HomeMy WebLinkAboutSW6210905_Supplement-EZ Form_20220225SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1
Project Name
Champion Court Rental
2
Project Area ac
6,72
3
Coastal Wetland Area ac
0
4
Surface Water Area ac
0
5
Is this project High or Low Density?
High
6
Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
NIA
8
Will the vegetated setback remain vegetated?
WA
9
If BUA is proposed in the setback, does It meet NCAC 02H.1003 4 c-d ?
N/A
10
Is streambank stabilization proposed on this project?
_
NUMBER AND TYPE OF SCMaf
11 Infiltration System
12
Bioretention Cell
13
Wet Pond
14
Stor nwater Wetland
15
Permeable Pavement.-
16
Sand Filter
17
Rainwater Harves6n RWK
18
Green Roof
--
19
LevelSpreader-Filler StyiLS-FS
2D
Disconnected Ire pious Surface DIS
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
Silva Cell
25
Bayfilter
26
Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Samuel R7NM2, PE Principal En Inner
28
O anization: _
Street address: _._
CI State Zt : _
Phone numbs e _ _.- _ _ --
Email:
The Site Group, PLLC
29
1111 Oberlin Rd.
30
Raleigh, NC 27607
31
- 919-M-4787
32
sm®thesilegroup.net
Q.Qft. alion Slalgtpp0,►;
I certify, under penalty of law that this Supplement-EZ form And all supporting informat on were prepared under my direction ar supervision; that the
information provided In the form Is, to the best of my knowledge and belief, true, accurate, Ind complete; and that the engineennl plans,
apociAcntions, oparotion and maintenance agreements and other supporting information are consistent with the inforrnabon provided here
11\ CAR
?•a� 0
pr•-
3 4981
i
,I I,/, kae of Dnipner
Mare
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Wetpond
5
Total drainage area (sq ft
316899
193759
6
Onsite drainage area (sq ft)
205413
183789
7
Offsite drainage area (sq ft)
111486
9970
8
Total BUA in project (sq ft)
166330 sf
151472 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft)
10
New BUA not on subdivided lots (subject to
1 permitting) (so
149948 sf
145819 sf
11
Offsite BUA (sq ft)
5653 sf
12
Breakdown of new BUA not on subdivided lots:
- Parking (sq ft)
89468 sf
85339 sf
- Sidewalk (sq ft)
- Roof (sq ft)
20160 sf
20160 sf
- Roadway (sq ft)
- Future (sq ft)
40320 sf
40320 sf
- Other, please specify in the comment box
below (sq ft)
13
New infiltrating permeable pavement on subdivided
lots (sq ft)
New infiltrating permeable pavement not on
subdivided lots (sq ft)
14
16382 sf
15
Existing BUA that will remain (not subject to
permitting) (sq ft)
16
Existing BUA that is already permitted (sq ft)
17
Existing BUA that will be removed (sq ft)
18
Percent BUA
52%
78%
19
Design storm (inches)
1.0 in
1.0 in
20
1 Design volume of SCM cu ft
12147 cf
21
1 Calculation method for design volume
INFORMATION
Please use this space to provide any additional information about the
drainage area(s):
SCS Method
ADDITIONAL
22
Area for the entire site includes offsite drainage bypassing the wetpond and
Drainage Area C. To offset the new BUA that cannot be treated by the pond,
5,653 SF of the existing Buffalo Lake Road is treated.
WET POND
area number
ERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
I Yes
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
259.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
260.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
264.00
23
Elevation of the permanent pool (fmsl)
264.50
24
Elevation of the top of the vegetated shelf (fmsl)
265.00
25
Elevation of the temporary pool (fmsl)
266.00
26
Surface area of the main permanent pool (square feet)
5653
27
Volume of the main permanent pool (cubic feet)
15887 cf
28
Average depth of the main pool (feet)
6.50 ft
29
Average depth equation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
346.8 ft
31
If using equation 3, width of submerged veg. shelf (feet)
3.0 ft
32
Volume of the forebay (cubic feet)
2778 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
54 in
351
Design volume of SCM (cu ft)
12147 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
2 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.8
41
Are the inlet(s) and outlet located in a manner that avoids short-
arcuitin ?
Yes
42
Are berms or baffles provided to improve the flow path?
Yes
43
Depth of forebay at entrance (inches)
78 in
44
Depth of forebay at exit (inches)
72 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
ermanent pooI?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Centipede grass
54
Has a P antinq plan been provided for the vegetated shelf?
Yes
DITIONAL INFORMATION
55 Please use this space to provide any additional information about the
wet pond(s):
Actual Orifice Diameter: 1.5 inches
Wet Pond 3 9:31 AM 2/25/2022