Loading...
HomeMy WebLinkAboutSW3211202_Supplement-EZ Form_20220223SUPPLEMENT-EZ COVER PAGE FORMS LOFIQE[; PROJECTINFQRMATION..........................�..,._._.....,...,..�.......�..._....._..,_..__.-..__.....___....,,...._.�..�.,..,......,..,....�.,...,...—.._..,,,_..._...v.�.. 1 P%sect Name _� -___TO _PaVW!A"M Road $War.Fa m, U.0 - 3 Coastal Wetland Area _ — 4 Surface WeterArea �a��w �__ 0 5 6 Is thiaproject High or Low Denelty? Does this project use an off -site SCM? NO 7 Width of etatad satbaoka vidad l 15 _ _ _h o a _ . fir? .. _�t) � 8 Will the vegetated setback remain vegetated? _ _ _ __. _ — Yea 9 M 9UA Is ProopoaW In the setback, does it meet NCAC 021­1.1003 4- �^ 10 Is streambank stabilization proposed on this project? No� NUI4 11 D TYPE OF SCMS: Infiltration System 12 Bioretentlon Cell 13 Pond-,-'—----—---- Wet Wet 14 __ Storl t iS_ _ Permeable Pavement 16 17 Sand FI@er Rainwater_Hervesbnq (RWWW� 18 Green Roof 19 Level 3 reader -Filter Strip 20 �21^ Disconnected Impervious Surfacee(DIS)___-- 23T 24 Treatment Swale StormFtiter Suva Cell Bayfilter_-��..- _ 26 Filters Title: Mario T. Carreon, Civil Engineering Manage Cypress Creek Renewables, LLC Cettifiotion Statement; I cerUfy, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided In the form Is, to the hest of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. MIper.�1,' • SEAI i 045182 e Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? I No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LID 1 4 Type of SCM DIS DIS 5 Total drainage area (sq ft) 1359072 6 Onsite drainage area (sq ft) 1359072 7 Offsite drainage area (sq ft) 0 8 Total BUA in project (sq ft) 5439 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 10 New BUA not on subdivided lots (subject to permitting) (sf) Offsite BUA (sq ft) 11 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) 4126 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) 1313 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 0.4% 19 Design storm (inches) N/A 20 Design volume of SCM (cu ft) N/A 21 Calculation method for design volume N/A ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Inverter pads and steel piles supporting the fixed tilt solar panel system. LOW DENSITY UIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 oject below density thresholds set forth in the applicable stormwater rule? Yes r s project maximize dispersed flow and minimize channelization of flow? Yes the use of piping been minimized per.1003(2)(c)? Yes slopes of the vegetated conveyances (H:V) N/A 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (%) N/A 8 Bottom width of curb outlet swale(s) (feet) N/A 9 Maximum side slope of curb outlet swale(s) (H:V) N/A 10 Minimum length of curb outlet swale(s) (feet) N/A 11 1 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Are variations to rule .1003 proposed? No 14 No ADDITIONAL 15 INFORMATION 1 Please use this space to provide any additional information about this low density project: Solar farm construction was completed in 2015 and all project disturbed areas are vegetated. There are no permanent SCMs for the project - all flow is considered dispersed sheet flow. The project complies with the guidelines outlined in Recomendation 2: Disconnect runoff from solar panel arrays per NCDEQ Stormwater Design Manual E-6 (Figure 1). Swale Drainage BUA Pervious Q Slope Vallow Vactual Flow depth # Are (ac) area C (cfs) (%) (fps) (fps) (ft) (ac1 32.20 0.12 32.08 0.40 2 3 4 5 DISCONNECTED IMPERVIOUS SURFACES (DIS) GENERAL MDC FROM 02H.1050 1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 2 Is the SCM located away from contaminated soils? Yes 3 What are the side slopes of the SCM (H:V)? 15:1 4 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? No 5 No 6 Is there an overflow or bypass for inflow volume in excess of the design volume? No 7 What is the method for dewatering the SCM for maintenance? N/A 8 If applicable, will the SCM be cleaned out after construction? N/A 9 Does the maintenance access comply with General MDC (8)? Yes 10 Does the drainage easement comply with General MDC (9)? N/A 11 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A 12 Is there an O&M Agreement that complies with General MDC (11)? Yes 13 Is there an O&M Plan that complies with General MDC (12)? Yes 141 Does the SCM follow the device specific MDC? Yes 15 Was the SCM designed by an NC licensedprofessional? Yes 16 Maximum roof area that will be conveyed to the VRA (so 6055 sf 17 Will the VRA be rectangular in shape? Yes 18 Length of the rectangle in the direction of flow (feet) 500 ft 19 Width of the rectangle perpendicular to the direction of flow (feet) 8 ft 20 Will the downspouts be equipped with splash pads? No 21 Length of pavement draining to the VRA (feet) 160 ft 22 Width of the VRA (feet) 134 ft 23 Is the VRA free of BUA except for utility boxes, signs, and lamp posts? Yes 24 Hydrologic Soil Group of VRA C 25 Slope of the VRA in the direction of flow (%) Will the first 8" of soil be adjusted if needed to promote plant growth? 6.5% 26 Yes 27 Will the filter strip and side slopes be planted with non -clumping, deep-rooted sod? No 28 Is there a plan to protect the VRA from erosion until permanent round cover has taken root? INFORMATION Yes ADDITIONAL 29 Please use this space to provide any additional information about the disconnected impervious surface(s): Solar farm construction was completed in 2015 and all project disturbed areas are vegetated. CCR performs grass mowing as needed, along with debris removal as part of regular O&M activities (quarterly, min.). Hydrologic soil goup is actually combined C/D per USDA Soil Survey provided. 2