HomeMy WebLinkAbout20140221 Ver 1_Stormwater Info_20140404Strickland, Bev
From: Devane, Boyd
Sent: Friday, April 04, 2014 12:22 PM
To: Strickland, Bev
Subject: Luck Stone files # 14 -0221
Attachments: 13516 SHEET 3 032814.pdf, 13516 SuppForm- WetPond- 20120418- DWQ- SPU.pdf,
13516 Supplement- FiltStripLevelSpread- Rev.10_29June2012.pdf, 13516 Wet Pond
design layout.pdf, 13516 Level Spreader evfs.pdf
Please file these files and my email in the Charles Luck Stone file #14 -0221
From: Wes Webb [mailto:wwebb(aawck.com]
Sent: Wednesday, April 02, 2014 11:54 AM
To: Devane, Boyd
Cc: Bruce Smith; Howie Long; Mark Vigil
Subject: Luck Stone Raleigh Contractor Yard - Riparian Buffer Impact
Boyd
The stormwater treatment will be reviewed by the City of Raleigh. Attached are copies of the design work sheets for the
wet pond and level spreader. This should help confirm that the project will provide the required treatment.
Wes Webb, PE
Alley, Williams, Carmen & King, Inc.
120 South Main St.
PO Box 1248
Kannapolis, NC 28082 -1248
Tel. - (704)938 -1515
Fax - (704)938 -6810
wwebbCcDawck.com
www.awck.com
Permit No.
(to be provided by DWQ)
AL
AW*I
o
v� r
NCDENR
a
Rational C, post - development
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
Rainfall intensity: 1 -yr, 24 -hr storm
401 CERTIFICATION APPLICATION FORM
Pre - development 1 -yr, 24 -hr peak flow
WET DETENTION BASIN SUPPLEMENT
Post - development 1 -yr, 24 -hr peak flow
This form must be filled out, printed and submitted.
The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information.
I. PROJECT INFORMATION
Elevations
Project name
Raleigh Contractor Yard Relocation - Charles Luck Stone Center
Contact person
Wes Webb, PE
Phone number
704 - 938 -1515
Date
3/28/2014
Drainage area number
Bottom of 1 Oft vegetated shelf elevation
II. DESIGN INFORMATION
Sediment cleanout, top elevation (bottom of pond)
Site Characteristics
Sediment cleanout, bottom elevation
Drainage area
258,746 ft2
Impervious area, post - development
176,854 ft2
% impervious
68.35 %
Design rainfall depth
1.0 in
Storage Volume: Non -SA Waters
Minimum volume required
14,342 ft3
Volume provided
15,830 ft3
OK, volume provided is equal to or in excess of volume required.
Storage Volume: SA Waters
1.5' runoff volume ft3
Pre - development 1 -yr, 24 -hr runoff ft3
Post - development 1 -yr, 24 -hr runoff ft3
Minimum volume required ft3
Volume provided ft3
Peak Flow Calculations
Is the pre /post control of the 1 yr 24hr storm peak flow required?
Y (Y or N)
1 -yr, 24 -hr rainfall depth
2.9 in
Rational C, pre - development
0.25 (unitless)
Rational C, post - development
0.43 (unitless)
Rainfall intensity: 1 -yr, 24 -hr storm
4.90 in/hr OK
Pre - development 1 -yr, 24 -hr peak flow
3.19 ft3 /sec
Post - development 1 -yr, 24 -hr peak flow
1.07 ft3 /sec
Pre /Post 1 -yr, 24 -hr peak flow control
-2.12 ft3 /sec
Elevations
Temporary pool elevation
248.20 fmsl
Permanent pool elevation
247.00 fmsl
SHWT elevation (approx. at the perm. pool elevation)
fmsl
Top of 1 Oft vegetated shelf elevation
247.50 fmsl
Bottom of 1 Oft vegetated shelf elevation
246.50 fmsl
Sediment cleanout, top elevation (bottom of pond)
243.00 fmsl
Sediment cleanout, bottom elevation
242.00 fmsl
Sediment storage provided
1.00 ft
Is there additional volume stored above the state - required temp. pool?
Y (Y or N)
Elevation of the top of the additional volume
248.2 fmsl OK
Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Parts I. & II. Design Summary, Page 1 of 2
Permit No.
(to be provided by DWQ)
II. DESIGN INFORMATION
Surface Areas
Area, temporary pool
15,016 ft'
Area REQUIRED, permanent pool
10,220 ft
OK
SA/DA ratio
3.95 (unifless)
OK
Area PROVIDED, permanent pool, A,._p.I
10,494 ft'
OK
Area, bottom of 1 Oft vegetated shelf, An t shelf
8,528 ft
OK
Area, sediment cleanout, top elevation (bottom of pond), Ab t �,d
4,030 ft'
OK
Volumes
Y (Y or N)
OK
Volume, temporary pool
15,830 ft3
OK
Volume, permanent pool, V,._p.I
28,095 ft3
OK
Volume, forebay (sum of forebays if more than one forebay)
6,126 ft3
OK
Forebay% of permanent pool volume
21.8% %
OK
SA/DA Table Data
Bottom drain. Any remaining volume to be pumped.
Design TSS removal
90 %
Coastal SA/DA Table Used?
N (Y or N)
Mountain /Piedmont SA/DA Table Used?
Y (Y or N)
SA/DA ratio
3.95 (unifless)
Average depth (used in SA/DA table):
Calculation option 1 used? (See Figure 10 -2b)
N (Y or N)
Volume, permanent pool, V,._PI
28,095 ft3
Area provided, permanent pool, A,._p.I
10,494 ft'
Average depth calculated
ft
Need 3 ft min.
Average depth used in SA /DA, da,, (Round to nearest 0.5ft)
ft
Calculation option 2 used? (See Figure 10 -2b)
Y (Y or N)
Area provided, permanent pool, A,._p.I
10,494 ft'
Area, bottom of 1 Oft vegetated shelf, Ah�t shelf
8,528 ft
Area, sediment cleanout, top elevation (bottom of pond), Ab t ,d
4,030 ftz
"Depth" (distance b/w bottom of 1 Oft shelf and top of sediment)
3.50 ft
Average depth calculated
3.22 ft
OK
Average depth used in SA /DA, da,,, (Round to down to nearest 0.5ft)
3.0 ft
OK
Drawdown Calculations
Drawdown through orifice?
Y (Y or N)
Diameter of orifice (if circular)
2.00 in
Area of orifice (if- non - circular)
in
Coefficient of discharge (Co)
0.60 (unitless)
Driving head (Ho)
0.37 ft
Drawdown through weir?
N (Y or N)
Weir type
(unitless)
Coefficient of discharge (Cw)
( unitless)
Length of weir (L)
ft
Driving head (H)
ft
Pre - development 1 -yr, 24 -hr peak flow
3.19 ft3 /sec
Post - development 1 -yr, 24 -hr peak flow
12.50 ft3 /sec
Storage volume discharge rate (through discharge orifice or weir)
0.06 ft3 /sec
Storage volume drawdown time
2.86 days
OK, draws down in 2 -5 days.
Additional Information
Vegetated side slopes
3 :1
OK
Vegetated shelf slope
10 :1
OK
Vegetated shelf width
10.0 ft
OK
Length of flowpath to width ratio
4 :1
OK
Length to width ratio
3.6 :1
OK
Trash rack for overflow & orifice?
Y (Y or N)
OK
Freeboard provided
7.6 ft
OK
Vegetated filter provided?
N (Y or N)
OK
Recorded drainage easement provided?
Y (Y or N)
OK
Capures all runoff at ultimate build -out?
Y (Y or N)
OK
Drain mechanism for maintenance or emergencies is
Bottom drain. Any remaining volume to be pumped.
Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Parts I. & II. Design Summary, Page 2 of 2
r -_ r
u_;
®` GRESHAM LAKES
a mn�e wy re « nRea ce mn� "
a ` xtl i %
V.
rota rx E.Pn1. �11F3
.E
m�.xr� Ka n
,a,wewns,uuer ory nonxurox renl us.aPnn mreonrsaEne xans lau nwxrununownxoxwEmanrM nwramirra oxanwPx z ^aArt vuve ware nrear rvzzss5m %/� �r �i ¢ �,,\ F7,�� �j
aovw[consrnunory wonxrwrow ax xc Pp[ rvvmrcur.zms to vne xsrtxrour_unsc �� /X���i' _ / i`q �� � /� Vy // ' a
barvtwnvv[cmn �
oxrvrwc arvorxa�sx ����q " "' 1
mem.xr�xmn <r.,,, xa�xx aee.wa�rtl rnn
xaannw.rwrava:Ena n cwtl.wa�c x,.,a.,.x cx � / '
,rx,wa<x ns ewmR
FLNa ,00-rraR
yy
n�
x» a
.z
� Irva
��nrour z�a .
�, ary anoso% �
g �
r
\ 1
_ v�sr sawraar scvFle
\ _ vrsr oveRxeau eLwrwc fi
-
- xf f �,n IR R�olarE Cox o R Y Nr n a
_ alsr ram
I
era,TIvae 1 x 1, w �va `vase
Fpa 1.W YEAR
to zmn be Rie�a o� '�4yy��
e vme roxc: zma
_ � � earsr mra -__,_ _ - - __ ai ��e.et. Pnes. wno<+e mnn be mctaiea Pe' xcnor :mnanw: s • ;2�?
