HomeMy WebLinkAbout20201658 Ver 2_HWy 17 Ramsey Wetland Mod Cover Letter 2-23-2022_20220301 February 23, 2022 Mr. Jordan Jessop U.S. Army Corps of Engineers Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, North Carolina 28403 Re: Piedmont Natural Gas NCDOT Highway 17 Relocation: Ramsey Road Section Permit Modification Request Action ID #: SAW-2020-02021 Dear Mr. Jessop: This letter is being submitted as a request for permit modification to the Ramsey Road section of the NCDOT Highway 17 Relocation Project (Project) by Piedmont Natural Gas (PNG). The Project was previously authorized under a nationwide permit 12 for 1.05 acres of permanent wetland conversion impacts, 1.722 acres of temporary wetland impacts, 87.06 linear feet of temporary impacts to jurisdictional ditches, and 30.41 linear feet of temporary stream channel impact. This was documented by a General Permit Verification Letter dated January 27, 2021. Upon completion of construction, a post-construction as-built survey was completed, during which deviations in the pipeline route and limits of disturbance (LOD) were identified. Upon further investigation, it was determined the updated pipeline installation resulted in a total of 1.19 acres of permanent wetland conversion impacts, 0.646-acre of temporary wetland impacts, 139.60 linear feet of temporary impacts to jurisdictional ditches, and 21.17 linear feet of temporary stream channel impact. When compared to previously authorized impact totals (see attached Revised Impact Figure), the deviation resulted in a 0.14-acre increase in permanent wetland conversion impacts, a reduction in temporary wetland impacts by -1.076 acres, an additional 52.54 linear feet of temporary impacts to jurisdictional ditches, and a reduction of stream impacts by -9.24 linear feet. The permanent conversion impacts will be a result from the post-construction pipeline easement maintenance conducted by PNG and not from construction activities associated with pipeline installation. The post-construction maintenance will be conducted as outlined in the PNG Permanent Access Corridor Protocol document. The following table provides a general breakdown of the change in impact totals. PNGHighway17RamseyRoad:RevisedImpactTotalsComparison OriginalPerm.UpdatedPerm.DifferenceinPerm. ConversionImpactsConversionImpactsConversionImpacts Classification(Acres)(acres)(acres) Wetlands: tChЉ͵ЉЊЏЉЉ͵ЉЊЏ Permanent Conversion t{{Њ͵ЉЌЍЊ͵ЊВЉ͵ЊЎЏ t9aЉЉЉ Total1.051.190.14 OriginalTemp.UpdatedTemp.DifferenceinTemp. ClassificationImpacts(acres)Impacts(acres)Impacts(acres) tChЉ͵АВЊЉЉ͵АВЊ Wetlands: Temporary t{{Љ͵ЎВЌЉ͵ЋВЋЉ͵ЌЉЊ t9aЉ͵ЌЌБЉ͵ЌЎЍЉ͵ЉЊЏ Total1.7220.6461.076 OriginalTemp.UpdatedTemp.DifferenceinTemp. Jurisdictional ClassificationImpacts(LF)Impacts(LF)Impacts(LF) Ditches: W55źƷĭŷБА͵ЉЏЊЌВ͵ЏЎЋ͵ЎЍ Temporary Total87.06139.652.54 OriginalTemp.UpdatedTemp.DifferenceinTemp. Stream ClassificationImpacts(LF)Impacts(LF)Impacts(LF) Channel: tĻƩĻƓƓźğƌЌЉ͵ЍЊЋЊ͵ЊАВ͵ЋЍ Temporary Total30.4121.179.24 These deviations remained parallel and adjacent to the previously authorized route. Furthermore, the deviation avoided a previously authorized 0.016-acre PFO conversion impact, and the Project did not result in any permanent loss of waters. Included with this modification are the Project wetland impact figures and aquatic resources impacts tables comparing the previously authorized impacts and the updated impacts from the as-built review. Also included is a copy of the January 27, 2021 Verification Letter. Please feel free to contact me at 804-386-7318 or pkmeier@burnsmcd.com to discuss this matter, if you have any questions, or require additional information. Sincerely, Patrick K. Meier Wetland Scientist Enclosure Attachment cc: Jeremy Meads Î Piedmont Natural Gas Steve Cahoon Î Piedmont Natural Gas Brad Tripp Î Piedmont Natural Gas Sara Kent Î Burns & McDonnell Anthony McMullan Î Burns & McDonnell