Loading...
HomeMy WebLinkAboutNew A95 review_22-0170_B-5929_Scoping Carpenter,Kristi From:Hardison, Lyn Sent:Tuesday, February 08, 2022 6:06 PM To:Cottrell, Leland; Wainwright, David; Hood, Donna; Conchilla, Ryan Subject:New A95 review (Comments due -3-7-2022) Importance:High Afternoon, Here are a few projects for review. • go to the SEPA portal to review the documents, https://ncconnect.sharepoint.com/sites/deq_ext/sepa/SitePages/Home.aspx If you need more time to review these documents, please let me know so that I can request an extension. If you have any questions, please contact give me at 252-948-3842 Thank you…Lyn Project Department/ Rec'd Regional SEPA/NEPA Previously Project Name/Description County Due date # Applicant date FRO – Lee North Carolina Scoping - Proposed project is for the intersection improvements at DAQ, DWR, PW, 22- NEPA Department of NC24/NC27 and SR1006 (Glendon-Carthage Road) and the Moore 2/8/2022 3/7/2022 DEMLR & UST & 0170 Transportation adjacent intersections with US 15/501. TIP R-5929 Ryan Scoping - Proposed project is for the expansion of the West Stanly Wastewater Treatment Plant in order to increase its current capacity from 1.2 MGD to 2.5MGD. Project includes construction of two new 1.25-MGD aeration basins, a new 3-MGD Equalization tank, a new 75-ft diameter secondary clarifier with a dedicated MRO – Paul Stanly County RAS pump station, and disc filters for filtration of BOD and TSS; DAQ, DWR, PW, 22-Public NEPA Improvements to: the McCoy's Creek Pump Station, the WWTP's Stanly 2/8/2022 3/7/2022 DEMLR & UST & 0169 Utilities/USDA- existing control/laboratory building, the David RD chlorination/dechlorination contact tank, and the Effluent Pump Station; Installation of ~17,000 LF of 16-inch influent force main parallel to the existing 16-inch influent force main; and Installation of ~13,000 LF of 24-inch effluent force main will be installed parallel to the existing 12-inch effluent force main. MRO – Paul North Carolina DAQ, DWR, PW, 22-Scoping - Proposed project is for the replacement of Bridge No. NEPA Department of Rowan 2/8/2022 3/7/2022 DEMLR & UST & 0171 155 on SR2136 (Agner Road) over an unnamed creek. Transportation Donna MRO – Paul Environmental Assessment/Finding of No Significant Impact - DAQ, DWR, PW, 22-Department of NEPA Proposed project is for the construction, renovation and Stanly 2/8/2022 3/7/2022 DEMLR & UST & 0172 Defense demolition of facilities at the Stanly County Air National Guard Donna 1 Geographically Separated Unit (Stanly County GSU) at Stanly County Airport. Lyn Hardison lyn.hardison@ncdenr.gov Environmental Assistance and SEPA Coordinator NC Department of Environmental Quality Division of Environmental Assistance & Customer Services (DEACS) Washington Regional Office 943 Washington Square Mall Washington, NC 27889 Phone: 252-948-3842 Fax: 252-975-3716 Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 2