGE PIN 16" 3" PLATE 3/4" LOCK BOLT 8 TYPICAL COAT ALL STEEL SURFACES W/ FOX INDUSTRIES FX-420 3/4" HAND L 27" COAL TAR EPDXY COATING 3/4" HINGE OR APPROVED EQUAL. 16 SQ. #6 REBAR ENTRY UARD STEEL SURFACES WHICH ARE i o TO RECEIVE FX-240 COAL TAR 3" ANGLE (TYP.) EPDXY COATING SHOULD BE PREPARED BY ABRASIVE 3/4" LOCK BOLT 8 TYPICAL BLASTING TO A COMMERCIAL GRAY METAL (SP-6) STANDARD. ANY SURFACE BLASTED SHOULD BE COATED THE SAME DAY. IF PREPARED SEE PLAN SURFACES ARE 3/4" DOWEL LOCKING 3/4" HANDLE CONTAMINATED BY RUST OR ALUMINUM PIN OTHER CONTAMINANTS, THEY TRASH RACK DETAIL MUST BE RE -BLASTED. NTS INSURE TOP OF STONE IS LEVEL WITH THE TOP OF SHELF AND THE PERMANENT POOL ELEVATION TOP OF RISER OUTLET STRUCTURE NOTES: 1. ALL STRUCTURES OVER T-6" IN DEPTH TO BE PROVIDED WITH STEPS T-2" ON CENTERS. STEP SHALL BE IN ACCORDANCE WITH STANDARD 841 2. CLASS "B" CONCRETE TO BE USED. ORIFICE SIZE AND ELEVATION. 3. ALL MOTOR JOINTS ARE 1/2" t 1/8" E 4 FORMS ARE TO BE USED FOR THE CONSTRUCTION 8 UGLJLI O = �GINEE�GQ�,` V. ZPPG`.�. lum11110 8/25/2021 1 PVC PIPE X V H 1-i MIN — N�-"`- BARREL OUTLET INVERT --I MIN \\ MIN Q a U< Z Z aQC co ti LLl m m i I DIP DRAIN WITH GATE o z � Z U) U) VALVE AND HAND WHEEL. �O ANCHOR TO OUTLET STRUCTURE. VAVLE TO BE OPEN DURING DRAIN VALVE CONSTRUCTION. SEE POND PLAN FOR DIAMETER: 4" ACTUAL FOOTER DIMENSION, WHICH MAY EXCEED MINIMUM PERMANENT OUTLET STRUCTURE SECTION Y-Y NOT TO SCALE _ E 0 0D 0 rU)) > e� 0 N PVC DRAIN DIAMETER: 4" INSTALL (1) 2" HOLE LU IN BOTTOM OF PVC TEE In 0 ONCE SKIMMER IS REMOVED —' AND POND NO LONGER OPERATES UJI AS A TEMPORARY SEDIMENT BASIN SECTION X-X OUTLET STRUCTURE NOT TO SCALE o #57 WASHED _ C7 STONE NOTES: LIMITS OF MINIMUM DENSITY SHALL NOT BE LESS THAN 95% OF MAXIMUM DRY DENSITY WITH MOISTURE _ CONCRETE 6" SOLID WALL PVC TO CONTENT WITHIN +/- 2% OF THE OPTIMUM. EACH LIFT OF FILL SHALL BE COMPACTED AS NECESSARY F- CRADLE v� d - FLOW VARIE d - — — — —�r — `---2' DAYL SCR ON 0 01 ° CONCRETE — — — — — — — — — — — IGHT VARMINT TO OBTAIN THAT DENSITY. ALL COMPACTION IS DETERMINED PER AASHTO METHOD T-99 (STANDARD EEN W N N TO BE PLACED PROCTOR). > w o C) PEN END DAM EMBANKMENT IS TO BE SEEDED IMMEDIATELY AFTER DAM CONSTRUCTION IS COMPLETE, STORMWATER MANAGEMENT STRUCTURE IS TO BE UTILIZED AS A TEMPORARY EROSION CONTROL Q DEVICE INITIALLY. ONCE CONSTRUCTION IS COMPLETED AND UPSTREAM SURFACES HAVE BEEN Zz O O PERMANENTLY STABILIZED, CONTRACTOR IS TO REMOVE ALL SEDIMENT FROM BASIN AND CONVERT ,._., DATE TO PERMANENT WATER QUALITY STRUCTURE. THIS INCLUDES INSTALLING THE PROPOSED U0 0-4 PLANTINGS ALONG THE LITTORAL SHELF. c>c 0812512021 DRAWN BY DAM EMBANKMENT CONSTRUCTION NOTES: 1. CONSTRUCTION OF THIS DAM SHALL BE DONE UNDER THE OBSERVATION OF A QUALIFIED GEOTECHNICAL ENGINEER, WHO