Loading...
HomeMy WebLinkAboutWQ0043142_Application (FTSE)_20220225O M. ! )VVR, JAN 2 7 UV— \ ' a THE S PAU LD I N G GROUP, PAF ;YE Tr-:�� �.i.. u; ;r�,, gm"' planning civil engineering July 21,2021 Raleigh Regional Office — Water Quality Section Jason Robinson 3800 Barrett Drive Raleigh, NC 27609 RE: Gregory Village Subdivision Town of Lillington, NC Fast -Track Application Dear Mr. Robinson, It 0 71 VA 76 i....-.. ,c) O0,4 r. .... ot.;;.:. s 0 0 . Please see enclosed two (2) sets of Fast -Track Applications (FTA 04-16) and an accompanying review fee check of $480.00 for the subject project for your review and approval. The proposed Gregory Village Subdivision is located at the intersection of NC 210 and Tripp Road in the Town of Lillington, Harnett County, NC. We are seeking a permit to install a public sanitary sewer extension to serve 112 proposed single-family and townhome residences. The proposed sanitary sewer extension consists of 3,728 LF of 8" PVC and 813 LF of 8" DIP extending off of an existing sanitary sewer main located along NC 210 South of the site. The proposed sanitary sewer main will be public. The construction of this sanitary sewer extension is projected to begin in Spring of 2021. If you have any questions or need any additional information, please contact me at (919) 854-7990. Sincerely, Thomas Spaulding, PE The Spaulding Group, PA Phone: (919)854-7990 • Fax (919)854-7925.1611 Jones Franklin Road Suite 101 • Raleigh, NC 27607 9 7 2 r Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned L APPLICANT INFORMATION: 1. Applicant's name: Town of Lillington (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership Privately -Owned Public Utility ['Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Ashley Wimberly per 15A NCAC 02T .0106(b) Title: Public Utilities Director 4. Applicant's mailing address: PO Box 296 City: Lillington State: NC Zip: 27546- 5. Applicant's contact information: Phone number: (910) 893-2654 Email Address: awimberlvaa 1i11ingtonnc.org II. PROJECT INFORMATION Ieigh Regional Officio 1. Project name Gregory Village Subdivision 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: if new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: -Harnett I ' 4. Approximate Coordinates (Decimal Degrees): Latitude: ,35 433920° Longitude:-78.794867°: jI [ ) 5, Parcel ID (if applicable): 0661-02-3738 (Harnett County P1Nl N 3 (or Parcel ID to closest downstream sewer) I1I. CONSULTANT INFORMATION: 1. Professional Engineer: Tom Spaulding. PE Firm: The Spaulding Group. PA Mailing address: 5318 Burning Oak Ct. NC Nigcf Environmentki Quail JAN 19 2022 License Number: 19375 r' E., FOR SECURITY PURPOSES, THE FACE OF THIS DOCUMENT CONTAINS A COLORED BACKGROUND AND MICROPRINTING IN THE BORDER Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Lillington (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Ashley Wimberly per 1SA NCAC 02T .0106(b) Title: Public Utilities Director 4. Applicant's mailing address: PO Box 296 City: Lillington State: NC Zip: 27546- 5. Applicant's contact information: Phone number: (910) 893-2654 Email Address: awimberlvalillinQtonnc.org II. PROJECT INFORMATION: 1. Project name: Gregory Village Subdivision 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Harnett 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.433920° Longitude: -78.794867° 5. Parcel ID (if applicable): 0661-02-3738 (Harnett County PIN) (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Tom Spaulding. PE Firm: The Spaulding Group. PA Mailing address: 5318 Burning Oak Ct. City: Raleigh State: NC Zip: 27606- Phone number: (9191854-7990 Email Address: tom(..spaulding-groun.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: North Harnett WWTP Permit Number: NC002163¢ Owner Name: Harnett Regional Water License Number: 19375 V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s)iif applicable): WQCS00297 Owner Name(s): Town of Lillington FORM: FTA 04-16 WC NO of Ennvlranmentat QuAtirt JAN 19 2022 Raleigh Regional Off JAN 2 7' -tf1, Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned 0 Retail (stores, centers, malls) ❑ Residential Leased 0 Retail with food preparation/service ❑ School / preschool / day care 0 Medical / dental / veterinary facilities ❑ Food and drink facilities 0 Church 0 Businesses / offices / factories 0 Nursing Home 5. Nature of wastewater : 100 % Domestic/Commercial _% Commercial % Industrial (See 15A NCAC 02T .0103(20)) �Is there a Pretreatment Program in effect? ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) ❑ Yes 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ® Yes 0 No ➢ If ves, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: ❑ No Establishment Type (see 02T.0114(f1) Daily Design Flow a,b No. of Units Flow Single -Family Residence 360 gal/day 112 40,320 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 40,320 GPD a See I5A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per I5A NCAC 02T .0114(c), design flow rates for establishments not identified [in table I5A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 40,320 GPD (per I5A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: 0 Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 3,728 PVC 8 813 DIP > Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria > Section 111 contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIH. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Puma Stations/Force MainsZ: COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: . ° Longitude: - . ° 3. Design flow of the pump station: _ millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at _ feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): > Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): > It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. > If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(i)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(fl & (gl ➢ I5A NCAC 02T.0305(fl contains minimum separations that shall be d d El Yes ❑ No Jul El Yes ❑ No provt a Oland' DiOWI..D. Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item 1X.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage > If noncompliance with 02T.0305(fl or (el see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes 0 No 0 N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet > No variance is required if the altemative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per I5A NCAC 02B .0200? ® Yes 0 No 0 N/A > This would include Trout Buffered Streams per I5A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? > Information can be obtained from the 401 & Buffer Permitting Branch ®Yes ❑No 5. Does project comply with ISA NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes 0 No Per 15A NCAC 02T.0105(c)(6) directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes /4 No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage > If noncompliance with 02T.0305(fl or (el see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes 0 No 0 N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet > No variance is required if the altemative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per I5A NCAC 02B .0200? ® Yes 0 No 0 N/A > This would include Trout Buffered Streams per I5A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? > Information can be obtained from the 401 & Buffer Permitting Branch ®Yes ❑No 5. Does project comply with ISA NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes 0 No Per 15A NCAC 02T.0105(c)(6) directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes /4 No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ®Yes ❑No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: THOMAS J SPAULDING, PE attest Ihat this application for (Professional Engineer's name from Application Item IB.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): 12-22-21 I, j7S`1fr7 i •�7 Pt,11.( u+:i;{'rf l9'reeto attest that this application for (Signature Authority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: / G } t?J -2 FORM: ETA 04-16 Page 5 of 5 i. Yq.s;i�.gAi vi State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Town of Lillington Project Name for which flow is being requested: Gregory Village subdivision More than one P bE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: 0021636 Allflows are in MGD c. WWTP facility's permitted flow 1.2 d. Estimated obligated flow not yet tributary to the WWTP 0.18228 e. WWTP facility's actual avg. flow .864817 f. Total flow for this specific request .04032 g. Total actual and obligated flows to the facility 1.087417 h. Percent of permitted flow used 90% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (EHA-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** Mckinney 0.7056 0.28224 0.113721 0.16632 0.280041 .002199 * The Finn Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Lillington Collection System Downstream Permit Number: WQCS00297 Page 1 of 6 FTSE 04-16 III. Certification Statement: I Ashley Wimberly certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. �%'�ne-- ..✓ _sue®.. , C od da- Signing OfciaiSignature Date Page 2 of 6 FTSE 04-16 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore; Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of 6 FTSE 04-16 Instructions for Flow Tracking/Acceptance form (FTSE) and Planning Assessment Addendum (PAA) Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + f] h. Percent of permitted flow used: Equals [(g / c)*100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January 15, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f. = 0.015 MGD g. = 3.215 MGD h.=53.6% The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD: c. = 6.0 MGD d. = 0.515 MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8 % Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 04-16 Section II List the pump station name or number and approximate pump station firm capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet tributary (C). Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the Minimum Design Criteria. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less than 2.5. If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in the permitting process. (A) (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Design Approx. Not Yet Total Current Firm Average Current Avg. Tributary Flow Plus Pump Station Capacity Daily Flow Daily Flow, Daily Flow, Obligated Available (Name or Number) MGD (Firm / pf) MGD MGD Flow Capacity* Kaw Creek PS 0.800 0.320 0.252 0.080 0.332 -0.012 Valley Road PS 1.895 0.758 0.472 0.135 0.607 0.151 Page 5 of 6 FTSE 04-16 Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section II where available capacity is < O. A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or construction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion, flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance compliance. For example: Given that: a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01 MGD per year; and that c. A funded capital project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: The master plan and ten year capital plan contain recommended scope and funding for a capital project entitled Kaw Creek Pump Station upgrade with funding planned in July 2014. This project is planned to add 0.100 MGD to the firm capacity of the pump station by October 2015. Inclusion of this proposed capital project as a condition of this Flow Tracking/Acceptance for Sewer Extension Permit Application elevates this project's priority for funding and construction to be implemented ahead of the activation of obligated, not yet tributary flows in amounts that exceed the firm pump station capacities identified in Section II above. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. Page 6 of 6 FTSE 04-16 V) 4-1 a) c (13 • isn 11/931 NOS .LON vo. c., ,-„ • • • • • , tt 1 (c1' 7'4 .$, 4:5 (CO A 7 9) !IP64 tJW