Loading...
HomeMy WebLinkAbout20220323 Ver 1_Riparian Buffer Authorization Request_20220227Water Resources ENTAL QUALITY Original Submittal 2/27/2022 A. Owner/Applicant Information General Information Primary Contact Email: * michaelburkhard@att.net Please list the contact person's email for questions or payment on this project if needed. Who is submitting the application?* Owner Applicant other than Owner Agent 1. Property Owner Information: 1a. Name on Recorded Deed: 1b. Responsible Party: 1c. Mailing Address:* 1 d. Telephone:* 704-909-9100 3. Agent Information HARBISON MARTHA L REVOCABLE TRUST (for Corporations) Street Address 2479 Camelia Pointe Drive Address Line 2 City State / Province / Region Sherrills Ford NC Postal / Zip Code Country 28673-9139 United States 1e. Email Address:* roncox52@gmail.com 3a. Name: 3b. Company Affiliation: 3c. Mailing Address: Street Address Address Line 2 City State / Province / Region Postal / Zip Code Country 3d. Telephone: 3e. Email Address: 3f. Attach a signed and dated copy of the agent Click the upload button or drag and drop files here to attach document authorization form. PDP only B. Project Information and Prior Project History 1. Project Information 1a. Name of Project:* Ron Cox (Subdivision, facility, or establishment name) 1b. Is this a publicly -funded transportation project?* Yes No 1d. Subdivision Name: LAKEPOINTE NORTH PH 2 le. Nearest Municipality: Mooresville 1f. Property Size: 0.73 acres 1g. County (or Counties) where the project is located: Catawba 1h. Property ID# Date of Purchase 462801284512 8/25/2021 Tax PIN or Parcel id 1 i. Deed Information Type of Book Book#11 Page# Deed F 1306 Map 46 3,4,5,6 1 j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document Catawba_lmages_Deeds Lot 54 Recorded Deed April 124.65KB 21 1999.pdf Catawba_lmages_Deeds_Recorde Plat April 23 330.19K6 1998. pdf PDF only 1k. How would you like to provide the Latitude and Longitude information?* Address Lookup • Manually Latitude*-80.9438 Longitude* 35.6264 11. Is the project located in any of North Carolina's twenty coastal counties?* Yes • No 2. Surface Waters 2a. Name of the nearest body of water to proposed project: Lake Norman 2b. Water Quality Classification of nearest receiving water: WS-IV Critical Area 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: * (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This is a single-family home that was constructed in a typical residential subdivision on Lake Norman, in approximately year 2000. It had a boat dock and pier when purchased by the present owners. Both have recently been replaced, after approval by Duke Energy. The shoreline is presently somewhat stabilized with rip rap, although there are large gaps in the existing rip rap and the underlying fabric is missing, allowing erosion into Lake Norman. The back yard has a slope of approximately 2 1/2 to I. A large portion of the buffer is wooded. 3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document USGS Topo.pdf 310.46KB Topo Map.pdf 181.62KB PDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document Soil —Map Soil Survey.pdf 521.96KB PDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* Do maintenance and enhancement of the existing shoreline stabilization, by implementing an "Enhanced Boulder" technique from the 760 — 762 contour lines. We will accomplish this by "pulling down" the existing riprap to fill in the bare areas below the 762-contour line, where the riprap has washed into Lake Norman. We will then place large boulders over the riprap creating a stable shoreline, which will, in turn create critical habitat for the numerous aquatic species of plant and animal life that live in Lake Norman. All work will be done from the water using a long reach track hoe. This will create a massive planting area all along the entire slope, for the full width of our property. The new planting area will be filled with all North Carolina native species plant material and will create a large area of infiltration, between the area where the artificial turf is located and the lake. We are also requesting approval to remove 5 trees, two (2) of which recently fell into Lake Norman, during a recent storm (see attached photos; two (2) trees which have grown together, and which are severely undercut, which has severely compromised their root systems. These two trees are located within the existing riprap and pose a threat to our boat dock and pier. And one (1) tree that is buttressing and leaning over the neighbor's boat dock and pier, causing concern for the safety of their property. We are requesting approval to allow the existing artificial turf to remain, in exchange for which we propose to do onsite mitigation using a variety of different species of native plants to serve as mitigation to allow the artificial turf to remain in the Catawba River Buffer in Zone 1 and Zone 2. We have calculated that approximately 2,510 square feet along the shoreline will be planted as mitigation for allowing the artifical turf to remain. In addition, new native plants will be incorporated into the wooded area in both zone 1 and zone 2. We will address the additional RR as noted in the NOV-2021-PC-0417 issued August 18, 2021 Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document Site Plan.pdf 670.86KB PDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* Yes • No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* Yes No 6b. List any permits/approvals that have been requested or obtained for this project in the past. Application Date Date Issued Permit Type 1 /4/2021 IEE: Buffer Authorization 6c. Please explain and detail according to "help file" instructions.* DW R #21-0026 This approval was granted for the removal of approximately 200 sq./ft. of Impervious Material (Fire Pit) out of the critical area Zone 1, to build a new patio and fire pit in Zone 2. Attached Approval Letter 7. Future Project Plans 7a. Is this project a phased project?* O Yes O No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* Neuse River Basin (15A NCAC 02B.0233) • Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 02B.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 02B.0267) Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type Zone 1 Zone 2 .................. Shoreline Lake Permanent Allowable 1,672. 