Loading...
HomeMy WebLinkAbout20210694 Ver 1_Site Inspection 2.28.22 Br 57 on I-40 (B-6054A)_20220228Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20210694 NCDOT - Replace Bridge 57 on I-40 (B-6054A) Haywood NCDOT - Replace Bridge 57 on I-40 (B-6054A) NC DOT Division 14 - Sylva 2/28/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-83° 01' 26''+35° 44' 14'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on February 28, 2022. Rolin Phillips was present during the inspection. The following are items that need attention: Silt fence along the left bank descending of Cold Springs at the base of the rip rap is damaged. Either replace or remove (only at base of rip rap). This was discussed with Rolin. Continue to add ground cover as required. page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20210694 2/28/2022 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2