Loading...
HomeMy WebLinkAboutSW6210905_Plansheet - Grading/Drainage Plan_20220225I 3 I 5 D C B I277W o ' NC'1 �� I GHWNY PUBLIC R/W _ S87°22'34"W _ 174.71' I \ 54 S 8�S5 W \ 7- N/F -/ oN L N14*48'17"E 61.27' Ln G doQN/ Ljj I NS (n C CIRCLE KTOR- ES INC I I I Il L rII J PIN: 9587-66-2038 Ww / DB:3448, PAGE: 0642 Q(W EXISTING ZONING:COMMERCIAL N/F USE:GAS STATION CIRCLE K STORES INC PIN: 9587-56-8017 oCA C' DB:3448, PAGE: 0642 � L, EXISTING ZONING:COMMERCIAL m N/F N USE:CAR WASH CHAMPION COURT RENTAL LLC o PIN: 9587-65-0971 DB:3918, PAGE: 0407 m EXISTING ZONING:COMMERCIAL AREA: 6.72 AC. - _ I I Ij ' / I C 0. I WORNOM AND PERKINS f I O PIN: 9587-22-0860 DB:3319, PAGE: 0515 I S w N I / EXISTING ZONING: COMMERCIAL I I I / I /CA USE: NONE J NO 0�' 20' WIDE EMERGENCY SPILLWAY LIMITS OF DISTURBANCE 6' LITTORAL SHELF NORMAL WATER ELEV. 264.50 FOREBAY ELEV. 264.50 VELOCITY RIP -RAP - DISSIPATOR PAD 12'X4.5' 18"D CLASS B SCM MAINTENANCE & ACCESS EASEMENT VARIABLE WIDTH VELOCITY RIP -RAP DISSIPATOR PAD 12' X 6' 18"D CLASS B S89'18'16"E N /F MCKOY EVELYN CAMERON PIN: 9587-55-6209 DB:833, PAGE: 0313 EXISTING ZONING: RA-20R �275"" ICE HOUS� � Z CI#17 _ - I / V / 20' SCM MA TENANCE P i INLET PROTECTION (TYP) & ACCESS EASEMENT V I 700 / r / YI#10 ' HP 275.6 / I I I YI #13 (0 YI #16 / N 77- � 1o / YI#14B Z N/ F N n I I � I ^-278 HAMILTONJOANN L N I ry PIN: 9587-65-5715 i I I DB:2398, PAGE: 0103 x I 4" PVC •PIPE @ 1 % I EXISTING ZONING:RA-20R HP 275.6 FUTURE / PROPOSED I PROPOSED 2 - ■^ I BUILDING NI � \ AYI#9 I YI #12 C)HP 275.6/ YI #8 24" RCP T 5' TYPE D CLEAN WATER DIVERSION DITCH #2 BOTTOM WIDTH = 0 FT SIDE SLOPES = 2:1 DEPTH = 2 FT SLOPE = 2.3% DEPTH OF FLOW (Q2) = 10.0 IN VELOCITY (Q2) = 4.1 FPS TEMPORARY LINER = S75 NORTH AMERICAN GREEN 1117-141 / N U / 583.3 YI #11- BUILDING 'FE 276.5 / YI #15 / I / I `,8" RCP -� P LIMITS OF DISTURBANCE TREE PROTECTION FENCE (TYP) BUILDING M 3 Y - s- (1 I m N/F HAMILTON GLENN PAUL & HAMILTON JOANN L PIN: 9587-65-7688 DB:3618, PAGE: 0852 I EXISTING ZONING:RA-20R LINE LEGEND -- W -- --ss -- -- -OHP- - - GENERAL NOTES 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH HARNETT COUNTY AND THE STATE OF NORTH CAROLINA STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (811) LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 3. CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF ALL EXISTING UTILITIES AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR CONFLICTS PRIOR TO BEGINNING CONSTRUCTION. 4. BOUNDARY AND SURVEY INFORMATION IS TAKEN FROM A SURVEY BY CAROLINA CORNERSTONE SURVEYING, INC. DATED DECEMBER 16, 2020. ADDITIONAL SITE INFORMATION TAKEN FROM HARNETT COUNTY GIS. 5. ALL CONSTRUCTION SHALL CONFORM TO A.D.A. STANDARDS. 6. NO WETLANDS PRESENT ON -SITE. STRUCTURE TABLE STRUCTURE NAME: DETAILS: Rim = 275.85 YI#14 INV IN = 268.67', 18" RCP INV OUT = 268.67', 18" RCP Rim = 275.81 YI#15 INV IN = 269.47', 15" RCP INV OUT = 269.22', 18" RCP YI#16 Rim = 275.81 INV OUT = 270.83', 15" RCP Rim = 274.50 YI#11 INV IN = 267.83', 18" RCP INV IN = 267.83', 18" RCP INV OUT = 267.33', 24" RCP YI#13 Rim = 274.31 INV OUT = 269.74', 15" RCP Rim = 274.31 YI#12 INV IN = 268.63', 15" RCP INV OUT = 268.38', 18" RCP CI#17 Rim = 273.59 INV OUT = 269.20', 15" RCP Rim = 273.36 YI#8 INV IN = 266.59', 24" RCP INV IN = 267.34', 15" RCP INV OUT = 266.59', 24" RCP YI#10 Rim = 273.32 INV OUT = 269.13', 15" RCP Rim = 273.31 YI#9 INV IN = 268.33', 15" RCP INV OUT = 268.33', 15" RCP Rim = 272.51 YI#4 INV IN = 265.54', 24" RCP INV IN = 265.82', 18" RCP INV OUT = 265.54', 24" RCP Rim = 272.31 YI#5 INV IN = 266.54', 15" RCP INV OUT = 266.29', 18" RCP Rim = 272.31 YI#6 INV IN = 267.33', 15" RCP INV OUT = 267.33', 15" RCP Rim = 271.98 JB#3 INV IN = 265.00', 24" RCP INV OUT = 265.00', 24" RCP Rim = 271.96 CI#7 INV IN = 267.79', 15" RCP INV OUT = 267.79', 15" RCP STABILIZATION LEGEND TO BE STABILIZED WITHIN 7 DAYS AND SEEDED WITH GROUNDCOVER GROUND STABILIZATION NOTE: DIVERSION DITCHES AND 3:1 OR GREATER SLOPES SHALL BE STABUZED WITHIN 7 DAYS. SEE SECTION E: GROUND STABIUZATION ON SITE 302 PROPERTY BOUNDARY EX. INTERIOR/ADJ LOT LINE ACCESS EASEMENT EXISTING WATER LINE EXISTING SEWER LINE EXISTING UNDERGROUND POWER EXISTING TOPO MAJOR EXISTING TOPO MINOR PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR LIMITS OF DISTURBANCE SILT FENCE PROPOSED STORM SEWER DISTURBED AREA: 5.06 AC 220,535 SF. NORTH GRADING & DRAINAGE PLAN SCALE: 1 » = 40 ' (DRAWING SCALED FOR 24x36 INCH PLOTS) 0 40 80 120 160 GRO�A � R�OECTU/Zy� o /O Z CERT. NO. '- r 353 g n • ZO�lH CAROB-��P. IGH,NG FNC ENGINEERING ICENSE NO. P-0803 „ X SEAS. 3498 GIN p. LR.,,,+�`�``°�` AJ l (n U W 0 U W Q U 41 V) 0 Q Z 0 QJ _ 100 Lo 0) . LO I- N N -0 O q- N (, 0_ 0�L0) N L DLN�V)-C Ld O W rnrn@ (� O N Z 0) 0) W -0 Z � O W L .. J �� �U 0 i W X I� 6w 6 U ��0_0 LLW ■`N OEM J z W 0 z U J Of z C) 0 LL.r- H O ^ c� Of O N 1..� >_ Z � Q 0 _j 0- T 0O LL. LLI y z F_ 0 a F U z(1) BY Drawn svo Checked By SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 2L09 NOV 2021 w SITE PLANS c� GRADING & DRAINAGE PLAN J a a Job Code HCSS 1 ul 583.3 YI #11- BUILDING 'FE 276.5 / YI #15 / I / I `,8" RCP -� P LIMITS OF DISTURBANCE TREE PROTECTION FENCE (TYP) BUILDING M 3 Y - s- (1 I m N/F HAMILTON GLENN PAUL & HAMILTON JOANN L PIN: 9587-65-7688 DB:3618, PAGE: 0852 I EXISTING ZONING:RA-20R LINE LEGEND -- W -- --ss -- -- -OHP- - - GENERAL NOTES 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH HARNETT COUNTY AND THE STATE OF NORTH CAROLINA STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (811) LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 3. CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF ALL EXISTING UTILITIES AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR CONFLICTS PRIOR TO BEGINNING CONSTRUCTION. 4. BOUNDARY AND SURVEY INFORMATION IS TAKEN FROM A SURVEY BY CAROLINA CORNERSTONE SURVEYING, INC. DATED DECEMBER 16, 2020. ADDITIONAL SITE INFORMATION TAKEN FROM HARNETT COUNTY GIS. 5. ALL CONSTRUCTION SHALL CONFORM TO A.D.A. STANDARDS. 6. NO WETLANDS PRESENT ON -SITE. STRUCTURE TABLE STRUCTURE NAME: DETAILS: Rim = 275.85 YI#14 INV IN = 268.67', 18" RCP INV OUT = 268.67', 18" RCP Rim = 275.81 YI#15 INV IN = 269.47', 15" RCP INV OUT = 269.22', 18" RCP YI#16 Rim = 275.81 INV OUT = 270.83', 15" RCP Rim = 274.50 YI#11 INV IN = 267.83', 18" RCP INV IN = 267.83', 18" RCP INV OUT = 267.33', 24" RCP YI#13 Rim = 274.31 INV OUT = 269.74', 15" RCP Rim = 274.31 YI#12 INV IN = 268.63', 15" RCP INV OUT = 268.38', 18" RCP CI#17 Rim = 273.59 INV OUT = 269.20', 15" RCP Rim = 273.36 YI#8 INV IN = 266.59', 24" RCP INV IN = 267.34', 15" RCP INV OUT = 266.59', 24" RCP YI#10 Rim = 273.32 INV OUT = 269.13', 15" RCP Rim = 273.31 YI#9 INV IN = 268.33', 15" RCP INV OUT = 268.33', 15" RCP Rim = 272.51 YI#4 INV IN = 265.54', 24" RCP INV IN = 265.82', 18" RCP INV OUT = 265.54', 24" RCP Rim = 272.31 YI#5 INV IN = 266.54', 15" RCP INV OUT = 266.29', 18" RCP Rim = 272.31 YI#6 INV IN = 267.33', 15" RCP INV OUT = 267.33', 15" RCP Rim = 271.98 JB#3 INV IN = 265.00', 24" RCP INV OUT = 265.00', 24" RCP Rim = 271.96 CI#7 INV IN = 267.79', 15" RCP INV OUT = 267.79', 15" RCP STABILIZATION LEGEND TO BE STABILIZED WITHIN 7 DAYS AND SEEDED WITH GROUNDCOVER GROUND STABILIZATION NOTE: DIVERSION DITCHES AND 3:1 OR GREATER SLOPES SHALL BE STABUZED WITHIN 7 DAYS. SEE SECTION E: GROUND STABIUZATION ON SITE 302 PROPERTY BOUNDARY EX. INTERIOR/ADJ LOT LINE ACCESS EASEMENT EXISTING WATER LINE EXISTING SEWER LINE EXISTING UNDERGROUND POWER EXISTING TOPO MAJOR EXISTING TOPO MINOR PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR LIMITS OF DISTURBANCE SILT FENCE PROPOSED STORM SEWER DISTURBED AREA: 5.06 AC 220,535 SF. NORTH GRADING & DRAINAGE PLAN SCALE: 1 » = 40 ' (DRAWING SCALED FOR 24x36 INCH PLOTS) 0 40 80 120 160 GRO�A � R�OECTU/Zy� o /O Z CERT. NO. '- r 353 g n • ZO�lH CAROB-��P. IGH,NG FNC ENGINEERING ICENSE NO. P-0803 „ X SEAS. 3498 GIN p. LR.,,,+�`�``°�` AJ l (n U W 0 U W Q U 41 V) 0 Q Z 0 QJ _ 100 Lo 0) . LO I- N N -0 O q- N (, 0_ 0�L0) N L DLN�V)-C Ld O W rnrn@ (� O N Z 0) 0) W -0 Z � O W L .. J �� �U 0 i W X I� 6w 6 U ��0_0 LLW ■`N OEM J z W 0 z U J Of z C) 0 LL.r- H O ^ c� Of O N 1..� >_ Z � Q 0 _j 0- T 0O LL. LLI y z F_ 0 a F U z(1) BY Drawn svo Checked By SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 2L09 NOV 2021 w SITE PLANS c� GRADING & DRAINAGE PLAN J a a Job Code HCSS 1 ul STABILIZATION LEGEND TO BE STABILIZED WITHIN 7 DAYS AND SEEDED WITH GROUNDCOVER GROUND STABILIZATION NOTE: DIVERSION DITCHES AND 3:1 OR GREATER SLOPES SHALL BE STABUZED WITHIN 7 DAYS. SEE SECTION E: GROUND STABIUZATION ON SITE 302 PROPERTY BOUNDARY EX. INTERIOR/ADJ LOT LINE ACCESS EASEMENT EXISTING WATER LINE EXISTING SEWER LINE EXISTING UNDERGROUND POWER EXISTING TOPO MAJOR EXISTING TOPO MINOR PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR LIMITS OF DISTURBANCE SILT FENCE PROPOSED STORM SEWER DISTURBED AREA: 5.06 AC 220,535 SF. NORTH GRADING & DRAINAGE PLAN SCALE: 1 » = 40 ' (DRAWING SCALED FOR 24x36 INCH PLOTS) 0 40 80 120 160 GRO�A � R�OECTU/Zy� o /O Z CERT. NO. '- r 353 g n • ZO�lH CAROB-��P. IGH,NG FNC ENGINEERING ICENSE NO. P-0803 „ X SEAS. 3498 GIN p. LR.,,,+�`�``°�` AJ l (n U W 0 U W Q U 41 V) 0 Q Z 0 QJ _ 100 Lo 0) . LO I- N N -0 O q- N (, 0_ 0�L0) N L DLN�V)-C Ld O W rnrn@ (� O N Z 0) 0) W -0 Z � O W L .. J �� �U 0 i W X I� 6w 6 U ��0_0 LLW ■`N OEM J z W 0 z U J Of z C) 0 LL.r- H O ^ c� Of O N 1..� >_ Z � Q 0 _j 0- T 0O LL. LLI y z F_ 0 a F U z(1) BY Drawn svo Checked By SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 2L09 NOV 2021 w SITE PLANS c� GRADING & DRAINAGE PLAN J a a Job Code HCSS 1 ul J z W 0 z U J Of z C) 0 LL.r- H O ^ c� Of O N 1..� >_ Z � Q 0 _j 0- T 0O LL. LLI y z F_ 0 a F U z(1) BY Drawn svo Checked By SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 2L09 NOV 2021 w SITE PLANS c� GRADING & DRAINAGE PLAN J a a Job Code HCSS 1 ul BY Drawn svo Checked By SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 2L09 NOV 2021 w SITE PLANS c� GRADING & DRAINAGE PLAN J a a Job Code HCSS 1 ul I 3 I 5 C 0 01 - - - - - - - _-- _ ---- W ----7 W _ -w- -w- W- _ -W _ W ----- W----- W----- W -- W 3 w ---- w - - -W ----- W ----- W ----- W ----- W ----- w ----- ---- -- w - W - - I o -- W ----- W ----- W ----- W ----- W ----- W---- w ----- w ----- w---- W - WNC\ IGHWAY 27 W -_ w 1 6 PUBLIC R/W 1 3 \ S87°22'34"W _ 174.71' I I 41.54' S 8s 3 � I N14°48'17"E L 61.27' 3 ; o tIG � I \ I I N cD r1;� �I-- 3 \ \ I I C� I I I w oN ' N/F 3 / � r I N J C CIRCLE K STORES INC I i I L J In a_ / / / � PIN: 9587-66-2038 , w( ( / DB:3448, PAGE: 0642 1 I N F W 0 LwLI ` ` EXISTING ZONING:COMMERCIAL 3 / a, Q \ I I USE:GAS STATION CIRCLE K STORES INC � CA /- / I I PIN: 9587-56-8017 � DB:3448, PAGE: 0642 I �, I EXISTING ZONING:COMMERCIAL �^ Q N/F N 3 I- USE:CAR WASH L l I CHAMPION COURT RENTAL LLC o I j PIN: 9587-65-0971 m I 1 I DB:3918, PAGE: 0407 EXISTING ZONING:COMMERCIAL - �/ / AREA: 6.72 AC. I I IF IN/F - - I I OC 0. WORNOM AND PERKINS PIN: 9587-22-0860 N I / J O I I DB:3319, PAGE: 0515 I I oW I I N EXISTING ZONING: COMMERCIAL I N 1 / I / 3 USE: NONE I r J N of i I II S03°27'20"E 7.10_ 3 I I ' N ; 20' SEWER/UTILITY EASEMENT SS MANHOLE � I / / SEE PB 2007 PG 15 _ RIM: 270.95' �,�- 3 SILT FENCE OUTLET (TYP) INV' 262.67' moon ((C I Z63.5� � ' t-:Rs- FES 7 S 84'59� -S85*3910"-� _ -- C=o__ss- - ss-----ss- \ C.O. � �-2� ----ss� � _� s �_ f -----ss- � �86'18'57" E 80.45' ss--- ash ss�---- - /3 I s N �N/F #1 / „ -�� C.O. - ss-__-asses_-- �- �2�� I NATIONAL RETAIL PROPERTIES LP / \ �-� = --- F PIN: 9587-65-4990 /Ip, = SILT FENCE (TYP)\. SILT FENCE OUTLET (TYP) VPI Jl I I °' / 3 DB:2985, PAGE: 0854 CS #1 / - "���ill / �_ l w 1 EXISTING ZONING:COMMERCIAL uuuu � 1 TS USE:RETAIL -CONCRETE RETE 20' WIDE CLEANOUT I� ICE HOUSE I OI I 91 2.5" SKIMMER SIZEEMERGENCY fI I I \275 -275 SPILLWAY W/ 2.3" DIA ORIFICE v 265 -TETHERED TO POND \ BANK / �/ I I DIVERSION DITCH #1 j / j / \ BOTTOM WIDTH = 1 FT / `\ J SIDE SLOPES = 2:1 P DEPTH = 2 FT I \ SLOPE = 1.6% TEMPORARY , I DEPTH OF FLOW Q2 = 15.4 IN CONSTRUCTION y� V 3 / �N ^� / VELOCITY (Q LINER 5.1 FPS / TO BEINSTALLED TALLED 7x N ss h i s O DURING INITIAL S75 NORTH AMERICAN GREEN EC PHASES r� w� I� 25' x 50' � � ��u �( � i# �9°i� � 1 \� /i \ TEMPORARY ( ) \ 1 TOPSOIL � �\ \ STOCKPILE / 77- 1 1 r \ \ \ \ \ \ \ AREA \ o I LIMITS OF DISTURBANCE 1 � I I � I \ \ \ \ � ✓ / / I li I 3 I BAFFLES I I \ 275 / / 16' N/F I (TYP) \ / I -278 �I I F HAMILTON/JOANN L \ \ \ \ \ o I PIN: 9587-65-5715 B0 EXISTINGZONING:RA12OR LA 260 FOREBAY TO BE I / I \ / / I 80 / EXCAVATED DURING FINAL EROSION \ L I ( I Z 1 I CONTROL STAGE I J 3 I I 3 Lu �� o RIP RAP / 1 -� 265 DISSIPATER PAD ? r I\ �� / I O 12'x6'x18"D \ ` 01 / / ` o� J 0-- I a Q / Q Ex 1' 0. CLASS B / I i / / = 60 R/W 1 o I \ / SKIMMER SEDIMENT BASIN / / / wl , / i 1 N F I I I I \ t7l- DA=4.22 AC, C=0.45, 110=7.86 IN/HR / / / / / o 3 / m HAMILTON G ENN PAUL & 1 \ Q10=14.93 CFS / / I 1 i HAMILTON JOANN L \ REQUIRED SURFACE AREA=6,493 SF I PROPOSED SURFACE AREA=6,894 SF / / / / / / / / i /o 1 PIN: 9587-65-7688 REQUIRED I \\ \ \52 VOO UME 715902 CF / / / / / 0281""' / 3 / / EXISTING BZONING:RA8 PROPOSEDV20R I�-- BOTTOM ELEV=260' _ WEIR ELEV=268' / / TOP OF DAM=269' / / / / / / / 3 ;1 l SILT FENCE OUTLET (TYP) - / / 1 ---- N/F MCKOY EVELYN CAMERON PIN: 9587-55-6209 DB:833, PAGE: 0313 EXISTING ZONING: RA-20R DRAINAGE. SWALE CHART Swale Number Swale Bottom Width () Side SIape Depth afSwale () Channel Slope ( Ilt) Depth of Flow O2 (in) Velocity Q2 (,$), Liner Temporary Lin mlaLi Penent ner 6 1 1 2 2 U. 011 160 15..4 5.1 S75 G RAS S M I BTU RE. 2 0 2 2 00230 101 O 4,.1i S75 GRASS ICI I. IRE NOTE: LJNER MATERIAL TO BE NORTH AMERICAN GREEN/TENSAR OR APPROVED EQUAL SEE SITE " 0 FOR SWALE 2 583.30' 1 / / / 1 INV: LIMITS OF DISTURBANCE 281 97' 4,. RC[t 1pV: TREE PROTECTION FENCE (TYP) //281.10' CLEAN WATER DIVERSION / 1 DITCH #2 BOTTOM WIDTH = 0 FT I 1 1 \ SIDE SLOPES = 2:1 / DEPTH = 2 FT SLOPE = 2.3% 3 DEPTH OF FLOW (Q2) = 10.0 IN VELOCITY (Q2) = 4.1 FPS TEMPORARY LINER = S75 NORTH AMERICAN GREEN GROUND STABILIZATION NOTE: DIVERSION DITCHES AND 3:1 OR GREATER SLOPES SHALL BE STABUZED WITHIN 7 DAYS. SEE SECTION E: GROUND STABILIZATION ON SITE 302 GENERAL NOTES 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH HARNETT COUNTY AND THE STATE OF NORTH CAROLINA STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (811) LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 3. CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF ALL EXISTING UTILITIES AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR CONFLICTS PRIOR TO BEGINNING CONSTRUCTION. 4. BOUNDARY AND SURVEY INFORMATION IS TAKEN FROM A SURVEY BY CAROLINA CORNERSTONE SURVEYING, INC. DATED DECEMBER 16, 2020. ADDITIONAL SITE INFORMATION TAKEN FROM HARNETT COUNTY GIS. 5. ALL CONSTRUCTION SHALL CONFORM TO A.D.A. STANDARDS. 6. NO WETLANDS PRESENT ON -SITE. LINE LEGEND m m � PROPERTY BOUNDARY - - EX. INTERIOR/ADJ LOT LINE ACCESS EASEMENT -- W -- EXISTING WATER LINE ss EXISTING SEWER LINE - - -OHP- - - EXISTING UNDERGROUND POWER EXISTING TOPO MAJOR EXISTING TOPO MINOR PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR LIMITS OF DISTURBANCE sF SILT FENCE CONSTRUCTION IONSEQUENCE (PHASE 1): 1. OBTAIN A DISTURBING 2. PRIOR TO THE BEGINNING CONSTRUCTION, THE CONTRACTOR MUST NOTIFY THE NCDEQ LQS INSPECTOR. 3. CLEAR ONLY AS NECESSARY TO INSTALL ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE EROSION CONTROL PLAN (PHASE 1): A. INSTALL CONSTRUCTION ENTRANCE. B. INSTALL SILT FENCING AND SILT FENCE OUTLETS. C. INSTALL DIVERSION DITCH. D. INSTALL SEDIMENT SKIMMER BASIN. 4. MAINTAIN EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 5. STABILIZATION IS REQUIRED WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON PROJECT SITE. 6. SCHEDULE A SITE INSPECTION THROUGH THE HARNETT COUNTY INSPECTIONS DEPARTMENT. 7. UPON APPROVAL OF THE STORMWATER SITE INSPECTION, PROCEED WITH GRADING THE SITE. 8. PROCEED TO PHASE 2 OF THE EROSION CONTROL SEQUENCE. CONSTRUCTION SEQUENCE (PHASE 2) (SEE SITE 300 1. PROCEED WITH CLEARING, GRUBBING AND GRADING. ADJUST TEMPORARY DIVERSIONS AS REQUIRED. 2. MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES IN GOOD WORKING ORDER. SILT FENCE, INLET PROTECTION AND OTHER SIMILAR MEASURES MUST BE CLEANED OUT BEFORE THEY ARE HALF FULL. CLOGGED STONE FILTERS MUST BE REFRESHED/REPLACED. SILT FENCE CAN NOT HAVE HOLES OR TEARS. 3. REFER TO SITE 300, THE GRADING & DRAINAGE PLAN, INSTALL STORM SEWERS AND PROTECT WITH INLET PROTECTION AS INSTALLED. 4. DEWATER SEDIMENT BASIN AND REMOVE ACCUMULATED SEDIMENT. 5. REMOVE BAFFLES AND SKIMMER. 6. INSTALL FOREBAY CONVERTING THE SEDIMENT BASIN INTO A WETPOND AND REMOVE DIVERSION DITCH. FINISH GRADING SITE FOR BUILDING PAD. CALL SAM NYE AT 919-996-9136 FOR INSPECTION AND DOCUMENTATION OF THIS INSTALLATION FOR AS-BUILTS. 7. INSTALL UTILITIES, BUILDING PAD BASE AND BASE FOR PARKING AREA. 8. STABILIZATION IS REQUIRED WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON PROJECT SITE. 5. ONCE APPROVED, SURVEY EXISTING SCM AND STRUCTURE ELEVATIONS. 6. AS-BUILTS MUST BE COMPLETED AND SUBMITTED ONE WEEK PRIOR TO FINAL INSPECTION. 4. STABILIZATION IS REQUIRED WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON PROJECT SITE. 8. SCHEDULE THE FINAL SITE INSPECTION THROUGH HARNETT COUNTY INSPECTIONS DEPARTMENT. 9. SUBMIT DOCUMENTATION REQUIRED UNDER THE SITE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY (CNG010000) TO STORMWATER INSPECTIONS THROUGHOUT THE PROJECT. DISTURBED AREA: 5.06 AC 220,535 SF. NORTH INITIAL EROSION CONTROL PLAN SCALE: 1 » = 40 ' (DRAWING SCALED FOR 24x36 INCH PLOTS) GRO�A � R�\'fECTU/Zy� o /O Z CERT. NO. '- r 353 g n • ZO�9l8 CARO\-\ �'��EIGH,NG NC ENGINEERING LICENSE NO. P-0803 0\ r 1i,ti e 1111r,,fl® , \\A C AR0 *SSS/o ®cX SEAS, a 3498 Q U) 41 O � O J 100Lo 0) J LO I- N N -0 O q- N 0 1` � N D�N�OM-C O 00� C �d7@ O C) - - �zG)0) w O U) 0) W= N X� 1- - 0_ 0 LL W J z W 0 U Z J Of z C) 0 O LL.r- ^ H c� Of O N Q 0- 2 0o LLI T y = Z F- U U 0 a Z(1) BY rawn SVO Checked By SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 2L09 NOV 2021 w SITE PLANS INITIAL EROSION CONTROL PLAN Job 0 Code HCSS1 3 5 C 0 0 Ln N 0 N GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE li CONSTRUCTION GENERAL PERMIT implementing the details and specifications on this Ian sheet will result in the construction p g p p activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization ■ Tern perary grass seed covered with straw or ■ Perm anent grass seed covered with straw or other mulches and tackifiers other m ulches and tackifiers • Hydreseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcem eat m atting without tem perary grass seed ■ Hy droseeding ■ Appropriately applied straw or other mulch ■ Shrubs or other perm anent plantings covered ■ Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion ■ Structural methods such asconcrete, asphalt or retainingwalls ■ Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER ,V A w wr" J 0 0 _ sT,w 9M., o 00 n (iwme u"m ww'2°"�eA"nw 10 NL , 2or tta e2w 0 air N] CE C#tfd` gmA»Tm., U 0 till., 0 0 cw 0 0 ° °� 0 0 0 �.. sE�n�, B a A 2N (TW., CU:MLY NIJU® SMNAWYN) �SECYIIXJ A -A OR STIPIFS fE1DV"'� IDMTION OE,EIYN® N NTNO OEMf£ (1N')Q{' ^ l 1ACNIL LOCATAN OE19UfED N NFID NNNpN,r�./ N�Yp ��SjK� 2 M COIOY:1[ WA9NUT NI.uNUIT r 81NIICMIE6 BNAIL BE YIpTA1E0 ��r 2 ,Ni IbNCRETE NA21,oUT sTAUCTUE3 N,ru wcN 1K uou, AIO/pt _ Sr YANrW MQ, NE uauN AWPoR M PEMIEB �[ K TE S,PoMTRS AF/N2E4 kilt a 11E STPLCIUIF3 Ag1Y CAVA[ftt ro NIOYLE AOEWATE ply. 3.CMICIEIE YAN w Bf@ICTNE NIDS ro SrELM 90NO DEM2:. xmNpere Maxour c,Nl,mllu NE06 ro er t2FMY YMIQS M,N NPIA6C NOING tev2:. BELOW GRADE WASHOUT STRUCTURE ABOVE GRADE WASHOUT STRUCTURE 6 ro 2cAu Nn ro roar CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlets) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must Include: business hours) (1) Raingauge Daily Doily rainfall amounts_ maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no irndividuskday rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded m "zero" The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2_ Date and time of the inspection, and within 24 3_ Name of the person perfr i rig the inspection, hours of a rain 4_ Indication of whetherthe measures were operating event � 10 inch in properly, 24 hours 5_ Description of maintenance rneedsforthemeasure, 6_ Description, evidence, and date of corrective actions taken_ (3) Stormwater At least once per 1_ Identification ofthe discharge outfalls inspected, discharge 7 onIF ndar days 2_ Date and time of the inspection, outfalls (Si and within 24 3. Name of the person perform ng the inspection, hours of a rain 4. Evidence of indicators ofstermwater pollution such as of I event , 1.0 inch in sheen, floating or suspended solids or discoloration, 241 5_ Indication ofvisible sediment leaving the site, 6_ Description, evidence, and date of corrective actions taken_ (4) Perimeter of At least once per Ifvisi ble sedimentation is found outside site limits, then a record site 7 calendar days etthefall owirig shall be made: and within 24 1. Actionsta ken to clean up or stabilize the secii went that has left hours of a rain thesite limits, event> 10 inch in 2_ nescripu on, evidence, and date ofcnrrective actions taken, and 24 hours 3_ An euplannticn as to the act ienstaken to control future releases_ (5) Strea ms or At least once per Ifthe stream or wetland has inureasedvisible sedimentation or a wetlands onsite 7 calendar days stream has visibleincreased turbidity from the construction or offsite and within 24 activity,then a record of the following shall be made: (where hours of a rain 1. Uescript on, evidence and date of corrective actions taken, and accessible} event � 10 inch in 2. Records ofthe required reports to the appropriate UiAsion 24hours Regional Office per Part III, Section L� Item (2)(a) ofthis permit. (6) Ground After each phase 1. The phaseof grading (installation of perimeter E&SC stabilization ofgrading measures, clearingandgrubbing, installation ofstorm measures drainage faci Iities, compl etien of all land -disturbing activity, construction or redevelopment, permanent ground cover}. 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurancethatthey will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has peen installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation ofthe E&SC measures or if the E&SC measures are modified after initial installation. (h) A phase of grading has heen completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection repo rttc indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. reportto indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all F&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to F&SC measures. plan or complete, date and sign an inspection repo rtto indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART 11, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. EFFECTIVE: 04/01/19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 14 hours, an oral or electronic notification. deposition in a M Within 7 calendar days, a report that contains a description of the stream ar wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case-hy-case hasis. • If the stream is named on the NC 303(d) his as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with thefederal or state impaired -waters conditions. (b) Oil spills and a Within 14 hours, an oral or electronic notification. The notification release of shall include information aheut the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1{b)-{c) above (c) Anticipated • A report at feast ten days before the dare of the bypass, if possible. hypasses 140 CFR The report shall include an evaluation of the anticipated quality a nd 122.41[m)[3)] effect of the bypass. (d) Unanticipated a Within 14 hours, an oral or electronic notification. hypasses 140 CFR • Within 7 calendar days, a report that includes an eva luation of the 122.41(m)(3)] quality and effect cf the bypass. (e) Noncompliance ■ Within 14 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the ofthis permitthat noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expectedto environment[410 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 12Z.41(I)(6). ■ Division staff may waive the requirement for a written report on a case-hy-case basis. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 NPDES PLAN NOTES 1. THIS PAGE IS SUBMITTED TO COMPLY WITH NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE COUNTY DRB PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. 4. THE COUNTY IS NOT AUTHORIZED TO ENFORCE THIS PAGE OF THE PLANS AND IT IS NOT PART OF THE APPROVED PLANS FOR PURPOSES OF ENFORCEMENT ACTION UNDER THE COUNTY CODE. GRO�A � \IECTU/tyy o Z CERT. NO. '- r 353 g n • Z0 CARD\ \�P. G_ NC ENGINEERING LICENSE NO. P-0803 0\I 111,E 5. DOCUMENTATION REQUIRED UNDER THE SITE NPDES STORMWATER PERMIT FOR CONTRACTION NA���s�d ACTIVITY SHALL BE SUBMITTED TO THE COUNTY., = ®CX SEAS. .�. Y 3498 DISTURBED AREA: 5.06 AC 220,535 SF. U W I U < W < D U 41 O V) (D c 0 Q Z O Qi to J _ 10o to 0) . tOiN N -a O N 0 0_ 01t0) N 11 DLNin-C Ld O w 0_ c 0) 0) (� O NZ0)0) Z W u0 1 O w -C J �� i Ld X ]E 6 w C3 U I- L 0 LL W A' 1 E J z W Ir OZ U J O Of z O ^ r H cV O Z � d Q 0 0 O W T + Z t I U a Z(1) BY rawn SVO Checked By SRN DATE: 30 JUN 2021 REVISED: 1& 16 SEP 2021 D09 NOV 2021 0 w w SITE ir PLANS W x ca J NPDES PLAN a a Job Code HCSS 1 I 3 I 5 C 0 � \ IGHWAY 27\W o ' t NC 60' PUBLIC R/W 1 1\T_ \ S87°22'34"W \ \ 174.71' I 41.54' S 8� / N14°48'17"E ED / co -� cV- f \ \ I I < N / N N/F 2-70 J ' / / C CIRCLE K STORES INC / I L J / / \ \ 0- DB 34488 PA 6-20 42 \ - I F / ���A U`w EXISTING NG:COMMERCIAL \ \ / QUSE:GAS STATION / CIRCLE K STORES INC / o � � / /- -- I / o -270 PIN: 87-56-8017 00 � 1 ( NJ/ DB:34 8, PAGE: 0642 I L, EXISTING ONING:COMMERCIAL Ili N/F N / US :CAR WASH I L�l I CHAMPION COURT RENTAL LLC o PIN: 9587-65-0971 DB:3918, PAGE: 0407 m / / EXISTING ZONING:COMMERCIAL / AREA: 6.72 AC. N/F WORNOM AND PERKINS f / I 0C 0. - PIN: 9587-22-0860 / I / DB: 3319, PAGE: 0515 / / I- w I I I N N EXISTING ZONING: COMMERCIAL I / / p N I / I / _ I USE: NONE J I S0Y7'20"E API J / _ _ II N 1 PLY NORTH AMERICAN SILT FENCE 1 D' OUTLET \ 7./ I �60 GREEN C350 MATTING EVERY 15' ALONG / % ' EASEMENT ( 1 / TO SLOPE THIS SLOPE 20SEWER/UTILITY MANHOLE L�,s M (cROss HATCHFn ARFA) i / / / SEE PB 2007 PG 15 RIM: 270.95 l � VELOCITY RIP -RAP DISSIPATOR PAD 12'X4.5'18"D CLASS B FES #1 - 20' WIDE EMERGENCY SPILLWAY LIMITS OF DISTURBANCE - \2�0\ NORMAL WATER ELEV. 264.50 FOREBAY ELEV. 264.50 VELOCITY RIP -RAP - DISSIPATOR PAD 12'X4.5' 18"D CLASS B SCM MAINTENANCE & ACCESS EASEMENT I VARIABLE WIDTH I \ N� O - ENV: 262.67' - -/-� c __ss-- II I \ i S 84'59 - - - C O.-2 --�9 ��.. I ss-----ss- �S�_--ss- I \ - - - \ --Ess �� /N 86°18'57" E 80.45' � � � � I \N/F C.O. - ss - _asses--- �- 721� NATIONAL RETAYL PROPERTIES LP �-�--- -� PIN: 9587 65-4990 SILT FENCE (TYP) .\ - SILT FENCE OUTLET (TYP) Jl II DB:2985, PAGE: 0854 1 - l w / EXISTING ZONIN :COMMERCIAL _ P INTS I I I a, /\ USE:RETAIL 1 o 915 I o �E HOUS� I - - - P o / \ 0 1 i col) \ YI#15B Z N/F I ^^-278 H MILTON JOANN L ry �B 2 9587-65-5715 11 I B0 4" PVC PIPE 1 % / EXISTI'NGZONING:RA120R I I �I N ' 2 '" 1 ' I I 80 I N � � I Y v- / r CID 60 , R/W � I t YI#15A / CoCoHAMILTON G ENN PAUL & I • PINM1LTON 958 65AN 688 Bpp EXISTNGZOINAING:RA820R 4" PVC PIPE 0 1 % Z # I 'CPO \ IN VELOCITY RIP -RAP CLEAN WATER DIVERSION INV: DISSIPATOR PAD DITCH #2 LIMITS OF DISTURBANCE 281 97' \ � 11 12'X6'18"D / / / 0�� BOTTOM WIDTH = 0 FT TREE PROTECTION FENCE (TYP) CLASS B I / / SIDE SLOPES = 2:1 - - \ DEPTH = 2 FT \ l / N/F SLOPE = 2.3% f / MCKO EVELYN CAMERON DEPTH OF FLOW (Q2) = 11.5 IN PIN. 9587-55-6209 VELOCITY (Q2) = 3.1 FPS o \ DW:833, PAGE: 0313 TEMPORARY LINER = \ ` fFXISTING ZONING: RA-20R RIPRAP CLASS B P INV: I I 281.10' LINE LEGEND GENERAL NOTES 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH HARNETT COUNTY AND THE STATE OF NORTH CAROLINA STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (811) LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 3. CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF ALL EXISTING UTILITIES AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR CONFLICTS PRIOR TO BEGINNING CONSTRUCTION. 4. BOUNDARY AND SURVEY INFORMATION IS TAKEN FROM A SURVEY BY CAROLINA CORNERSTONE SURVEYING, INC. DATED DECEMBER 16, 2020. ADDITIONAL SITE INFORMATION TAKEN FROM HARNETT COUNTY GIS. 5. ALL CONSTRUCTION SHALL CONFORM TO A.D.A. STANDARDS. 6. NO WETLANDS PRESENT ON -SITE. STRUCTURE TABLE STRUCTURE NAME: DETAILS: CI#18 Rim = 273.59 INV OUT = 270.80', 15" RCP @ 0.73% YI#17 Rim = 275.81 INV OUT = 272.13', 15" RCP 0 1.00% Rim = 275.81 YI#16 INV IN = 270.87', 15" RCP ® 1.00% INV OUT = 270.62', 18" RCP @ 0.83% Rim = 275.85 YI#15 INV IN = 269.97', 18" RCP Q 0.83% INV OUT = 269.77', 18" RCP @ 0.87% YI#14 Rim = 274.31 INV OUT = 270.84', 15" RCP @ 0.80% Rim = 274.31 YI#13 INV IN = 269.83', 15" RCP ® 0.80% INV OUT = 269.38', 18" RCP @ 0.70% Rim = 274.50 YI#12 INV IN = 268.73', 18" RCP @ 0.87% INV IN = 268.83', 18" RCP Q 0.70% INV OUT = 268.23', 24" RCP ® 0.89% YI#11 Rim = 273.32 INV OUT = 269.53', 15" RCP @ 0.71% Rim = 273.31 YI#10 INV IN = 268.63', 15" RCP @ 0.71% INV OUT = 268.63', 15" RCP @ 0.88% Rim = 273.36 YI#9 INV IN = 267.29', 24" RCP ® 0.89% INV IN = 267.94', 15" RCP ® 0.88% INV OUT = 267.09', 24" RCP @ 0.81% Rim = 271.96 CI#8 INV IN = 269.49', 15" RCP ® 0.73% INV OUT = 269.29', 15" RCP ® 0.71% Rim = 272.31 YI#7 INV IN = 268.63', 15" RCP @ 0.71% INV OUT = 268.43', 15" RCP @ 0.71% Rim = 272.31 YI#6 INV IN = 267.54', 15" RCP @ 0.71% INV OUT = 267.09', 18" RCP @ 0.71% Rim = 272.51 YI#5 INV IN = 266.04', 24" RCP @ 0.81% INV IN = 266.54', 18" RCP © 0.71% INV OUT = 265.84', 24" RCP @ 0.91% Rim = 271.98 JB#4 INV IN = 265.20', 24" RCP @ 0.91% INV OUT = 265.00', 24" RCP ® 0.72% FES#3 Rim = 266.75 INV IN = 264.50', 24" RCP ® 0.72% CS#2 Rim = 268.00 INV OUT = 263.00', 24" RCP @ 1.60% FES#1 Rim = 268.00 INV OUT = 261.50', 24" RCP @ 2.40% STABILIZATION LEGEND TO BE STABILIZED WITHIN 7 DAYS AND SEEDED WITH GROUNDCOVER GROUND STABILIZATION NOTE: DIVERSION DITCHES AND 3:1 OR GREATER SLOPES SHALL BE STABUZED WITHIN 7 DAYS. SEE SECTION E: GROUND STABIUZATION ON SITE 302 PROPERTY BOUNDARY - - EX. INTERIOR/ADJ LOT LINE ACCESS EASEMENT -- W -- EXISTING WATER LINE --ss-- EXISTING SEWER LINE - - -OHP- - - EXISTING UNDERGROUND POWER EXISTING TOPO MAJOR EXISTING TOPO MINOR PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR LIMITS OF DISTURBANCE SF SILT FENCE PROPOSED STORM SEWER NORTH GRADING DRAINAGE SCALE: 1 " = 40 ' DISTURBED AREA: 5.06 AC 220,535 SF. 8c P LAN (DRAWING SCALED FOR 24x36 INCH PLOTS) GRO�A � R�\'fECTU/Zy� o /O Z CERT. NO. '- r 353 g n • Z0.0211y CARO'��P. �'��EIGH,NG NC ENGINEERING LICENSE NO. P-0803 .� EAL ' U W 0 U W Q U 41 V) 0 Q z QJ O _ I Co Ln 0) LO I- N N . 0 0- 0�L0 N 0_ DLN�V)-C Ld W 0 0_ 07 0) z Ld -0 t: O Ld ��. _j 0 Ld NL X� i I= 0w 6 U I--0_O LLW OEM J z W Oz U J Of z 0 O ILL.r- ^ 1..� H c� Of >_ O N Z 3: 0 Q 0- 0o LLI T y ILL. z F_ U 0 a z(1) BY rawn SVO Checked By SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 2L09 NOV 2021 3325 FEB 2022 0 w SITE PLANS GRADING & DRAINAGE PLAN a a Job HCSS 1 Code ul I 3 I 5 C 0 rn O N O 0 N N O N N u 0 u V O a Q 0 7) Q) H _ W _---- W -- II n --- w ----- W/ ---- w ---- / 3 _ - - w -- ---- w - --- w ----- w -- w ----- w - w ----- W ----- ____ w - w�1 -- �- --- ----- ---- W ----- W ----- w---- w - NC IGHWAY 27W o / -- ---- w --- w -- �sva� -- W - w� \ 1 601 PUBLIC R/W 3 / \ S87°22'34"W \ 174.71' I I I 41.54' S 8s I / N14°48'17"E \ / r IG / I � I I J 0 I < C) I W N N J ' / N/F 2-70 I 3 1 L / I CIRCLE K STORES INC J / U) � / / \ - ` PIN: 9587-66-2038 j - I W / ( / DB:3448, PA 42 \ �� F / ��L� U�w EXISTING VfNG:COMMERCIAL 3� / Q\ I I USE:GAS STATION CIRCLE K STORES INC / � w /- - / -270 PIN: 87-56-8017 00 DB:34 8, PAGE: 0642 I Ln I I \ r EXISTING ONING:COMMERCIAL m Q N/F N US :CAR WASH I L�l I CHAMPION COURT RENTAL LLC o I I PIN: 9587-65-0971 I DB:3918, PAGE: 0407 I I rn I \ / EXISTING ZONING:COMMERCIAL AREA: 6.72 AC. N/F / I / / I I I 3 I I WORNOM AND PERKINS f / I ' I OC �' / �I PIN: 9587-22-0860 v) I / J O I I DB:3319, PAGE: 0515 / / I o I I 1 I EXISTING ZONING: COMMERCIAL I N (/ I / `� / / / t I USE: NONE I r JLA II S0�7'20"E I 11 (I J / / 7.10' IIN I i - 20' SEWER/UTILITY EASEMENT � _ /SS MANHOLEWIM SEE PB 2007 PG 15 _ RIM: 270.95'� SILT FENCE OUTLET (TYP) I I 1 1 ems. ENV: 262.67' - - S 84.59 C _-ss-- II I f o -- S 885'39 10 _ C _ --- / ---- - / ss _ ss-----ss- \ 0 --�-ss I I FES 1 / - _� ss�-f ---------ss- / _� �(.��� 86°18'57" E 80.45' r ss--- �s�� s= 3 j �N F \ # SF r- s - - \' �� C.O. --_ ss -- sue'-ss a- �_ �2� NATIONAL RETAi PROPERTIES LP 1 F PIN: 958 65 4990 SILT FENCE (TYP) S� FENCE OUTLET (TYP)PPINT,')� DB:2985, P}�GE: 0854CS #1 / - -EXISTING MERCIAL XS rr ." rn j j USSE �RETAILM < I� I / \ / CONCRETE / 20' WIDE �- / CLEANOUT O I EMERGENCY 2.5" SKIMMER SIZE / ,,;;��. 2> \ �� �275 ICE HOUS� z� I / W 2.3" DIA ORIFICE SPILLWAY 'TETHERED TO POND \ 265 BANK / _ / / I TEMPORARY SWALE #1 BOTTOM WIDTH = 1 FT - 3 ����� SIDE SLOPES = 2:1 _ _ - P I \ / \ \ / / // DEPTH - 2 FT \ 1 I I \ / / SLOPE = 1.6% / TEMPORARY j I DEPTH OF FLOW Q2 = 10.9 IN CONSTRUCTION y� V 3 I \ VELOCITY Q2 = ( 4.2 FPS ENTRANCE -"TEMPORARY 4#rsrr, j 1 h ( I TO BE INSTALLED TEMPORARY LINER = DURING INITIAL S75 NORTH AMERICAN GREEN � EC PHASES Sae rH g I t y" �1 (25' x 50') TEMPORARY w \ \\ TOPSOIL - 77 1 CA I I \ AN S75 \ STOCKPILE ��i \ � � TEMPORARY MATTING � � AREA � � / �1uo \ \ AND CHECK DAMS - 1I = ` IMMEDIATELY UPON �� o LIMITS DISTURBANCE 1 I f I \ \ CONSTRUCTION / 1 / I 275 / / In I ( I j N/F BAFFLES -278 I I H MILTON JOANN L (TYP) I I \ \ �V A TEMPORARY / o it PIN 9587-65-5715 11 CHECK DAMS ' 3 / EXISTING BZONING:RA1020R I I \ \ INSTALLED EVERY DRAINAGE AREA I 50 FEET TO SWALE # 1 3.92 AC. Liq `SWALE #1 �">O L 260 �F� DRAINAGE AREA / JFOREBAY TO BE I / I I \ \ \ / / / ' gO 4 EXCAVATED I I I L DURING FINAL EROSION CONTROL STAGE o Y� l RIP RAP ,// / / / � �� I I o 265 DISSIPATER PAD ? f / I\ / / /m I 12'x6'x18" p A 01 / / �� Ek 3 i (n .� CLASS B i / z 60 R/W'° coo V \jSKIMMER SEDIMENT BASIN �� I F \ / DA=4.45 AC, C=0.45, 110=7.86 IN/HR / > 4l / t / o HAMILTONLENN PAUL & Q10=15.74 CFS / / i3 �� HAMILTO JOANN L REQUIRED SURFACE AREA=6,847 SF \ I I \\ \ PROPOSED SURFACE AREA=6,894 SF / / INSTALL C350 PERMANENT / Z o PIN: 958-65 7688 REQUIRED VOLUME=7,596 CF / MATTING IMMEDIATELY UPON - �281, i D6:3618, AGE: 0852 _PROPOSED VOLUME=15,902 CF / / / / / CONSTRUCTION $J 13 I� I EXISTING Z NING:RA-20R� / I BOTTOM ELEV=260 W ' \ \ _ _ WEIR ELEV=268' TOP OF DAM=269' / / / / / CID N � SILT FENCE OUTLET TYP7711 0 77- ,,,,,,,,,,,;,,, pla / mes MEN MENEM= S89'18'16"Ei� 583.30' � INV: MIN 4" \ / LIMITS�OF DISTURBANCE 281.97V: TREE PROTECTION FENCE (TYP) Q81.10' 1 / CLEAN WATER DIVERSION / N/F SWALE #2 MCKO EVELYN CAMERON BOTTOM WIDTH = 0 FT i PIN 9587-55-6209 SIDE SLOPES = 2:1 o ` /FXD : 833,NG PAGE: RA120R - J DEPTH = 2 FT DEPTH OF FLOW ( / Q2) = 10.1 IN 3 i VELOCITY (Q2) = 4.6 FPS TEMPORARY LINER = C350 NORTH AMERICAN GREEN CIFINA,-GE 'YAdArLE CFIA,RT Swale Number Swale Bottom Width �ft Side Slope Depth of Swale ft ` Channel Slope (ft,Ff.) Depth of Flew �2 (in) Velocity 02 (fps) Temporary Liner Permanent Liner B 1 1 2 2 6 0160 10 91 4.2 S75 S75 2 6 2 1 2' 6 0230 16.1 4.6 C350 C350 NOTE: LINER MATERIAL TO BE NORTH AMERICAN GREEN/TEN'SAR OR APPROVED EQUAL GROUND STABILIZATION NOTE: DIVERSION DITCHES AND 3:1 OR GREATER SLOPES SHALL BE STABUZED WITHIN 7 DAYS. SEE SECTION E: GROUND STABIUZATION ON SITE 302 66191\1001rR&7\Loll 1211111 GIS CONTOURS HAVE BEEN FIELD VERIFIED ALONG THE SOUTHERN PROPERTY EDGE FROM BUFFALO LAKE ROAD TO THE WESTERN EDGE AND NORTHERN EDGE OF THE POND. THE CONTOURS HAVE BEEN CONFIRMED AS ACCURATE WITH POSITIVE DRAINAGE. RIDGE SEPARATES PROPERTY FROM WESTERN EDGE. GENERAL NOTES 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH HARNETT COUNTY AND THE STATE OF NORTH CAROLINA STANDARDS AND SPECIFICATIONS. 2. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (811) LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 3. CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF ALL EXISTING UTILITIES AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR CONFLICTS PRIOR TO BEGINNING CONSTRUCTION. 4. BOUNDARY AND SURVEY INFORMATION IS TAKEN FROM A SURVEY BY CAROLINA CORNERSTONE SURVEYING, INC. DATED DECEMBER 16, 2020. ADDITIONAL SITE INFORMATION TAKEN FROM HARNETT COUNTY GIS. 5. ALL CONSTRUCTION SHALL CONFORM TO A.D.A. STANDARDS. 6. NO WETLANDS PRESENT ON -SITE. LINE LEGEND m m � PROPERTY BOUNDARY - - EX. INTERIOR/ADJ LOT LINE ACCESS EASEMENT -- w-- EXISTING WATER LINE ss EXISTING SEWER LINE - - -OHP- - - EXISTING UNDERGROUND POWER EXISTING TOPO MAJOR EXISTING TOPO MINOR PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR LIMITS OF DISTURBANCE sF SILT FENCE CONSTRUCTION IONSEQUENCE (PHASE 1): 1. OBTAIN A DISTURBING 2. PRIOR TO THE BEGINNING CONSTRUCTION, THE CONTRACTOR MUST NOTIFY THE NCDEQ LQS INSPECTOR. 3. CLEAR ONLY AS NECESSARY TO INSTALL ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE EROSION CONTROL PLAN (PHASE 1): A. INSTALL CONSTRUCTION ENTRANCE. B. INSTALL SILT FENCING AND SILT FENCE OUTLETS. C. INSTALL DIVERSION DITCH. D. INSTALL SEDIMENT SKIMMER BASIN. 4. MAINTAIN EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 5. STABILIZATION IS REQUIRED WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON PROJECT SITE. 6. SCHEDULE A SITE INSPECTION THROUGH THE HARNETT COUNTY INSPECTIONS DEPARTMENT. 7. UPON APPROVAL OF THE STORMWATER SITE INSPECTION, PROCEED WITH GRADING THE SITE. 8. PROCEED TO PHASE 2 OF THE EROSION CONTROL SEQUENCE. CONSTRUCTION SEQUENCE (PHASE 2) (SEE SITE 300 1. PROCEED WITH CLEARING, GRUBBING AND GRADING. ADJUST TEMPORARY DIVERSIONS AS REQUIRED. 2. MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES IN GOOD WORKING ORDER. SILT FENCE, INLET PROTECTION AND OTHER SIMILAR MEASURES MUST BE CLEANED OUT BEFORE THEY ARE HALF FULL. CLOGGED STONE FILTERS MUST BE REFRESHED/REPLACED. SILT FENCE CAN NOT HAVE HOLES OR TEARS. 3. REFER TO SITE 300, THE GRADING & DRAINAGE PLAN, INSTALL STORM SEWERS AND PROTECT WITH INLET PROTECTION AS INSTALLED. 4. DEWATER SEDIMENT BASIN AND REMOVE ACCUMULATED SEDIMENT. 5. REMOVE BAFFLES AND SKIMMER. 6. INSTALL FOREBAY CONVERTING THE SEDIMENT BASIN INTO A WETPOND AND REMOVE DIVERSION DITCH. FINISH GRADING SITE FOR BUILDING PAD. CALL SAM NYE AT 919-996-9136 FOR INSPECTION AND DOCUMENTATION OF THIS INSTALLATION FOR AS-BUILTS. 7. INSTALL UTILITIES, BUILDING PAD BASE AND BASE FOR PARKING AREA. 8. STABILIZATION IS REQUIRED WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON PROJECT SITE. 5. ONCE APPROVED, SURVEY EXISTING SCM AND STRUCTURE ELEVATIONS. 6. AS-BUILTS MUST BE COMPLETED AND SUBMITTED ONE WEEK PRIOR TO FINAL INSPECTION. 4. STABILIZATION IS REQUIRED WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON PROJECT SITE. 8. SCHEDULE THE FINAL SITE INSPECTION THROUGH HARNETT COUNTY INSPECTIONS DEPARTMENT. 9. SUBMIT DOCUMENTATION REQUIRED UNDER THE SITE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY (CNG010000) TO STORMWATER INSPECTIONS THROUGHOUT THE PROJECT. DISTURBED AREA: 5.06 AC 220,535 SF. NORTH INITIAL EROSION CONTROL PLAN SCALE: 1 » = 40 ' (DRAWING SCALED FOR 24x36 INCH PLOTS) GRO�A � \IECTU/Zy� o Z CERT. NO. '- r 353 g n • Z0.0211y CARO\-��P. NC ENGINEERING LICENSE NO. P-0803 Q U) 41 0 O � 0 100Ln 0) LOr- N N -0 O � N 0 0 1` � N D�N�0M-C O �� c rn0)@ Z0)0) W-0cn It: O U) 0) z� Ow 0 0�0 W W J z W 0 U Z J Of z 0 0 _ O� N 0 >_ O N Z � Q _j 0- r� 2 0O LLI T y LL. z F_ U 0 a Z(1) BY rawn SVO Checked By SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 2L09 NOV 2021 3325 FEB 2022 0 w SITE PLANS INITIAL EROSION CONTROL PLAN a Job Code HCSS 1 3 5 C 0 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE li CONSTRUCTION GENERAL PERMIT implementing the details and specifications on this Ian sheet will result in the construction p g p p activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization ■ Tern perary grass seed covered with straw or ■ Perm anent grass seed covered with straw or other mulches and tackifiers other m ulches and tackifiers • Hydreseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcem eat m atting without tem perary grass seed ■ Hy droseeding ■ Appropriately applied straw or other mulch ■ Shrubs or other perm anent plantings covered ■ Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion ■ Structural methods such asconcrete, asphalt or retainingwalls ■ Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER ,V A w wr" J 0 0 _ sT,w 9M., o 00 n (iwme u"m ww'2°"�eA"nw 10 NL , 2or tta e2w 0 air N] CE C#tfd` gmA»Tm., U 0 till., 0 0 cw 0 0 ° °� 0 0 0 �.. sE�n�, B a A 2N (TW., CU:MLY NIJU® SMNAWYN) �SECYIIXJ A -A OR STIPIFS fE1DV"'� IDMTION OE,EIYN® N NTNO OEMf£ (1N')Q{' ^ l 1ACNIL LOCATAN OE19UfED N NFID NNNpN,r�./ N�Yp ��SjK� 2 M COIOY:1[ WA9NUT NI.uNUIT r 81NIICMIE6 BNAIL BE YIpTA1E0 ��r 2 ,Ni IbNCRETE NA21,oUT sTAUCTUE3 N,ru wcN 1K uou, AIO/pt _ Sr YANrW MQ, NE uauN AWPoR M PEMIEB �[ K TE S,PoMTRS AF/N2E4 kilt a 11E STPLCIUIF3 Ag1Y CAVA[ftt ro NIOYLE AOEWATE ply. 3.CMICIEIE YAN w Bf@ICTNE NIDS ro SrELM 90NO DEM2:. xmNpere Maxour c,Nl,mllu NE06 ro er t2FMY YMIQS M,N NPIA6C NOING tev2:. BELOW GRADE WASHOUT STRUCTURE ABOVE GRADE WASHOUT STRUCTURE 6 ro 2cAu Nn ro roar CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlets) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must Include: business hours) (1) Raingauge Daily Doily rainfall amounts_ maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no irndividuskday rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded m "zero" The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2_ Date and time of the inspection, and within 24 3_ Name of the person perfr i rig the inspection, hours of a rain 4_ Indication of whetherthe measures were operating event � 10 inch in properly, 24 hours 5_ Description of maintenance rneedsforthemeasure, 6_ Description, evidence, and date of corrective actions taken_ (3) Stormwater At least once per 1_ Identification ofthe discharge outfalls inspected, discharge 7 onIF ndar days 2_ Date and time of the inspection, outfalls (Si and within 24 3. Name of the person perform ng the inspection, hours of a rain 4. Evidence of indicators ofstermwater pollution such as of I event , 1.0 inch in sheen, floating or suspended solids or discoloration, 241 5_ Indication ofvisible sediment leaving the site, 6_ Description, evidence, and date of corrective actions taken_ (4) Perimeter of At least once per Ifvisi ble sedimentation is found outside site limits, then a record site 7 calendar days etthefall owirig shall be made: and within 24 1. Actionsta ken to clean up or stabilize the secii went that has left hours of a rain thesite limits, event> 10 inch in 2_ nescripu on, evidence, and date ofcnrrective actions taken, and 24 hours 3_ An euplannticn as to the act ienstaken to control future releases_ (5) Strea ms or At least once per Ifthe stream or wetland has inureasedvisible sedimentation or a wetlands onsite 7 calendar days stream has visibleincreased turbidity from the construction or offsite and within 24 activity,then a record of the following shall be made: (where hours of a rain 1. Uescript on, evidence and date of corrective actions taken, and accessible} event � 10 inch in 2. Records ofthe required reports to the appropriate UiAsion 24hours Regional Office per Part III, Section L� Item (2)(a) ofthis permit. (6) Ground After each phase 1. The phaseof grading (installation of perimeter E&SC stabilization ofgrading measures, clearingandgrubbing, installation ofstorm measures drainage faci Iities, compl etien of all land -disturbing activity, construction or redevelopment, permanent ground cover}. 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurancethatthey will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has peen installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation ofthe E&SC measures or if the E&SC measures are modified after initial installation. (h) A phase of grading has heen completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection repo rttc indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. reportto indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all F&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to F&SC measures. plan or complete, date and sign an inspection repo rtto indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART 11, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. EFFECTIVE: 04/01/19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 14 hours, an oral or electronic notification. deposition in a M Within 7 calendar days, a report that contains a description of the stream ar wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case-hy-case hasis. • If the stream is named on the NC 303(d) his as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and a Within 14 hours, an oral or electronic notification. The notification release of shall include information aheut the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(h)-(c) above (c) Anticipated • A report at feast ren days before the dare of the bypass, if possible. hypasses 140 CFR The report shall include an evaluation of the anticipated quality a nd 122.41[m)[3)] effect of the bypass. (d) Unanticipated a Within 14 hours, an oral or electronic notification. hypasses 140 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect cf the bypass. (e) Noncompliance ■ Within 14 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the ofthis permitthat noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expectedto environment[410 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 12Z.41(I)(6). ■ Division staff may waive the requirement for a written report on a case-hy-case basis. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 NPDES PLAN NOTES 1. THIS PAGE IS SUBMITTED TO COMPLY WITH NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE COUNTY DRB PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. 4. THE COUNTY IS NOT AUTHORIZED TO ENFORCE THIS PAGE OF THE PLANS AND IT IS NOT PART OF THE APPROVED PLANS FOR PURPOSES OF ENFORCEMENT ACTION UNDER THE COUNTY CODE. GRO�A � \IECTU/tyy o Z CERT. NO. '- r 353 g n • Z0 CARD\ \�P. G_ NC ENGINEERING LICENSE NO. P-0803 �1�v�q 5 DOCUMACTIVITENTATISUBMITTEDON REQIREDUNDER THE THE SITE NPDES STORMWATER PERMIT FOR CONTRACTION �"® NA C,$ COU .� SEAL m 34981 04,0 1 Na* DISTURBED AREA: 5.06 AC 220,535 SF. U W I U < W < D U 41 O V) (D c 0 Q Z O Qi to J _ 10o to 0) . tOiN N -a O N 0 0_ 01t0) N 11 DLNin-C Ld O w 0_ c 0) 0) (� O NZ0)0) Z W u0 1 O w -C J �� i Ld X ]E 6 w C3 U I- L 0 LL W A' 1 E J z W Ir OZ U J O Of z O ^ r H cV O Z � d Q 0 0 O W T + Z t I U a Z(1) BY rawn SVO Checked By SRN DATE: 30 JUN 2021 REVISED: 1& 16 SEP 2021 D09 NOV 2021 A25 FEB 2022 0 w w SITE ir PLANS W x ca J NPDES PLAN a a Job Code HCSS 1