Loading...
HomeMy WebLinkAbout20220320 Ver 1_Shoreline Stabilization_20220301Shoreline Stabilization Application Form NORTH CAROLINA EnWnnmentufQu&lry 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TIME Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * Owner Information: renata@nicheram.com Please provide an email address for payment and requests for more information here. Name:* John Barja Jr. Email: * renata@nicheram.com Phone Number: (704)491-6345 (x)o)xxx-xxxx Mailing Address: * Street Address 113 Anglers Place Address Line 2 City State / Province / Region Mooresville NC Postal / Zip Code Country 28117 US Is there an agent working on the project?* Yes No Agent/Consultant Information Name: * Company Affiliation: * Email:* Phone Number:* Janice Estep CBC Stone & Recycling, LLC info@cbcstoneandrecycling.com (704)660-5111 (xxx)xxx-xxxx Mailing Address: * Street Address 638 Oakridge Farm Hwy Address Line 2 City State / Province / Region Mooresville NC Postal / Zip Code Country 28115 United States A signed and dated copy of the Agent Authorization letter:* Auth. Form.pdf 542.41 K B Link to: Sample Agent Authorization Form Project Information [15A NCAC O2H .O5O2(a) & (b)] Project Name:* Barja Shoreline If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. * Upload File Look up address Upload Map: Survey.pdf 989.68KB Vicinity Maps.pdf 6.3 M B Latitude: * 35.546374 Longitude: *-80.895619 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Site Plan.pdf Buffer Form.pdf Please use the diagram at the link below: 903.5KB 969.19KB https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) Shoreline Pics.pdf 24.72MB 4. Location of the property (where work is to be conducted) Nearest Town: * Mooresville County:* Iredell Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address: * Lot 129 Commodore Peninsula Include phase/lot number Directions to site: * 610 E Center Ave Mooresville, NC 28115 Head south on Evergreen St toward E Center Ave 15 s (197 ft) Turn right onto E Center Ave 2 min (0.5 mi) Continue on S Church St. Take E Catawba Ave to W Wilson Ave 3 min (0.6 mi) Turn left onto S Church St 0.3 mi Turn right onto E Catawba Ave 0.2 mi Turn left onto S Academy St 0.1 mi Take NC-1100/Brawley School Rd to Stutts Rd 11 min (5.4 mi) Turn right onto W Wilson Ave 1.2 mi Continue onto NC-1100/Brawley School Rd 1.0 mi Continue straight to stay on NC-1100/Brawley School Rd 3.2 mi Follow Stutts Rd to Anglers P1 3 min (1.7 mi) Turn left onto Stutts Rd 1.7 mi Turn left onto Anglers P1 141 ft 113 Anglers P1 Mooresville, NC 28117 Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: * Residential Residential, undeveloped, etc. 6. Property Size 0.25 acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Remove undermined trees on immediate shoreline necessary to properly stabilize bank. Install matting and install class "B" rip rap for new shoreline stabilization. 8. How will the work be done?* From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 4' below (468 sf) square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 1' above (117 sf) square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) Grass buffer, remove trees and brush on immediate shoreline, no disturbance to buffer. Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): a $240.00 for impacts to lake (below normal water level) of less than 1 acre a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name: * Janice Estep Signature: csaxrjfr p v[n%. Submittal Date: 2/25/2022 Initial Review Is this accepted into the review process?* Yes No Project Number:* 20220320 Version:* 1 Select Reviewer: * Doug Perez:eads\djperez Select Reviewing Office: Mooresville Regional Office - (704) 663-1699 Has payment been received?* ( No Payment Needed C Fee Received C• Need Fee - send electronic notification What amount is owed?* C• $240.00 C $570.00 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. PLAN NO. PARCEL ID: STREET ADDRESS: i 13 nq lers Moore .0) ( � N\c. a F,11 Please print: Property Owner: Torn v1 Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize Jan ice ES e , of C,PIC cvt-cone_ ec3C� nc� LLC (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: 104- Li GI 1 - (j3/-15 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. i Authorized Sig, re Date: a- aa- `)•DN, Authorized Signature Date: mvomzr O EO°XYyy - Q9 C. V %ti �- E .. cog F d4 G o g- z.gg. 4J <� -c m rn Om am. m f 0 w g <a 0 is• S' : ✓5-5- z < d -63 ,O O m'-' ml ob x MO 0 t--, i P� r r C tri o - C1 zw 0 K H ,J b,-CGil OG WN A.j�` ;5[ O.o <z +�it'° N Ouo oo We aww too c yba t7 <-ya y- T 8 ID v 2 N ID N CD m m 0 01 0 m r ID 0 a R a 0 'e hi r�u.H C oo 2/15/22, 12:46 PM Iredell.ConnectGlS ir co N N E,E6T+91 1:51 Feet https://iredell.connectgis.com/Map.aspx 1/1 2/15/22, 12:49 PM Iredell.ConnectGlS CO FC I GIS wt& 4051:Ntc. .507 • 124 https://iredell.connectgis.com/Map.aspx Iredell County 1:50 Feet 104 121 1/1 Legend 113 Anglers PI wieffestawisomenverm Full Pond/ Normal Water Level Shoreline Lake (At Full Pond/Norrnai Water Level) r Li I 1.-J l 07 o 00-Do\J X 0 0 � N 1 I 1 I enSlr-h houses 377/ `e-m(3ve- Sever 2\ uncle - rn v-)eCk �re-eS No c ; S-kur bo r,c� ko \ovceo- Please approximately sketch the following information on this plan, length of shoreline (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 CATl AWBA ROPM N BUFFER NOTIIFIIC T(ON FORM M Project Name/address: Owner: County: Print Contractor/agent: S'�c3Yle e `le_ Print Signature LLC Sishaktire The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 021-1.0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 028.0243(5), (6)] Acknowledgement of Notification 1, hereby state that i have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement_ Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): r� Date: 7 Z/7 vY 1\�iYb, t. flarifiliPean aig#szatioemo.-N-642.-r. 0 --aSaVARTAIMV Uki