IS A REGISTERED PROFESSIONAL ENIGINEER IN THE STATE OF 331 NORTH CAROLINA. CONTROLLED FILL, AS SPECIFIED BY THE GEOTECHNICAL ENGINEER, IN THE DESIGNED BY DAM EMBANKMENT SHALL BE PLACED IN 6-INCH LOOSE LAYERS (3-INCH LOOSE LAYERS WITHIN _ 3-FEET OF EITHER SIDE OF THE PRINCIPAL SPILLWAY PIPE TO A DEPTH OF 2-FEET OVER THE • PIPE) AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD 331 COLLECTOR PIPE TO PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF + OR - TWO PERCENTAGE POINTS OF . BE CAPPED ON BOTH THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. • CHECKED BY LIMIT OF CONCRETE ENDS 2. ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS SHALL BE REMOVED FROM THE FILL CRADLE MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSITY. SOILS WITH ORGANIC MATTER • M.ZACCARDO PLAN VIEW 6" PERFORATED CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. STONES GREATER THAN 3-INCH (IN • . PVC COLLECTOR ANY DIRECTION) SHALL BE REMOVED FROM THE FILL PRIOR TO COMPACTION. SCALE CLASS 3 O-RING PIPE 3. FILL MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES OR AT PIPE (TYP.) MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT CONFORMING TO • NA 12" MIN. 12" MIN. SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE MATERIALS. • 1, 4. ANY FILL LAYER THAT IS SMOOTH DRUM ROLLED TO REDUCE MOISTURE PENETRATION DURING PROPOSED A STORM EVENT SHALL BE PROPERLY SCARIFIED PRIOR TO THE PLACEMENT OF THE NEXT SOIL • 3' GRADE ON LIFT. • DOWNSTREAM 5. SURFACE WATER AND STREAM FLOW SHALL BE CONTINUOUSLY CONTROLLED THROUGHOUT SELECT FILL SIDE OF DAM CONSTRUCTION AND THE PLACEMENT OF CONTROLLED FILL. PLACED AND 2' MIN. 6. FOUNDATION AREAS MAY REQUIRE UNDERCUTTING OF COMPRESSIBLE AND/OR UNSUITABLE COMPACTED AT 95% SOILS IN ADDITION TO THAT INDICATED ON THE PLANS. ALL SUCH UNDERCUTTING SHALL BE STANDARD #57 WASHED PERFORMED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER AND SHALL BE MONITORED PROCTOR STONE AND DOCUMENTED. IN NO CASE SHALL THERE BE AN ATTEMPT TO STABILIZE ANY PORTIONS OF 2' THE FOUNDATION SOILS WITH CRUSHED STONE. CL a - 7. TREATMENT OF SEEPAGE AREAS, SUBGRADE PREPARATION, FOUNDATION DEWATERING AND - — — — — — — — — — -- — — — — — — — -- ROCK FOUNDATION PREPARATION (I.E., TREATMENT WITH SLUSH GROUTING, DENTAL 1/2 D FLOW VARIE CONCRETE CONCRETE, ETC.) MAY BE REQUIRED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER. ALL SUCH ACTIVITIES SHALL BE CLOSELY MONITORED AND DOCUMENTED BY THE — _ — — — — GEOTECHNICAL ENGINEER. 8. FILL ADJACENT TO THE RISER AND PRINCIPAL SPILLWAY PIPE SHALL BE PLACED SO THAT LIFTS 12" MIN. a v n d a 4 d 1 5': ARE AT THE SAME LEVEL ON BOTH SIDES OF THE STRUCTURES. d 9. EARTHWORK COMPACTION WITHIN 3-FEET OF ANY STRUCTURES SHALL BE ACCOMPLISHED BY MEANS OF HAND TAMPERS, MANUALLY DIRECTED POWER TAMPERS OR PLATE COMPACTORS OR N MINIATURE SELF-PROPELLED ROLLERS. Ln z CEI LIMIT OF CONCRETE 10. COMPACTION BY MEANS OF DROP WEIGHTS FROM A CRANE OR HOIST SHALL NOT BE � H CRADLE 2' PERMITTED. 