Loading...
HomeMy WebLinkAbout20180765 Ver 2_Year 3 Monitoirng Report_20220301 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 CLeaer An EnviroScience Company ClearWater Environmental Consultants,Inc. www.cwenv.com February 28, 2022 Mr. David Brown US Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 Ms. Kaylie Yankura NC Division of Water Resources 2090 US Highway 70 Swannanoa, North Carolina 28778 RE: High Hampton Golf Resort, LLC Holes 7 and 8 Culvert Removal and Stream Restoration Site Annual Monitoring Report— MY3 Jackson County, North Carolina USACE Action ID No. SAW 2017-02281 DWR Project No. 18-0765-V2 Dear Mr. Brown and Ms. Yankura, High Hampton Resort, LLC received after-the-fact authorization for 880 If of stream impacts associated with removal of a culvert and stream restoration activities at a tract of land (PIN 7571- 96-2363) known as the High Hampton Resort at 1525 NC Highway 107 South in Cashiers, Jackson County, North Carolina. This Year 3 Monitoring (MY3) Report is being submitted in order to satisfy the conditions of the NWP 27 (SAW 2017-02281) issued on April 25, 2019 and DWR 401 Water Quality Certification (DWR# 18-0765-V2) issued on March 22, 2019. Please do not hesitate to contact me at 828-698-9800 if you have any questions or comments. Sincerely, a—DocuSigned by: DocuSigned by: 2. U t 2,1d1t. —AE92310EDC6E42D 0A79F7DC85EE4F7... Britten Yant, P.W.S. R. Clement Riddle, P.W.S. Biologist Senior Scientist 145 7`h Avenue West, Suite B Hendersonville,NC 28792 828-698-9800 Tel DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 High Hampton Golf Resort, LLC Golf Course Holes 7 and 8 Culvert Removal and Stream Restoration Site Annual Monitoring Report Monitoring Year 3 of 3 USACE Action ID No. SAW 2017-02281 N.C. DWR Project No. 18-0765-V2 Pr_ ti zj -'. r: r4 r, • • . . �s.. w. r ~:A. • -T.F. February 2022 Prepared By: CLearWaer An EnviroScience Company a 145 7th Avenue West, Suite B Hendersonville, NC 28792 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Table of Contents 1.0 PROJECT SUMMARY 1 2.0 METHODS 2 3.0 GEOMORPHIC MONITORING RESULTS 2 4.0 VISUAL MONITORING RESULTS 8 5.0 MONITORING SUMMARY 10 6.0 REFERENCES 10 Monitoring Data Geomorphic Assessment: Table 1: Cross-Section Dimensions- Low Bank Stage Table 2: Cross-Section Dimensions- "Bankfull" Stage Cross-Sections 1-4 Photographs and Survey Plots Visual Assessment: Photographic Reference Photos (Photo Points 1-5) Figures Figure 1: Vicinity Map Figure 2: USGS Topographic Map Figure 3: Watershed Aerial Photograph Figure 4: USDA Soils Map Figure 5: Monitoring Features Map Attachment A: Memo from Andrew Bick, PE, Headwaters Engineering to David Brown, USACE and Kevin Mitchell, NCDWR RE: Stability Assessment and Stream Enhancements UTs to Fowler Creek High Hampton Resort, Cashiers, Jackson County, NC i DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 1.0 PROJECT SUMMARY High Hampton Resort, LLC received after-the-fact authorization for 880 If of stream impacts associated with removal of a culvert and stream restoration activities at a tract of land (PIN 7571-96-2363) known as the High Hampton Resort at 1525 NC Highway 107 South in Cashiers, Jackson County, North Carolina. This Year 3 Monitoring (MY3) Report is being submitted in order to satisfy the conditions of the NWP 27 (SAW 2017-02281) issued on April 25, 2019 and DWR 401 Water Quality Certification (DWR# 18-0765-V2) issued on March 22, 2019. Approximately 880 linear feet (LF) of culvert was removed from an unnamed tributary to Fowler Creek (referred to in the attached plans as UT1) at the High Hampton Resort golf course, which is currently undergoing a renovation. The banks of the daylighted channel were sloped and large stone was placed in the bed and on the banks. Fowler Creek is in the Savannah River basin (HUC 03060102). The site is located in Jackson County, North Carolina and is accessed from Route 107, just to the south of the town of Cashiers. A site vicinity map and USGS topographic map are included as Figures 1 and 2. An As-Built survey