Quible & Associates, P.C.
ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SURVEYING
SINCE 1959
March 31, 2014
Tracey Wheeler
US Army Corps of Engineers
2407 W 51h Street
Washington, NC 27889
Re: Nationwide 12 Permit Request
CenturyLink
Long Term Improvements (Phase II) To Pea Island
Pea Island NWR, Dare County, North Carolina
Ms. Wheeler:
A
P.O Drawer 870
Kitty Hawk, NC 27949
Phone: 252- 261 -3300
Fax. 252 -261 -1260
Web: quible.com
Please find enclosed a Pre - Construction Notification form and associated documentation for utilities construction
along the NC 12 Corridor on Pea Island. This notification is for those activities required to complete telephone
line connections.
Enclosed find the following:
• Project Narrative
• USGS Vicinity Map - Relevant Portion of USGS Topographic Quadrangle -Pea Island
• Nationwide 12 Site Plans (Provided by Others)
• PCN Application
• Photographs
• Agent Authorization Letter
• Copy of the $240 Processing Fee Check to NCDENR
Please do not hesitate to contact the undersigned at 252.261.3300 if you have any questions or requests for
additional information.
Sincerely,
cc: Craig Clark, CenturyLink
Jennifer Burdette, NC DWR WQP (five copies)
Rod Medlin, Outsource
Clay Willis, NC DOT
file
2 0 1 4 0 3 4 0,
Ark 2 2014
►R wA rY
v
Project Narrative
Utilities relocation was considered in the permits issued for Long Term Improvements (Phase II)
to Pea Island on NC 12 North Carolina Division of Coastal Management (NCDENR) Permit
#106 -12 and subsequent modifications, addresses utility relocation for the entire project
However, there were no proposed impacts to Waters of the US associate with the relocation of
CenturyLink's telephone lines The hired subcontractor, Lamberts Splicing, did not follow the
permit conditions and impacted coastal wetlands as a result Impacts include use of machinery
in wetlands (denoted as "Ruts" on the attached site plans -plans provided by CenturyLink's
engineer) and termination of borings within coastal wetlands
The attached Pre - Construction Notification (PCN) and accompanying information are for the
proposed activities required to complete connections (connection of conduit and splicing) of the
telephone conduit segments that were installed incorrectly (not according to permit
specifications found in NC DCM Permit #106 -12) The impacts proposed (575, sf total spread
out over eight locations as shown on the attached plans,) are temporary and'involve setting up
splicing /connection stations, and subsequently burying the connections .by hand using shovels
and conventional hand tools
Per'instructions by USACE, areas noted as "Ruts" and "Spills" on the accompanying site plans
are not included in this notification as requested impacts These impact areas are included and
noted within the CAMA Permit modification that NC DOT is processing and are shown here for
consistency only Based on NC DOT correspondence, there was an estimated 1,255 square
feet of unauthorized coastal wetlands impacts that occurred during relocation of portions of the
telephone conduit This PCN requests an additional 575 sf of temporary impacts to connect
those conduits that have already been installed
A table is provided as an,attachment, and for, your convenience, in addition to the square
footages listed on the Nationwide 12 PCN All of the proposed impacts required'to connect the
conduits already installed are noted on the attached plans (permit plan sets were designed by
others and the notations of existing and proposed impacts shown were generated by others
after discussions with NC DOT)
Photographs of the existing conditions and a typical detail showing the footprint of the proposed
work that will temporarily impact coastal wetlands as proposed are included with this PCN
5.5000000- VV 075.4916666' W 075.4833333- W 075.47
0
i.
fl
Ui
r-1A
wer(C)
C')
00
Ft x wit ni irr
Hc Ow JkR1 i k1,
�,rQv�c
is
7
``
nd Project
r �
t
z
�D
0
CD
in
r-
LO
CO
Lf)
Cl)
iza L
i
W
New Inle and
Tempora -y Bridge Site
rt 10
075.466666
\N
075.4666666'W
GrI )
LO
m I
FA
Ln
'Coo
M
M
R
00
(q
Lr)
'no]
FA
0
0
0
O r-
1p
Lr)
Oml
'Coo]
M
Cl)
M
Cl)
0:)
Lr)
m
z Ji
,t
fl
r-1A
wer(C)
C')
00
Ft x wit ni irr
Hc Ow JkR1 i k1,
�,rQv�c
7
``
r �
t
z
�D
0
CD
in
r-
Lf)
Cl)
iza L
i
Slue '
Ook
-k
U')
Cl)
t' ,
Ce
I - ,
"
) .
Y cial'r,
Week Creed
f
Goulds
Lump
Begi
Project
z
'_'U
Ira
f
co—
Declination
N CN
14�
075.4916666- W 075.4833333- W 075.4750000' W
SCALE 1:24000
0 -- -- - 1000 -- 2000 3000 - 4000 6000__
FEET
GN 0.28'W
MN 10.86'W
075.466666
\N
075.4666666'W
GrI )
LO
m I
FA
Ln
'Coo
M
M
R
00
(q
Lr)
'no]
FA
0
0
0
O r-
1p
Lr)
Oml
'Coo]
M
Cl)
M
Cl)
0:)
Lr)
m
f
cu
a�
J
0
WjA TF�9OG
P Nii� Y
�9- 20 1 4U 640
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Page 1 of 10
PCN Form — Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1a.
Type(s) of approval sought from the Corps:
❑X Section 404 Permit ❑ Section 10 Permit
1 b.
Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number:
1c.
Has the NWP or GP number been verified by the Corps?
X❑ Yes ❑ No
1d.
Type(s) of approval sought from the DWQ (check all that apply):
0 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes ❑X No
For the record only for Corps Permit:
❑ Yes ❑X No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes ❑X No
1g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below.
Yes ❑ No
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
X❑ Yes ❑ No
2.
Project Information
2a.
Name of project:
Relocate Telephone Facilities along NC 12 Pea Island
2b.
County:
Dare
2c.
Nearest municipality / town:
Nags Head, NC 27959
2d.
Subdivision name:
2e.
NCDOT only, T.I.P. or state project no:
WBS# 32635.3.FR6 B -2500A
3.
Owner Information
3a.
Name(s) on Recorded Deed:
United States of America
3b.
Deed Book and Page No.
None
3c.
Responsible Party (for LLC if
applicable):
US Government
3d.
Street address:
21 11 1 A NC 12 Hwy
3e.
City, state, zip:
3f.
Telephone no.:
3g.
Fax no.:
3h.
Email address:
Page 1 of 10
PCN Form — Version 1.4 January 2009
4.
Applicant Information (if different from owner)
4a
Applicant is
❑X Agent ❑ Other, specify
4b
Name
Craig Clark, Manager Engineering & Construction
4c
Business,name
(if applicable)
Centurylink
4d
Street address
1875 N 20th St
4e
City, state,, zip-
Morehead City, NC
4f
Telephone no
252- 247 -2000
4g
Fax no
252- 726 -0236
4h,
Email address,
craig cark@centurylink corn
5.
Agent /Consultant Information (if applicable)
5a
Name
Warren Dennis Eadus
5b
'Business name
(if applicable)
Quible & Associates, P C
5c
Street address
8 Juniper Trail
5d
City, state, zip
Southern Shores, NC`27949
5e
Telephone no,
252 261 3300
5f
Fax no
252 261 1260
5g
Email address
weadus @quible corn
Page 2of10
B.
Project Information and Prior Project History
1
Property Identification
1a
Property identification no (tax PIN or parcel ID)
lb
Site coordinates (in decimal degrees)
Latitude 35 2432 Longitude 75 173
1c
Property size
5 509 acres
2.
Surface Waters
2a
Name of nearest body of water to proposed project
Pamlico Sound
2b
Water Quality Classification of nearest receiving water
SA
2c
River basin
Pasquotank
3.
Project Description
3a Describe the existing conditions on the site and the general' land use in the vicinity of the project at the time of this
application
Undeveloped scrub shrub estuarine flats and open Section 404 wetlands dominated by
3b
List the total estimated acreage of all existing wetlands on the property 500
3c
List'the1otal,estimated linea "r'feet of all existing streams (intermittent and perennial) on the property 4,800
3d Explain the purpose of the proposed project
Relocate telephone infrastructure consisting of copper and fiber optic buried cable
3e Describe the overall project in detail, including the type of equipment to be used
Excavation by hand with shovel only Soil will be placed on a tarp and returned to pits after splicing is completed Soil will not be tamped or compress
4.
Jurisdictional Determinations
4a
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
0 Yes ❑ No ❑ Unknown
Comments
4b
lfthe Corps made the jurisdictional determination, what type
of determination was made?
❑ Preliminary Q Final
4c
If yes, who delineated the jurisdictional areas?
Name (if known) Lorn Lalibertta Boswell
Agency /Consultant Company CzR, Inc
Other -
4d If yes, list the dates of the Corps jurisdictional determination_ s or State determinations and attach documentation
18 -OCT -2012
5.
Project History
5a
Have permits or-certifications been requested or obtained for
this,project (including all prior phases),in the past?
El Yes X❑ No ❑ Unknown
5b
If yes, explain in detail according to "help file" instructions
6.
Future Project Plans
6a
Is this,a phased project?
❑ Yes ❑X No
6b
Ifyes, explain
Page 3 of 10
PCN Form — Version 1 4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
la Which sections were completed below for your project (check all that apply)
X❑ Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted
2a
Wetland impact
-number
Permanent (P) or
Temporary T
2b
Type of impact
2c
Type of wetland
2d
Forested
2e
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f
Area of
impact -
(acres)
W1 T
Excavation
Tidal Freshwater Marsh
No
Corps
00029
W2 T
Excavation
Tidal Freshwater Marsh
No
Corps
00023
W3 T
Excavation
Tidal Freshwater Marsh
No
Corps
000115
W4 T
Excavation
Tidal Freshwater Marsh
No
Corps
0 0011'5
W5 T
Excavation
Tidal Freshwater Marsh
No
Corps
000115
W6 T
Excavation
Tidal Freshwater Marsh
No
Corps
0 023
2g Total Wetland Impacts:
2h Comments
All areas are Coastal Marsh
W7 T Excavation Tidal Freshwater Marsh Non Forested Corps 0 00115 Acres
W8 T Excavation Tidal Freshwater Marsh Non Forested Corps 0 00115 Acres
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted
3a
Stream impact
number
Permanent,(P) or
Temporary (T)
3b
Type of impact
3c
Stream name
3d
Perennial (PER) or
intermittent (INT)?
3e
Type of
jurisdiction
3f
Average
stream
width
(feet)
3g
Impact
length
(linear
feet)
S1
Choose one
S2
Choose one
-
S3
Choose one
S4
Choose one
S5
Choose one
S6
Choose one
3h Total stream and tributary impacts
31 Comments
Page 4 of 1,0
PCN Form — Version 1 4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S then indiv ually list all o en'water impacts below
4a
Open water
impact number
Permanent (P) or
Temporary T
4b
Name of waterbody
(if applicable)
4c
Type of impact
4d
Waterbody
type
4e
Area of impact (acres)
01
Choose one
Choose
02
Choose one
Choose
03
Choose one
Choose
04
Choose one
Choose
4f Total open water impacts
4g Comments
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below
5a
Pond ID number
5b
Proposed use or
purpose of pond
5c
Wetland Impacts (acres)
5d
Stream Impacts (feet)
5e
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f Total:
5g Comments
5h Is a dam high hazard permit required?
❑ Yes ® No If yes, permit ID no
51 Expected pond surface area (acres)
5j Size of pond watershed (acres)
5k Method of construction
6. Buffer Impacts (for DWQ)
If,prolect will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts
below If any impacts require mite ation, then vou MUST fill out Section D of this form
6a. Project is in which protected basin?
❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other
6b
Buffer Impact
number —
Permanent (P) or
Temporary T
6c
Reason for impact
6d
Stream name
6e
Buffer
mitigation
required?
