Loading...
HomeMy WebLinkAboutSW6210905_Plansheet - Misc. Detail_202202252 3 4 5 D C B a I 0.5% MIN.L 2" #57 STONE SURFACE COURSE 6" COMPACTED AGGREGATE BASE COURSE COMPACTED SUBGRADE I' HEAVY DUTY GRAVEL SURFACE N.T.S. 1 % MIN. _ NCDOT R/W PAVEMENT N.T.S. NOTE: FINAL PAVEMENT SECTIONS TO BE REVIEWED AND APPROVED BY GEOTECHNICAL ENGINEER OF RECORD PRIOR TO CONSTRUCTION. 3" BITUMINOUS CONCRETE SURFACE COURSE, TYPE S9.5C 4" BITUMINOUS CONCRETE INTERMEDIATE COURSE, TYPE 119.00 10" COMPACTED AGGREGATE BASE COURSE (OF IF <6' WIDE; 5" B25.00) COMPACTED SUBGRADE EX. EDGE OF PAVEMENT w > EX. EDGE OF PAVEMENT R20'� 1 �R20' z m z _30'-m m m O O n -n O O G G VARIABLE & 8' 5' WIDTH SHOULDER WIDTH 1 /4"/FT OR EX. X-SLOPE -2 08% +8% III - III=III - OR -180 1 "/FT 5' SHOULDER SECTION GRADES DRIVEWAY DETAIL N.T.S. SEEDING SCHEDULE BERMUDA LAWN, SLOPES (MAX. 3:1) DATE TYPE PLANTING RATE APR. 15 -JUNE 15 BERMUDA 2 LBS/1000 SF LATE SPRING(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/1000 SF EARLY SUMMER(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/1000 SF LATE SUMMER(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/1000 SF EARLY FALL(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/1000 SF MID SUMMER (ESTABLISHED) 16-04-08 SLOW RELEASE FERTILIZER 5 LBS/1000 SF LATE SUMMER (ESTABLISHED) 16-04-08 SLOW RELEASE FERTILIZER 5 LBS/1000 SF SHOULDERS, SIDE DITCHES, SLOPES (3:1 TO 2:1) DATE TYPE PLANTING RATE MAR 1. -JUN. 1 SERICEA LESPEDESA 50 LBS/ACRE & MAR 1. - APR. 15 ADD TALL FESCUE 120 LBS/ACRE JUN. 1 -SEP. 1 ***TALL FESCUE AND 120 LBS/ACRE ***BROWNTOP MILLET OR 25 LBS/ACRE SOUGHNUM-SUDAN HYBRID 30 LBS/ACRE SEP. 1 - MAR. 1 ERICEA LESEDESCA AND 70 LBS/ACRE TALL FESCUE 120 LBS/ACRE NOV. 1 - MAR. 1 ADD ABRUZZI RYE. 25 LBS/ACRE o olo o CONSULT EROSION CONTROL ENGINEER OR SOIL CONSERVATION SERVICES FOR OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS. OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ***TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROWN OVER 12-INCHES IN HEIGHT BEFORE MOWING. OTHERWISE FESCUE MAY BE SHADED OUT. SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF THEY OCCUR. AFTER ALL ROUGH GRADING IS COMPLETED, TILL SOIL AREAS TO BE SEEDED AND PLANTED TO A DEPTH OF FIVE INCHES. 2. REMOVE ALL LOOSE ROCKS, ROOTS, DIRT CLODS, AND OTHER OBSTRUCTIONS LEAVING GROUND SURFACE SMOOTH AND UNIFORM. 3. TO PREPARE UNIFORM SEEDBED, INCORPORATE AGRICULTURAL LIME FERTILIZER AND SUPERPHOSPHATE INTO SOIL AREAS TO BE VEGETATED. DISK NUTRIENTS INTO SOIL UNTIL WELL PULVERIZED. 4. SEED ON PREPARED SEEDBED AND COVER LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK. APPLY TEMPORARY SEEDING TO SOIL STOCKPILE AREAS THAT WILL BE DISTURBED WITHIN 30 DAYS. APPLY PERMANENT SEEDING TO WHERE FINISH GRADES ARE ESTABLISHED. 5. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR WITH LIQUID ASPHALT AT 400 GAL./ACRE OR EMULSIFIED ASPHALT AT 300 GAL./ACRE. 6. MULCH ALL SEEDED AREAS WITH SMALL GRAIN STRAW AT 90 LBS./1000 SF AND SPREAD UNIFORMLY. GROUND SURFACE SHOULD BE VISIBLE TO ALLOW SUNLIGHT PENETRATION. 7. MULCH AROUND SHRUBBERY AND TREES WITH SHREDDED HARDWOOD TO A DEPTH OF 3 INCHES. 8. AFTER WORK IS COMPLETED AND AREAS ARE STABILIZED, CALL EROSION CONTROL OFFICER FOR SITE INSPECTION AND RECEIVE CERTIFICATE OF COMPLETION. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES, INSTALL RIP -RAP, AND SEED AND MULCH ANY REMAINING BARE AREAS. w �wOf O� U N U O Z Z O OO OU U U U w �w �Q _L< =o 0 a2 aN Qw N 00 Z NOTES: 1. ALL PAVEMENT CUTS SHALL BE REPAIRED WITHIN A MAXIMUM OF SEVEN (7) DAYS FROM THE DATE THE CUT IS MADE. 2. IF CONDITIONS DO NOT PERMIT A PERMANENT REPAIR WITHIN THE GIVEN TIME LIMIT, PERMISSION TO MAKE A TEMPORARY REPAIR MUST BE OBTAINED FROM THE TOWN ENGINEER. 12" BACKFILL 6" MAX. LIFTS COMPACTION: 95% MAX. DRY DENSITY (STD. PROCTOR) TRENCH WIDTH MIN: PIPE OUTSIDE DIAMETER + 8" EACH SIDE MAX: PIPE OUTSIDE DIAMETER +12" EACH SIDE TRENCH I PAVEMENT REPAIR SECTIONS STANDARD TYPE (UP TO 20 FEET IN DEPTH) 1 5" O 1 1714 48" MIN. 0_ FLAT TOP STANDARDS STEP DETAIL 16" ON CENTER _ (TYP.) \ I 12" -STANDARD -STANDARD MANHOLE RING & COVER -TOP DESIGNED FOR HS-20 LOADING --PLASTIC CEMENT PUTTY OR BUTYL RUBBER JOINTS JEEP HOLES W/ STONE & WIRE MESH, 2" MIN. DIA. `BRICK & MORTAR INVERT STONE BEDDING 8" 0 TRAFFIC AREAS: ECCENTRIC CONE ONLY NON -TRAFFIC AREAS: FLAT TOP ONLY PRECAST MANHOLE JUNCTION BOX RCP CLASS MIN III MAX (ft) III 2 20 IV 1 30 CPP CSP CAP Diamet a MIN (in) MAX (ft) MIN (in) MAX III MIN (in) IM 15 28 12 158 2 98 18 12 28 12 1 12 81 21 12 113 12 69 24 12 26 98 12 60 30 12 26 1 79 12 57 36 12 0 12 12 47 42 1 20 12 55 12 40 48 12 20 12 48 35 5 12 56 15 31 60 24 20 1 12 50 15 2 1� 4" 8" BACKFILL INITIAL LIFT: 12" MAX. NON TRAFFIC AREAS: 12" MAX. LIFTS TRAFFIC AREAS: 6" MAX. LIFTS COMPACTION: 95% MAX. DRY DENSITY (STANDARD PROCTOR) -GEOTEXTILE FABRIC (NON -WOVEN) WRAP STONE AND PIPE -#57 STONE BACKFILL TO SPRINGLINE 0 A' . L-L �•dj�.. ,.5: NOTES: 1. EXCAVATE TO 4 INCHES BELOW THE PROPOSED PIPE ELEVATION. 2. PROVIDE 4 INCHES STONE BEDDING AND STONE BACKFILL TO SPRINGLINE. 3. WHERE BELL AND SPIGOT PIPE IS USED, PROVIDE RECESSES TO RECEIVE PIPE BELL. 4. UNDERCUT UNSUITABLE MATERIAL AS DIRECTED BY THE ENGINEER AND BACKFILL WITH STONE OR OTHER APPROVED MATERIAL. 5. BACKFILL MATERIAL SHALL BE APPROVED SUITABLE MATERIAL. 6. WHERE NECESSARY, TEMPORARILY DIVERT SURFACE WATER TO MAINTAIN A DRY CONDITION IN THE PIPE FOUNDATION. DIRECT THIS TEMPORARY FLOW INTO SUITABLE EROSION CONTROL DEVICES. STORM DRAIN PPE BEDDING I BACKF LL NG 35" MIN STANDARD 24"X24" GRATE & FRAME 1 26" X 26" MINIMUM OPENING Te CORBEL BRICK 1" PER,/ OURSE FOR 6 COURSES m ROUT < WEEP HOLES W/ STONE & WIRE MESH, 2" MIN. DIA. . ..............................; .............................. . .................... . . .ms ......... fgg "-3 000 PSI CONCRETE STONE BEDDING PLAN SECTION NOTE: 1. EITHER SOLID BLOCK, CONCRETE, OR PRECAST CONCRETE MAY BE USED. 2. FOR 24" R.C.P. AND LARGER --USE PIPE DIA PLUS 12" FOR MINIMUM INSIDE DIMENSION. 3. CAST IN PLACE DESIGNS TO BE SUBMITTED. YARD INLET W/ GRATE I FRAME 8 E �••� #4 BARS "V" I 6" @ EQUAL SPACES 1 %2 „ 3 R �' _ W R U Er A m 't w ch �, S PLAN OF TOP SLAB 8" E #8 "W" BARS #4 BARS "V" 6" @3 EQUAL SPACES #4 BARS "U" E12 „ SECTION R-R �•j 6" 1 1/2 rr co U) w Q a (j) J)w HI x mm 4t w v C, SECTION S-S T #4 BAR NIT 6" DOWEL CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP ELEVATION 6„ EXPANSION JOINT USE ON FLAT GRADES 2% AND UNDER EXPANSION JOINT 3'-0 lr1 I CO I-� DEPRESSED GUTTER LINE ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES TOP ELEVATION NORMAL GUTTER LINE 6" 8rr EXPANSIONOJOIN USE ON GRADES OVER 2% ? I 10" MAX - 0 EXPANSION JOINT 1 L Q ' DEPRESSED GUTTER LINE ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR BRICK CATCH BASIN(BASED ON MIN. HEIGHT, H, WITH NO RISER)* DIMENSIONS OF BOX AND PIPE TOP SLAB DIMENSIONS I CU.YDS. CONC. IN BOX BRICK MASONRY DEDUCTIONS ONE PIPE PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT BARS-U NO. LENGTH BARS-V NO. LENGTH BARS-W NO. LENGTH TOTAL LBS. TOP SLAB BOTTOM SLAB TOTAL CONC. BRICKMSNA. IN WALLS TOTAL BRICK AND CONCRETE D A B C G H E F C.M. R.C. 12" 3'-0" 2'-2" 2'-9" 0.281 0.281 0.883 1.164 0.020 0.042 15" 3'-0" 2'-2" 3'-0" 0.281 0.281 0.963 1.244 0.031 0.047 18" 3'-0" 2'-2" 3'-3" 0.281 0.281 1.043 1.324 0.044 0.065 24" 3'-0" 2'-2" 3'-9" 0.281 0.281 1.204 1.485 0.078 0.121 30" 3'-0" 2'-2" 3'-4" 4'-3" 1'-2" 4'-4" 4 V-6" 3 4'-1" 3 4'-1" 45 0.147 0.374 0.521 1.606 2.217 0.122 0.184 36" 3'-0" 2'-2" 3'-10" 4'-9" 1'-8" 4'-4" 4 2'-0" 4 4'-1" 3 4'-1"141 0.187 0.415 0.602 1.914 2.516 0.176 0.261 42" 3'-0" 2'-2" 4'-5" 5'-3° V-5" 3'-6" 4 1'-9" 3 3'-3° 3 3'-3" 0.135 0.373 0.508 2.152 2.660 0.240 0.371 48" 3'-0" 2'-2" 5'-0" 5'-9" 2'-0" 3'-6" 4 2'-6" 4 3'-3" 3 3'-3° 0.173 0.410 0.583 2.415 2.998 0.313 0.477 54" 3'-0" 2'-2" 5'-7" 6'-3" 2'-7" 3'-6" 4 3'-O" 6 3' 3" 3 3' 3"7 0 211 0 448 0.659 2 806 3 465 0.396 10.595 BACK OF CURB SECTION Y-Y .t gii•�i�ih .in IN .I. INN � -LWill WHFRF 30" TO 36" PIPF IS USED WHERE 42" TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RISER CONSTRUCTION z OIi L) IF Q Q HOC�C� LLJ0I--Iz 00 _ � Z QO�O�Oi H cA1-LLO_j OOCnCC z H � H 1 Lll p � p - - SHEET 2 OF 2 * RISER HAS .321 CUBIC YARDS OF BRICK MASONRY PER FOOT HEIGHT 1840.01 z NOTES: MORTAR JOINTS 1/2" +/- 1/8" THICK, p USE CLASS "B" CONCRETE THROUGHOUT. H } TOP ELEVATION USE FORMS FOR CONSTRUCTION OF THE BOTTOM SLAB. HQ Q DEDUCT FOR PIPES) FROM TOTAL CU. YDS. OF BRICK MASONRY. Q H ' �; USE #4 BAR DOWELS AT 12" CENTERS FOR ALL PIPE SIZES. III71 PROVIDE ALL CATCH BASINS OVER 3'-6" IN DEPTH WITH STEPS 12" LL J H Z ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. O 0 L7 = USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. LU Q Z LL USE BRICK OR CONCRETE BLOCK WHICH COMPLIES WITH THE REQUIREMENTS H U cc g" = OF SECTION 840 OF THE STANDARD SPECIFICATIONS. MIN. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB N O W AS SHOWN ON STD. NO. 840.00. -� O FOR 8'-0" IN HEIGHT OR LESS, USE 8" WALL. OVER 8'-0" IN HEIGHT, USE O IIIi 12" WALL TO 6'-0" FROM TOP OF WALL AND 8" WALL FOR THE REMAINING Z H 6'-Q". QUANTITES TO BE ADJUSTED ACCORDINGLY. �_ H SEE NOTE CONSTRUCT WITH PIPE CROWNS MATCHING. r W p CHAMFER ALL EXPOSED CORNERS 1". r p DRAWING NOT TO SCALE. TOP ELEVATION STEPS - STD. NO. 840.66 • -MIN .IN .IN min iiiiiii WIN min MIN =IN INN INN MIN min 61 MIN.. T SECTION J-J WHERE 30" TO 36" PIPE IS USED PLAN SEE NOTE 6"1 SECTION Ill 3,r WHERE 42" TO 54" PIPE IS USED PLAN SEE NOTE � v � zCQ�_ F U) N � F-I IIr p m Q O GRO�A �P�GN\1ECT(/Rg7 C, Appp U y W Z CERT. NO. 353 n •�RTh CARO\\G• ENGINEERINGFNC ENSE N0. P-0803 011 :k SEAL 49 '>is�FL1 cn U w u w Q w Q Q U 1 (n O o z � a O J I DO i . 0 I i I N -0O4-N' (n � W 0 1 Ln O) N �11�N000 LijO w i I � L_zrnrn 1 z w W-0 - O J U) N CI _ U W X � T� O� p C) I-10 LLW ■L ■■■ J Z W ZD O Z U J z Q O _O c� O < 0 z Q Q 2 0_ = �_ O LL Lli � U U Q V z1i Drawn By J HJ Checked By SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 D09 NOV 2021 w SITE PLAN V) x a SITE U DETAILS a „ Job Code HCSS1 2 3 4 5 D C B NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE STONE, THEN THE TIRES OF THE VEHICLE MUST BE WASHED BEFORE ENTERING PUBLIC ROAD. 3. IF A PROJECT CONTINUES TO DEPOSIT MUD AND DEBRIS ONTO THE PUBLIC ROAD, THE TOWN WILL CLEAN THE AREA AND INVOICE THE FINANCIALLY RESPONSIBLE PARTY. EXISTING ROADWAY MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS CN SPECIFICATION: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. ENTRANCE TYPE L W STONE SIZE GENERAL 50' 25' 2-3" RESIDENTIAL* 25' 12' #57 * INDIVIDUAL SINGLE FAMILY CROSS SECTION NEW CONSTRUCTION - ABRIC UNDER STONE CONSTRUCTION ENTRANCE MAINTENANCE: CN SPECIFICATION: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND 1. REMOVE AND DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT 2• ENSURE THAT THE MIN. CONSTRUCTION CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWERS AT ANY POINT THAN THE DESIGN ELEVATION PLUS CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS THE SPECIFIED SETTLEMENT. AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSION TO PERMIT MACHINE REGRADING AND CLEANOUT. STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN BLEND WITH THE NATURAL GROUND LEVEL AND 30 WORKING DAYS. APPROPRIATELY STABILIZE IT. 2' MIN. 2' MIN. I'110 COMPACTED - 00 1111�1�' STEEP CUT OR FILL SLOPES - - - SIDE SLOPE 2:1 (MAX UPSLOPE TOE `L2:1 SLOPE (MAX) IMMEDIATELY STABILIZE CROSS SECTION DIVERSION DITCH WITH TEMPORARY SEEDING OR EROSION CONTROL NETTING AS CALLED OUT ON THE EROSION CONTROL PLANS POSITIVE GRADE 1.0% MAX. Z N PLAN VIEW DIVERSION DITCH CUT OR FILL SLOPE 0 SELECT DESIRED HEIGHT: 84" (SHOWN) 96" 0 SELECT DESIRED COLOR: [i SATIN BLACK 8' 0" ON CENTER 0 BLACK FINE TEXTURE 0 NINETY BRONZE 0 BRONZE FINE TEXTURE 1 1/2" W X 1 1/2" H RAILS 0 SPECKLED WALNUT 0 SANDY SHORE 0 WHITE FINE TEXTURE M 0 GLOSS BEIGE M 1" X 1" 0 CHOCOLATE PICKETS 0 GLOSS WHITE 3 3/4" 0 BROWN FINE TEXTURE N SPACING 0 SILVER a; 0 SELECT DESIRED OPTION: 21/2" X 21/2" d] SHORT PICKETS POSTS b SELECT DESIRED POST CAPS: M 0 21/2" FLAT M 1 112" W X 0 4" FLAT 1 1/2" H RAILS 0 6" FLAT (STANDARD) I L 0 21/2" BALL 0 4" BALL (OPTIONAL) `� FRONT ELEVATION b SELECT DESIRED FINIAL OPTION: 0 QUAD 1 0 TRIAD MANUFACTURER NOTES: 1. PLEASE CONTACT MANUFACTURER FOR ALL THE OTHER SIZES AND OPTIONS. NOTES: 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWING. 3. THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALS FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION. 4. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 5. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTER REFERENCE NUMBER HCSS1_Det INDUSTRIAL ALUMINUM FENCE 5000 SERIES 5000 SERIES: 4- RAIL W/SPEAR POINTS, AVAILABLE W/ALT. SPEAR POINTS (#5141 & #5142) MAINTENANCE: A FLOATING SKIMMER SHOULD BE ATTACHED TO THE BASE OF THE RISER. CN SPECIFICATION: THE ORIFICE IN THE SKIMMER WILL CONTROL THE RATE OF DEWATERING. CN SPECIFICATION: 1.❑ UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. THE SKIMMER SHOULD BE SIZED TO DEWATER THE BASIN IN 2-5 DAYS. 1. CONSTRUCT THE BASIN ACCORDING TO THE EROSION AND SEDIMENT CONTROL 2.11 DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE I A CHART TO DETERMINE THE APPROPRIATE SKIMMER AND ORIFICE SIZE IS PLAN WITH THE BASIN SURFACE FREE OF OBSTRUCTIONS, DEBRIS AND POCKETS INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF INCLDUED ON PAGE 6.64.3. SEE PRACTICE 6.64, SKIMMER BASINS FOR OF LOW -DENSITY MATERIAL. 4 FEET APART. DETAILS ON THE INSTALLATION OF SKIMMERS. 2. ASSEMBLE AND INSTALL THE SKIMMER AS INSTRUCTED BY THE MANUFACTURER. 3.11 SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE 3. PLACE A 6-INCH BAND OF SEALANT AROUND THE INTERIOR FACE OF THE OUTLET MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A PVC END CAP SCHEDULE 40 BARREL PIPE. 2-FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS PVC VENT PIPE VC ELBOW PVC PIPE 4. DEPENDING ON THE EXPECTED TIME PERIOD FOR WHICH THE SKIMMER BASIN RECOMMENDED. IS DESIGNED, PERMANENTLY OR TEMPORARILY SEED ALL BARE SIDE SLOPES OF 4.11 PLACE CLEAN GRAVEL (NC DOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A WATER SURFACE 0 THE BASIN. TANDARD METAL POSTS 2' IN GROUND HEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. LIMIT THE DAM HEIGHT TO 5 FEET. 5.11 ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE VC END CAP 0 6. INSTALL THE SKIMMER A MINIMUM OF 1 FOOT FROM THE BOTTOM OF THE BASIN. ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS. SCHEDULE 4 ORIFICE PLATE 7. THE MINIMUM BASIN WIDTH SHOULD BE 3 TIMES THE DEPTH OF THE BASIN. 6.11 COMPACT THE AREA PROPERLY AND STABILIZED IT WITH GROUNDCOVER PVC TEE-------" EE PVC PIPE FOR A BASIN DEPTH OF 3 FEET, THE MINIMUM BASIN WIDTH SHOULD BE 9 FEET. PIPE J" HOLES TIN VC TEE 8. INSTALL COIR FIBER MATTING UNDER THE OUTLET OF THE SKIMMER WITH ALVANIZED HARDWARE NDERSIDE MINIMUM DIMENSIONS OF 9 FEET LONG BY 6 FEET WIDE. WIRE EXTENDS TO TOP OF BOX MAINTENANCE: 9. INSTALL MATTING FOR EROSION CONTROL ON EXPOSED SIDE SLOPES AFTER INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1h INCH OR SEEDING IS COMPLETED. GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER 10. UNROLL THE GEOTEXTILE ON THE SPILLWAY IN THE DIRECTION OF FLOW, WITH OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO EDGES BURIED AT LEAST 6 INCHES DEEP. THE GEOTEXTILE SHOULD BE ONE DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE FLEXIBLE HOSE _�3' CONTINUOUS PIECE OF MATERIAL OR OVERLAPPED A MINIMUM OF 18 INCHES. AS NEEDED. PROFILE PROFILE X 3' X 12" FOR DIVISIONS 1, 2, 3, 4, AND 6 IN THE EASTERN PART OF THE STATE, USE A - ° CLASS B LOW PERMEABILITY GEOTEXTILE. o DISSIPATER PAD 11. REPLACE THE PLASTIC SLOPE DRAIN PIPE AT THE INLET OF THE BASIN WITH a $ GEOTEXTILE AS DIRECTED. o� o 12. INSTALL 3 COIR FIBER BAFFLES IN THE SKIMMER BASIN WITH A SPACING OF 1/ - goo o THE BASIN LENGTH. f 0 0 13. INSTALL A MINIMUM OF 2 COIR FIBER BAFFLES IN BASINS WITH LESS THAN 20 0 O� ° -� ARM ASSEMBLY 0 FEET OF LENGTH AT SPACING OF 1 /3 THE BASIN LENGTH. no o "C" ENCLOSURE 14. INSTALL A CLASS B STONE PAD (4 FEET BY 4 FEET BY 12 INCHES HIGH DIRECTLY d&oq., OV o UNDERNEATH THE SKIMMER DEVICE. 15. ANCHOR THE COIR FIBER MAT WITH WOODEN STAKES, STEEL REINFORCEMENT �(D„-00. �p0°0m� N. REBAR OR METAL STAPLES. 16. ANCHOR THE GEOTEXTILE WITH 6" STAPLES AT A MAXIMUM SPACING OF 3 FT. �- -� 0 0 WATER ENTRY UNIT PRIMARY SPILLWAY 17. CONSTRUCT THE PRIMARY SPILLWAY WITH A TRAPEZOIDAL CROSS-SECTION, WITH 2:1 SIDE SLOPES, AND A MINIMUM BASE WIDTH OF 4 FEET. #57 WASHED STONE PLACED TO A HEIGHT OF 12"-18" MIN. ABOVE TOP OF BOX. CATCH BASIN 8c YARD INLET SKIMMER PROTECTION DETAIL MIN. 10 GA. LINE WIRES VARIABLEAS II■■■■■■■■■■■■■■II II■ �■■■■■■■■r III II■ �■■■■■■■■� III II■ ■,11■■■■■■■ III II■ ■■■■■ III INSTALLED TO SECOND WIRE FROM TOP EH E = FRONT VIEW NOTES: STEEL POST 1. USE SILT FENCE ONLY WHEN WOVEN WIRE FABRIC DRAINAGE AREA DOES NOT SILT FENCE GEOTEXTILE FABRIC EXCEED 1 ACRE AND NEVER 32" MIN. WIDTH 21 IN AREAS OF CONCENTRATED ILL SLOPE FLOW. w 2. END OF SILT FENCE NEEDS N {_ TO BE TURNED UPHILL. ' -_ RADE USE #57 WASHED STONE FOR I�I�� �_ 8 MIN. COVER X 4 MIN. REPAIR OF SILT FENCE =_' WIDTH OVER SKIRT FAILURES, AND FOR ANCHOR (BACKFILL TRENCH AND WHEN SILT FENCE IS SIDE VIEW COMPACT THOROUGHLY) PROTECTING CATCH BASIN. IN. 121 GA. INTERMEDIATE WIRES RADE ROPERTY LINE - F ;sF; IRE HYDRANT I L :F SI LT FENCE ----CURB AND A-..' GUTTER SIDEWALK I � FH INSTALLATION MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CN SPECIFICATION: 1. THE BASE OF BOTH END POSTS SHOULD BE A LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION.L 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. FLOW DIRECTION FILTER OF # 57 WASHED STONE SILT FENCE FABRIC TO OVERLAP HARDWARE CLOTH BY 12 INCHES STEEL FENCE POST WIRE FENCE PLAN VIEW STEEL FENCE POST HARDWARE CLOT FILTER OF NOTE: 1. APPLICABLE FOR DRAINAGE AREAS NO MORE THAN 1 4 ACRE. 57 WASHED 2. USE AS A REPAIR OF SILT FENCE FAILURES. / FLOW DIRECTION 3. BURY WIRE FENCE, HARDWARE CLOTH, AND SILT FENCE FABRIC 8 I INCHES DEEP AND 4" WIDE MIN. SIDE VIEW 1 r SILT FENCE u u u u FRONT VIEW MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CN SPECIFICATION: 1. THE BASE OF BOTH END POSTS SHOULD BE A LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION.L 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. 3.0' 4.0' DIVISION SIX / DISTRICT TWO PAVEMENT WIDENING - SECONDARY ROADS PAVEMENT SCHEDULE (TAPER MILLING REQUIRED EACH SIDE OF WIDENING 25 FEET a 0' - 1.5' 3.0' S 9.5 C 4.0' B 25.0 C DRAWING IS NOT TO SCALE ,�- GROUA RON\TECTU/Z4� , Z CERT. N0. r 353 z n •�RTH CARO�\G• .�EIGH,N' NC ENGINEERING LICENSE NO. P-0803 X SEAL ®. 3498 rH ®�✓VLt `fit � l\®®®O 0 / U 11_d Ou W Q U Q) z Q J �r- L J I OD Lo 01 D_ LOAN N . -0 0 1- N +' Cn pr_LO0) N D0n00n0-C w O 0- 0) 0) 0 NZ0)0) z w -o w ~ O .. J N 0 w� X� _ 0 4-- 0 u I- 0�O Lew ■W.IN ■■■ J z W 0 z CU J z Q 0 O 04 Ch O u)< Z Q a 2 00 Lv _ LI_ F_ U) CU U Q z U) Drawn By JHJ Checked By SRN DATE: 30 JUN 2021 REVISED: zL16 SEP 2021 zi�09 NOV 2021 w SITE PLAN ca a SITE J DETAILS J a Job 0 Code HCSS1 r,; TEMPORARY SILT FENCE TEMPORARY SILT FENCE OUTLET 2 3 4 5 D C co 140-OOIA In,;1xvt skirmiler wdirnant ba;uni at [east %Y&Wy mid after e;ach Mp�idicartt (one,Viaff itich or grewer) ratnfag event wid r>vprmwr kernove sedLmenl and re%tore thie ha-,n,Ii rem its originaH dimeilmorv; Adhen stdun,ent -iocuunulate% to r,)ne-halftlle Iteighir of the firsi Iliffle, PIAII the skilirrvier to orle rode qo flyat the seiifirnent nnidemeath it Qiri he excavated. Excavate time sediment froin the en6re basiti, notjast tiround the skimmar or die firsi ecil. make sure Ve gg L3 tiolt growing in die bortom oft lie bai � rt does n0t hold down time qkilllnier. Iter"'air the baffle"; if they are daniagtd. ke-,eichcx the baffles ifwatur is flowing linclerreath (m around theril- If the skurnrncr, urF, ck-)ggedwitli trash aad there Rs water in The saint, nsuaHy db-lodc �erkfing on dic rcape wfll retake time m e sk�rner bot) up and down, camel die debrk, and restore flow. If diis• doe,, not work, puft die skinirner,over to 6e itde 4 aae [,jasiii, and rertiove die debrisAfsA:,) check tke orifice, inside die skirnnter oosee ifit is ckig,gcd, ifs4w remove die &bnl . If the qk innnff arm r,r hirj"L'il Pjie tir cin W-ed, the orifice cin he reninved ind sure and rephice theorifice beffire reposittontingthe sklmn-or. fteck the fabric lined sllHHwity for danitige and make tarty requited repairs wodi fabriz idiar slams the, fuN %idthofrlie spHwayCheck dieembanki-neim spflways, itxA oudLt for eroion darnap,,e, aitd inspe,,cl die entiltirdallent fol Pup)ng, and wettlenlent, N11keall rtee ws.a f repairs ifnrnedrat,6y. Rernnvf M11 trash widotherdebrii frijini the Fkimmcr wldpoart/ "rea, 5,. Freez,iit,g wetit[wr esu can re in toe fornling, dirt thic haS.",om sirt. e ;IN'Cial pr ec au 6, orts, shouid be takeri Gni die whiter to prevent the Skimmer from 1A Ug girt g Wi dk Ic e. Itltltltla ;; � �IIII� ,���lr urm, »III00 NORTH AMERICAN GREEN® 12" CRITICAL POINTS DESIGN INFORMATION TO BE PROVIDED BY THE ENGINEER ON THE CONSTRUCTION DRAWINGS DIMENSIONS ELEV EMERGENCY SPILLWAY 20 267.75 TOP OF DAM WIDTH TO 269.0 ANTI SEEP COLLAR 54"X54"X12 N A RIP RAP DISSIPATOR FAD 12'x4.5'x18"D N/A TOP OF RISER 4 W 4 SIDES 266.0 OUTLET PIPE INVERT IN 4 PVC 360.0 OUTLET PIPE INVERT OUT 15" RCP 360.0 ANTI -FLOATATION DEVICE 54"x54A 8 ' " N A SKIMMER SIZE 2.5 " N A ORIFICE SIZE 11.9" N A CONSTRUCTION SPECIFICATION: 1. ('Near,, grub alb strop die, area wider il,e root mat. fi.mlove all sua-face soH tnuttfinin,; oforgank ranatter 91,ffltl atltl 0I)jWTnrmh1,P nintertni rn dw, designateld dqpaial area. I,Lwe temporary wtdirxient czntlol rneasurci below basin w need, d 2. Fnanre that fill ryntavall for the ernhankment o� frie of roots, Wood)' Vegetation, Organic nutter, and other obectlpnablle ntaie6aL Ptliice, life, fl it un PLAN VIEW Cwtr ffl I) driecridmink Ili, ent: 66 415 to aHow fear scule'luetil. EMERGENCY SPILLWAY CONSTRUCTED OVER .4. Shapethe basin to time specified diniensions. Vrnent die sidimmung. device UNDISTURBED GROUND AND ARMORED WITH RIP RAP AND FILTER FABRIC prowding a low -tuipnrt underthe b n1rer. 4. Place, the barrel t`typicaHy44nch 'khadule 44) PVC'pipevon a fimi,, snitoth fnnnfLifinrij of �rnpei%1rmn,,, ,nfl 1)n nor uN,,e pervvrm; marerml inch as qxand, gravcl, or cnished stone as backfiH around the pape. Place the fill nutc6al arnumd the, pq),c sj,�tflw�w In 4-inch ��wcri and ofinilmot tt under lid arnujlad IP RAP IP RAP die pilm to at �ead die, -.anne 6ansity 3"r JhL' ad acent ernbardmiera Care, musl "mi ISS DISSIPATOR he Tak,111i IWIT 1,11 rakk' I he pipe from the h irt with iT enna� s fbitildarisis w1len P AD PAD COMpactnig tuider the puree haun0ws, 4DA Place, it nlin ullwil depth of' feetofcompacted backfil over die piriespfflivay 3' X 3' X 12 CLASS B craiduit be iristahed by catting a trendi throughthe dailtafter theenibanliment DISSIPATER PAD k k complete. 5. AsqeniNe the skmifnet folhiwng the rualbufituturer's lililluck4flLw, ni nq deqiigned. Lay the asiernblod sidninier on the botiona nftlie, linsdt wkh i1he flexibic, SLOPE DRAIN (TYP.2 Lj TI UTLET PIPE j4,� nt at die unlet of die barrel pipe. Attach the fl,exdbiej6nttc 11be harreI) pulie, and oveirdie excavated pit earmlipon. fi,E sure to attach POROUS BAFFLES (3 MIN. M AM W ARTH D Ld Of SKIMMER to pufl the skinimer to die side, for mirilenailee. WATER LEVEL DURING STOR CONCRETE RISER L� 7. Larthert spiHways- InstaH the SJ)HhN3Y irb Un&srurbed .oi�l to the greatest POROUS BAFFLES (3 MIN. z eXtefll jlfnsAW r�e. 1 lie achievenient de.F.ugn wvdda, SKIMMERA and entnuice and exit cliarinetl ",orei are cridcn, l W the �Ucce4sfA operanon I'l- SLOPE DRAT of the » -�ugd 1%, hned w4h larn�nated pb�dc or jliHway. I'he %piflwny ;;Ik MERGENCY SPILLWAY ELEV. flilivit"lle all te, ��',eimcmfle fabt 6c. The fabric inust be wi& and longenough to co ver t he 1) ottoni an d st de s a nd e mend n Ix o die bap of die dn In for anc ho I! ing. INIMUM FORESLOPE 212:1 in a trench.1 Ife edges may be sanired with 8, inch starilec, oi- pim. 1 lie, fabile inust be Long enaitgh to extend dfmwl the OoPe and Exttnnio ;tabk prowd. INIMUM BACKSLOPE 3:1 Tll,e Wkith of 61P failInC fnUir lie ane piece, nryt jinuijed or qike,edfitherwke 3' X 3' X 12 raw ater can get Lundet the fab6c. If the tlelqgdi,iif Olt: fablic k t1eufficienE fix die, ARTH DAM eyflnre length of the �piiflway. rnithirik, �,e clions, qlantang thecoolitictearidfli, 1 CLASS B may be used. I lie, uplyar sectam(0 stnoald aveflap ilk- tlewer section(s) s,o DISSIPATER PAD GATE VALVE OR ORIFICE CP DISCHARGE PIPE that wmer cannot flow ander the fabnc. Secure die upper edge and lidel ANTI -FLOATATION BLOCK nf ille f�hrwe in a Trench with qmp�e; or pini,, 4Adapted Ift'rail , A klmithqj, fur NOTES: UTLET rebmary, 1. SEDIMENT STORAGE: 3,600 CF/DISTURBED ACRE ANTI -SEEP COLLAR PROTECTION 2. SURFACE AREA BASED ON: Q25 CROSS SECTION (DETAIL 400.18) H. tlnp,eL�L-I)a,,,c[Rat�qewii,crniitf,aaiE-I)amjiioiiaiiiaiiiiertclpievLitterc)F,D,t)i:l. Use 3. INSTALL SEDIMENT CLEANOUT ELEVATION STAKES. hMdC!fi1W3tL1 In d1PLij1f1,el endof I lit pvol.,-Uen t'nimiprove ba,.in iap efficieiwy 4. BAFFLES SHALL INCLUDE 700 GSM COIR EROSION BLANKET. ami ()?etrei 5 FLOW ENTERING THE BASIN MUST BE DIRECTED TO AVOID EROSION ALONG THE SLOPE AND SCOUR IN THE BASIN. APPROPRIATELY SIZED SLOPE DRAINS, PER THE STANDARD DETAIL, ARE RECOMMENDED. NORTH AMERICAN GREEN 5401 ST. WENDEL-CYNTHIANA ROAD POSEYVILLE, IN 47633 TOLL FREE: 1-800-522-5011 PHONE: (812) 867-6632 FAX: (812) 867-0247 www.nagreen.com A M, UVCfC LMOMINUOCMIVIO B B PROJECTED WATERLINE C. CHANNEL BOTTOM/SIDE C SLOPE VERTICES * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED A IF NECESSARY TO ALLOW STAPLES TO SECURE THE B CRITICAL POINTS ALONG THE CHANNEL SURFACE. C IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. NOTES 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWINGS. 3. REFER TO 140-OOIB FOR ADDITIONAL NOTES. 4. CONTRACTORS NOTE FOR PRODUCT AND PURCHASING INFORMATION VISIT wwvv.CADdetails.com/info REFERENCE NUMBER 140-001A. ROLLED EROSION CONTROL PRODUCT CHANNEL INSTALLATION X, /-6' MAX BAFFLE (TYP.) EARTH BERM BAFFLE INSTALLATION -STFP I CLASS #1 RIP RAP NOTES: 1. DRIVE STEEL FENCE POST AT LEAST 18" INTO i TREE PROTECTION FENCE SOLID GROUND OR COIR DOUBLED OVER HOG WIRE 2. WOOD POSTS ARE NOT ACCEPTABLE ' A\ RISER BARREL SEDIMENT BASIN Tensar. NORTH AMERICAN GREEN® NORTH AMERICAN GREEN 5401 ST. WENDEL-CYNTHIANA ROAD POSEYVILLE, IN 47633 TOLL FREE: 1-800-522-5011 PHONE: (812) 867-6632 FAX: (812) 867-0247 www.nagreen.com 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED, DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH THE PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH WITH APPROXIMATELY 12"(30CM) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12"(30CM) PORTION OF BLANKET OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12"(30CM) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6"(10CM-15CM) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4"(10CM) APART AND 4"(10") ON CENTER TO SECURE BLANKETS. Lxmiqln control- t'illISITUCL 1171C. StrULAUR' &0 drat the chshurbed area is nnmirnize�Li IlAveri. sm-faca watcT awiry frorn bare annis. CorripIciz the en -ibanknw,ni. 1xi"bre. I]-& 2mu is cizzatxt. SLLbiI;L,,t ffiln e eergcnc,,, sptI.IwLky cTrihankineni oul all iAher &,�rurhirikl arw, ahvvin the cl-em of the , , pri11CITC11 in. huoldl Twinlus hrnlftt�, ay, ;rw6fied in Pra;iice fi,FA, 1'nmul ft,q'&,x It, Aftrralidie areas been peTnianenfly slabflizti� rt'in,ove die stricture ard al], die uiulabla NNE17112sat. 'iLrTWJ0th tbt- sLr2a, to blend "Ida Ille adjqxtnnlAin-as and subilize prapieHy lktfemm-cs: SixrO�,e Tensar. NORTH AMERICAN GREEN® *2"-5" *2"-5" (5CM-12.5CM) ]I_0 _11 (5CM-12.5CM) (5CM-12.5CM) -� -SEAM STITCH 3.3 0 1.6' (1.0m) I (0.5M) - e 31' 11 (1.0m) 1 0 0 1 1.15 STAPLES PER SQ. YD. (1.35 STAPLES PER SQ. M) FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM PLACE STAPLES/STAKES THROUGH EACH OF THE RED COLORED DOTS *2"-5" *2"-5" (5CM-12.5CM) (5CM-12.5CM) -SEAM STITCH 0 0 0 20" q 0 0 0 (0.5M) - t U) LLJ 0:� LLJ PLAN [-- 17, VIEW _Lj Lj < L ILT R FABRIC SECTION 'A -A' NOTES: PIPE OUTLET TO WELL-DEFINED CHANNEL PLAN VIEW 1. L = THE LENGTH OF THE RIPRAP APRON 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 12 INCHES 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 4. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO 6 INCHES ABOVE THE MAXIMUM TAILWATER DEPTH OR THE TOP OF THE BANK, WHICHEVER IS LESS. NORTH AMERICAN GREEN 5401 ST. WENDEL-CYNTHIANA ROAD POSEYVILLE, IN 47633 TOLL FREE: 1-800-522-5011 PHONE: (812) 867-6632 FAX: (812) 867-0247 www.nagreen.com (5CM-12.5CM) SEAM STITCH 3.3 (1.0N 0.7 STAPLES PER SQ. YD (0.8 STAPLES PER SQ. M) FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM PLACE STAPLES/STAKES THROUGH EACH OF THE BLUE COLORED DOTS. *2"-5" *2"-5" (5CM-12.5CM) 1--i (5CM-12.5CM) 1.6'(0.5M) SEAM STITCH 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) 0 0 t 3.3 APART IN 6"(15CM)DEEP X 6"(15CM)WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 0 0 0 (1.0m) 1 1.7 STAPLES PER SQ. YD. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5CM-1 2.5CM) (DEPENDING ON BLANKET TYPE)AND STAPLED.TO ENSURE 3.4 STAPLES PER SQ. YD. (2.0 STAPLES PER SQ. M) FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET(BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED (4.1 STAPLES PER SQ. M) GREEN DOT SYSTEM PLACE STAPLES/STAKES SEAM STITCH ON THE BLANKET BEING OVERLAPPED. FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM' PLACE STAPLES/STAKES THROUGH EACH OF THE GREEN COLORED DOTS THROUGH EACH OF THE WHITE COLORED DOTS *2"-5" *2"-5" 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30'TO 40'(9M-12M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4"(10CM)APART AND 4"(10CM) ON CENTER OVER ENTIRE WIDTH OF CHANNEL. (5CM-12.5CM) (D-1 (5CM-12.5CM) 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN A 6"(15CM)DEEP X6"(15CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. SEAM STITCH 0 0 10"STAPLE PATTERN GUIDE 0 0 0 0 (0.25M) MAINTENANCE 1. Visually inspect erosion control matting after every rain event. *LOCATION OF SEAM STITCH WILL VARY DEPENDING 0 0 0 3.3'(1.0M)- 2. Replace any damaged matting with new. ON NORTH AMERICAN GREEN PRODUCT TYPE t 0 0 0 0 20" (0.5M) 3. Regrade damaged diversion ditches and replace matting as necessary. 140-001 B SEDIMENT PIT 3. USE STAPLES 1 APART TO ATTACH FABRIC PERSPECTIVE VIEiN TO *HOG WIRE* 4. BAFFLE SPACED AS PER APPROVED PLAN. MAINTENANCE: 1. CHECK BAFFLES AFTER EVERY RAIN EVENT. BOTTOM OF BAFFLE IN 2. REPAIR BAFFLES IF THEY ARE DAMAGED. TRENCH AND TRENCH FILLED WITH SOIL AND 3. RE -ANCHOR BAFFLES IF WATER IS FLOWING COMPACTED UNDERNEATH OR AROUND THEM. R*71LE INSTALLATION STEP 2 BAFFLE INSTALLATION & MAINTENANCE NOTES 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWINGS. 3. CONTRACTORS NOTE FOR PRODUCT AND PURCHASING INFORMATION VISIT wwvv.CADdetails.com/info REFERENCE NUMBER 140-001 B. ROLLED EROSION CONTROL PRODUCT CHANNEL INSTALLATION COPYRIGHT @2013 CADDETAILS.COM LTD. 0 0 3.75 STAPLES PER SQ. YD. (4.5 STAPLES PER SQ. M) FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM PLACE STAPLES/STAKES NOTES THROUGH EACH OF THE YELLOW COLORED DOTS 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWINGS. 3. CONTRACTORS NOTE FOR PRODUCT AND PURCHASING INFORMATION VISIT wwvv.CADdetails.com/info REFERENCE NUMBER 140-004. ROLLED EROSION CONTROL PRODUCT STAPLE PATTERN GUIDE 140-004 CADdetails.com PROTECTED BY COPYRIGHT @2013 CADDETAILS.COM LTD PIPE OUTLET MAINTENANCE: 1. TEMPORARY CONCRETE WASHOUT FACILITIES ARE TO BE INSPECTED BY THE RESIDENT ENGINEER DURING HIS/HER WEEKLY EROSION AND SEDIMENT CONTROL INSPECTION, AFTER A STORM EVENT OFI/2" OR GREATER AND AT THE END OF ANY DAY WHEN CONCRETE HAS BEEN POURED ON THE CONSTRUCTION SITE. THE INSPECTOR IS TO ENSURE THAT THERE ARE NO LEAKS, NO SPILLS AND THAT THE FACILITIES CAPACITY HAS NOT YET BEEN COMPROMISED. 2. ANY OVERFLOWING OF THE WASHOUT FACILITIES ONTO THE GROUND MUST BE CLEANED UP AND REMOVED WITHIN 24 HOURS OF DISCOVERY. 3. IF A RAIN OR SNOW EVENT IS FORECASTED, A NON -COLLAPSING, NON -WATER COLLECTING COVER SHALL BE PLACED OVER THE WASHOUT FACILITY AND SECURED TO PREVENT ACCUMULATION AND OVERFLOW OF PRECIPITATION. 4. CONTENTS OF EACH CONCRETE WASHOUT FACILITY ARE NOT TO EXCEED 75% OF ITS DESIGNED CAPACITY. IF THE CONTENTS REACH 75% CAPACITY, DISCONTINUE POURING CONCRETE INTO THE FACILITY UNTIL IT HAS BEEN CLEANED OUT. 5. ALLOW SLURRY TO EVAPORATE OR REMOVE FROM THE SITE IN A SAFE MANNER (IE. VACUUM TRUCK). ALL HARDENED MATERIAL CAN THEN BE REMOVED AND DISPOSED OF PROPERLY. 6. IF A LINED BASIN IS USED, IMMEDIATELY REPLACE THE LINER IF IT BECOMES DAMAGED. 7. REMOVE TEMPORARY CONCRETE WASHOUT FACILITIES WHEN THEY ARE NO LONGER NEEDED AND RESTORE THE DISTURBED AREAS TO THEIR ORIGINAL CONDITION. 8. NOT THE LOCATIONS OF TEMPORARY CONCRETE WASHOUT FACILITIES AND CHANGES TO THESE FACILITIES ON THE SWPPP. CN SPECIFICATION: 1. THE CONTRACTOR MUST SUBMIT A PLAN OF HIS/HER PROPOSED TEMPORARY CONCRETE WASHOUT FACILITY TO THE RESIDENT ENGINEER FOR HIS/HER APPROVAL AT LEAST 10 DAYS PRIOR TO THE FIRST CONCRETE POUR. 2. TEMPORARY CONCRETE WASHOUT FACILITIES ARE TO BE IN PLACE BEFORE ANY DELIVERY OF CONCRETE TO THE CONSTRUCTION SITE. 3. TEMPORARY CONCRETE WASHOUT FACILITIES ARE TO BE LOCATED AT LEAST 50 FEET FROM STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, OR WATER BODIES. EACH FACILITY IS TO BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS AREAS TO PREVENT DISTURBANCE OR TRACKING. 4. A SIGN IS TO BE INSTALLED ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS OF THE DESIGNATED WASHOUT FACILITY. -15' MIN- + + + - - Z_ A ' :2 - 0 - + + + ENTRY SIDE OF --- WASHOUT ABOVE GRADE DETAIL PLAN VIEW 3' TYP EDGE OF 10 MIL PLASTIC LINER EARTHE BERM STRAW BALES 2 HIGH MAX) WOOD OR METAL / STAKES (2 PER A BALE) WEDGE 2" LOOSE 16 GAUGE STRAW - STEEL BETWEEN CO WIRE BALES STAPLE DETAIL 15' MIN- - B 3' 1:1 L-1 3:1 I \ /� B ENTRY SIDE OF -- WASHOUT BELOW GRADE DETAIL PLAN VIEW %PLES 10 MIL PER BAL PLASTIC LINER I - - - L __J_ _l_ SECTION A -A 1 - GENERAL NOTES: 1. DO NOT DISCHARGE CONCRETE OR CEMENT SLURRY FROM THE SITE. 2. THE CONCRETE WASHOUT FACILITY SHOULD BE LOCATED A MINIMUM OF 50' FROM STORM DRAIN INLETS, BUFFERS, OR WATERCOURSES. 3. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30' OF THE FACILITY. 4. THE ACTUAL LAYOUT CAN BE DETERMINED IN THE FIELD USING EITHER THE ABOVE GRADE OR BELOW GRADE CONSTRUCTION OPTION. 10 MIL PLASTIC LINER UNDER BERM AT ENTRY EARTHEN MIN EARTHE 3' BERM MAINTENANCE: INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACES, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. CN SPECIFICATION: 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENISTY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS ABOVE THE DOWNSTREAM LAYER A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER -RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OF SLIGHTLY BELOW IT. 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON. 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION. -PLYWOOD CONCRETE 4'-0" X 2'-0" +1 I I I PAINTED WHITE WAS OUT 11 I ---BLACK LETTERS + L 41.6" HEIGHT AG SCREWS(l /2") WOOD POST 11 71 (3Y2"x3)/2"x8'-0") II 0 _0 I 1 1 II I II _P0 Li to to SIGN DETAIL 5. THE CONCRETE WASHOUT FACILITY SHOULD BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT SIZE AND QUANTITY TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY THE WASHOUT OPERATION. 6. THE PERIMETER OF THE 10 MIL LINER MUST BE HELD IN PLACE WITH SAND BAGS OR STEEL STAPLES. 7. ONCE CONCRETE WASTES ARE WASHED AND ALLOWED TO HARDEN THE CONCRETE SHOULD BE BROKEN UP, REMOVED AND DISPOSED OF AT AN APPROVED FACILITY IN ACCORDANCE WITH LOCAL AND STATE REGULATIONS. DISPOSE OF HARDENED CONCRETE ONCE THE WASHOUT FACILITY IS 75% FULL. 8. ONCE THE FACILITY IS NO LONGER NEEDED ALL MATERIALS SHALL BE REMOVED AND THE EXISTING GRADES SHALL BE RESTORED. 9. STORMWATER ACCUMULATED WITHIN THE WASHOUT MAY NOT BE DISCHARGED INTO THE STORM DRAIN SYSTEM OR RECEIVING SURFACE WATERS. TEMPORARY CONCRETE WASHOUT GRO '\ \N\JECT 2 CERT. No. 353 z n A Rov\ IG F NC ENGINEERING P 080:3 LICENSE NO. ] S�\ -o >z V %J *tAL a = 3498 t elmsI- IN lit cn U Ld T_ O U < < V) < U 41 Q) cn (D o n 0- z - :3 < 0 - r- LO _j _j _j 1 00 Lo 0) 0- LO r- N Q) -0 0 1- N --t cn (1: 0 0 rl_ (D to 0) n P0 Ld �-C 00 00 Ld Li -I 0 01- C: 0)0) 0 Q) Z 0) 0) z Ld -0 Ld F 0 -C V) _j > LLJ _0 1: - 4-- C) U i­- - � 0 LL Lij 172 iiIMP M _j < Z Uj O < z _j Z 0 Of O 0 �_ ts� 0 - C*%j Of 0 z < < _j < 3: d = Of 0 bi 0 ILL. z F_ 0 0 z V) Drawn By JHJ Checked By SRN DATE: 30JUN 2021 REVISED: zL16 SEP 2020 ZL09 NOV 2021 w > V) SITE PLAN it _j _j SITE 6 _1 DETAILS _j Job Code HCSS1 j.21 � 0 0 Dwg No. SITE 602 2 3 4 5 D C B 0.5% MIN,w 2" #57 STONE SURFACE COURSE 6" COMPACTED AGGREGATE BASE COURSE 0 0 0 0 0 0 0 0 0 0 0 oI _I I � ,l I I II I- I I - COMPACTED SUBGRADE I' HEAVY DUTY GRAVEL SURFACE N.T.S. 1 % MIN. Nli R/W PAVEMENT N.T.S. NOTE: FINAL PAVEMENT SECTIONS TO BE REVIEWED AND APPROVED BY GEOTECHNICAL ENGINEER OF RECORD PRIOR TO CONSTRUCTION. U) w z 1171 � 30' m 0 c� m 0 m D < m r z m m 0 c� m 0 m D m r 3" BITUMINOUS CONCRETE SURFACE COURSE, TYPE S9.5C 4" BITUMINOUS CONCRETE INTERMEDIATE COURSE, TYPE 119.00 10" COMPACTED AGGREGATE BASE COURSE (OF IF <6' WIDE; 5" B25.00) COMPACTED SUBGRADE 20' EX. EDGE OF PAVEMENT EX. EDGE OF PAVEMENT VARIABLE 6' 8' 5' WIDTH SHOULDER WIDTH 1 /4"/FT OR +8% EX. X-SLOPE -2.08% _ III=III=III= -8.33 % 1 VFT OR8% 5' SHOULDER SECTION GRADES DRIVEWAY DETAIL N.T.S. SEEDING SCHEDULE BERMUDA LAWN, SLOPES (MAX. 3:1) DATE TYPE PLANTING RATE APR. 15 - JUNE 15 BERMUDA 2 LBS/1000 SF LATE SPRING(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/l000 SF EARLY SUMMER(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/l000 SF LATE SUMMER(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/l000 SF EARLY FALL(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/l000 SF MID SUMMER (ESTABLISHED) 16-04-08 SLOW RELEASE FERTILIZER 5 LBS/l000 SF LATE SUMMER(ESTABLISHED) 16-04-08 SLOW RELEASE FERTILIZER 5 LBS/l000 SF SHOULDERS, SIDE DITCHES, SLOPES (3:1 TO 2:1) DATE TYPE PLANTING RATE MAR 1. JUN. 1 SERICEA LESPEDESA 50 LBS/ACRE & MAR 1. - APR. 15 ADD TALL FESCUE 120 LBS/ACRE JUN. 1 -SEP. 1 ***TALL FESCUE AND 120 LBS/ACRE ***BROW NTOP MILLET OR 25 LBS/ACRE SOUGHNUM-SUDAN HYBRID 30 LBS/ACRE SEP. 1 - MAR. 1 ERICEA LESEDESCA AND 70 LBS/ACRE TALL FESCUE 120 LBS/ACRE NOV. 1 -MAR. 1 ADD ABRUZZI RYE. 25 LBS/ACRE CONSULT EROSION CONTROL ENGINEER OR SOIL CONSERVATION SERVICES FOR OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS. OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ***TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROWN OVER 12-INCHES IN HEIGHT BEFORE MOWING. OTHERWISE FESCUE MAY BE SHADED OUT. SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF THEY OCCUR. AFTER ALL ROUGH GRADING IS COMPLETED, TILL SOIL AREAS TO BE SEEDED AND PLANTED TO A DEPTH OF FIVE INCHES. 2. REMOVE ALL LOOSE ROCKS, ROOTS, DIRT CLODS, AND OTHER OBSTRUCTIONS LEAVING GROUND SURFACE SMOOTH AND UNIFORM. 3. TO PREPARE UNIFORM SEEDBED, INCORPORATE AGRICULTURAL LIME FERTILIZER AND SUPERPHOSPHATE INTO SOIL AREAS TO BE VEGETATED. DISK NUTRIENTS INTO SOIL UNTIL WELL PULVERIZED. 4. SEED ON PREPARED SEEDBED AND COVER LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK. APPLY TEMPORARY SEEDING TO SOIL STOCKPILE AREAS THAT WILL BE DISTURBED WITHIN 30 DAYS. APPLY PERMANENT SEEDING TO WHERE FINISH GRADES ARE ESTABLISHED. 5. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR WITH LIQUID ASPHALT AT 400 GAL./ACRE OR EMULSIFIED ASPHALT AT 300 GAL./ACRE. 6. MULCH ALL SEEDED AREAS WITH SMALL GRAIN STRAW AT 90 LBS./l000 SF AND SPREAD UNIFORMLY. GROUND SURFACE SHOULD BE VISIBLE TO ALLOW SUNLIGHT PENETRATION. 7. MULCH AROUND SHRUBBERY AND TREES WITH SHREDDED HARDWOOD TO A DEPTH OF 3 INCHES. 8. AFTER WORK IS COMPLETED AND AREAS ARE STABILIZED, CALL EROSION CONTROL OFFICER FOR SITE INSPECTION AND RECEIVE CERTIFICATE OF COMPLETION. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES, INSTALL RIP -RAP, AND SEED AND MULCH ANY REMAINING BARE AREAS. w �L-iw wN U Cr LLJ In Of zOf z0 O 0 O U U U U w _j � Q 2 L< = a� CLm QN aw �i EXISTING PAVEMENT N OTES: 1. ALL PAVEMENT CUTS SHALL BE REPAIRED WITHIN A MAXIMUM OF SEVEN (7) DAYS FROM THE DATE THE CUT IS MADE. 2. IF CONDITIONS DO NOT PERMIT A PERMANENT REPAIR WITHIN THE GIVEN TIME LIMIT, PERMISSION TO MAKE A TEMPORARY REPAIR MUST BE OBTAINED FROM THE TOWN ENGINEER. EXISTING PAVEMENT BACKFILL 5" MAX. LIFTS COMPACTION: 95% MAX. DRY DENSITY (STD. PROCTOR) TRENCH WIDTH MIN: PIPE OUTSIDE DIAMETER + 8" EACH SIDE MAX: PIPE OUTSIDE DIAMETER +12" EACH SIDE TRENCH & PAVEMENT REPAIR SECTIONS STANDARD TYPE (UP TO 20 FEET IN DEPTH) 0 N 48" MIN. o_ n FLAT TOP STANDARDS STEP DETAIL 16" ON CENTER _ I 12" -STANDARD MANHOLE RING & COVER -TOP DESIGNED FOR HS-20 LOADING PLASTIC CEMENT PUTTY OR BUTYL RUBBER JOINTS JEEP HOLES W/ STONE & WIRE MESH, 2" MIN. DIA. BRICK & MORTAR INVERT STONE BEDDING 8" 0 TRAFFIC AREAS: ECCENTRIC CONE ONLY NON -TRAFFIC AREAS: FLAT TOP ONLY PRECAST MANHOLE JUNCTION BOX RCP CLASS MIN (ft) MAX (ft) III 2 20 IV 1 30 CPI CSP CAP Diamet a MIN (in) MAX (ft) MIN (in) MAX (ft) MIN (in) (ft) 15 28 12 158 2 98 18 12 28 12 12 81 21 12 113 12 69 24 12 26 98 12 60 30 12 26 1 79 12 57 36 12 0 12 12 47 42 1 20 12 55 12 40 48 12 20 12 48 35 5 12 56 15 31 60 24 20 1 12 1 50 15 �:2]Ej MIN. - 4" 8" 35" MIN STANDARD 24"X24" GRATE & FRAME 26" X 26" MINIMUM ' a, N OPENING w Of CO 0 CORBEL BRICK 1" PE OURSE FOR 6 COURSES � r z M m ROUT WEEP HOLES W/ STONE & WIRE MESH, 2" :a MIN. DIA. d.. . G da. a..• 3000 PSI CONCRETE STONE BEDDING PLAN SECTION NOTE: 1. EITHER SOLID BLOCK, CONCRETE, OR PRECAST CONCRETE MAY BE USED. 2. FOR 24" R.C.P. AND LARGER --USE PIPE DIA PLUS 12" FOR MINIMUM INSIDE DIMENSION. 3. CAST IN PLACE DESIGNS TO BE SUBMITTED. YARD INLET W/ GRATE 8c FRAME BACKFILL INITIAL LIFT: 12" MAX. NON TRAFFIC AREAS: 12" MAX. LIFTS TRAFFIC AREAS: 6" MAX. LIFTS COMPACTION: 95% MAX. DRY DENSITY (STANDARD PROCTOR) ----GEOTEXTILE FABRIC (NON -WOVEN) WRAP STONE AND PIPE -#57 STONE BACKFILL TO SPRINGLINE NOTES: 1. EXCAVATE TO 4 INCHES BELOW THE PROPOSED PIPE ELEVATION. 2. PROVIDE 4 INCHES STONE BEDDING AND STONE BACKFILL TO SPRINGLINE. 3. WHERE BELL AND SPIGOT PIPE IS USED, PROVIDE RECESSES TO RECEIVE PIPE BELL. 4. UNDERCUT UNSUITABLE MATERIAL AS DIRECTED BY THE ENGINEER AND BACKFILL WITH STONE OR OTHER APPROVED MATERIAL. 5. BACKFILL MATERIAL SHALL BE APPROVED SUITABLE MATERIAL. 6. WHERE NECESSARY, TEMPORARILY DIVERT SURFACE WATER TO MAINTAIN A DRY CONDITION IN THE PIPE FOUNDATION. DIRECT THIS TEMPORARY FLOW INTO SUITABLE EROSION CONTROL DEVICES. STORM DRAIN PPE BEDDING & BACKF LL NG S 8° E� #4 BARS '"V,, 6" --j 6'" E�UAL SPACESPACE 3 � 1 %2 "r 11<2 ,r R' _ w R - w ¢ CL n cti {fi U) -4u- Lr) U) -I ¢ m mM *W *LU co M, e7 (51 PT S PLAN 017' T0P SLAB SECTION S-S 8"" E #8 "W" BARS r #4 BAR #4 BARS '"V" 6 @3 EQUAL SPACES - #4 BARS "1 „ 6 SECTION R-R DONNE, r LMIII CURB AND GUTTER WITH CATCH (BASIN ON STEEP GRADES TOP ELEVATION EXPANSION JOINT USE ON FLAT GRADES 2�S AND UNDER - I T 3" map - DEPRESSED GUTTER LINE EXPANSION JOINT ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES TOP ELEVATION NORMAL GUTTER LINE S" EXPANSION JOINT USE ON GRADES OVER 24s 1D" TZ6°- EXPANSION JOINT y " O p" DEPRESSED GUTTER LINE ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR BRICK CATCH BASIN(BASED ON MIN. HEIGHT, H, WITH NO RISER)* DIMENSIONS OF BOX AND PIPE TOP SLAB PIPE SPAN WIDTH WIDTH SPAN (MIN. HEIGHT DIMENSIONS CU.YDS. CONC. IN BOX BRICK MASONRY DEDUCTIONS ONE PIPE C.M. R.C. BARS-U NO. LENGTH BARS-V NO. LENGTH BARS-W TOTAL NO, LENGTH ISLAB TOP BOTTOM SLAB TOTAL CONIC. 8HI0KM$NR IN WALLS TQ1At COCK T CONCRETE D A B C G H E F 12" 3"-0°' 2'_2°' 2'_9'° 0.281 0,281 0.883 1.164 0.020 0.042 151, 3' 0" 2" 2"" 3'-01, 0,281 0.281 0.963 1.244 0.031 0.047 18Y, 3'-0°' 2'-2 31 3" 0.281 0.281 1.043 1.324 0.044 0.065 24" 3'- 0 °, 2'- 2 °" 3'- 9" 0.281 0.281 1.204 1.485 0.079 0.121 301° 3 0" 2' 2°" 3" 4 4' 3" 1' 2" 4 4'" 4 1' 6"' 3 4' 1 "° 3 4 1 "' 45 0.147 p.374 0.521 1.606 2.217 0.122 0.1814 36'° 42"° 48'° 3'- 0`° 3 0" 3' ®„ 2'-2"" 2" 2"" 2" 2"" 3' 10" 4' 9"' 1' 8" 4" 55 1-3 1 1'-5" 5'-0" 5" 91' 2" p" 4'- 4 3 -6" 3°-6" 4 4 4 2'-0" V-9"' 2" 611 4 3 4 4' 1" 3"-3"' 3'-3" 3 3 3 4 -1" 49 3 3'° 3$ 3'-3"' 41 0.187 p.13S 0.173 p.415 0.373 0.41'p 0.602 0.508 p.583 1.914 2.152 2.415 2.516 2.660 2.99$ 0",176 0,261 0.240 0,371 0.313 0.477 54" 3'-® 2"-2°, 5' 76'-3'° 2"-7°' 3'-6" 4 3' 0" 6 3" 3'" 3 3" 3" 47 0.211 0.448 0.659 2.806 3,466 p.396 p.595 BACK OF CURB SECTION Y-Y rr_ ir�r��1r r��il . w .I. .I. WHERE 30" TO 36" PIPE IS USED WHERE 42" TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RISER CONSTRUCTION IL1 a .� in iI z 0 t!a <C F-1 . ILL A [L F-4 �TZ Z <��� W10J oat "> CL cc 0 I (0 Z = m H 0 sdLu Iq LL a L) H Q W�CN CO O * RISER HAS .321 CUBIC YARDS OF BRICK MASONRY PER FOOT HEIGHT 1840.01 NOTES: MORTAR JOINTS 1/2" +/- 1/8" THICK. 71 0 USE CLASS "B" CONCRETE THROUGHOUT", " >_ TOP ELEVATION USE FORMS FOR CONSTRUCTION OF THE BOTTOM SLAB., H- Q DEDUCT FOR PIP'E(SI FROM TOTAL CU. YDS. OF BRICK MASONRY. " cc 0 USE #4 BAR DOWELS AT 12" CENTERS FOR ALL PIPE SIZES. � . PROVIDE ALL, CATCH BASINS OVER 3°-61' IN DEPTH WITH STEPS 12"" J t I ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. 0 0co i USE TYPE "E"' '"F" AND "G°" GRATES UNLESS OTHERWISE INDICATED. cc ILL! < LL USE (BRICK OR CONCRETE BLOCK WHICH COMPLIES WITH THE REQUIREMENTS �- O Lcc o o OF SECTION 840 OF THE STANDARD SPECIFICATIONS," H wi MIN. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB €/BI- 0 AS SHOWN ON STD. NO. 840.00. ©� FOR 8' 0" IN HEIGHT OR LESS, USE 8" WALL. OVER 8' 0" IN HEIGHT, USE O cr 12" WALL TO 6°-0" FROM TOP OF WALL AND 8" WALL FOR THE REMAINING zI--I 6" 0". QUANTITES TO BE ADJUSTED ACCORDINGLY. SEE NOTE CONSTRUCT WITH PIPE CROWNS MATCHING. r- W CHAMFER ALL EXPOSED CORNERS 1". L3 DRAWING NOT TO SCALE. TOP ELEVATION STEPS - STD. NO. 840.66 ■ MIN mirld .� �r •ICI MOM! -_ � WinMIN �r _ _ �L�MINIM- _ MINIM .. T SECTION J-J WHERE 30" TO 36" PIPE IS USED PLAN u_E NOTE.. T 6"MIN. e .'. . SECTION III3 WHERE 42" TO 54" PIPE IS USED PLAN SEE NOTE GRO�10 APRON\fECTU,Z c, = z CERT. NO. 7�- E 353 20 ~ORTN CARO\'\RP �'��EIGH,NG NC ENGINEERING LICENSE NO. P-0803 �C A :'Cx . SEAL 34901 «a �" U7 U W 0 U 0_ w Q 0_ U 41 N LD C � � Q z o _j IDO 1rn . W LO I N N -0OtN+ (n W 0 1 LO d7 N N000 W00 w O I C 0) 0) z 0'LU-- L C N z 0) 0) (n z w -0 0 J V) N - .