documenting baseline conditions was completed on February 25, 2019 and summarized in a memo to the USACE and NCDWR in a memo dated March 5, 2019 from Andrew Bick, PE of Headwaters Engineering (Attachment A). Monitoring Year 1 efforts were conducted on November 14, 2019, Monitoring Year 2 efforts were conducted on October 26, 2020 and Monitoring Year 3 efforts began on February 1, 2022 and were completed February 10, 2022. A digitized watershed boundary of the drainage area at the end of the 700 ft monitoring reach shows a drainage area of 14 acres (ac), or approximately 0.02 square miles (mi2) (Figure 3). USGS web-based hydrology tool StreamStats estimates the drainage area of UT1 to be 22 acres, or approximately 0.03 mi2. The High Hampton project site is located in the southern Blue Ridge physiographic province (NCGS 2004) in the Blue Ridge Belt in the Dqd (quartz diorite to granodiorite) rock unit formation, dating to the Devonian period (359-419 million years ago) (NCGS 1985). Soils within the project area consist of Udorthents and Edneyville-Chestnut Complex (USDA Web Soil Survey, Figure 4). The performance of the project will be evaluated for geomorphic and visual components. The following are specific performance standards: • Geomorphic Stability — Channel dimension, and profile, remains within the range of natural variability. • Visual Assessment— Minimal bed or bank erosion/scour from natural channel adjustment. High Hampton Golf Resort, LLC Golf Course Monitoring Year 3 of 3 Holes 7 and 8 Culvert Removal and Stream Restoration Site February 2022 USACE Action ID No. SAW-2017-02281 Page 1 of 11 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 2.0 METHODS ClearWater Environmental Consultants, an EnviroScience Company (ClearWater) conducted geomorphic monitoring and visual documentation of a 700 LF reach UT1 to Fowler Creek (hereafter referred to as UT1) as shown in the Project Vicinity Map (Figure 1). Geomorphic monitoring of stream dimension included a survey of four(4) stream cross-sections. The cross-section surveys are located as indicated on the Monitoring Features Map (Figure 5), with three representative "riffle" cross sections (XS1-3) and one representative "run" cross-section (XS4). The cross- sections were monumented with permanent capped rebar pins and a wooden stake on each bank to serve as a spatially referenced control. The cross-section surveys were performed using a laser-level, reel tape, and stadia rod. Photographs of each cross section facing downstream were taken on the day of monitoring. The locations of these control pins were recorded with a sub-meter accuracy Global Positioning System (GPS) device. Geomorphic data was analyzed using the Reference Reach Spreadsheet for Channel Survey Data Management Version 4.2L. (Dan Mecklenburg, Ohio Department of Natural Resources). Photographic reference points (photo-points) were used to visually document stream conditions and include both a downstream facing photo and an upstream facing photo at each photo reference point. Photo-points were established at five (5) stations along the length of the 700 ft UT1 reach. The photo-points were recorded with a sub-meter accuracy GPS and monumented with a wooden stake. The photographer will make a reasonable attempt to capture the same perspective in each photo-point location annually. Please refer to Figure 2 for the proposed locations of all monitoring features. The bankfull stage was determined using the North Carolina Mountain Regional Curve (Harmon et al. 2000). Using a drainage area of 0.03 mi2, the regional curve predicts bankfull cross-sectional area at approximately 2.0 square feet (ft2) with a bankfull discharge of 7 cubic feet per second (cfs), mean depth of 0.4 ft and bankfull width of 5.2 ft. Regional curve prediction at the extremely low end of the range of data for streams, as in this case, is not as reliable as predictions for those in the middle of the range (between 2-30 mi2). Local streams with similar watershed size under reference conditions serve as a better comparison in this lower range. 