Loading...
HomeMy WebLinkAboutWQ0043142_Application Attachment_20220225DWP Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Town of Lillington Project Name for which flow is being requested: Gregory Village Subdivision More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NC0021636 c. WWTP facility's permitted flow Fuquay-Varina Allocated Flow Lillington Allocated Flow Angier Allocated Flow d. Estimated obligated flow not yet tributary to the WWTP FV Obligated Flow NYT Lillington Obligated Flow NYT HC Obligated Flow NYT Angier Obligated Flow NYT e. WWTP facility's actual avg. flow FV Actual Flow Lillington Actual Flow HC Actual Flow Angier Actual Flow f. Total flow for this specific request g. Total actual and obligated flows to the facility FV Actual Avg. + Obligated Flow Lillington Actual Avg. + Obligated Flow HC Actual Avg. + Obligated Flow Angier Actual + Obligated Flow h. Percent of permitted flow used All flows are in MGD 7.5 MGD 2.60 MGD 1.20 MGD 1.008 MGD 2.285 MGD 0.685 MGD 0.197 MGD 0.662 MGD 0.641 MGD 5.200 MGD 1.344 MGD 0.642 MGD 2.568 MGD 0.646 MGD 0.040 MGD 7.425 MGD 2.029 MGD 0.879 MGD 3.230 MGD 1.287 MGD 99.00% *** ***A PER to expand the NHRWTTP treatment capacity has been completed and design of the expansion is currently underway. II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. Page 1 of 2 FTSE 06-13 List pump stations located between the project connection point and the WWTP: Pump Station (Name or Number) Firm Capacity, * MGD (A) Design Average Daily Flow** (Firm /pf), MGD Approx. Current Avg. Daily Flow, MGD (B) (C) Obligated, Not Yet Tributary Daily Flow, MGD (D)=(B+C) (E)=(A-D) Total Current Flow Plus Obligated Flow Available Capacity*** SLS 120 14.4 5.76 3.558 2.089 5.647 0.113 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (p1) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Dry Creek Interceptor Downstream Permit Number: WQ0028647 III. Certification Statement: ward certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of thjs wpt water flow. Signing Official Signature] Date Page 2 of 2 FTSE 06-13