/ - IWE -- .__.__._- .- _• - -... matlwnM�ism m Me Omer oM ae '2:'
FLWU FR xours PNar- mtmn aP cnY cmcrete. 6E
-- .._ 3. alt nzynnit clwa be instnllea Pey NCnOi zmnm�u'c ♦or mnterkls wtl v�ncznnn
_ _ - wiumn ei nny nzp�l1n�iey tYa oxnev ona enObxer ,e nou�z PNOy to tro _ 16883 `
n�gbtlrWt r<epY `mnn�mi ztaMnMSim'wter'WS �pYame Lrl :.c �; .., � `�
Slno 2 PROrrLnVE raR➢, rntlb'pnalP� �a+ azrattY remerenerrte ion rmacays oM enbnnHnents.y al 'i,,�L, EYi
oaR otne Yeas nqy rnn NCWi aewty nomowz cm ewnmaents Vi G
alley, Williams, car en, ffi king, inc. RALEIGH CO RELOCATION c.,sw+ oescaRnox arE xnw sralF Pxa ,_2, _,q
CONSULTINGm ENGINEERS CHARLES LUCK STONE CENTER R 1 1I Srre RUN z -n -,< Rcc x r• =so' �: 13516
Rcc GRADING AND STORM w 3
NRN LICENSE He. f -0203 2 PER C 0 R. COAIkEN15 3 -28 -,4 RCC
izo soure wux smEEr R.o. eax ,sae 6921 CAPITAL BOULEVARD � Ewa+ DRAINAGE PLAN
KANN.,POIIS. NC 28082 )00./938 -1515 RALEIGH, NORTH CAROLINA 6: 13
Form SW401 - LS -VFS - 29June2012 - Rev.10 page 1 of 3
o�oF w ar�gv�
NCDENR
p Y
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION
APPLICATION FORM
LEVEL SPREADER - VEGETATED
FILTER STRIP (LS -VFS) SUPPLEMENT
This form must be completely filled out, printed, initialed, and submitted.
I. PROJECT INFORMATION
Project name
Raleigh Contractor Yard Relocation - Charles Luck Stone Center
Contact name
Wes Webb, PE
Phone number
704 - 938 -1515
Date
March 28, 2014
Drainage area number
II. DESIGN INFORMATION
The purpose of the LS -VFS
Pollutant removal: 40% TSS, 30% TN, 35% TP
Stormwater enters LS -VFS from
The drainage area
Type of VFS
Engineered filter strip (graded & sodded, slope < 8 %)
Explanation of any "Other" responses above
If Stormwater Enters the LS -VFS from the Drainage Area
Drainage area
34,848 fig
Impervious surface area
24,829 fe
Percent impervious
71.25 %
Rational C coefficient
0.47
Peak flow from the 1 in /hr storm
0.38 cfs
Time of concentration
5.00 min
Rainfall intensity, 10- yrstorm
7.22 in /hr
Peak flow from the 10 -yr storm
2.71 cfs
Design storm
10 -year storm
Maximum amount of flow directed to the LS-VFS
2.7 cfs
Is a flow bypass system going to be used?
N (Y or N)
Explanation of any "Other" responses above
If Stormwater Enters the LS -VFS from a BMP
Do not complete this section of the form.
Type of BMP
Pick one
Peak discharge from the BMP during the design storm
cfs
Peak discharge from the BMP during the 10 -year storm
cfs Do not complete this section of the form.
Maximum capacity of a 100 -foot long LS-VFS
10 cfs
Peak flow directed to the LS-VFS
cfs Do not complete this section of the form.
Is a flow bypass system going to be used?
(Y or N)
Explanation of any "Other" responses above
Form SW401 - LS -VFS - 29June2012 - Rev.10 page 1 of 3
LS -VFS Design
Forebay surface area
Depth of forebay at stormwater entry point
Depth of forebay at stormwater exit point
Feet of level lip needed per cfs
Computed minimum length of the level lip needed
Length of level lip provided
Width of VFS
Elevation at downslope base of level lip
Elevation at the end of the VFS that is farthest from the LS
Slope (from level lip to the end of the VFS)
Are any draws present in the VFS?
Is there a collector swale at the end of the VFS?
Bypass System Design (if applicable)
Is a bypass system provided?
Is there an engineered flow splitting device?
Dimensions of the channel (see diagram below):
M
B
W
y (flow depth for 10 -year storm)
freeboard (during the 10 -year storm)
Peak velocity in the channel during the 10 -yr storm
Channel lining material
Does the bypass discharge through a wetland?