3.0 GEOMORPHIC MONITORING RESULTS Based on the comparison to a local reference reach and regional curve data, it appears that the daylighted channel was constructed with low bank heights and channel widths exceeding the corresponding theoretical bankfull stage predicted by the North Carolina Mountain Regional Curve. Therefore, floodwaters from the majority of rain events are expected to remain contained by the channel. Geomorphic monitoring results are analyzed below at the low bank stage (Table 1) as well as at bankfull stage estimated based on regional curve data (Table 2). It should be noted that the XS3 rebar pins were unintentionally removed by course staff during 2021, therefore XS3 data was omitted from the MY3 geomorphic data. High Hampton Golf Resort, LLC Golf Course Monitoring Year 3 of 3 Holes 7 and 8 Culvert Removal and Stream Restoration Site February 2022 USACE Action ID No. SAW-2017-02281 Page 2 of 11 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Low Bank Height Due to the 0.03 mi2 contributing area of the watershed, flood events reaching the low bank stage should be infrequent and exceptional. Analysis of the MY3 surveyed riffle cross-sections corresponding to the low bank height indicates an average cross-sectional area of 25.7 ft2 average width of 12.5 ft and average mean depth of 1.8 ft. Cross section XS4 is a run located in a flatter section of the reach with a slope of approximately 0.5% slope. Using corresponding riffle facet slopes and an estimate of flow resistance coefficient of 0.05, average discharge rate was estimated to be 229.5 cfs at low bank stage. Shear stresses in the riffles at low bank stage were calculated to be approximately 6.0 pounds per square foot (psf) on average. With reference to Shield's equation, the predicted grain size for threshold of motion (stream competence) was 429.5 mm, or roughly 14 inches, at the low bank stage. This corresponds to the "small boulder" particle size which could be mobilized at the low bank stage. Table 1.Cross-Section Dimensions with parameters calculated at low bank stage Riffle Run XS1 XS2 XS3 _ XS4 Units Parameter MY1 MY2 MY3 MY1 MY2 MY3 MY1 MY2 MY3 MY1 MY2 MY3 ft2 Cross Sectional Area 17.5 16.4 16.0 35.9 35.2 34.1 13.9 13.8 N/A _ 28.0 26.8 27.1 ft Width _ 12.7 12.5 12.5 16.9 17.5 12.5 8.9 10.0 N/A _ 12.8 12.8 12.4 ft Mean Depth 1.4 1.3 1.3 2.1 2.0 2.0 1.6 1.4 N/A 2.2 2.1 2.2 ft Max depth _ 1.8 1.7 1.8 2.9 2.9 3.0 2.2 2.2 N/A 3.0 2.9 3.1 ft/s Velocity 11.1 10.6 10.2 14.4 13.4 13.1 11.3 10.3 N/A 3.1 2.9 2.9 cfs Discharge Rate _ 195.3 173.1 162.4 516.8 470.5 448.2 156.4 142.1 N/A _ 86.0 76.9 77.9 lbs/ft2 Shear Stress 8.1 7.5 7.1 11.9 10.7 10.4 8.2 7.1 N/A _ 0.6 0.5 0.5 mm Threshold Grain Size 399.0 369.5 348.4 584.2 523.6 510.6 401.4 350.5 N/A 27.0 24.4 24.4 Facet Slope 15% 15% 13% 2% Channel Slope 6.2% Bankfull Stage Using the hydrologic definition of"bankfull stage,"flood events reaching the bankfull stage should happen with relative frequency, with a recurrence interval of approximately 1.5 years. The bankfull elevation was calculated based on a mean depth of 0.4 ft predicted by the contributing watershed area of 0.03 mi2. The resulting bankfull elevations were below the observed low bank height, with bank height ratios ranging from 2.9 to 3.9. The stream is considered entrenched to moderately entrenched, with entrenchment ratios ranging from 1.1-2.1. Cross section dimensions corresponding to the bankfull stage resulted in average cross-sectional area of 2.7 ft2 and average width of 8.4 ft. Using the estimated bankfull stream dimensions, stream competence at this stage was calculated at 86.7 (approximately 3.4 inches). While quantitative analysis of streambed sediment size (i.e. Wolman pebble count) was not performed, the observational estimate of average streambed particle size is medium cobble. High Hampton Golf Resort, LLC Golf Course Monitoring Year 3 of 3 Holes 7 and 8 Culvert Removal and Stream Restoration Site February 2022 USACE Action ID No. SAW-2017-02281 Page 3 of 11 