HomeMy WebLinkAboutSW3211203_O&M Agreement/Plan_20220223Operation & Maintenance Agreement
Project Name: BG Stewart Solar Farm, LLC
Project Location: 1515 Old Highway 74 Marshville, NC 28103
Cover Page
Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s).
The SCM(s) on this project include (check all that apply & co
Infiltration Basin
Quantity:
Infiltration Trench
Quantity:
Bioretention Cell
Quantity. -
Wet Pond
Quantity:
Stormwater Wetland
Quantity:
Permeable Pavement
Quantity:
Sand Filter
Quantity:
Rainwater Harvesting
Quantity:
Green Roof
Quantity:
Level Spreader - Filter Strip
Quantity:
Proprietary System
Quantity:
Treatment Swale
Quantity:
Dry Pond
Quantity:
Disconnected Impervious Surface
Present:
User Defined SCM
Present:
Low Density
Present:
)&M sheets will
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s).-
Location(s):
Location(s):
Location(s):
Type:
oe aaaea automaticai
134.970320,-80.389222 1
4 4- 4-A_..-R In _ram. zo.C77 -7 7 _ 1
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the
system or responsible party.
Responsible Party:
Title & Organization:
Street address:
City, state, zip:
Phone number(s):
Email:
.Cypress Creek Renewables . ,
n N/ Nk a r /w /h 1n e�1 3 �wC1vr .wc-t
5310 S. Alston Ave Building 300
Durham, NC 27713
�- /
Signature: � Date: o•
1, ACC k"�oliw ,if Vw/V'.,t_1 a Notary Public for the State of
County of,do hereby certify thati/�I'�
personally appeared before me this 77f/1, day of L_ C kll- 4'L , vZ-/ and
acknowledge the due execution of the Operations and Maintenance Agreement .
Witness my hand and official seal,
Seal
A notary public or other officer completing this
•- HECTOR Q AL certificate verifies only the Identity of the
COMM. # 226072,1 Individual who signed the document to which
• NOTARY PUBLIC - CALIFORNIA �% this certificate is attached, and not the
SONOMA COUNTY truthfulness, accuracy, or validity of that
COMM-EXPIREJ document.
My commission expires C c_.) ,
STORM-EZ 10/27/2021
Version 1.5 O&M Agreement Page 1 of 1
User Defined SCM Maintenance Requirements
Section 1
Important operation and maintenance procedures:
The entire Project vegetated area will be carefully managed to reduced sediment load discharge.
Minimize use of herbicides and fertilizers per NCDEQ Stormwater Manual E-6 Recommendation 4
Avoid compaction of Subsoil per NCDEQ Stormwater Design Manual E-6 Recommendation 1
Avoid concentration of Stormwater per NCDEQ Stormwater Design Manual E-6 Recommendation 3
The system will be inspected at least quarterly. Records of operation and maintenance will be kept in a known set
location and will be available upon request.
Section 2
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element:
Potentialproblem:
How to remediate theproblem:
Entire Vegetated Area
Areas of bare soil/erosion
Regrade as needed and replant disturbed areas
Entire Vegetated Area
Vegetation too short/long
Maintain vegetation at a height of 6 inches
Receiving Water Body
Erosion or sedimentation
Contact NCDEQ Regional Office
Low Density Maintenance Requirements
Important maintenance procedures:
The drainage area to the vegetated conveyance or vegetated receiving area will be carefully
managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area.
After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated
receiving area, fertilizer will not be applied to the vegetated receiving areas.
The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of operation and
maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element:
Potential problem:
How to remediate the problem:
Vegetation is too short or
Maintain grassed vegetation such that the swale or vegetated
Vegetation
too long.
area does not erode during the peak flow from the 10-year
storm
Trash/debris is present.
Remove the trash/debris.
Areas of bare soil and/or
Regrade the soil if necessary to remove the gully, and then re -
Vegetated receiving
areas
erosive gullies have
sod (or plant with other appropriate species) and water until
formed.
established. Provide lime and a one-time fertilizer application.
Clogging has occurred.
Clean out the outlet device. Dispose of the sediment off -site.
The outlet device (if
applicable)
The outlet device is
Repair or replace the outlet device.
damaged
Erosion or other signs of
damage have occurred at
Repair the damage and improve the flow dissipation structure.
the outlet.
Discharges from the site
The receiving water
are causing erosion or
Contact the local NCDEQ Regional Office.
sedimentation in the
receiving water.