- 0 W� X� = r U 0 LLw �L�G? ■`M ■■■ J z W OZ U J z O o� ^ L1� Cam) O 0 Z Q J <2 0 LIJ -O Z in Z (n BY rawn JHJ Checked By SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 A2 09 NOV 2021 3325 FEB 2022 w SITE PLAN a SITE 6 DETAILS a Ci Job Code HCSS 1 2 3 4 5 D C B NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE STONE, THEN THE TIRES OF THE VEHICLE MUST BE WASHED BEFORE ENTERING PUBLIC ROAD. 3. IF A PROJECT CONTINUES TO DEPOSIT MUD AND DEBRIS ONTO THE PUBLIC ROAD, THE TOWN WILL CLEAN THE AREA AND INVOICE THE FINANCIALLY RESPONSIBLE PARTY. 0 Z X Lv EXISTING ROADWAY MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS CN SPECIFICATION: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. ENTRANCE TYPE L W STONE SIZE GENERAL 50' 25' 2-3" RESIDENTIAL* 25' 12' #57 * INDIVIDUAL SINGLE FAMILY CROSS SECTION NEW CONSTRUCTION- 2 ABRIC UNDER STONE CONSTRUCTION ENTRANCE MAINTENANCE: CN SPECIFICATION: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND 1. REMOVE AND DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT 2• ENSURE THAT THE MIN. CONSTRUCTION CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWERS AT ANY POINT THAN THE DESIGN ELEVATION PLUS CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS THE SPECIFIED SETTLEMENT. AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSION TO PERMIT MACHINE REGRADING AND CLEANOUT. STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN BLEND WITH THE NATURAL GROUND LEVEL AND 30 WORKING DAYS. APPROPRIATELY STABILIZE IT. 2' MIN. 2' MIN. ill-III-1 I I -III _I � I- _ COMPACTED - 00 STEEP CUT OR FILL SLOPES - - - - ,=�I=„11�,1T SIDE SLOPE 2:1 (MAX UPSLOPE T ---�-2:1 SLOPE (MAX) IMMEDIATELY STABILIZE CROSS SECTION DIVERSION DITCH WITH TEMPORARY SEEDING OR EROSION CONTROL NETTING AS CALLED OUT ON THE EROSION CONTROL PLANS POSITIVE GRADE 1.0% MAX. N PLAN VIEW DIVERSION DITCH CUT OR FILL SLOPE ❑ SELECT DESIRED HEIGHT: 84" (SHOWN) 96" ❑ SELECT DESIRED COLOR: b SATIN BLACK 8' 0" ON CENTER ❑ BLACK FINE TEXTURE ❑ NINETY BRONZE [3 BRONZE FINE TEXTURE 1 1/2" W X 1 1/2" H RAILS [3 SPECKLED WALNUT ❑ SANDY SHORE ❑ WHITE FINE TEXTURE At ❑ GLOSS BEIGE M 1"X 1" ❑ CHOCOLATE PICKETS ❑ GLOSS WHITE 3 3/4" ❑ BROWN FINE TEXTURE N SPACING ❑ SILVER o ❑ SELECT DESIRED OPTION: 21/2" X 21/2" b SHORT PICKETS POSTS Ib SELECT DESIRED POST CAPS: [32 1/2" FLAT co 1 1/2" W X ❑ 4" FLAT 1 1/2" H RAILS ❑ 6" FLAT (STANDARD) I L IL [32 1/2" BALL ❑ 4" BALL (OPTIONAL) `� FRONT ELEVATION b SELECT DESIRED FINIAL OPTION: ❑ QUAD 1 ❑ TRIAD MANUFACTURER NOTES: 1. PLEASE CONTACT MANUFACTURER FOR ALL THE OTHER SIZES AND OPTIONS. NOTES: 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWING. 3. THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALS FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION. 4. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 5. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTER REFERENCE NUMBER HCSS1_Det �� INDUSTRIAL ALUMINUM FENCE 5000 SERIES 5000 SERIES: 4- RAIL W/SPEAR POINTS, AVAILABLE W/ALT. SPEAR POINTS (#5141 & #5142) MAINTENANCE: A FLOATING SKIMMER SHOULD BE ATTACHED TO THE BASE OF THE RISER. CN SPECIFICATION: THE ORIFICE IN THE SKIMMER WILL CONTROL THE RATE OF DEWATERING. CN SPECIFICATION: 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. THE SKIMMER SHOULD BE SIZED TO DEWATER THE BASIN IN 2-5 DAYS. 1. CONSTRUCT THE BASIN ACCORDING TO THE EROSION AND SEDIMENT CONTROL 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE I A CHART TO DETERMINE THE APPROPRIATE SKIMMER AND ORIFICE SIZE IS PLAN WITH THE BASIN SURFACE FREE OF OBSTRUCTIONS, DEBRIS AND POCKETS INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF INCLDUED ON PAGE 6.64.3. SEE PRACTICE 6.64, SKIMMER BASINS FOR OF LOW -DENSITY MATERIAL. 4 FEET APART. DETAILS ON THE INSTALLATION OF SKIMMERS. 2. ASSEMBLE AND INSTALL THE SKIMMER AS INSTRUCTED BY THE MANUFACTURER. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE 3. PLACE A 6-INCH BAND OF SEALANT AROUND THE INTERIOR FACE OF THE OUTLET MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A PVC END CAP HEDULE 40 BARREL PIPE. 2-FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS PVC VC ELBOW VENT PIPE C PIPE 4. DEPENDING ON THE EXPECTED TIME PERIOD FOR WHICH THE SKIMMER BASIN RECOMMENDED. IS DESIGNED, PERMANENTLY OR TEMPORARILY SEED ALL BARE SIDE SLOPES OF 4. PLACE CLEAN GRAVEL (NC DOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A WATER SURFACEf�L�4 THE BASIN. TANDARD METAL POSTS 2' IN GROUND HEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. LIMIT THE DAM HEIGHT TO 5 FEET. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE VC END CAP ° 6. INSTALL THE SKIMMER A MINIMUM OF 1 FOOT FROM THE BOTTOM OF THE BASIN. ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS. SCHEDULE 4 ORIFICE PLATE 7. THE MINIMUM BASIN WIDTH SHOULD BE 3 TIMES THE DEPTH OF THE BASIN. 6. COMPACT THE AREA PROPERLY AND STABILIZED IT WITH GROUNDCOVER PVC TEE------*" EE PVC PIPE FOR A BASIN DEPTH OF 3 FEET, THE MINIMUM BASIN WIDTH SHOULD BE 9 FEET. PIPE 4" HOLES TIN VC TEE 8. INSTALL COIR FIBER MATTING UNDER THE OUTLET OF THE SKIMMER WITH ALVANIZED HARDWARE NDERSIDE MINIMUM DIMENSIONS OF 9 FEET LONG BY 6 FEET WIDE. WIRE EXTENDS TO TOP OF BOX MAINTENANCE: 9. INSTALL MATTING FOR EROSION CONTROL ON EXPOSED SIDE SLOPES AFTER INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT I INCH OR SEEDING IS COMPLETED. GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER 10. UNROLL THE GEOTEXTILE ON THE SPILLWAY IN THE DIRECTION OF FLOW, WITH OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO EDGES BURIED AT LEAST 6 INCHES DEEP. THE GEOTEXTILE SHOULD BE ONE DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE FLEXIBLE HOSE _--3' CONTINUOUS PIECE OF MATERIAL OR OVERLAPPED A MINIMUM OF 18 INCHES. OCOQO AS NEEDED. PROFILE PROFILE X 3' X 12" FOR DIVISIONS 1, 2, 3, 4, AND 6 IN THE EASTERN PART OF THE STATE, USE A °° ° o CLASS B LOW PERMEABILITY GEOTEXTILE. ° DISSIPATER PAD 11. REPLACE THE PLASTIC SLOPE DRAIN PIPE AT THE INLET OF THE BASIN WITH �" ° GEOTEXTILE AS DIRECTED. °oo °"O S 12. INSTALL 3 COIR FIBER BAFFLES IN THE SKIMMER BASIN WITH A SPACING OF 1/ - -'o THE BASIN LENGTH. ° 0 ° 13. INSTALL A MINIMUM OF 2 COIR FIBER BAFFLES IN BASINS WITH LESS THAN 20 o ARM ASSEMBLY FEET OF LENGTH AT SPACING OF 1/3 THE BASIN LENGTH. d`� 0 ° 'C" ENCLOSURE 14. INSTALL A CLASS B STONE PAD (4 FEET BY 4 FEET BY 12 INCHES HIGH DIRECTLY OV� UNDERNEATH THE SKIMMER DEVICE. -� o 0 15. ANCHOR THE COIR FIBER MAT WITH WOODEN STAKES, STEEL REINFORCEMENT � g0 9�O�(D-00 b C�°°�® _ �° REBAR OR METAL STAPLES. 16. ANCHOR THE GEOTEXTILE WITH 6" STAPLES AT A MAXIMUM SPACING OF 3 FT. -\ WATER ENTRY UNIT PRIMARY SPILLWAY 17. CONSTRUCT THE PRIMARY SPILLWAY WITH A TRAPEZOIDAL CROSS-SECTION, WITH 2:1 SIDE SLOPES, AND A MINIMUM BASE WIDTH OF 4 FEET. #57 WASHED STONE PLACED TO A HEIGHT OF 12"-18" MIN. ABOVE TOP OF BOX. CATCH BASIN 8c YARD INLET SKIMMER PROTECTION DETAIL 0 IVUAA VARIABLE AS DIRECTED BY THE ENGINEER IN. 124 GA. MIN. 10 GA. LINE WIRES INTERMEDIATE WIRES _-GRADE III -III -III-III,,-III-III-III,,, -III-111-III-III-111-III-III-III-111-III-III-III-III,,-III-III IT SILT FENCE FABRIC AN INSTALLED TO SECOND WIRE FROM TOP FRONT VIEW NOTES: STEEL POST ROPERTY LINE _ 1. USE SILT FENCE ONLY WHEN WOVEN WIRE FABRIC - F ;sF_ IRE DRAINAGE AREA DOES NOT SILT FENCE GEOTEXTILE FABRIC HYDRANT EXCEED j ACRE AND NEVER 32" MIN. WIDTH 1 4: IN AREAS OF CONCENTRATED ILL SLOPE C,� FLOW.LT _ 2. END OF SILT FENCE NEEDS N FENICE TO BE TURNED UPHILL. -----CURB AND GUTTER RADE SIDEWALK A.' I LO *USE #57 WASHED STONE FOR N 8" MIN. COVER X 4" MIN. I- m REPAIR OF SILT FENCE WIDTH OVER SKIRT FAILURES, AND FOR ANCHOR vw (BACKFILL TRENCH AND WHEN SILT FENCE IS SIDE VIEW COMPACT THOROUGHLY) FH INSTALLATION PROTECTING CATCH BASIN. MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CN SPECIFICATION: 1. THE BASE OF BOTH END POSTS SHOULD BE A LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION.L 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. FLOW DIRECTION FILTER OF # 57 WASHED STONE SILT FENCE FABRIC TO OVERLAP HARDWARE CLOTH BY 12 INCHES STEEL FENCE POST WIRE FENCE PLAN VIEW STEEL FENCE POST HARDWARE CLOT FILTER OF NOTE: 57 WASHED 1. APPLICABLE FOR DRAINAGE AREAS NO MORE THAN 1 /4 ACRE. STON 2. USE AS A REPAIR OF SILT FENCE FAILURES. FLOW DIRECTION 3. BURY WIRE FENCE, HARDWARE CLOTH, AND SILT FENCE FABRIC 8 11 INCHES DEEP AND 4" WIDE MIN. SIDE VIEW r SILT FENCE 1.1 1.1 10 1.1 1.1 u u u u FRONT VIEW MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CN SPECIFICATION: 1. THE BASE OF BOTH END POSTS SHOULD BE A LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION.L 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. 3.0' 4.0' DIVISION SIX / DISTRICT TWO PAVEMENT WIDENING - SECONDARY ROADS PAVEMENT SCHEDULE (TAPER MILLING REQUIRED EACH SIDE OF WIDENING 25 FEET a 0' - 1.5' 3.0' S 9.5 C 4.0' B 25.0 C DRAWING IS NOT TO SCALE G R 0 RG�\JECTu/�� , = z CERT. N0. '_ r 353 z n 40 RTH CARO\'\�P R�LEIGH,N" ' NC ENGINEERING LICENSE NO. P-0803 ��r�k CAR 111111�t�,��o 0 ct EA L 34981 i I$d�•: 20 L7 U w 0 U w Q w U � � c 0 a Z 0 i ICOLoI . n cn 0 o�LOa' 0�N�Dq41 W w O � �_ rnrn@ Z N z d7 d7 cQ Z w Ld- 0- -C L1.1� X2 04- 0 U 0_0 Lew 111111111111111114, MEN-, ■■■ J z Lu ZD O z U J z O o� ^ cv O Z Q 2 0O LLI Z F- I U Q Z 0 BY rawn JHJ Checked By SRN DATE: 30 JUN 2021 REVISED: 1�16 SEP 2021 2 09 0 NOV 2021 3 25 0 FEB 2022 w w of of SITE PLAN Qf a SITE DETAILS J a Job 0 Code HCSS 1 r, TEMPORARY SILT FENCE TEMPORARY SILT FENCE OUTLET 2 3 4 5 D C B 140-OOIA MAINTENANCE: fit.91vu skrkanizr iedkmenit Imsins at iust awekE,v aild aftef vaell !