HomeMy WebLinkAboutNew A95 review_22-0170_B-5929_Scoping
Carpenter,Kristi
From:Hardison, Lyn
Sent:Tuesday, February 08, 2022 6:06 PM
To:Cottrell, Leland; Wainwright, David; Hood, Donna; Conchilla, Ryan
Subject:New A95 review (Comments due -3-7-2022)
Importance:High
Afternoon,
Here are a few projects for review.
• go to the SEPA portal to review the
documents, https://ncconnect.sharepoint.com/sites/deq_ext/sepa/SitePages/Home.aspx
If you need more time to review these documents, please let me know so that I can request an extension.
If you have any questions, please contact give me at 252-948-3842
Thank you…Lyn
Project Department/ Rec'd
Regional SEPA/NEPA Previously Project Name/Description County Due date
# Applicant date
FRO – Lee
North Carolina Scoping - Proposed project is for the intersection improvements at
DAQ, DWR, PW, 22-
NEPA Department of NC24/NC27 and SR1006 (Glendon-Carthage Road) and the Moore 2/8/2022 3/7/2022
DEMLR & UST & 0170
Transportation adjacent intersections with US 15/501. TIP R-5929
Ryan
Scoping - Proposed project is for the expansion of the West Stanly
Wastewater Treatment Plant in order to increase its current
capacity from 1.2 MGD to 2.5MGD. Project includes construction
of two new 1.25-MGD aeration basins, a new 3-MGD Equalization
tank, a new 75-ft diameter secondary clarifier with a dedicated
MRO – Paul Stanly County
RAS pump station, and disc filters for filtration of BOD and TSS;
DAQ, DWR, PW, 22-Public
NEPA Improvements to: the McCoy's Creek Pump Station, the WWTP's Stanly 2/8/2022 3/7/2022
DEMLR & UST & 0169 Utilities/USDA-
existing control/laboratory building, the
David RD
chlorination/dechlorination contact tank, and the Effluent Pump
Station; Installation of ~17,000 LF of 16-inch influent force main
parallel to the existing 16-inch influent force main; and Installation
of ~13,000 LF of 24-inch effluent force main will be installed
parallel to the existing 12-inch effluent force main.
MRO – Paul
North Carolina
DAQ, DWR, PW, 22-Scoping - Proposed project is for the replacement of Bridge No.
NEPA Department of Rowan 2/8/2022 3/7/2022
DEMLR & UST & 0171 155 on SR2136 (Agner Road) over an unnamed creek.
Transportation
Donna
MRO – Paul
Environmental Assessment/Finding of No Significant Impact -
DAQ, DWR, PW, 22-Department of
NEPA Proposed project is for the construction, renovation and Stanly 2/8/2022 3/7/2022
DEMLR & UST & 0172 Defense
demolition of facilities at the Stanly County Air National Guard
Donna
1
Geographically Separated Unit (Stanly County GSU) at Stanly
County Airport.
Lyn Hardison lyn.hardison@ncdenr.gov
Environmental Assistance and SEPA Coordinator
NC Department of Environmental Quality
Division of Environmental Assistance & Customer Services (DEACS)
Washington Regional Office
943 Washington Square Mall
Washington, NC 27889
Phone: 252-948-3842
Fax: 252-975-3716
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on
staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
2