0 CONCRETE SELECT FILL PLACED 11. HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO PASS OVER CAST -IN -PLACE STRUCTURES U � CRADLE (MIN 2000 AND COMPACTED AT SECTION VIEW (INCLUDING THE CRADLE) UNTIL ADEQUATE CURING TIME HAS ELAPSED. W U PSI CONCRETE) 95% STANDARD 12. TO RE-ESTABLISH VEGETATION AFTER CONSTRUCTION, A 2- TO 3-INCH LAYER OF TOPSOIL PROCTOR SHALL BE PLACED ON THE DISTURBED EMBANKMENT SURFACE AND THE AREA SEEDED AND (� MIRAFI 140N MULCHED OR HYDROSEEDED. z V / � CONCRETE CRADLE DETAIL GEOSYNTHETIc FABRIC o ' ^ FILTER DIAPHRAGM DETAIL 13. THE EMBANKMENT MATERIAL SHALL BE COMPRISED OF CLAYEY SAND OR SANDY CLAY WITH A LU GC v, NOT TO SCALE WITH 18-INCH OVERLAP Z J AT ALL SEAMS (TYP) NOT TO SCALE MINIMUM OF 30% PASSING THE #200 SIEVE, A LIQUID LIMIT OF AT LEAST 25 AND A PLASTICITY Z T INDEX OF AT LEAST 10%, AND LESS THAN 5% ORGANICS. THIS MATERIAL SHALL ALSO HAVE A y UNIFIED SOIL CLASSIFICATION OF SC OR CL W ACCESS DOOR SHALL IU-1 = U 1111 OPEN TO ALLOW ACCESS -J = UQ FROM DIRECTION OF DAM. LIJ INSTALL SLOPE PROTECTION MATTING Q Y ON ALL SLOPES STEEPER THAN 6:1 z Q AND FLOOR OF POND DAM WIDTH: SEE PLAN INSTALL SLOPE PROTECTION MATTING J U TOP OF EMBANKMENT ON ALL SLOPES STEEPER THAN 6:1 "'Iz/ 11 O O z _ EMERGENCY SPILLWAY _ SEED & MULCH EMBANKMENT Q _T STEPS SHALL ALIGN WITH i — SEE SEEDING SCHEDULE < Q ACCESS DOOR MYU SHELF WIDTH OUTLET STRUCTURE 5' SEE DETAIL THIS SHEET PERMANENT POOL 3 6 1 FOREBAY 1 I-- 18" THICK CLASS'B' 1 STONE OVER FILTER FABRIC —J 1 3 POND SECTION NOT TO SCALE 1� r- 3 O z �� V WIDE VEGETATED SHELF 6:1 SLOPE CONC. ANTI -SEEP (SEE POND PLAN FOR LOCATION) COLLAR (6" WIDE) 0 N D^^ — REFER TO PLAN SHEETS FOR OUTLET BARREL: CLASS 3 RCP WITH LOCKING WATER-TIGHT'O' RING JOINTS INFORMATION z V NOTE N EMBANKMENT SHALL BE CONSTRUCTED OF CLEAN STRUCTURAL SOIL, FREE OF ROOTS, EMBANKMENT SECTION 1 VEGETATION, ROCKS & OTHER OBJECTIONABLE MATERIAL, SCARIFY SURFACES BEFORE NOT TO SCALE I 5-�caIJAY-VAP I IAA Z PLACING FILL. PLACE FILL IN 6-8 INCH LOOSE LIFTS. COMPACT TO AT LEAST 95% OF " O NINE STANDARD PROCTOR DENSITY. [ "1 2-FT DEEP CUT OFF TRENCH. ENGIN NG D P hPROVAL EXCAVATE TRENCH ALONG CENTERLINE Rf�� 2 (� JOB NO. OF EMBANKMENT AND EXTEND INTO BOTH signature Date STORMWATER WET POND DETAIL ABUTMENTS TO AT LEAST THE ELEVATION r e on p 1 .- s 3 O OF THE RISER CREST. 40697 GEOTECHNICAL CERTIFICATION NOTE: - � "� 17 O SHEET NO. ASBUILT CERTIFICATION OF THE EMBANKMENT COMPACTION, ANTI SEEP COLLARS, CUT OFF TRENCH, ETC. WILL BE REQUIRED PRIOR TO CERTIFICATE OF OCCUPANCY Z CE3.4 L