Loading...
HomeMy WebLinkAbout20071278 Ver 1_More Info Received_20070815~ 7 - t ~,1 $ X. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XI. Sewage Disposal (required by DWQ) Cleazly detail the ultimate treatment methods and disposition (non-dischazge or dischazge) of wastewater generated from the proposed project, or available capacity of the subject facility. n/a _ __ XII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this anafter-the-fact permit application? Yes ^ No XIII. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). r `°~'j~ ~ Applicant/Agent's Signature ~ Da'te (Agent's signature is valid only if an authorization letter from the applicant is provided.) Q~~~od~~ Aus i S 200 ~~.~,~~ ~~5,~ Page 12 of 12