HomeMy WebLinkAbout20210694 Ver 1_Site Inspection 2.28.22 Br 57 on I-40 (B-6054A)_20220228Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20210694
NCDOT - Replace Bridge 57 on I-40 (B-6054A)
Haywood
NCDOT - Replace Bridge 57 on I-40 (B-6054A)
NC DOT Division 14 - Sylva
2/28/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-83° 01' 26''+35° 44' 14''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on February 28, 2022. Rolin
Phillips was present during the inspection. The following are items that need attention:
Silt fence along the left bank descending of Cold Springs at the base of the rip rap is damaged. Either replace or remove
(only at base of rip rap). This was discussed with Rolin.
Continue to add ground cover as required.
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20210694
2/28/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2