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 _ Table 2.Cross-Section Dimensions with parameters set at bankfull stage _ Riffle Run XS1 XS2 XS3 XS4 Units Parameter MY1 MY2 MY3 MY1 MY2 MY3 MY1 MY2 MY3 MY1 MY2 MY3 ft2 Cross Sectional Area 4.0 2.9 2.6 2.9 3.1 2.5 2.1 1.8 N/A 3.2 2.8 3.0 ft Width 10.0 10.2 10.1 7.6 7.3 7.2 5.2 5.4 N/A 8.8 7.5 7.8 ft Mean Depth* 0.4 0.3 0.3 0.4 0.4 0.3 0.4 0.3 N/A 0.4 0.4 0.4 ft Max depth 0.6 0.5 0.6 0.7 0.7 0.8 0.5 0.6 N/A 0.8 0.7 0.8 Entrenchment Ratio 1.2 1.1 1.1 2.0 2.0 2.1 1.3 1.3 N/A 1.2 1.4 1.4 _ Bank Height Ratio 3.0 _ 3.4 _ 2.9 4.3 4.4 3.9 4.0 3.7 N/A _ 4.0 4.4 3.8 ft/s Velocity 5.1 4.1 3.7 4.9 5.1 4.4 4.9 4.4 N/A 1.0 1.0 1.0 cfs Discharge Rate 20.7 11.9 9.4 14.1 15.7 10.8 10.4 8.0 N/A 3.3 2.8 3.0 Ibs/ftz Shear Stress 2.5 1.8 1.5 2.4 2.5 2.0 2.36 2.0 N/A _ 0.1 0.1 0.1 _ mm Threshold Grain Size 125.0 _ 89.0 74.9 117.0 123.0 98.5 116.0 96.0 N/A _ 5.0 5.0 5.0 Facet Slope 15% 15% 13% 2% Channel Slope _ 6.2% *Mean depth set at 0.4ft based on the Mountain Rural Regional Curve for 0.03 sqmi watershed Cross Section 1 993 991 x 0 989 m w 987 985 983 0 5 10 15 20 25 30 Station(ft) --MY111.14.2019 --M92 10.26.2020 --MY3 2.10.2022 ,rw R :. -- .. • • • �. . �� • • y * 7 d r.. r l sat r ..:-. ', �.f y, • .:4 .., ... • , 4; . , Dc 1 10l:.2O22. 13 DO .. � �`t - High Hampton Golf Resort, LLC Golf Course Monitoring Year 3 of 3 Holes 7 and 8 Culvert Removal and Stream Restoration Site February 2022 USACE Action ID No. SAW-2017-02281 Page 4 of 11 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Cross Section 2 994 992 x 0 990 w 988 986 984 0 5 10 15 20 25 30 Station(ft) MY1 11.14.2019 —e—MY2 10.26.2020 t MY3 2.10.2022 t f a, tip. Wi I r. J I. r y I. 'ie..— -, --4. 414IP It .-.• , . r.. :11):14o2miw-2-o22 12:37 "fit ' High Hampton Golf Resort, LLC Golf Course Monitoring Year 3 of 3 Holes 7 and 8 Culvert Removal and Stream Restoration Site February 2022 USACE Action ID No. SAW-2017-02281 Page 5 of 11 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Cross Section 3 999 997 x 0 995 w w 993 .......1N....4,446, X"."...41-149.6 991 �� 989 0 5 10 15 20 25 30 Station(ft) —e—MY111.14.2019 —e—MY210.26.2020 —*—MY3 Omitted(LPIN and RPIN Removed) � .r': 4 mr . sus:' : �► - T, lir* illItis&%; 1, -.w Both rebar pins from XS3 were unintentionally removed by course staff during 2022, therefore XS3 data was omitted from the MY3 geomorphic data. Comparison photographs of XS3 taken on October 26th 2020 (Left) and February 10th 2022 (Right) show little to no visual change and indicate strong stream stability. High Hampton Golf Resort, LLC Golf Course Monitoring Year 3 of 3 Holes 7 and 8 Culvert Removal and Stream Restoration Site February 2022 USACE Action ID No. SAW-2017-02281 Page 6 of 11 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Cross Section 4 997 995 x o0 993 v 991 989 987 0 5 10 15 20 25 30 Station(ft) t M5111.14.2019 --MY210.26.2020 tMY32.1.2022 _ %114 • High Hampton Golf Resort, LLC Golf Course Monitoring Year 3 of 3 Holes 7 and 8 Culvert Removal and Stream Restoration Site February 2022 USACE Action ID No. SAW-2017-02281 Page 7 of 11 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 4.0 VISUAL MONITORING RESULTS Visual monitoring data indicated that the stream is stable and performing well with no significant bank erosion or bed scour. No aggradation or degradation was observed within the project reach. A wooden footbridge was added during MY1, located near cross-section 4. The new bridge is visible in photo-point 5 facing upstream. • ;�.• - .,: _ �- PP1 Facing Upstream Feb 10, 2022 PP1 Facing Downstream Feb 10, 2022 __.- '. i 4010415. 1 -"-- ',,�+`c "- : max,;,:' a i . .. PP2 Facin• Upstream Feb 10, 2022 PP2 Facing Downstream Feb 10, 2022 "asv - r.' . - ;''.. '',-, _ • 1._ - f -' per. •a te' ,r.;' '.r.'r - .,, •' A. "f � {. •• . •'x` , : .-,,,,;.4- y:;0i+'4+?OY3`:iiite4.r. 02l1612't) ;. , i- ' , PP3 Facing Upstream Feb 10, 2022 PP3 Facing Downstream Feb 10, 2022 High Hampton Golf Resort, LLC Golf Course Monitoring Year 3 of 3 Holes 7 and 8 Culvert Removal and Stream Restoration Site February 2022 USACE Action ID No. SAW-2017-02281 Page 8 of 11 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 ...‘41-':•,.{4,.kt....:.4., r:-.4:4..14e1 '/!'),FI - .I."--/'_".,-.-.,.. ,.4—,.. ...!..7.1...,;•,•''''• '-- ''''..4.;,-,-5'. .:,..,.T, s Win' ,.,,1,-.4,-,- ,_. ..4.,0 Ir4.- i••4 i,$.7 - r 01'.192 13'2` . -IIIIN. .. I I O f 2 .2 t 3:18 • ..,,:„. PP4 Facing Upstream Feb 10, 2022 PP4 Facing Downstream Feb 10, 2022 .., :-:�" .- ,_"_ -_ _ "-" V 4 'till'i I .. • -7 ...,,,...y.sr. ,,,. . . - .p• er' yA / ` ry ._.:... -: ‘=:...."- -1%,..,,--,-,,,--4r., — -, . .. -'!„.-.... ..;•%,,,,-- _,....-, , , , , . , ....,..„.... ...7., '':.••:.;40, -• •.. ."0" -- ' -•••••,..,..... •3' C. 4.... _. .iir'' •-I ioneOriii,.• - _ , , , -r.,.•,i. , 1 ionon-.)rie ►ate`r ''.` • PP5 Facin• Upstream Feb 10, 2022 PP5 Facing Downstream Feb 10, 2022 High Hampton Golf Resort, LLC Golf Course Monitoring Year 3 of 3 Holes 7 and 8 Culvert Removal and Stream Restoration Site February 2022 USACE Action ID No. SAW-2017-02281 Page 9 of 11 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 5.0 MONITORING SUMMARY This report represents the third of three annual monitoring reports, as required in the permit conditions for USACE NWP 29 (SAW-2017-02281) Issued May 6, 2019 and NCDWR Water Quality Certification Number 4134 issued March 22, 2019, "ensuring that no streambank and/or streamed destabilization is occurring within the restored reach." ClearWater concludes that the geomorphic and visual monitoring data collected for MY3 indicate that the performance standards for stability have been met. 6.0 REFERENCES Harman, W.H. et al. 2000. Bankfull Regional Curves for North Carolina Mountain Streams. In: Kane, D.L. (Ed.). Proc. AWRA Conf. Water Resources in Extreme Environments, Anchorage, AK. Pp. 185-190. NCGS (North Carolina Geological Survey). 2004. Physiography of North Carolina. Map compiled by the Division of Land Resources. Raleigh. NCGS 1985. Geologic map of North Carolina: North Carolina Geological Survey, General Geologic Map, scale 1:500000. Rosgen, D. 1996. Applied River Morphology. Wildland Hydrology. Pagosa Springs, Colorado. High Hampton Golf Resort, LLC Golf Course Monitoring Year 3 of 3 Holes 7 and 8 Culvert Removal and Stream Restoration Site February 2022 USACE Action ID No. SAW-2017-02281 Page 10 of 11 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 FIGURES DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Hign Hampton UoIT course culvert Removal and Stream Restoration .,, " -',-.,...:•.. ...5 --,.._ 'u 11.1:1 641 -' L, .FrF i ft- Cashiers t f . Il li Il .• 4a�7P J`yL r r 4 III.!e' IN Alil . tt 'ay a r 1P107 a E:f011 l}'ti I; 4 �'.1 i ii-,., 65116 +. Or aoe lib I : .ti' Wade Rd /"1":R8' .f Chirnne'l i . I i\ nd),,,, cle P!rtriaU ' ,-! ai r j K c '"� b��e ti d,1 i t Turkey 8ru5r , Do5 o o l..,,,1ppr:�r, I •:r Rir3'IP e' IMO ea%1 • 107 J ,..,,j!)41,-Ill!' . Ai i I ill I IVIIrr t 'r 1 n d Legend 414i,. II 0 0.25 0.5 1 i- i Permitted Project Boundary Miles Drawn by:AKT,12,-13.2019;CEC Project#918 '', Jackson County, [LearWaLer Vicinity Map North Carolina Figure 1 32 Clayton Street Asheville,North Carolina 28801 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Hign Hampton UoIT course culvert Removal and Stream Restoration .,, " -',-.,...:•.. ...5 --,.._ 'u 11.1:1 641 -' L, .FrF i ft- Cashiers t f . Il li Il .• 4a�7P J`yL r r 4 III.!e' IN Alil . tt 'ay a r 1P107 a E:f011 l}'ti I; 4 �'.1 i ii-,., 65116 +. Or aoe lib I : .ti' Wade Rd /"1":R8' .f Chirnne'l i . I i\ nd),,,, cle P!rtriaU ' ,-! ai r j K c '"� b��e ti d,1 i t Turkey 8ru5r , Do5 o o l..,,,1ppr:�r, I •:r Rir3'IP e' IMO ea%1 • 107 J ,..,,j!)41,-Ill!' . Ai i I ill I IVIIrr t 'r 1 n d Legend 414i,. II 0 0.25 0.5 1 i- i Permitted Project Boundary Miles Drawn by:AKT,12,-13.2019;CEC Project#918 '', Jackson County, [LearWaLer Vicinity Map North Carolina Figure 1 32 Clayton Street Asheville,North Carolina 28801 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Hign Hampton uoit course uuivert Removal and Stream Restoration —.....,_._-______,..j,(..---,----;\.„......, •,,,. , • • • . • ....--- ,-- ,,,v2- - -, , .• ' 1 . .) ,-,/ ,,,..-0 I / ...,_±.11.----'----\--,..,,,, -..---1'.r/ , .: ___'- -.4:4 Illiiiii_ta; .• • .... .1 ,?:, ...• • '. . Li--.__ ._,. ,,_ • , . N.... ...._ ... ■ f11 y / ■J '\\N,--\-.1) _\\\_ ,),..„. *,. \.',.-__. Li_ --7 p 1 e + ,_ _ ..„\y ► r ti p. „ It ..... ..,. .. --:‘,. ":7 i ' �■ ',(: • ■ Ili 4' :•�� �f i 1 Iv �S- v ; . ,, ) 1) * • , j GPJdER_�, 9 • -, Cashiers " 4 A�fir_. I . ,„— ....- .i '`..=.7"..; • \ ,,; .t 412i1 4....i- , IN 1 "---,,F .r.c---- / de...;----'' ■ ■ ■• ��� :ram+d. % 1,.... • L • f j �►•cc •- .11... '1 ..+-1; 1.-.•.°i • ! • J — , . • = • -- . C ....it__. _e- ,i, sit .0% . ...- .< i cil ' L , .-1 '-• 4%* • • l s, 1.:* * +Ail.'! ' %,.., ,NL"* c*\._ _ ->\. . ,, t • .'',"1-,.,'I /.1,---- .609' ---v. -:---.):. ‘,)k.'\ 'It . 4 -'-'sN/ -..\_.\ 4. • a ] 343 • CaNf � .f 1-, . � 4lw z-, ____ . __-• . \ . 7 _t( f___. r—L-------,_=7"1" s . '0(14 4 c1} _, i . _......5 - - . ...-f Cri:(44 i/iF'7 -- r' ar. ' .... _ ------- ----_----/ \ ± ' h. Legend .....1.--„:;----..„ ■ ' �t '-'' r f` 0 0.25 0.5 1 3e Permitted Project Boundary ` i______� ____, Miles --.,Drawn by:AKT,12.13.2019;CEO(9(gjec ��ft + L1\$- ' --- \ �.,...1�' Jackson County, CLear\ater USGS Topographic Map North Carolina Cashiers Quad 32 Clayton Street Figure 2 Asheville,North Carolina 28801 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Hlgn Hampton uoit Lourse cuivert Removal and Stream Restoration . _. : : `' -�,.• •,+ ..n ', . Yam; �.. ,.•.. f tit.ti5 r. c_ :' .,-L • l-ttio,, 4.#, ,,. ,,;,/* ...ho & ‘ ',. , .1 : ' ,_. \‘ '', '.....51 " \ *.".*.s .,Iii. a..If .4 a'4'. • (b- �yT w '\ i 4+1.L a. S /,PItt Allb . 4 . , ; i, -.0..4,:. 4 .., , •044° ' -!". ' i ' ' if°''1.r-- .' i r : : } 4 .Ir•. ,...w ior lie.: .,,_ 4,..."-, i ), -. Akfl*Al4v,'. ' - .. prop :v - :. 'II,i" • if.. -. •• i' 14 /.0 l? ' .,.. •:Oast mil'; .. s • /110 _.:G ,. _ .. �: e .' ' ' - - .: 4 Att.' 4 .441r1 :,,,,, , . k �., f•'r�... _�.• ':1 Arty,.{.° 7{! � Ip• ' ` ,.R� w- ..:41,:ti-.14.... ,,,,ii,..,...,,-*,.:•:,."'-)r -.4-`-..!Si.r.:,' :',:' ,. it.1., ,-. a'. r 1: sl _, • a :,�:. 'ice. „• `..i ' � � 4f N r Legend ;� ' ,,I(L,'ll,';�: �. "•��' ;; a e•, p�' ; L----I Permitted Project Boundary `�f, itl'I �.ii. ' „'H 11� + ' , n= UT1 to Fowlers Creek Watershed (14 AC) - :, � :$;° ;ii .I r* ;� " 1.' I ', 0 100 200 400 Monitoring Reach ;ir`a _''�R '. {'';" lf ,�j , ,.i ,,: , Feet IL! Jackson County, CLear\ater Aerial Photography North Carolina NCCGIA(2019 32 Clayton Street Figure 3 Asheville,North Carolina 28801 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Hign Hampton uoit course uuivert Removal and Stream Restoration ^ ; % "x .iti 3'.' .. .,5,. . • - rdij r;S.. ...„ - .,•' , \ .. t0 �' • x: 1F'',, , 'P4' .� .t ." -`_ ` fir'. "' ;' ' 67`ryr �. i A c r d. ' j .i�: :�.. .`.'.i Il'� ie. ;til. i I „1 • / .. BSI ` •_ •• --- `_. . •.r�. ...'A°y,.s�3�•'i.•Yois. 1i • ,I. e. .. . b. �.9.�.'• . . ..f dC _r-- :' "[` j , y i 1'. ' q r „y R.'. t •i. A..7 ..01i. ���ppp i s � jt.it.:;•:,..,..jAP. .. .., ' .•:.4. - ...."..L1...':',A,.•;'.',-.„.. ..:: . -•.,4.:*:iitte'..' •ic'S.'0.1• i f•ri!•••-- .'••.•:'‘1:—;,'•.tr•..,: ...•.•:;': ..',..,•i::.4"' V. ••' :7 '...•Ii:: ••• 1..... ••. . . •• • •• ::' ''..t'i•... .r. !' , ''': 74:74*"... .t.,i;.• ,..::..';4:7.,• •'• i•ii•i'.1 lii' . .•WI i H'.!.. ..4i'.44'.11.* :: ' :•..... . ... .0k ,,,,o, . . i i.','.I• ' ' • , •'' . `14-'.••..LA..;.:.-v• •—.. .; -AL. . •••• :_' ..-. •• ' 3.i 4, r.i •.2 lt• ,... , : .,: .. r ,.. ,.. . :...:• ..,,......i.;.. . _ ,.,,... ,.4...v., • • • - . : 4- . •. Fl 4 rr t, , . : : ; ,' �. ,. -Legend . � \,. T} •• *ems,• F { Permitted Project Boundary .' +,:°fin 1:f:. i;:;°'''i ' `; ,: Monitoring Reach ';. C „' t:.�' L A �. `'fyx- , r� Soils• fit 4.r lj �y f . i:' t � . . 