HomeMy WebLinkAbout20140175 Ver 1_Approval Letter_20140325NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Director Secretary - March 25, 2014 Watauga County NCDWQ Project No. 20140175 R -5525, Summit Meadow Lane APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS Mr. Mike Pettyjohn, P.E., Division Engineer NCDOT, Division 11 PO Box 250 N. Wilkesboro, NC 28659 Mr. Richard Sparks, CEO Appalachian Regional Healthcare System 336 Deerfield Rd Boone NC 28607 Dear Mr. Pettyjohn and Mr. Sparks: You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of improving Summit Meadow Lane to serve the Chestnut Ridge at Blowing Rock Medical Facility in Watauga County. Stream Impacts in the New River Basin Site Permanent Fill in Temporary Fill in Permanent Fill in Temporary Fill in Total Stream Stream Impacts Intermittent Intermittent Stream Perennial Stream Perennial Stream Impact Impacts Stream (linear ft) (linear ft) (linear ft) (linear ft) (linear ft) Requiring Clearing (ac) Wetland Requiring (ac) Mitigation Impact (ac) Mitigation (ac) 1 0.03 linear ft 1 1 0.04 1 1 112 40 152 0 0.00 0.00 1 0.04 112 40 152 0 Total Total Stream Impact for Project: 152 linear feet. Wetland Impacts in the New River Basin Total Wetland Impact for Project: 0.07 acres. Transportation and Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919. 807 -63001 FAX: 919$07-6492 Internet: www.ncwaterauality.orcl An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Natumll,ff Fill Total Impacts Excavation Mechanized Hand Site Fill (ac) (temporary) (ac) Clearing (ac) Clearing (ac) Wetland Requiring (ac) Impact (ac) Mitigation (ac) 1 0.03 1 0.04 1 1 1 0 Total 0.03 0.00 0.00 1 0.04 1 0.00 1 0.00 1 0 Total Wetland Impact for Project: 0.07 acres. Transportation and Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919. 807 -63001 FAX: 919$07-6492 Internet: www.ncwaterauality.orcl An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Natumll,ff The project shall be constructed in accordance with your application dated received February 20, 2014. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 3886. This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non - Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. Condition(s) of Certification: 1. Stormwater from Summit Meadow Lane (all portions maintained by NCDOT) shall be constructed as depicted on the Stormwater Management Plan for Linear Roadway Projects submitted with the application and hereby incorporated by reference. Stormwater facilities along the NCDOT maintained portion of Summit Meadow Lane shall be the responsibility of NCDOT and shall be maintained in accordance with NDPES Permit NCS000250 issued to NCDOT by the Division. Stormwater management from all impervious surfaces other than the NCDOT maintained portion of Summit Meadow Lane shall be the responsibility of Appalachian Regional Health System. The Division approves the SMP for all non - roadway built upon areas consisting of one Wet Detention Basin and one Bioretention Cell and all associated stormwater conveyances, inlet and outlet structures, and the grading and drainage patterns depicted on plan sheets dated March 7, 2014 and March 17, 2014, which are incorporated by reference and are enforceable by the Division. The following conditions also apply: a) The maximum allowable drainage area for the approved Chestnut Ridge Medical Facility shall be 229,997 square feet and the maximum allowable built -upon area within that drainage area shall be 124,582 square feet draining to the Wet Detention Basin and 100,624 square feet and the maximum allowable built -upon area within that drainage area shall be 54,450 square feet draining to the Bioretention Cell. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised stormwater management plan by the Division. b) The footprint of all stormwater management devices as well as an additional 10 -foot wide area on all sides of the devices shall be located in either: public rights -of -way; dedicated common areas; or recorded easement areas. The final plats for the project showing all such rights -of -way, common areas and easement areas shall be in accordance with the approved plans. c) The approved SMP shall be constructed and operational before any permanent building or other structure is occupied at the site. d) The SMP for the Chestnut Ridge Medical Facility may not be modified without prior written authorization from the Division. e) Maintenance activities for the Wet Detention Basin and the Bioretention Cell shall be performed in accordance with the notarized O &M agreements signed by Richard Sparks on March 12, 2014. The O &M agreements shall transfer with the sale of the land or transfer of ownership /responsibility for the BMP facility. The Division shall be notified promptly of every transfer. f) The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at http: / /portal.ncdenr.or web /wg /sn /ws /401 /certsandpermits /apply /forms). 3. Any additional impacts to streams and/or wetlands as a result of future roads, buildings, driveways, utility lines or other development related activities within this subdivision will require a modification of this 401 Water Quality Certification approval. 4. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. - 5. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. 6. The use of rip -rap above the Normal High Water Mark shall be minimized. Any rip -rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 7. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. 8. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 9. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 10. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. 11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 12. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on -site project manager. 13. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 14. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 15. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. 16. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify NCDWQ when all work included in the 401 Certification has been completed. 17. Native riparian vegetation (ex. list herbaceous, trees, and shrubs native to your geographic region) must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. 18. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and 5:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed - provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 Telephone: (919) - 431 - 3000,. Facsimile: (919)- 431 -3100 A copy of the petition must also be served on DENR as follows: Mr. Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood at (336)771 -4964 or sue.homewood @ncdenr.gov. Sincerely, %, (Y�' �"� Thomas A. Reeder cc: Heath Slaughter, Division 11 Environmental Officer (electronic copy only) Walter Roberts, Louis Berger Group (electronic copy only) Tasha McCormick, US Army Corps of Engineers, Asheville Field Office (electronic copy only) Marla Chambers, NC Wildlife Resources Commission (electronic copy only) DWR Transportation Permitting Unit WSRO File Copy