HomeMy WebLinkAboutSW3211202_O&M Agreement/Plan_20220223Operation & Maintenance Agreement
Project Name:
Project Location:
Old Pageland Monroe Road Solar Farm, LLC
919 Old Pageland Monroe Road, Monroe, NC 28112
Cover Page
Maintenance records shall be kept on the folla�ving SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
affect the integrity of structures, safety of the 01ublic, and the pollutant removal efficiency of the SCM(s).
The SCM(s) on this project include (check all that
Infiltration Basin
Infiltration Trench
Bioretention Cell
Wet Pond
Stormwater Wetland
Permeable Pavement
Sand Filter
Rainwater Harvesting
Green Roof
Level Spreader - Filter Strip
Proprietary System
Treatment Swale
Dry Pond
Disconnected Impervious Surface
User Defined SCM
Low Density
apply & corres
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Present:
Present:
Present:
onding
O&M sheets will
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Type:
Yes
Yes
be added automatically):
34.95196,-80.48224
3 , . ih l Wit — 80- 4 '2-L
Dis ersed flow only
I acknowledge and agree by my signature belcw that I am responsible for the performance of the maintenance procedures listed for
each SCM above, and attached O&M tables. II agree to notify NCDEQ of any problems with the system or prior to any changes to the
system or responsible party.
Responsible Party:
Title & Organization:
Street address:
City, state, zip:
Phone number(s):
Email:
Signature:
C re
s Creek Renewables [.t,C
Andrew
Nourafshan, Managing Director, Structured Finance
5310 S.
Alston Ave Building 300
Durham, NC 27713
415 842-2603
andrew.nourafshan@ccrenew.com
t m/ 27 f 2021
a Notary Public for the State of C, �,�N�,o T—
Date:
County of
do hereby certify that
AJ a;oc
personally appeared before me this
F day of Cr)c_ fv /,£2_
z /
and
acknowledge the due execution of the Operations and Maintenance Agreement .
Witness my hand and official seal,
Sp
.- HECTOR OMAR ALOANA�
U COMM. # 2260721
(� NOTARY PUBLIC • CALIFORNIA
SONOMA COUNTY O
COMM, EXPIRES OCT. 1, 2012
My commission expires
A notary public or other officer completing this
certificate verifies only the identity of the
individual who signed the document to which
this certilicate Is attached, and not the
truthfulness, accuracy, or validity of that
document.
2 2
STORM-EZ 10/27/2021
Version 1.5 O&M Agreement Page 1 of 1
Disconnected Impervious Area Maintenance Requirements
Important operation and maintenance procedures:
The roof area will be maintained to reduce the debris and sediment load to the system. Excess
- debris can clog the system and lead to bypass of the design storm, reducing infiltration and pollutant
removal.
To ensure proper operation as designed, a licensed Professional Engineer, Landscape Architect, or
other qualified professional will inspect the system annually.
- The system components will be repaired or replaced whenever they fail to function properly.
After the DIS is constructed, it shall be inspected quarterly. Records of operation and maintenance shall be kept in a
known set location and shall be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element:
Potential problem:
How to remediate the problem:
The contributing
Excess debris or sediment
is present on the rooftop or
Remove the debris or sediment as soon as possible.
impervious area
impervious surface.
Gutters are clogged or
Unclog and remove the debris. May need to install gutter
water is backing up out of
screens to prevent future clogging.
the gutter system.
The gutter system (if
applicable)
Rooftop runoff is not
Correct the positioning or installation of the gutters. Replace if
flowing into gutter system.
necessary to capture the roof runoff.
Rooftop runoff is causing
Install or repair splash blocks as needed.
erosion at outlet.
Runoff flows to the
Remove any sediment or obstructions at the pavement -
pervious area as
vegetated area interface.
concentrated flow.
Roadways & parking lots
The aggregate transition
(if applicable)
area or concrete edge
restraint is cracked,
Repair or replace the transition area or concrete edge restraint.
settled, undercut, eroded
or otherwise damaged.
Areas of bare soil and/or
Regrade the soil if necessary to remove the gully, re -seed the
erosive gullies have
vegetated receiving area and water until it is established.
formed.
Provide lime and a one-time fertilizer application.
The vegetated receiving
Trees or shrubs have
area
begun to grow.
Remove the trees or shrubs.
Vegetation is too short or
Maintain vegetation at a height of approximately three to four
too long.
inches.
nce Requirements
section i
Important operation and maintenance procedures:
- The entire Project vegetated area will be carefully managed to reduce sediment load discharge.
- Minimize use of herbicides and fertilizers per NCDEQ Stormwater Manual E-6 Recommendation 4
- Avoid compaction of Subsoil per NCDEQ Stormwater Design Manual E-6 Recommendation 1
- Avoid concentration of Stormwater per NCDEQ Stormwater Design Manual E-6 Recommendation 3
The system will be inspected at least quarterly. Records of operation and maintenance will be kept in a known set
location and will be available upon request.
Section 2
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element:
Potentialproblem:
How to remediate the roblem:
Entire Vegetated Area
Areas of bare soil/erosion
Regrade as needed and replant disturbed areas
Entire Vegetated Area
Vegetation too short/long
Maintain vegetation at a height of approximately 6 inches
Receiving Water Body
Erosion or sedimentation
Contact NCDEQ Regional Office
Low Density Maintenance Requirements
Important maintenance procedures:
The drainage area to the vegetated conveyance or vegetated receiving area will be carefully
managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area.
After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated
receiving area, fertilizer will not be applied to the vegetated receiving areas.
The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of operation and
maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element:
Potential problem:
How to remediate the problem:
Vegetation is too short or
Maintain grassed vegetation such that the swale or vegetated
Vegetation
too long.
area does not erode during the peak flow from the 10-year
storm
Trash/debris is present.
Remove the trash/debris.
Areas of bare soil and/or
Regrade the soil if necessary to remove the gully, and then re -
Vegetated receiving
areas
erosive gullies have
sod (or plant with other appropriate species) and water until
formed.
established. Provide lime and a one-time fertilizer application.
Clogging has occurred.
Clean out the outlet device. Dispose of the sediment off -site.
The outlet device (if
applicable)
The outlet device is
Repair or replace the outlet device.
damaged
Erosion or other signs of
damage have occurred at
Repair the damage and improve the flow dissipation structure.
the outlet.
Discharges from the site
The receiving water
are causing erosion or
Contact the local NCDEQ Regional Office.
sedimentation in the
receiving water.