1 EdC; EdD - Edneyville-Chestnut Complex '.' :4 I �"4,:.r: . , �=+ '• I•;, . '' .4 ' ; le � ¢r '•.. �': 3'` 0 100 200 400 Ud - Udorthents, loamy 1,i. •1' .., ' : '' + I Feet . _.. _ Jackson County, CLearWaLer USDA Soils Map North Carolina NRCS Web Soil Survey 32 Clayton Street Figure 4 Asheville,North Carolina 28801 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Hign Hampton uoit course uuivert Removal and Stream Restoration s. h y , N { v 1i"1 ,ice vN\N*4: . / r iilif\' P5 ® kr A' ' • / XS4 -- — i r , � i XS3 i ' i K PP4 O / 1 PP3 a z i O . • ► . / XS2 i i PP2 i /. / ,/- / XS1 / — N r- i PP1 i j 0 /'i- i 0 50 100 200 ,- / i i �� Feet \ i = „} *. Legend ► � / , ' • r i Permitted Project Boundary — — Monitoring Reach (UT1 to Fowlers Creek) . Cross-Section (XS) C Photgraphic Referece Point(PP) Drawn by:AKT,12.13.2019;CEC Project#918 t Jackson Count , CLearWaLer Monitoring Features Map Y Figure 5 North Carolina 32 Clayton Street Asheville,North Carolina 28801 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 ATTACHMENT A: Memo from Andrew Bick, PE, Headwaters Engineering to David Brown, USACE and Kevin Mitchell, NCDWR RE: Stability Assessment and Stream Enhancements UTs to Fowler Creek High Hampton Resort, Cashiers, Jackson County, NC DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 Headwaters Engineering, PC NCBELS Lic. No. C-4500 MEMORANDUM TO: David Brown,US Army Corps of Engineers Kevin Mitchell,NC Division of Water Resources FROM: Andrew Bick, PE DATE: March 5, 2019 RE: Stability Assessment and Stream Enhancements UTs to Fowler Creek High Hampton Resort, Cashiers, Jackson County,NC Approximately 880 linear feet(LF) of culvert was removed from an unnamed tributary to Fowler Creek(referred to in the attached plans as UT1) at the High Hampton Resort golf course, which is currently undergoing a renovation. The banks of the daylighted channel were sloped and large stone was placed in the bed and on the banks. A subsequent sediment removal effort was completed at the request of DWR. UT2 is located about 1,700 LF east of UT1 in the#2 fairway. The Corps and DWR expressed concern with the height of the drop at the beginning of the UT2 channel at a headwall where two culverts discharge, specifically with regard to stability and aquatic organism passage. The purpose of this memo is to document as-built surveys completed by ClearWater Environmental Consultants (CEC), to summarize our analysis of channel stability based on this survey and our observations of the site, and to present proposed stream enhancements. As-Built Surveys In February 2019, CEC staff completed total station surveys of the daylighted UT 1 channel and UT2 near the headwall. The surveys were based on a local datum. The UT1 survey included points along the top of both banks, the thalweg and water surface, four cross sections and several ground points. The UT2 survey collected points along the thalweg of the channel and at a transect immediately downstream of the headwall. The attached plans show the results of the surveys superimposed on 2015 aerial imagery,which was collected prior to the stream daylighting. The plan view of UT 1 indicates a relatively straight alignment through roughly the low point of the valley between a culvert under a cart path at the upstream end and a sediment trap at the downstream end. The profile data indicate a slope of approximately 6 percent; the relatively straight alignment would be expected for a slope in this range. The slope over the downstream 200 LF is noticeably flatter than the upstream 500 LF, apparently in response to the effects of the sediment trap, which is currently a 3-foot tall riprap check dam. (In late January 2019, Headwaters Engineering completed a laser level reference reach survey of UT1 downstream of 1 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 the sediment trap in order to support a design to remove the trap and create a stable transition to a bedrock slide immediately downstream of the trap.) Cross section surveys through the daylighted reach of UTI indicate a relatively narrow and deep channel, with width-depth ratios of 10 or less. Bank heights range from 2.4 to 3.2 feet and top widths range from 11 to 20 feet. Cross section plots with dimension parameters are attached. As shown on the attached