HomeMy WebLinkAboutNCC220855_ESC Approval Submitted_20220224ROY COOPER
Governor a
r
ELIZABETH S. BISER
Secretary -�
BRIAN WRENN
Director
Estvrronrareratral+' u a t y
February 17, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Allison's Custom Construction, LLC
Attention: Issac Cody Allison Helms, Jr., Manager
1317 Helms Short Cut Road
Monroe, North Carolina 28112
RE: Project Name: Allison Helms Lot Grading (Lots 1-10)
Acres Approved: 6.6
Project ID: UNION-2022-062
County: Union, City: Monroe
Address: Corinth Church Rd.
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Kevin Herring, PE, Kevin E. Herring Engineering
Date Received by LQS'. January 24, 2022
Plan Type: New
Dear Mr. Helms:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCGOI. Please direct questions about the eNOI form to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of ' this project changes in the future, the new responsible
party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file
at the job site:
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115
d.. 704-663-1699
Letter of Approval with Modifications
Allison's Custom Construction, LLC
February 17, 2022
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days
Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to
the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGOI Fact Sheet
c: Inspection Department
ec: Kevin Herring, PE
Letter of Approval with Modifications
Allison's Custom Construction, LLC
February 17, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Allison Helms Lot Grading (Lots 1-10)
Project ID: UNION-2022-062
County: Union
1. Wattles and/or Rock Check Dams shall be installed at the outlet of all temporary diversion ditches.
In addition, these measures shall be installed along diversion to control velocity as necessary.
2. Fill slopes over 24" CMP to Lot 3 shall not exceed 2H:1 V.
14
0
0
Re
R
�
g
.
m
»
:
u
�
0
�
m
Mug
00
»
4-4
�
2
2
m
�
