Loading...
HomeMy WebLinkAbout20160471 Ver 2_CAMA Application_20220224ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director February 24, 2022 MEMORANDUM: FROM: SUBJECT: Applicant: Project Location: NORTH CAROUNA Environmental Quality Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregq. bodnar(a)ncdenr.gov CAMA Major Permit Application Review Earl and Nancy DeHoog 23538 Hwy 264 East Pantego NC 27860 Proposed Project: To perform maintenance dredging in the channelized portion of Broad Creek, construct a boat ramp that will involve the filling of 300ft' of undelineated 404-wetlands, construct a 58ft bulkhead, and construct a 70'x6' pier with a 39.5' x 25.5' boathouse. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gre-go Bodnar at the address above by March 17, 2021. If you have any questions regarding the proposed project, contact Shane Staples (252)948-3950 when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. *"Additional comments may be attached" PRINT NAME AGENCY SIGNATURE DATE This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. D Q North Carolina Department of Environmental Quality I Division of Coastal Management Washington Office 1 943 Washington Square Mall I Washington, North Carolina 27889 n�tx�ir+cvao�wn �' orn.rt-MofF-W—Wo-ft! / 252.946.6481 3 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Earl and Nancy DeHoog 2. LOCATION OF PROJECT SITE: Beaufort County, Pantego, 23538 Hwy 264 East adjacent to Broad Creek Location - 35' 34' 06" N 76° 41' 28" W 3. INVESTIGATION TYPE: CAMA/Dredge & Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — September 28, 2021 Was Applicant Present — Yes 5. PROCESSING PROCEDURE: Application Received - January 28, 2022 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan — Beaufort County Land CIassification from LUP: Residential/agricultural/forestry (B) AEC(s) Involved: PTA, PTS (D) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing — Residential Septic Planned — NIA (F) Type of Structures: Existing — Residential home Planned — Access pier, boathouse, boat ramp, maintenance excavation, bulkhead (G) Estimated Annual Rate of Erosion: NIA HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Uplands 6,400ft2 (spoil placement) (B) Non -Vegetated Wetlands 1,664ft2 84ft2 1,200ft2 (shallow bottom) ( Maintenance (Boat Ramp) (Shading) excavation (C) Estuarine Shoreline 58 Linear Feet (D) Non -Coastal Wetland 300ft2 (D) Total Area Disturbed: 8,644ft2 (E) Primary Nursery Area: No (F) Water Classification: SC, NSW Open: No 8. PROJECT SUMMARY: The applicant proposes to perform maintenance dredging in the channelized portion of Broad Creek, construct a boat ramp that will involve the filling of 300ft2 of undelineated 404-wetlands, construct a 58ft bulkhead, and construct a 70' x 6' pier with a 39.5' x 25.5ft' boathouse. Earl and Nancy DeHoog 23508 Hwy 264 East Pantego, NC 27860 Project Setting The subject property is located at 23508 Hwy 264 East, Pantego, NC 27860 adjacent to Broad Creek in an area where the creek has been channelized as part of the Beaufort County drainage district. The property consists of developed and undeveloped uplands as well as 404- wetlands in areas near the shoreline; no official delineation has been completed. Existing upland development includes a single family residence and man-made ponds. A previous CAMA Major Permit #64-16 was issued in June of 2016 authorizing 1,250ft2 of 404-wetland fill to create access to a portion of high ground disconnected from the main body of the property and upland excavation to create a partial basin to construct a boathouse adjacent to Broad Creek. The only development completed from that Major Permit was the wetland fill created access to the upland area adjacent top Broad Creek. This Major Permit has since expired. Broad Creek in the project location is designated is classified as SC, NSW by the Environmental Resources Commission and is subject to the DWR Tar/Pam buffer rules. Broad Creek is designated as an inland waterbody by the Wildlife Resources Commission. No coastal wetland or submerged aquatic vegetation was observed in the vicinity of the project. Project Description The applicant has submitted a new proposal for a boat ramp, pier with boathouse, and maintenance excavation in Broad Creek in the area immediately downstream of the previously permitted boathouse and excavation. This given reason for the change in proposal is to better accommodate ADA access and to move the boat house out of the main Flow of Broad Creek. The proposal includes maintenance excavation in an area just adjacent to the main channel of Broad Creek measuring 52' x 32'(avg) to a final depth of -4ft at NWL removing an average of 2' of material within the dredge footprint. The spoil from excavation will be placed at an approved upland area measuring 80' x 80' on the property outside of the CAMA AEC. A 32' long x 12' wide boat ramp that would require the filling of 300ft2 of 404-wetlands adjacent to Broad Creek for construction; the terminal end of the proposed ramp will be within the maintenance excavation footprint. Within the maintenance excavation footprint a boathouse measuring 25'6" wide x 39'6" is proposed that will be connected to land with a 6' x 70' pier. The boathouse will house a lift for a 26' boat and a 5' walkway around 3-sides of the lift to provide wheelchair access. The applicant also has proposed 58' of bulkhead located at NWL along a peninsula of land that is adjacent to the proposed boathouse. Anticipated Impacts The project as proposed will result in the maintenance excavation of approximately 1,664ft2 of Broad Creek shallow bottom, the filling of 300ft2 of 404-wetlands, hardening of 58' of shoreline, and shading of 1,427ft2 of shallow bottom that will be Iargely within the maintenance excavation footprint. Short-term noise and turbidity are expected during construction. Shane Staples — February 21, 2022 Project Narrative November 23, 2021 Dear Sirs, We have decided not to renew our expired Major CAMA permit number 64-16, issued on June 27, 2016 for the excavation of the canal bank and construction of a boathouse. Based on our observations over the last few years we have lived here, we have come to realize that having the boathouse in the canal would lead to several problems. First, the current from the canal is very strong, not only in hurricanes, but after heavy rains too. It drains a large area up through Terra Ceia. Unfortunately, there is a lot of debris just from the litter that gets into the canal. The debris, coupled with the force of the current will lead to problems and damage to the boathouse structure. Then there is also the issue that the bank is not stable and therefore many trees have fallen in after storms and hurricanes. These trees are not accessible for us to personally clear, and that puts us at the mercy of the drainage district sending cleanup crews to keep the waterway open. The land that borders the canal gets extremely slick from the mud that the occasional flooding leaves. This is difficult for anyone to walk on, but my wife has disabilities and it is unsafe for her. The canal also receives a lot of erosion due to the strong flow that goes through it. We are concerned that the boathouse in this location would catch a lot of debris and also the erosion would cause the pilings to undermine. All these issues along with problems encountered due to my wife's handicap in reaching the original location of the proposed boathouse made us redesign the location of the proposed boathouse. We are submitting a permit application to put a boathouse and a ramp in an existing man-made basin area off the canal. We feel this is a perfect area for this project since it is out of the main flow of the canal. Some trees will have to be cut and stumps ground to facilitate the maintenance and cleaning of the silt in this basin. Any leaning trees that pose a hazard to vessels or structures will be removed. Maintenance excavation in the canal would be undertaken by an excavator operating from the existing spoil bank and adjacent uplands placing the material in a small dump truck or dump trailer. A 32' x 52' area will be impacted during the maintenance excavation removing an average of 2' of material for a maximum final depth of minus 4' below the normal water level and resulting in 130 cubic yards of spoil material. Installation of the boat ramp will impact 300 square feet of 404 wetlands. Wetla have not been delineated by the USACE. DCM has verified no coastal wetlandE C g JAN 2 8 2021 The reason we would like to have a ramp is for convenience of launching on our own property. The nearest boat ramp is a 5 mile trip by boat. Due to my wife's disabilities I often launch our boat single handed from the public ramp in Belhaven and make the trip to our property. From there, my wife drives me back to Belhaven to retrieve the truck and trailer. There have been times when storms put trees across the canal trapping our boat at our property until the drainage district cleared and snagged the canal. If we had a boat ramp we could retrieve our boat from the canal until the canal is cleared. We also would use the ramp to be able to launch some smaller boats from our property. We are also applying for a pier 6' wide, and 70' long. This would be constructed using handicap concrete slats. This would also be a good location to run power cable and water lines to the boathouse. This pier would serve both as a launch pier for the boat ramp as well as provide access to the 256" x 39' 6" boathouse. A 5' wide catwalk will encircle the boathouse on three sides. 58' of vinyl bulkhead will be installed to prevent erosion next to the boathouse. Included in the 58' of vinyl bulkhead will be 16' of bulkhead up the side of the canal bank with a 5' return into the bank. As mentioned above, my wife has many spinal issues. She has had 8 spinal surgeries and anticipates more. With this project, we are looking forward, and would like to make sure that everything makes this usable for a person in a wheelchair. The new project design/location has more direct pedestrian access from our home across gently sloped uplands down to the existing basin. Per the latest guidance from the Division of Water Resources, I have submitted the electronic meeting request of 2021 for the boat ramp and maintenance excavation in regards to obtaining the 401 Water Quality Certification and have included the email documentation in this application package. I certify that all information contained in this application package is true, accurate, and complete to the best of my knowledge and belief. I hereby request that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period time. Sincerely, 41Z(�r; s?7 Earl De Hoo g Nancy De Hoog RECEIVED JAN 2 8 2022 DCM-WARD �l DomMp-i for � F 5 (last rev]sod 12127/06) North Ca(olina DIVISION OF COASTAL MANAGEMENT <Form continues on backs JAN 2 8 2027 252-f3t2a-21i0(3 r �r'%RA �lfAf' O 1-Ui313-4FtCOASY .. www.'nccoastali,�a��age,:ii��t.nct f I Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 4. Site Description a. Total length of shoreline on the tract (ft) b. Size of entire tract (sq.ft.) c. Size of individual lots} /'/A d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) ❑NHW or ®NWL e. Vegetation on tract `` U4� ; c�vs h Cl-p w00d Y P .4 C��5� f, Man-made features and uses now o� tract S-fe' *'SC/5A yr 4 R es ; c t,' ; o f i UvSc' ¢ ✓��a� : �e �, ati c g. Identify and describe the existing landuses ad'acent to the proposed projects site. / h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ,®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes 19No ❑NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes Af' Vo ❑NA National Register listed or eligible property? <Forin continues on next page> 252-808-2808 9-fi88-A3tt:[)d�S1" wwvr.ne:coasr:,lr;r«nag.±iner,t.r �t f Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? tHYes El No (ii) Are there coastal wetlands onthe site? El Yes JRNo (iii)Ifyes toeither(i)or(ii)above. has a d elineation been conducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing waste atertreatr entfacilities. o. Describe existing drinking watersupplysorree. Be-u u ev,4 C o -j, 4 y- JAX4few p. Describe existing storm water management or treatment systems. AloF-,e 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government SPrivate/Community b. Give a brief d escription of purpose, use, and daily operations of the project when complete. q Ct: tr3 InVY»C4 Gr.r �aa+ , R , , 4 ha 1,se- 4 )ti Ft I o s-fire ; .} c. Describe the proposed construction methodology, types ofronstruotion equipment to be used during construction, then umber of each ty pe ofequipmentandwhereitist bestore I h f�eir�b�t'j►'�j �` n cl�va#23r u �r c� �r;,��enahceJexrvtGr�rno,��%res0 f us d. List all d opmenta vitiesyoupropose caU a�� o n/ a� of �GM�� P_7(Ca�a' a,�� .f �S e. Are the proposed activities maintenance of an existing proje t,newwork,orboth? [ACW f f. What is the approximate total disturhe land area resulting from the proposed project? OSq.Ft orpoAcres i g. Will the proposed pro' encroach on any public easement, public accessway orother area ❑Yes No DNA that the publichas established use of? h. Describe location and type of existing and proposed dischargeslowaters of [he state. sufac.r? mno f f i. Will wastewater or stormwater bed ischarged into a wetland? ❑ Yes 0 No D NA If yes, will thisdischarrdedwater beofthe same salinity asthereceiving water? ❑Yes DNo DNA j. Is there any mitigation proposed? D Yes JVNo ❑ If yes, attach a mitigation proposal 4 EC E I Z! E D <Form continues on back> JAN 2 8 91022 252-808-2808 1-888-4RCOAST :. www.nccoastafmanagement. not Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-I)the following items below, d applicable, mustbe submitted in orderforthe application package to be complete. items (a) — (0 are always applicable to any major developmentapplication. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan viewand cross -sectional drawings)d rawn to scale. Please give the present statusof the proposedproject Is any portion already complete? If p re,0 ously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed tog uide agency personnel unfamiliar with the area to the site. d. A copy ofthe deed (with state application only) orotherinstrument underwhich the applicantclaimstitle to the affected properties. e. The appropriate application fee. Checkor money order made payable to DENR. f. A I ist of then ames and co mplete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received acopyofthe application and plats bycertified mail, Such landowners must be advised that they have 30days! n which to submit comments on the proposed project to the Division of Coastal Management. Name owl'I'Qrn C �or,t?s Phone No. Address Igo SC(t 1 ri4� NL /of 15 Name IVC -De-PI U �itQ�`�Oi'! f}-j�n IJ�RC' � > � Phone No. Address 1701 _;5 +�' Sfi . V 6LSh(hO&17 a -5a-613 Name Phone No. Address g. A I ist of previous state or federal permits issued forwo rkon the project tract. Include permit numbers. permittee, and issuing dates. h. Signed consultant oragentauthorizationform, if applicable. i. Wetlanddeiineation,ifnecessary. f j. AsignedAEChazardnoticeforprojectsinoceanf tand6letareas. (Must be signed byproperty owner) /f k. Astatement ofcompliance with theN.C. Environmental PolicyAct(N.C.G.S.113A1-10).ifnecessary. If the project involves expenditure of public funds oruse of publiclands, attach a stalementdocumentingcorrpliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand thatany permit issued in response to this application will allow only the developmentdescribed in the application. The projectwill be subjectto the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in factgrant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. Ifurtherrce ifyth tthe information provided inthis applicabonistruthfultothebest ofmyknowledge. Date 1l �a Print Name 1Qr 1 p (4 �� Na1TGt r�,_ f Signature -1 a ' '3 L' f G,F2�� Please indicate application attachments pertaining to your proposed project. Id DCM MP-2 Excavation and Fill Information O DCM MP-5 Bridges and Culverts ❑ DCM MP-3 Upland Development PaDCM MP-4 Structures Information 252-808-2808 .. 9-i;;3;-411RCOAST www.nccoastalrvranagernent.ne.t Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access iNL or Canal Boat Basin Boat Ramp Ro�GroinNWL) yr�cse Length Width 3J, t Avg, ExistingC!Depth it i NAFinal Project Depth "' NA Rock Breakwater Other (excluding shoreline stabilization EN I. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. 5�4 c. (i) Does the area to be excavated include coastal wetlandsimarsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the f U number of square feet affected. ❑CW ❑SAV ❑SB AWL ❑None J)�/ cs s p A (/ rl' a f e 00 Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. a (i) Do you claim title to disposal area? ®Yes ❑No DNA (ii) If no, attach a letter granting permission from the owner. b. Dimensions of disposal area. d. e. (i) Does the disposal area include any coastal wetlandslmarsh f. (CW), submerged aquatic vegetation (SAV), shell bottom (813), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL EjNone 00 Describe the purpose of disposal in these areas: ❑This section not applicable W Will a disposal area be available for future maintenance? MYes ❑No ❑NA (ii) If yes, where? 1 1�q 'rt e 9 r&' G (i) Does the disposal include any area in the water? ❑Yes MNo DNA (ii) If yes, how much water area is affected? R ., JAN 2 S ZOZZ [) C M ANY' 252-808-2808 :: 1-886-4RCOAST www.n_ccoa�t_atmanagement_net revi.,ed: l2126106 Plarni DCM MP-2 (Excavation ,and rill, Page 2 of 2) v. %2"%Jf%GL11VC a JAt3lL1LA11UN (if development is a wood groin, use MP-4 — Structures) d. i ype or snoretine stabilization: %Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: c. Average distance wafter+wawrd/of NHW or NWL: LV� ❑This section not applicable b. Length: . 41 Width: / If d. Maximum distance waterward of NHW or NWL: e. Type of srahilization material: f. (i) Has there been shoreline erosion during preceding 12 v ! � I months? --� 1 ❑Yes RNo ❑NA 0) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet f fill to be placed below water level. Bulkhead backfill Riprap Breakwater/Sill Other Source of fill material. 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. (i) Will fill materiat be brought to the site? ,-,'Yes ❑No ❑NA If yes, 00 Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill 5. GENERAL h. Type of fill material. 1-1hd� 6 XThis section not applicable b. (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL -None (ii) Describe the purpose of the fill in these areas: a. How will excavated or fill material he kept on site and erosion b. controlled? %/ / ) p� 1 1 f V etrJ4 o1 1,cf JrcSC�t D : I ✓"1 v'T� �s S,'1 e e-nce r. reccv (roc,- G0var C. (i) Will navigational aids he regi 0red as a result of the project? d. []Yes ISNo ❑NA (ii) If yes, explain what type and how they will be implemented. Date I J . .;) l Project Name { N� I�[ 4 & a� 1 0 A� J C7 C,,,S iZ- What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Rq G 7� � P e — k-1 G oy<, 4 o t- 0) Will wetlands be crossed in transporting equipment to project site? []Yes ;KNo []NA 00 If yes, explain steps that will be taken to avoid or minimize environmental impacts. Applicant Name Est - J D e_ A� a, e_ ApplSignature iss 252.8083 2808 ' 1-888-4RCO ASin3geFvtt:fit. i3c-; F'evised. 1 Form DCIVI MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) is the docking facility/marina: ❑Commercial ❑PubliclGovernment �gPrivatefcommunity c. (1) Dock(s) and/or pier(s) (ii) Number (iii) Length (iv) Width z_ (v) Floating ❑Yes RNo e. (i) Are Platforms included? ❑Yes ;4No If yes: (ii) Number (iii) Length (iv) Width (v) Floating []Yes ONO Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips pr posed �0"a (H) Number of slips existing 6) i. Check the proposed type of siting: ❑ Land cut and access channel NOOpen water; dredging for basin and/or channel ❑Open water; no dredging required ❑Other; please describe: k. Typical boat length: DA m, (i) Wilk the facility have tie pilings? [--)Yes [KNo (ii) If yes number of tie pilings? El This section not applicable b. (i) Will the facility be open to the general public? ❑Yes NNo d. (i) Are Finger Piers included? ®Yes ❑No If yes: iV7 v U S C (4) Number _ (iii) Length Q U �Sy-& C� (iv) Width (v) Floating ❑Yes ®No f. (i) Are Boatlifts included? (Yes ❑No If yes: (ii) Number (iii) Length (iv) Width % 1 h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: ® Boat ramp(s); number of boat ramps: .Ef Other, please describe: a� 41 i P - D b/ -l�(n] m C2 j. Describe the typical boats to be served (e.g., open (unabout, charter boats, sail boats, mixed typ s). �d()(,h A Uh 7-00 Oaf (i) Will the facility be open to the general F 1 ��1 ❑Yes .�]No _°�� 0 252-808-2808 :: I -BB 3- IRCOAST :: www.nccoastalmanagerlient.riot f % v; m DCIA IVIP-4 (Structures, Page 2 of a) 2. DOCKING FACILITY/MARINA OPERATIONS This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. how will overboard discharge of sewage from boats be controlled . e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (J) Give the location and number of "pumpout Available" signs pro )osed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs propo:I id. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. if this project is an expansion of an existing marina, what types o{ services are currently provided? 252-808.2808 :: 1-888-4RC0AST :: wwwaiccuasi.almaiiay entant.rwt revis,�u 121-17 Js Form DCM MP-4 (structures, Page 3 of 4) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes No n. Is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area? Oyes No O. Is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shelf bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None P. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? Oyes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE {including covered lifts) a. (i) Is the boathouse structure(s): ❑This section not applicable ❑Commercial ❑PubliclGovernment ZPrivatelCommunity 00 Number _L (00 Length (iv) Width��� Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (a.g., wood, sheetpile, etc., if a rock groin, use MP-2, Excavation and Fill,) ' a. (i) Number � his section not applicable (ii)Length /" /A' 04) Width 5, BREAKWATER (e.g., wood, sheetpile, etc.) a• Length / c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS a. Is the structure(s): ❑Commercial ❑PubiiclGovemment ❑Private/Community c- Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. { v //4 . e. Arc of the swing ❑This section not applicable b. Average distance from NHW. NWL, or wetlands El This section not applicable b• Number d. Description of buoy (color, inscription, size, anchor, etc.) IVrr� JAN 2 8 2022 , C RIPWA Y3 0 292-908.2808 :: 1-888-4RCOASi :; www.izcco�stafnraEn erne��f.riof f revised: 12/271U8 F= ,rm DC1V1 MP-4 (Structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body e. (i) Will navigational aids be required as a result of the project? Oyes Wo ❑NA (ii) If yes, explain what type and how they will be implemented'. B. OTHER a. Give complete description: b. Proximity of structures) to adjacent docking faciii ties. d. Water depth at waterward end of structure at NLW or NWL Date Project Name l/ & l-1V'flS ,�T h1JU.5 Applicant ♦`lame �� l �.oZi Applicant Signature , .y s '^ f—'-7 4- �l This section not applicable r 252-808-2808 :: 1-888.4RC0A5T :: www.nccoastairnariayentier�#.net 0 revised: 52127IU6 Contact Name * Earl Dehoog Contact Email Address * de_hoog@yahoo.com Project Owner* Earl Dehoog Project Name * Dehoog Boathouse Project County* Beaufort Owner Address:* Street Address 23538 HWY US 264 East Address Line 2 aty Pantego Fbstal / Zap Code Zip Code 27860 Is this a transportation project?* f Yes {' No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - I"" 401 Water Quality Certification - Regular Express f Individual Permit I— Modification V Shoreline Stabilization Does this project have an existing project ID#? * r Yes r No State / Rovince / Region NC - North Carolina Cbunlry United States Do you know the name of the staff member you would like to request a meeting with? Chris Pullinger Please give a brief project description below and include location Information. Propose to undertake maintenance excavation in a man made basin off the channelized portion Pantego Creek, just below HWY 264 near the Town of Pantego in Beaufort County, North Carolina. The purpose of the excavation work is to improve depths in the basin to support a proposed boathouse and a small boat ramp) Once the 30 day pre -filing period has expired I will submit the required Major CAMA permit application. This property was subject of Major LAMA permit no. 64-16 that included the proposed boathouse. The boathouse was never built. This proposal will relocate the boathouse out of the flow in the channelized stream into an existing man made basin. The former DWR Project number was 16-0471 issued May 27,2016. RECEIVED .,JAN 2 8 202? By digitally sighing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * �lrtl,���/add Submittal Date 10/6/2021 JAN 2 8 2022 a HO c,,41'6ro b = �3,539 U S f{ Wy a bq F) Home: a5)- ggy-foa6 mlthwlck a Emandel 32 Plnetown 32 B A �. 61 O MapQuest E-EIVE MI 2 8 2022 DC II`IN R 99 Pantego I el le-14 92 P�— ( 92 " x. NE �►�'IftCk st-��,��c� st/us a 6 _ jc�(Ioty �b fir s. q m,lcs, 3� 3 a� �fG�e- l� 000�s 6r t�crrcr 3, a c`UsN y 3 rn I�es st ��rasl f �1 e rncrl fa r� Sc%6o 1. � tl0�( Pfff ��'Th� lane or � w , Y -f T ed e4c el too AG - A CA lots Pr 4 RECEIVED JAN 2 8 2022 [)CUI-kiVARO im Gam. I 7,1 1� -VV R I RECEIVE RECEIV,k:;D JAN 2 8 2022 z— � lJ LL W QcoE- \. 0 13ocZcc0 � LL - ly�'Q�xxz� i• zoaOwxzw¢NHWZJ z zW W LLJ LU OWaa ,=noZl=zzHQWCp Z�z�"QQa4 o�>a�ZwtOZZwZz-p-,C�j¢���OVOmoNwQ��zOnzOo�z �J zZwOwmOzwQzJ =Qzp�LL �UOa�mV�ao�OUO-�-zwO�=z O�o�ZWj QO �cf wOmw2 Ow0 WOu 0wp�Q�z�zO��ut¢; , d�o0�O 7ZxwQ�OQz-�azt oa a�QQo��O2J LU coVNCf 08-�i=02 a QW w o JOQ�azUp UoeQ�Ow Uao -sp zw&QUj0:=Ln a NOOFp-,6~QZiEdO:EN p pzwwzNaQ OU�-owzv�°0 wZ aC) oquT>-Uo= O vcDv Ia IDV) CL cli w N.4 NN � NN -i UTwOowz CJ=Ozz Wd<Eom< O -OoOUz w O J -OU���2OZUJz�z� QN� z m a JFv ¢V% 0 z CDOwmwn w� �a O4Ow LWa�mQN �,-z,Jw w U7�V[N � Vz?wu WW � W �� �m Z Zwz Oca 0o� G 4,gb?u �w aJ ^-o�O �om wx � � z w Jtu Zz-U- LL NQ,Xz z uo�ozwoz.00 Zwwz ��ow U� � crnw0 WZp04 0- mpT �� � C)L-) z pU Z wx Xp�p NOW uZz OUr Z oy w o�Qm l0 � Z J� N wQrzd X X X X X_wQ � O��u � �nion w zoLU arf Q=wuLJio kDOv) N N N I1n r-4 co ) cD co C OLUo Wa¢V W mca cd co oc �sLLU 00 wOOGCDi Oon%coa in^ NN w w F L �tiJ ❑- ❑ W�oXpm�Xa N�Nm J � ZLL ❑ w G W W m 5 o :Soww v m� er=O� I Nr� !I_QwN O (ObH:)5)„ZI1-T Q Q oonooao N [� ryN N � (Y > naaaRa d wmd„s wmd„oT QmZ X X XX 1coXxOO XXXX X JJ--AJ �zzzz z a z v m� er=O� I Nr� !I_QwN O (ObH:)5)„ZI1-T Q Q oonooao N [� ryN N � (Y > naaaRa d wmd„s wmd„oT QmZ X X XX 1coXxOO XXXX X JJ--AJ �zzzz z a z yj p c 90% P� e`r Ri"C' E I V E D JAN 2 S 2022 n0 M-kAj ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director February 24, 2022 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregq.bodnara-ncdenr.gov SUBJECT: CAMA Major Permit Application Review Applicant: Earl and Nancy DeHoog Project Location: 23538 Hwy 264 East Pantego NC 27860 Proposed Project: To perform maintenance dredging in the channelized portion of Broad Creek, construct a boat ramp that will involve the filling of 300ft2 of undelineated 404-wetlands, construct a 58ft bulkhead, and construct a 70'x6' pier with a 39.5' x 25.5' boathouse. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by March 17, 2021. If you have any questions regarding the proposed project, contact Shane Staples (252)948-3950 when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" PRINT NAME AGENCY SIGNATURE DATE This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. D EQ �� North Carolina Department of Environmental Quality I Division of Coastal Management Washington Office 1 943 Washington Square Mall I Washington, North Carolina 27889 Department ofEmvonmeme r� /'� 252.946.6481