photos, the bed and banks contain abundant riprap, generally ranging in median size from 8 inches to more than 24 inches. The UT2 survey indicates a drop of 1.8 feet from the invert of the north culvert to the thalweg and a relatively flat slope of 1.8 percent from this point downstream. The cross-section survey shows a relatively large channel with 3.4:1 side slopes and a maximum depth of 3.7 feet. UT1 Stability Analysis We used the USGS web-based hydrology tool StreamStats to estimate the drainage area above the subject reach of UT1 and found it to be 22 acres. A digitized watershed boundary using the Jackson County contours indicated a slightly smaller drainage area. Land use in the watershed includes forest, the golf course and low density residential. The North Carolina Mountain regional curve predicts a bankfull discharge of about 8 cubic feet per second(cfs) for a 22-acre watershed. Previous experience indicates that regional curve predictions at the extreme low end of the drainage area range such as this are not as reliable as those in the middle of the range (between 2 and 30 square miles). Analysis of the surveyed riffle cross sections indicates the discharge corresponding to the low bank stage is on the order of 140 to 200 cfs. The reference cross section survey by Headwaters in the relatively undisturbed reference reach indicates a bankfull discharge of about 60 cfs. Based primarily on a comparison to the reference reach cross section, it appears that the daylighted channel was constructed deeper and wider than would have been designed based on a natural channel design approach. Analyses of the as-built cross sections indicate shear stresses in the riffles on the order of 5 to 6 pounds per square foot(psf). With reference to Shield's equation, the predicted grain size for threshold of motion ranges from 240 to 300 mm, or 9 to 12 inches. Analysis of the reference cross section flowing full at a discharge of about 150 cfs indicates a shear stress and threshold grain size similar to those of the constructed channel (4.8 psf and 230 mm, respectively). We are aware of the daylighted channel being subjected to multiple flood events since it was constructed and there does not appear to be bank erosion or bed scour. In our experience, constructed streams are typically weakest immediately after construction and become more resilient with time. The large stone in the channel and on the banks does not appear to have been mobilized during any of these recent storms, and calculations indicate that even when flowing full (well above the predicted"bankfull" discharge), the majority of the bed and bank materials would not be mobilized. The proposed boulder steps at the downstream end of UTI will provide additional grade control. A visual monitoring program over the next two to three years will likely provide the data necessary to evaluate long term stream stability. UT2 Perched Conditions The concern expressed for UT2 is the high drop from the culverts to the receiving channel. The proposed boulder step downstream of the headwall will reduce the drop height to about 9 inches, and the proposed pool between the step and the headwall will help dissipate energy and promote 2 DocuSign Envelope ID: DB2078C8-1C66-4BD9-A600-EE24EBDCA9F8 better aquatic organism habitat. As with UT1,the UT2 channel has been subjected to multiple large floods and we have not observed stability issues even without the energy dissipation effects of the proposed pool and step. A visual monitoring program seems appropriate for UT2 as well. Closure Based on our review of the data and our calculations,we do not recommend any repairs or modifications to UTI at this time beyond the sediment trap removal and boulder steps at the downstream end. For UT2,the proposed boulder step and pool should address energy dissipation and aquatic organism passage concerns. If you have any questions, please call me at 828.606.0306. Attachments: Stream Enhancement Plans Cross Section Plots and Shear Stress Calculations Photos • )611 4) •r a@@i 1'•' 7