6f
Zone 1
impact
(square
feet )
6g
Zone 2
impact
(square
feet
131
Yes /No
B2
Yes /No
B3
Yes /No
B4
Yes/No
B5
Yes /Nb
B6
Yes /No
6h Total Buffer Impacts:
61 Comments
Page 5 of 10
D.
Impact Justification and Mitigation
1.
Avoidance and Minimization
1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
All work -will be performed by hand Excavated soils will be placed on tarps and placed back m, excavation
1b Specifically describe measures taken,to avoid or minimize the proposed Impacts through construction techniques
Hand excavation only Soil removed will be placed on tarp, No compression or tamping when backfilling
2.
Com ensator rY Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a
Does the project require Compensatory Mitigation for
Impacts to Waters of the U S or Waters of the State?
❑ Yes ❑X No
2b
If yes, mitigation Is required by (check all that apply)
❑ DWQ ❑ Corps
2c
If yes, which mitigation option will be used for this
project'?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3.
Complete if Using a Mitigation Bank
3a
Name of Mitigation Bank
3b
Credits Purchased (attach receipt and letter)
Type Choose one
Type Choose one
Type Choose one
Quantity
Quantity
Quantity
3c
'Comments
4.
Complete lete if Making,a Payment to In -lieu Fee Program
4a Approval,letter from in-'lieu fee program is attached
❑ Yes
4b
Stream mitigation requested
linear feet
4c
If using stream mitigation, stream temperature
Choose one
4d
Buffer mitigation requested (DWQ only)
square feet
4e
Riparian wetland mitigation requested
acres
4f
Non - riparian wetland mitigation requested
acres
4g
Coastal (tidal) wetland mitigation requested
acres
4h
Comments
5.
Complete if Using a Permlttee Responsible Mitigation Plan
5a
If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 1 4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes X No
6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square feet)
Multiplier
6e
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1 5
6f Total buffer mitigation required:
6g, If buffer mitigation is required, discuss what•type of mitigation is proposed (e g , payment to ; private mitigation bank,
permittee responsible riparian' buffer restoration, payment into an approved in -lieu fee fund)
6h Comments
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1
Diffuse Flow Plan
1a
Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ❑X No
within one of the NC Riparian Buffer Protection Rules?
lb
If yes, then Is a diffuse flow plan Included? If no, explain why
❑ Yes ❑ No
2.
Stormwater Management Plan
2a
What Is the overall percent Imperviousness of this project?
0
2b
Does this project require a Stormwater Management Plan?
❑'Y,es 0 No
2c
If`this project DOES NOT require a Stormwater Management Plan, explain why
Temporary impacts only with no impervious or improved surfaces of any kind
2d
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan
NA
2e
Who will be responsible for the review of the Stormwater Management Plan?
NA
3.
Certified Local Government, Stormwater Review
3&
In which local governments jurisdiction Is this project?
NA
❑ Phase II
❑ NSW
3b
Which of the following locally - Implemented stormwater management programs
❑ USMP
apply (check all,that apply)
❑ Water Supply Watershed
❑ Other
3c
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4.
DWQ Stormwater Program Review
❑Coastal counties
❑HQW
4a
Which of the following state - Implemented stormwater management programs apply
❑ORW
(check all that apply)
❑Session Law 2006 -246
[]Other
4b
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
5.
DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1 4 January 2009
F.
Supplementary Information
1
Environmental Documentation (DWQ Requirement)
1a
Does the project involve an expenditure of public (federal /state /local) funds or,the
❑X Yes ❑ No
use of public (federal /state) land?
1b
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑Yes ® No
(North Carolina) Environmental Policy Act (NEPA'/SEPA)?
1'c
If "you answered "yes" to the,above, has the document °review been finalized' by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
® Yes ❑ No
letter ) SEPA for,overall project'approved and EIS issued This work scope is proposed to
Comments take place within existing utility easements within the National Wildlife Refuge
2.
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards,
❑ Yes ❑ No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this.an after - the -fact permit application?
