Loading...
HomeMy WebLinkAboutNCC211495_Modification Review ADD LOT 5_20220223Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 2/22/2022 4:52:23 PM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany A 2/23/2022 9:00:17 AM (Construction COC ADD TO FILE Review - NCC211495) • The task was assigned to Georgoulias, Bethany A. The due date is: February 25, 2022 5:00 PM 2/22/2022 4:52 PM i �M1 itowl�a NORTH CAROLINA EnNlmnmrnfel QuoN1y Certificate of NCC211495 Coverage (COC) No.* Enter the Certificate of Coverage Number (Use capital letters) Information associated with this permit: Project Name Southern Hill Estates Lot 32 Address sky vista way, Raleigh, NC County Wake Latitude 35.9580 Longitude-78.6909 Permittee Listed St. Clair Construction Group LLC Legally Responsible Samuel St Clair Individual NC Reference No. NCG01-2021-1495 E&SC Plan ID SEC-053642-2021 Original NOI Tracking 47649 No. * Date COC Issued * 03/15/2021 Prior Rescission Date This field will populate only if COC has already been rescinded. Modification Information: Reason for Closed -Out Lots/Outparcels in E&SC Plan Modification* Additional Lots/Outparcels Approved - E&SC Revised Other Revision(s) to E&SC Plan Legally Responsible Individual and/or Site Contact Has Changed Multiple Reasons (List) Addional Explanation More information (e.g., new Site Contact details). If lots are being added, please include specific lot numbers. Lot 32 southern hills is in the same subdivision as lot 5 southern hills where I will be doing land disturbance You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form Supporting Upload Supporting Documentation (Revised E&SC Approval, Close -Out Doc, etc.) Documentation lot 5 sh SECSLPA — SEDIMENT AND EROSION 290.04KB CONTROL SINGLE LOT PLAN APPROVAL.pdf lot 5 sh frp.pdf 1.26MB Must be PDF format North Carolina General Statute 143-215.613 (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). * I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* • The Legally Responsible Individual Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature We400ll Type Name* Samuel St. clair ii Title* president Organization * St. Clair Construction Group LLC Date * 02/22/2022 Email Address* stclairconstructiongroup@gmail.com Email for confirmation Telephone Number* 9195592071 Contact number if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email Additional email for confirmation (Optional) Original Permittee stclairconstructiongroup@gmail.com Email Original Site Contact stclairconstructiongroup@gmail.com Email Review Date 02/23/2022 Rescinded Since Submitted? Request Date 20220222 Formatted Review Date 20220223 Formatted