0.00 Stabilization Norman (P) 00 Square Map label (e.g. Road Perm or Temp Square Feet Crossing 1) Feet Buffer Lake Permanent Allowable 963.00 578.00 Map label (e.g. Road Norman (P) Square Square Crossing 1) Perm or Temp Feet Feet Total Zone 1 Impacts: 2,635.00 Total Zone 2 Impacts: 578.00 Total Buffer Impacts: 3,213.00 Comments: The impacts in Zone 1 and 2 of the Catawba River Buffer consist of artificial turf and the underlayment panels to stabilize this area from eroding. Neither the owner nor the landscape contractor, which did the installation per specifications, were aware that this would be a violation of any kind, as artificial turf is used and can be seen on numerous lots on Lake Norman and installed within the Catawba River Buffer. Plus, an exhaustive search of the applicable guidelines by the owner did not disclose any explicit, or implicit, reference to artificial turf as being prohibited within the respective buffers. Numerous attempts to stabilize this area by the previous owners of the property had failed, due to the slope and the nature of the soil and rocks. In fact, the slope where the artificial turf is located, had been stripped of all of its topsoil, due to erosion. Both the artificial turf and the underlayment panels are demonstrably pervious! The artificial turf has the permeability of 700 inches/hour/square yard and the underlayment panels have the permeability of 1,582 inches/hour/square foot before installation of the artificial turf. Specifications of these products are uploaded in Additional Information for your review. D. Impact Justification and Mitigation 1. Avoidance and Minimization h' .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. A local landscaping company was consulted to help address the problems of not being able to stabilize the backyard area after numerous attempts. Previous owners had attempted to establish a traditional grass yard by over -seeding. Also, evidence was found of a failed attempt to place sod in the area. All previous efforts to stabilize the area where the artificial turf is presently located failed. Failure was attributed to poor soil and rocky conditions, plus all of the topsoil had been washed away, due to erosion. They recommended the installation of SYN LAWN artificial turf with underlayment panels, both of which are pervious materials. Using this material, the soil would stop eroding and prevent additional sediment impacting Lake Norman. Additionally, the severe slope of the area, coupled with the fact that existing structures made it difficult if not impossible, to access the area with even small equipment, such as lawn mowers, etc., resulted in the decision to install the artificial turf. Maintenance of such an area is always an issue, especially for the present owners, both of whom are in their 70's. Low maintenance of the area was an important factor to them, especially in light of the fact that all previous efforts to stabilize the area had failed. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The project was well coordinated with all material on site prior to the commencement of work. Installation of the aggregate base material was scheduled with the prediction of clear weather for 3 days and was completed in one day and the project was completed the following day. Work was done using wheelbarrows, hand tools and manual labor, so as not to further destabilize the area during installation of the artificial turf. E. Diffuse Flow Plan 1a. What type of SCM are you providing? * Level Spreader ✓ Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Proposed project will not create concentrated stormwater flow through the buffer Other SCM that removed minimum of 30% nitrogen 1 c. Diffuse Flow Documentation Click the upload button or drag and drop files here to attach document Buffer Authorization Application Storm Water Plan.pdf 667.33KB PDF only F. Supplementary Information Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? Yes • No 2b. Is this an after -the -fact buffer authorization application? 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Neither the owner nor the contractor, which did the installation, were aware that this would be a violation of any kind, as artificial turf is used on numerous lots on Lake Norman and installed within the Catawba River Buffer. The owners visited several sites on lake Norman, where the same material was installed, within both Zone 1 and Zone 2. They were told repeatedly that no approval was sought or required. Plus, an exhaustive review of 15A NCAC 02B .0614 before the artificial turf was installed, did not disclose any mention of artificial turf one way or the other. *"See attached Disclaimer— G. Additional Information Please upload any additional information you would like the Division to consider during application review. u Additional Attachments: Click the upload button or drag and drop files here to attach document Enhanced shoreline to scale.pdf 525.82KB Landscape Plan .pdf 293.92KB Tree Removal near neighbors dock.pdf 818.69KB Tree Removal of 2 in RR shoreline.pdf 572.59KB Tree Removal of 2 which have fallen in the lake.pdf 522.5KB SYNLawn-SYNAugustine-X47-SAX47-USA.pdf 882.39KB Champion Panel System.pdf 2MB Letter of Approval 21-0026 withCertificate of 1.34MB Completion.pdf Non -Compliance -NOV - Cox#2.docx.pdf 827.34KB PDF only Additional Comments: This Application is submitted for the purposes of resolving a disputed claim on the part of DWR/DEQ and is for settlement purposes only, and neither the fact of, nor any provision contained in this Application or its Exhibits, nor any action taken hereunder by either DWR/DEQ or the Applicant(s), shall constitute, be construed as, or be admissible in evidence as an admission of the validity of any claim or any fact alleged by DWR/DEQ, or agents acting on their behalf, in this action or in any other action, or of any wrongdoing, fault, violation of law, or liability of any kind on the part of the Applicant(s) of any claim or allegation made by DWR/DEQ, in this or any other action, or as any admission by the Applicant(s). H. Sign and Submit .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name: * Michael W. Burkhard Signature Ac6ael1v %r-kkr-cJ Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version: Select Reviewer: Select Reviewing Office* Has payment been received?* • Yes No Yes • No 20220323 1 Doug Perez:eads\djperez Mooresville Regional Office - (704) 663-1699 • No Payment Needed Fee Received Need Fee - send electronic notification