❑ Yes X❑ No
2c
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s)
This application involves impacts required to relocate buried telephone cables for NCDOT project B -2500A Utilities relocation efforts were addressed
in the CAMA Permits issued for this project However, dunng the installation of telephone lines the, contractor impacted coastal wetlands with
machinery, term inated'borings in coastal wetlands and;leaked drilling fluid and oils in coastal wetlands This notification is limited to those activities
required to complete4he necessary connections as noted on the site plans and as detailed ^in the project narrative
3.
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future Impacts) result In
❑ Yes ® No
additional development, which could Impact' nearby downstream water quality?
3b
If,you answered "`yes" to the above, submit a qualitative or quantitative�cumulative Impact analysis In accordance with the
most recent DWQ policy If you answered "no," provide a short narrative description
NA
4.
Sewage Disposal (DWQ Requirement)
4a
Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility
NA
Page 9 of 10
PCN Form — Version 1 4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
❑ Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
❑X Yes ❑ No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
A Section 7 Consultation was performed as part of the formal federally listed species assessment conducted in 2008. As per discussions with Gary
Jordan USFWS, and provided that the proposed activities stay within existing granted ROW's, the proposed work will have "no effect ".
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑X No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
All proposed work will occur within wetlands not directly abutting open waters of the Pamlico Sound. All proposed temporary impacts will occur within
existing utilities easements with do direct impact to EFH.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
Yes ❑ No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Pea Island National Wildlife Refuge listed as Significant Natural Heritage Area. All proposed temporary impacts will occur within existing utilities
easements.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA- designated 100 -year floodplain?
X❑ Yes ❑ No
8b. If yes, explain how project meets FEMA requirements:
These types of temporary impacts are allowed within the 100 year floodplain.
8c. What source(s) did you use to make the floodplain determination?
Dare County GIS website, FEMA website
Warren Dennis Eadus��
f
l
Applicant /Agent's Printed Name
Date
V Ap Hcan nt's Signature
(Agent's signature is valid only if an authorization
letter from the applicant is provided.)
Page 10 of 10
Q
O
Q
Q
Q
Q
Q
Q
Q
Q
Q
L
Q
O
7
-p
Q
O
Q
O
Q
O
Q
O
Q
O
Q
O
Q
c
Q
Q
Q
Q
Q
Q
4-
O
+1
3
a+
7
�_
7
4-
7
±+
7
+_+
7
C
O
C
C
C
C
C
C
U
ai
X
U
U
u
U
u
U
Ln
N
�I
N
m
to
O
0
O
Ln
O
Ln
O
Ln
O
0
O
in
O
Ln
Ln
�
Li
,Q
I
�
v
m
t
O
O
O
O
O
O
O
O
i
tw
Ln
N
O
e-1
O
c-i
O
c l
O
r q
O
N
O
a l
O
-1
Q
a
Gl
J
_
�
O
0
•>
L
O
O
O
O
O
O
O
O
.a
Ln
0,
Ln
Ln
Ln
Ln
Ln
L(1
L
U
1
N
i
o
s
p,
10,
Ln
,
O
+
O
+
O
`+,
O
Ln
O
+
Ln
1
m
00
O
l-0
oN0
u
J
000
000
O
O
QN1
O
m
eN-i
m
m
m
C)
C
O
V
L
X
LU
E
3
z
O
u
C.
_N
E
m
>
>
>
>
>
> >
> >
>
>
� �
0
N
r-I
M
M
IZT N
r-I
O
N
M
M
0
N
c-i
m
m
a
a
m
a
7
��
ai
Y .�-
OC ^
O �
U m
6
7
O
b
a
� a
s<
JN
v
0
N
-4
m
m
Agent Authorization Form
Date March 25, 2014
Name of Property Owner(s) Applying for Permit
_Centurylink
Types of Permits Sought-
NW -12
By signature below I do hereby certify that I have the authority and duly authorize Quible &
Associates, P.'C to act on my behalf'for purposes of applying for and obtaining any and all
necessary permits for my property located at
NC 12 on Pea Island Wildlife Refuge in the area adjacent to NCDOT project B- 2500A_
_Dare County, NC
This certification is valid until: Dec 31, 2014
Sincerely,
Craig Clark
Manager - Engineering & Construction
Centurylink
1875 N 20th St
Morehead City, NC 28557