Does the channel enter the stream at an angle?
Explanation of any "Other' responses above
200
sq ft Forebay is adequately sized.
18
in
18
in Too deep.
10
ft/cfs
27
ft
30
ft
33
ft
251.00
fmsl
250.40
fmsl
1.82
%
N
(Y or N) OK
N
(Y or N)
(Y or N)
(Y or N)
ft
ft
ft
ft
ft
fUsec
Pick one
(Y or N)
(Y or N)
W
♦ B
Form SW401 - LS -VFS - 29June2012 - Rev. 10 page 2 of 3
Site Luck Stone Raleigh Contractor Yard Relocation
Date 3/28/2014
# 13516
Wet Pond Design Summary
Drainage Area
5.94
Acres
Target Surface Area 10220 ft2
258746
ft2
Actual Surface Area 10630 ft2
Impervious Area
4.06
Acres
Impervious Cover
68.35%
Target SA /DA
3.95
Actual SA /DA
4.11
Option 1 Avg
Depth
2.59
Target Avg Depth
3
Pond Depth
4
Option 2 Avg
Depth
3.08
Forebay %
19.80% 20% target
Total Basin L/W 3.62
Litoral Shelf
Main Basin Dimensions
Elevation
247
ft
Bottom of Shelf Elevation
246.50
ft
Depth
0.5
ft
Bottom of Shelf Length
144.00
ft
Bench side slope
10
ft
Bottom of Shelf Width
45.00
ft
Rear side slope
2
ft
Bottom of Shelf Area
6480.00
ft2
Length of Normal Pool
150
ft
Bottom Elevation
243.00
ft
Width of Normal Pool
55
ft
Bottom Length
130.00
ft
Surface Area
8250
ft2
Bottom Width
31.00
ft
Main Basin L/W Ratio
2.73
Bottom Area
4030.00
ft2
Deep Pool
Sediment Storage Bottom Elevation
242.00
ft
Side slope
2
ft
Sediment Storage Bottom Length
126.00
ft2
Depth
3.5
ft
Sediment Storage Bottom Width
27.00
ft2
Sediment Depth
1
ft
Sediment Storage Bottom Area
3402.00
ft2
Forebay
Forebay Dimensions
Elevation
247.00
ft
Bottom Elevation
243.00
ft
side slope
2.00
ft
Bottom Length
19.00
ft
Depth
4.00
ft
Bottom Width
15.00
ft
Length
35.00
ft
Bottom Area
285.00
ft2
Width
68.00
ft
Bottom of Shelf Elevation
246.50
ft
Dam Width (at Normal Pool)
14.00
ft
Bottom of Shelf Length
33.00
ft
Surface Area
2380
ft2
Bottom of Shelf Width
66.00
ft
Sediment Depth
1
ft
Bottom of Shelf Area
2178.00
ft2
Sediment Storage Bottom Elevation
242.00
ft
Sediment Storage Bottom Length
15.00
ft2
Sediment Storage Bottom Width
11.00
ft2
Sediment Storage Bottom Area
165.00
ft2
Stage Storage Values
Main Pond
Forebay
Total Basin
Surface Incremental
Surface Incremental
Total
Surface
Incremental
Stage Elevation
Area
volume
Total Volume
Stage
Elevation Area volume
Volume
Area
volume Total Volume
0.00 243.00
4030
0
0
0
243.00 900 0
0
4930
0 0
1.00 244.00
4690
4360
4360
1.00
244.00 1188 1044
1044
5878
5404 5404
2.00 245.00
5382
5036
9396
2.00
245.00 1508 1348
2392
6890
6384 11788
3.00 246.00
6106
5744
15140
3.00
246.00 1860 1684
4076
7966
7428 19216
3.50 246.50
6480
3146.5
18287
3.50
246.50 2048 977
5053
8528
4123.5 23340
4.00 247.00
8250
3682.5
21969
4.00
247.00 2244 1073
6126
10494
4755.5 28095
Site Luck Stone Raleigh Contractor Yard Relocation
# 13516
Level Spreader Properties
Maximum Design Flow (10 Year)
2.71
cfs
Blind Swale Provided
Yes
Bypass Channel Required
No
Length of Level Spreader
30.0
ft
Slope of Level Spreader
0.0
%
Length of Stone Strip
3.0
ft
Width of Vegetated Filter Strip
30.0
ft
Length of Vegetated Filter Strip
30.0
ft
Vegetated Filter Strip Cross Slope
0.0
%
Vegetated Filter Strip Slope
1.8
%
Terrain Slope Draining to the Basin
2.8
%
Date 3/28/2014