�algrRtflcant toae-haff tkch preweirl ramtlt nvett 3.1d nepair timmiediatE,,ty- Ketnave s,edtment wd resorie die hasirl ID ltsorfgkmt dTtrctiskcpms %bell sedink"111, accunndaits roomedtaff i1be lieII11ii Of the first haffe. I'%H the FJctrnRief ici flazit the -crlinvrrut imdrrurr3th it cart he c-=i�m cd. f7tcavatr fl'ac .9tifinient fivrntivectitirc rivrind tht 5LkLmrMCF0r dace kirmt calf. Make siu-e vegeta6 on j;rDwing, in I lie bottonn oft Ike lias,in div, i not holddcmn the gkirflinjor. Mcpak time baffics i tfucy arr dani rd. kc-,micirtir thr baffin, if w3tnI U-S lirarwan r?T:MRMMd fl-DEM1. If the skiconler i,& cbg,ged Wadi Imsti and tbere m7, water irt the baswit, Licautly jierkirlg, ort ii�e r,01V uriHj Make dw skinumer bol�,, ur, a.Mdmn yid distodge Tte debrtF_ajid ries;K)rL flow. if d,Ntsdm I, i work, pu U11 tre ^.,Icilirvrer owner 10 to tfir,sid,r (7fithr, hamhv ared rrmri7re dtr drbriy, At sn c I-rc k I Iw, ni-6rc irn,idr the, rr=vc fiedchns. lfiti SLI(irrinfrer at. ni (m, ba,n,�t Il lie is eft .ged, theornet car lie rTm(wedgrid He sure, and reytace ihetfincv lit re, frpnsftionlrip,, ilia sidariiier. ChiecL I[E, fnrbri,r kin -ad rpUbaisrrr for d3aiage and naake avlw,, reqmired relalkr. ridgy faabrie Hitt qiaur. dw FuH wdth ofthe ip!Hvay. cha--ic dw abAlanklment, spitl"mVs, and oiifiet forefcf;bti daiiiage, arid inspect dle crtlkxtml rTler¢t for Txwharidatherdebristorn [lie wr as. Prgtzzknp WpAtbar C31% resutt in iae fxmiing in rtie basin. '�nnre iqvera.t J'Alecau,tiiALs, sl,NDUM he taken in, Litt! winter to Ixevvift tl,e skirnaiei, finull ri],4�gjrr,g wide ice. Iu 11 Jill lrewsw ON), 00 NORTH AMERICAN GREEN® DESIGN INFORMATION TO BE PROVIDED BY THE ENGINEER ON THE CONSTRUCTION DRAWINGS DIMENSIONS ELEV EMERGENCY SPILLWAY 20 267.75 TOP OF DAM WIDTH 107­- 269.0 ANTI -SEEP COLLAR 54"X54"X12" =A RIP RAP DISSIPATOR PAD 12'x4.5'x18"D N/A TOP OF RISER 4 W 4 SIDES 266.0 OUTLET PIPE INVERT IN 4 PVC 360.0 OUTLET PIPE INVERT OUT 15 RCP 360.0 ANTI -FLOATATION DEVICE "" 54"x5 4A 8 - N SKIMMER SIZE 2.5" N A JA] ORIFICE SIZE 11.9', A CONSTRUCTION SPECIFICATION: f1m1r. ri-al.% rind str ji thcaren arxicr diternlmnk rnniyt of wge tnti,*n lit, d ro,otrnat. RrMT)W III 'MUISCA SN't' WIARirlk g It ig h afflnUn L" eff ora nk rMal ter I'laut, dtobjwtionabEe materiat to the P�i"r�V mated Ms1w."31 ar. Mace rerinp(Alit-y qedfiTax ciowot, rnefdmtes llekw 1, i'im.nrc thnt flit rwitcrial for dw trinlimikrucal r fiet Ci 1T*Aq, woody vepatation, offf"falic multar% and other d.-jec6ntiabla inatorinL Plam, tlw fid ram PLAN VIEW Ceivier filt die einbarikincxt 6 krcbeiih allinur for igitlainetir. EMERGENCY SPILLWAY CONSTRUCTED OVER 1 1Itq-m the ba i it lu tbr, s:prr ificd dinicti-Arm. Iticvcrit dic ,b, rmrrnir._L-Nizz, UNDISTURBED GROUND AND ARMORED WITH Firtim sel fli mz Iran the tnud by exem,ataq, a, i,ha km, pk under the skim,xvic I i)r RIP RAP AND FILTER FABRIC nkininterofstfAw Drtialber. 4, Ptaee the bkrft4,kty foulwhid on of kniper"Ar" Mi L Do 1 kat ume I'M' Omy� nrata^Ia I gur'll ar, guld, gr2ke,1, ar C'M3Lhf"d swu as hac.AtH wcxurld the pipe. Iftice rhe flUJ omiefiak arourid tfur pipe irillw,ay In 44i,ch Effytr,.i and wralpact ia under and arnruLd IP RA IP RAP A� mierr. C.are, niusi: dte 19ii1te to at lewst the hale dmuqtyas, the i4,aoert arn1haak IF DISSIPATOR ISS I* taken ncat tn raiae tire pipe fromi the Anin ocwrtwt witli u�Ig fbwdatrnn when PD PAD AD ennijimthr UaidpTthe pipe livaunthe.a. 11a cir, a im hi intu -n6uTithafl; fnt,oI`rnnipaftrd baclidift mrr the pWMqx'I1vr,1y 3' X 3' X 12 }cfnT cmi�k;g it witIt crmitriertricir cqui innit In rinc-mt sliatild dx prpr P CLASS B wricluit he inimHvel lyy cutting a wenelk rfwou4i Ibe darnafter the ernkErikanzim DISSIPATER PAD b; onimli. a la. I!L fluqgEinblip the 4,,Irnim,r.T fhRmwing d.ie nranufacturert btsirwtLomi, er as I TI T P IN, Lay tIx­mwrmbI,Dd skirararr on fic buttoranitIr ban,inxith dw firxiltx N (TYP.2)-' SLOPE DRAIN UTLET PIPE journ al the idbt of [lip birript pqm. Attadi tl�e 6exiblejoint to t1w, bei-ret pirli, widppi�AuDrt Ihe ihirmnier ovier tire eArswatecl pil ew i:upprvi. Be qUrd to attat'll POROUS BAFFLES (3 MIN. LdARTH DAM a rope to dw:uIciriirnor anda me hc)r k tD die gi'de pf the haskL TIAg Witt I'v, Ue'd bi Of SKIMMER 1m1,Mflrfe for. rnaktienance. WATER LEVEL DURING STOR CONCRETE RISE L� 7. E3fthrm ir� iRwags ItIstafftlw 5pahvray ii�i urufinttLrbcd voi�t to the gEatc.'t P Z POROUS BAFFLES (3 MIN. SKIMMERA wid entrmtee and v%ft cl-onnel Mzreg we adtical) V) the ;arcvapfal clieralon SLOPE DRAIN- Df the ip Wway. 9 he gp 1way ghiiutIf tre 1. ned wt dr tani mared ptaxd r, or SPILLWAY ELEV. inaperyne-ahk ykmiext2e f-Atirk.. The fal-itt riniffa be %,dp ind long enbuo.1 noMERGENCY eltlt Komi rr darifnranchr-ning rrrw�r patrn ape ila la Ir INIMUM FORESLOPE 2j:1 6 a trancli.164a ed�es may he iecurdi '-irieh stalAff, or pirri.1 Ire, f4irir -we Noni,; - r : . Drum I errijigh to e�deird Llawri the itolrie auA, �exEt onto gI.&& F otirei INIMUM BACKSLOPE 3:1 91w vAdA dr M the, fab fic niagt be nae p6ecc, art Oimtd cr ;plkal; offivr-ww'o 3' X 3' X 12 to Walla, carii get tunckribe fatAic. Ifilbe lev,�Eh ofibe fabric is iasultctetir: fof the ARTH DAM cirlirc Icngth �nf Iltz �qiiltwuy., annuiRg thc rrnji,,rtc wIddt,, CLASS B ainy be, weA I'he the bwer sectionf.4l srp DISSIPATER PAD GATE VALVE OR ORIFICECP DISCHARGE PIPE Out water manol f1ew under 11w ldhisc. So'cure dra Upper edge and 46% ANTI -FLOATATION BLOCK rxf'dre fttwic it a trench wldhi;uplei Air pimF, (Adopted konl"A, Nimmat fbr NOTES: UTLET i-Z February, ANTI -SEEP COLLAR 1. SEDIMENT STORAGE: 3,600 CF/DISTURBED ACRE PROTECTION 2. SURFACE AREA BASED ON: 025 CROSS SECTION (DETAIL 400.18) & fifltm- Diltliml�gt wntcr inlothr bn�ii inn Unit 3. INSTALL SEDIMENT CLEANOUT ELEVATION STAKES. trap e ffizi 0 Be y 4. BAFFLES SHALL INCLUDE 700 G/SM COIR EROSION BLANKET. I trr.gk , 5. FLOW ENTERING THE BASIN MUST BE DIRECTED TO AVOID EROSION ALONG THE SLOPE AND SCOUR IN THE BASIN. APPROPRIATELY SIZED SLOPE DRAINS, PER THE STANDARD DETAIL, ARE RECOMMENDED. NORTH AMERICAN GREEN 5401 ST. WENDEL-CYNTHIANA ROAD POSEYVILLE, IN 47633 TOLL FREE: 1-800-522-5011 PHONE: (812) 867-6632 FAX: (812) 867-0247 12" www.nagreen.com (30CM) 6" (D J) . . . . . . . . . . . . . . . . . . . . . . . . . . (D x... .................. ............. . . . . . . . . . 4" . . . (10CM) . . . . . . . . . . . ............. . . . . . . . . . . . I. . . . . . . . . . . . . .... ... . . . .................. (D 2"-5" ............... (5 M- 12.5 M) ...................... ... ... ... ..... ............ ... ... ... ... p1 111 ... ........... ................... ... ... ... ... ... 4"-6" . ..... . ... ........................... I- �_ ... ... ................................... ... ... . ... ... (E) CRITICAL POINTS A A. OVERLAPS AND SEAMS B B PROJECTED WATERLINE C. CHANNEL BOTTOM/SIDE C SLOPE VERTICES HORIZONTAL STAPLE SPACING SHOULD BE ALTERED A IF NECESSARY TO ALLOW STAPLES TO SECURE THE B CRITICAL POINTS ALONG THE CHANNEL SURFACE. C IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. NOTES 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWINGS. 3. REFER TO 140-001 B FOR ADDITIONAL NOTES. 4. CONTRACTORS NOTE: FOR PRODUCT AND PURCHASING INFORMATION VISIT wvvw.CADdetails.com/info REFERENCE NUMBER 140-001A. ROLLED EROSION CONTROL PRODUCT CHANNEL INSTALLATION /-6' MAX BAFFLE (TYP.) EARTH BERM NOTES: CLASS #1 RIP RAP TREE PROTECTION FENCE 1. DRIVE STEEL FENCE POST AT LEAST 18" INTO OR COIR DOUBLED SOLID GROUND OVER HOG WIRE 2. WOOD POSTS ARE NOT ACCEPTABLE ' RISER BARREL SEDIMENT BASIN Tensar. NORTH AMERICAN GREEN® CONSTRUCTION SPECIFICATIONS NORTH AMERICAN GREEN 5401 ST. WENDEL-CYNTHIANA ROAD POSEYVILLE, IN 47633 TOLL FREE: 1-800-522-5011 PHONE: (812) 867-6632 FAX: (812) 867-0247 www.nagreen.com 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE WHEN USING CELL-O-SEED, DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH THE PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH WITH APPROXIMATELY 12"(30CM) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12"(30CM) PORTION OF BLANKET OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12"(30CM) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6"(1 0CM-15CM) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4"(1 OCM) APART AND 4" 10" ON CENTER TO SECURE BLANKETS. 9, Lircnitri ci.mtroIr C)AIS1711d Lire SITUClUrt' SO that Lilt di -curbed arrca is Trtintnni7til. IA.yert sLnfacc water waiay fnini bn-,- artas. Cii.-�npbfftc dre eirbarikTrriii lxfire tht ama is dearcd. ';Libdizz dre orninm spri I Iway rricy intibirrikTrrni Md 01, Uthlff diStUrfied Lrems, abiwe die crr.-sl t)r the iarl,irsln'a.t sptllwlw,� inimniff"dilkly I .'�ujer c4AiATwi. icm (Reftrencrs: 11). hrstilll Tam i.11N hafftth x%sTxL:i:fi)td irr lftaxtic-c-,6.fay, 11, Afteiral.l. arexi rcrnove, the s1ructine fim] all he UrislabIe Nediment S�Trfflkh the arta to hiend with the kidjcyi.ni:%,,,,a7rwN a.nd.:qLLbifi7e pt-ciperly I kekrcrron: SrVAA,,4: Tensar. NORTH AMERICAN GREEN® `2"-5" `2"-5" (5CM-12.5CM) I---@ ---]I (5CM-12.5CM) (5CM-12.5CM) 0 10 .-SEAM STITCH ' • 33 0 1.6' PE PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL RAP A PLAN LLJ of LLJ VIEW Ld r- LLJ < 0 L ILTER FABRIC SECTION 'A -A' NOTES: PIPE OUTLET TO WELL-DEFINED CHANNEL PLAN VIEW 1. L = THE LENGTH OF THE RIPRAP APRON 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 12 INCHES 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 4. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO 6 INCHES ABOVE THE MAXIMUM TAILWATER DEPTH OR THE TOP OF THE BANK, WHICHEVER IS LESS. NORTH AMERICAN GREEN 5401 ST. WENDEL-CYNTHIANA ROAD POSEYVILLE, IN 47633 TOLL FREE: 1-800-522-5011 PHONE: (812) 867-6632 FAX: (812) 867-0247 www.nagreen.com O (5CM-12.5CM) !a PCq I - SEAM STITCH (1.0m) I (0.5M) 3.3 • 31' 6 (1.0m) OM)l 1.15 STAPLES PER SQ. YD. (1.35 STAPLES PER SQ. M) FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM PLACE STAPLES/STAKES THROUGH EACH OF THE RED COLORED DOTS `2"-5" `2"-5" (5CM-12.5CM) (5CM-12.5CM) SEAM STITCH 0 0 0 20" 2 G 0 0 0 (0.5M) q UIV) 0.7 STAPLES PER SQ. YD. (0.8 STAPLES PER SQ. M) FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM PLACE STAPLES/STAKES THROUGH EACH OF THE BLUE COLORED DOTS. `2"-5" `2"-5" (5CM-12.5CM) (5CM-12.5CM) 1.6'(0.5M) SEAM STITCH 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) 0 0 3.3 APART IN 6"(15CM)DEEP X 6"(15CM)WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. (: 0 0 0 1 OM) 1.7 STAPLES PER SQ. YD. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5CM-12.5CM) (DEPENDING ON BLANKETTYPE)AND STAPLED.TO ENSURE 3.4 STAPLES PER SQ. YD. (2.0 STAPLES PER SQ. M) FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET(BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED (4.1 STAPLES PER SQ. M) GREEN DOT SYSTEM PLACE STAPLES/STAKES SEAM STITCH ON THE BLANKET BEING OVERLAPPED. FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM' PLACE STAPLES/STAKES THROUGH EACH OF THE GREEN COLORED DOTS THROUGH EACH OF THE WHITE COLORED DOTS `2"-5" `2"-5" 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30' TO 40'(9M-1 2M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4"(10CM)APART AND 4"(10CM) ON CENTER OVER ENTIRE WIDTH OF CHANNEL. (5CM-12.5CM) II�Q (5CM-12.5CM) 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN A 6"(15CM)DEEP X6"(15CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 0 •9 •9 SEAM STITCH 101, STAPLE PATTERN GUIDE • 0 0 • `025M) MAINTENANCE 1. Visually inspect erosion control matting after every rain event. "LOCATION OF SEAM STITCH WILL VARY DEPENDING 0 9 0 3.3'(1.0M) 2. Replace any damaged matting with new. ON NORTH AMERICAN GREEN PRODUCT TYPE 9 9 9 20" (0.5M) 3. Regrade damaged diversion ditches and replace matting as necessary. 1140-001 B CAF)deta Is corn PROTFC SEDIMENT PIT 3. USE STAPLES 1APART TO ATTACH FABRIC PERSPECTIVE VIEW TO *HOG WIRE" 4. BAFFLE SPACED AS PER APPROVED PLAN. :::`;;;7; MAINTENANCE: 1. CHECK BAFFLES AFTER EVERY RAIN EVENT. BOTTOM OF BAFFLE IN 2. REPAIR BAFFLES IF THEY ARE DAMAGED. TRENCH AND TRENCH FILLED ED WITH SOIL AND 3. RE -ANCHOR BAFFLES IF WATER IS FLOWING COMPACTED UNDERNEATH OR AROUND THEM. BAFFLE INSTALLATION STEP 2 BAFFLE INSTALLATION & MAINTENANCE NOTES 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWINGS. 3. CONTRACTORS NOTE: FOR PRODUCT AND PURCHASING INFORMATION VISIT wvvw.CADdetails.com/info REFERENCE NUMBER 140-001 B. ROLLED EROSION CONTROL PRODUCT CHANNEL INSTALLATION COPYRIGHT @2013 CADDETAILS.COM LTD. PLAN VIEW 15 MIN (SEE NOTE 3) 3.75 STAPLES PER SQ. YD. (4.5 STAPLES PER SQ. M) FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM PLACE STAPLES/STAKES NOTES THROUGH EACH OF THE YELLOW COLORED DOTS 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWINGS. 3. CONTRACTORS NOTE FOR PRODUCT AND PURCHASING INFORMATION VISIT wvvw.CADdetails.com/info REFERENCE NUMBER 140-004. ROLLED EROSION CONTROL PRODUCT STAPLE PATTERN GUIDE 1140-004 CADdetails.conn PROTECTED BY COPYRIGHT @2013 CADDETAILS.COM LTD 12" OF NCDOT #5 OR #57 WASHED STONE 15 NOTES: 1. ENSURE THAT CULVERT ENTRANCES BELOW CHECK DAMS ARE NOT SUBJECT TO MATTING DAMAGE OR BLOCKAGE FROM DISPLACED STONES. STABILAZATION L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION 00 2. THE DRAINAGE AREA IS LIMITED TO ONE HALF ACRE. 00 0,0000000 00 0 00000 A B 3. KEY THE STONE INTO THE DITCH BANKS AND EXTEND IT BEYOND THE ABUTMENTS A L MINIMUM OF 1.5 FEET TO AVOID WASHOUT FROM OVERFLOW AROUND THE DAM. 0;O000 0000000 0 C,0Or o 100 0 00 0 _Po000000, 000 MAINTENANCE: CLEAN OUT SEDIMENT AND DEBRIS AND REPAIR WASH OUTS. CHECK DAMS PROFILE VIEW CADdetails PIPE OUTLET MAINTENANCE: 1. TEMPORARY CONCRETE WASHOUT FACILITIES ARE TO BE INSPECTED BY THE RESIDENT ENGINEER DURING HIS/HER WEEKLY EROSION AND SEDIMENT CONTROL INSPECTION, AFTER A STORM EVENT OFI/2" OR GREATER AND AT THE END OF ANY DAY WHEN CONCRETE HAS BEEN POURED ON THE CONSTRUCTION SITE. THE INSPECTOR IS TO ENSURE THAT THERE ARE NO LEAKS, NO SPILLS AND THAT THE FACILITIES CAPACITY HAS NOT YET BEEN COMPROMISED. 2. ANY OVERFLOWING OF THE WASHOUT FACILITIES ONTO THE GROUND MUST BE CLEANED UP AND REMOVED WITHIN 24 HOURS OF DISCOVERY. 3. IF A RAIN OR SNOW EVENT IS FORECASTED, A NON -COLLAPSING, NON -WATER COLLECTING COVER SHALL BE PLACED OVER THE WASHOUT FACILITY AND SECURED TO PREVENT ACCUMULATION AND OVERFLOW OF PRECIPITATION. 4. CONTENTS OF EACH CONCRETE WASHOUT FACILITY ARE NOT TO EXCEED 75% OF ITS DESIGNED CAPACITY. IF THE CONTENTS REACH 75% CAPACITY, DISCONTINUE POURING CONCRETE INTO THE FACILITY UNTIL IT HAS BEEN CLEANED OUT. 5. ALLOW SLURRY TO EVAPORATE OR REMOVE FROM THE SITE IN A SAFE MANNER (IE. VACUUM TRUCK). ALL HARDENED MATERIAL CAN THEN BE REMOVED AND DISPOSED OF PROPERLY. 6. IF A LINED BASIN IS USED, IMMEDIATELY REPLACE THE LINER IF IT BECOMES DAMAGED. 7. REMOVE TEMPORARY CONCRETE WASHOUT FACILITIES WHEN THEY ARE NO LONGER NEEDED AND RESTORE THE DISTURBED AREAS TO THEIR ORIGINAL CONDITION. 8. NOT THE LOCATIONS OF TEMPORARY CONCRETE WASHOUT FACILITIES AND CHANGES TO THESE FACILITIES ON THE SWPPP. CN SPECIFICATION: 1. THE CONTRACTOR MUST SUBMIT A PLAN OF HIS/HER PROPOSED TEMPORARY CONCRETE WASHOUT FACILITY TO THE RESIDENT ENGINEER FOR HIS/HER APPROVAL AT LEAST 10 DAYS PRIOR TO THE FIRST CONCRETE POUR. 2. TEMPORARY CONCRETE WASHOUT FACILITIES ARE TO BE IN PLACE BEFORE ANY DELIVERY OF CONCRETE TO THE CONSTRUCTION SITE. 3. TEMPORARY CONCRETE WASHOUT FACILITIES ARE TO BE LOCATED AT LEAST 50 FEET FROM STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, OR WATER BODIES. EACH FACILITY IS TO BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS AREAS TO PREVENT DISTURBANCE OR TRACKING. 4. A SIGN IS TO BE INSTALLED ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS OF THE DESIGNATED WASHOUT FACILITY. -15' MIN- A 0 + + ENTRY SIDE OF --- WASHOUT ABOVE GRADE DETAIL PLAN VIEW 3 TYP EDGE Or-F 10 MIL PLASTIC LINER EARTHEN BERM STRAW BALES 2 HIGH MAX) ( WOOD OR METAL STAKES (2 PER A BALE) - WEDGE 2" LOOSE 1 -16 GAUGE STRAW - STEEL BETWEEN 00 - WIRE BALES STAPLE DETAIL STAPLES 10 MIL (2 PER BALE-4PLASTIC LINER F__ __j_ __1 _L_I__L _ _j_ J_+q SECTION A -A GENERAL NOTES: 1. DO NOT DISCHARGE CONCRETE OR CEMENT SLURRY FROM THE SITE. 2. THE CONCRETE WASHOUT FACILITY SHOULD BE LOCATED A MINIMUM OF 50' FROM STORM DRAIN INLETS, BUFFERS, OR 15' MIN- WATERCOURSES. 3. THE CONCRETE WASHOUT SIGN SHALL BE B 3' TYP INSTALLED WITHIN 30' OF THE FACILITY. - ------ - 4. THE ACTUAL LAYOUT CAN BE DETERMINED IN THE FIELD USING EITHER THE ABOVE GRADE OR BELOW GRADE CONSTRUCTION OPTION. 6-- i in i I I I B ENTRY SIDE OF� WASHOUT BELOW GRADE DETAIL PLAN VIEW 10 MIL PLASTIC LINER UNDER BERM AT ENTRY ,, 3' MIN EARTHEN 3' BERM SECTION 13-13 MAINTENANCE: INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACES, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. CN SPECIFICATION: 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENISTY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS ABOVE THE DOWNSTREAM LAYER A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER -RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVE'L WITH THE RECEIVING AREA OF SLIGHTLY BELOW IT. 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON. 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION. LYWOOD 4'-0" x 2'-0" CONCRETE PAINTED WHITE WAS VOUTlII LACK LETTERS + 6" HEIGHT AG SCREWS(l /2") WOOD POST 1 II (3y2"X3)/2"X8'-0'P) II II 0 II II 1 O Li SIGN DETAIL 5. THE CONCRETE WASHOUT FACILITY SHOULD BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT SIZE AND QUANTITY TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY THE WASHOUT OPERATION. 6. THE PERIMETER OF THE 10 MIL LINER MUST BE HELD IN PLACE WITH SAND BAGS OR STEEL STAPLES. 7. ONCE CONCRETE WASTES ARE WASHED AND ALLOWED TO HARDEN THE CONCRETE SHOULD BE BROKEN UP, REMOVED AND DISPOSED OF AT AN APPROVED FACILITY IN ACCORDANCE WITH LOCAL AND STATE REGULATIONS. DISPOSE OF HARDENED CONCRETE ONCE THE WASHOUT FACILITY IS 75% FULL. 8. ONCE THE FACILITY IS NO LONGER NEEDED ALL MATERIALS SHALL BE REMOVED AND THE EXISTING GRADES SHALL BE RESTORED. 9. STORMWATER ACCUMULATED WITHIN THE WASHOUT MAY NOT BE DISCHARGED INTO THE STORM DRAIN SYSTEM OR RECEIVING SURFACE WATERS. TEMPORARY CONCRETE WASHOUT G R 0 N\JECTT CERT. NO. z: 353 z n • /Y CA F NC ENGINEERING LICENSE NO. P-0803 F -I_.. "Wxn *'pro' - 4 "" N, R �\N 2- V) I- C) Ld I- 0 C) IY LL, 11 < 0 V) 41 U O V) (0 z u 0 r, Ln LO) _j _j oo Ln 11 to r- N Q) _0 0 t N --t * * (0 U (D 0 r_1 LO 0) IY N -C Ljj 00 00 Ld 0 0Y C 0)0) @ Z - C 0 Q) Z 0) 0) (0 z Ld _0 0 _j - X 5; 4 - U 4- C) U 0Y 0 LL LLJ MEN Uj O < _j 0 < 0 04 ()If 0 0 z z IZ _j 0 0 LLJ = LL_ z 0 c) < z 0 BY y JHJ Checked By SRN DATE: 30 JUN 2021 REVISED: Z�l 6 SEP 2020 ZLO9 NOV 2021 A325 FEB 2022 Of W of SITE PLAN I CE _j_j SITE DETAILS _j 0 Job 0 HCSS; _Q1 Code in -C Dwg No. 0 C14 SITE @ CL 602 0 Q