HomeMy WebLinkAboutNCC220907_ESC Approval Submitted_20220228ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
February 15, 2022
LETTER OF APPROVAL
Express Option
Duke Energy Progress, LLC
Attn: Josh Witherspoon, Sr. Trans. Permit Mgr.
410 S. Wilmington Street
Raleigh, NC 27601
RE: Project Name: Southern Pines Center Park 115kV Substation
Acres Approved: 8.03
Project ID: MOORE-2022-041
County: Moore City: Southern Pines Address: US Hwy 15-501
River Basin: Lumber
Stream Classification: Other
Submitted By: Dewberry
Date Received by LQS: February 15, 2022
Plan Type: Express
Dear Mr. Witherspoon:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted
at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing
activity has been undertaken, as required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the
commencement of any land disturbing activity on the above -named project. The NOI form may be
accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Paul Clark at
Paul.clarkkncdenr. og_v. After you submit a complete and correct NOI Form, a COC will be emailed to
you within three business days. A $100 fee will be charged annually until a Notice of Termination is
issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional Office 1225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
NORTH CAROLINA -
oewnmwtoiEnviro�memalaual� /`� 910.433.3300
Letter of Approval with Modifications
Duke Energy Progress, LLC, LLC
February 15, 2022
Page 2 of 2
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the
job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form.
This permit allows for a land -disturbance, as called for on the application plan, not to exceed the
approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan
and additional application fee. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
rX 'Qo�cL
Jodi Pace, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
cc: Fred Rash, Dewberry (electronic copy)
Southern Pines Planning and Inspections Department (electronic copy)
DEMLR - Fayetteville Regional Office File